ATTACHMENT 3 SPECS SAT FJRP052994 - ADF FJRP199040 dated 4 June 2021 Vol 3 of 4 476 pages.pdf

PDF 4 MB Posted

Attached to
145 Airlift Wing Add/Alter Small Air Terminal Building 5
Solicitation number
W50S87-21-B-5005
Issued by

About this file

This solicitation is for the 145 Airlift Wing Add/Alter Small Air Terminal Building 5 project. The North Carolina Army National Guard is seeking bids to complete construction and renovation work on the small air terminal building at the 145th Airlift Wing base. Bids are due by June 30, 2021. The pre-bid conference will be held on June 2, 2021 for interested contractors to review project details onsite. The solicitation includes drawings, specifications, and other attachments outlining the full scope of work. The project involves additions and alterations to improve the existing small air terminal building.

View the file

Other files

File Type Posted
Questions and Answers 15 JULY 2021.pdf PDF
NC ANG SAT ADF Addendum No 4.pdf PDF
Questions and Answers 13 JULY 2021.pdf PDF
W50S87-21-B-5005-0003.pdf PDF
W50S87-21-B-5005 0002.pdf PDF
Amendment 0002 Revised Drawing and Specifications.pdf PDF
Questions and Answers 1 July 2021.docx DOCX document
ATTACHMENT 4 SPECS SAT FJRP052994 - ADF FJRP199040 dated 4 June 2021 Vol 4 of 4 258 pages.pdf PDF
ATTACHMENT 21-DRAWINGS-SAT-VOL 2 OF 4 Architecture Interiors 32 pages.pdf PDF
Pre-Bid sign in sheet.pdf PDF
ATTACHMENT 22-DRAWINGS-SAT-VOL 3 OF 4 Fire Protection Plumbing Mechanical 36 pages.pdf PDF
ATTACHMENT 23-DRAWINGS-SAT-VOL 4 OF 4 Electrical 33 pages.pdf PDF
ATTACHMENT 20- DRAWINGS-SAT-VOL 1 OF 4 General Civil Landscape Structural 28 pages.pdf PDF
ATTACHMENT 18 Drawings ADF - Volume 1 of 2 General Civil Structural 24 pages.pdf PDF
ATTACHMENT 1 SPECS SAT FJRP052994 - ADF FJRP199040 dated 4 June 2021 Vol 1 of 4 524 pages.pdf PDF
ATTACHMENT 19 Drawings ADF - Volume 2 of 2 Architecture FP Plumbing 58 pages.pdf PDF
Amendment 0001 Add Alter Small Air Terminal Building 5.pdf PDF
PreBidSlides_W50S87-21-B-5005 Date1 June 2021.pdf PDF
ATTACHMENT 2 SPECS SAT FJRP052994 - ADF FJRP199040 dated 4 June 2021 Vol 2 of 4 578 pages.pdf PDF
ATTACHMENT 3 SPECS SAT FJRP052994 ADF FJRP199040 Volume 3 of 4.pdf PDF
ATTACHMENT 11 Brand name justification SAT Monaco Fire alarm trasceiver_Redacted.pdf PDF
ATTACHMENT 14 Pre Bid Conference and Site Visit Bid Drop-Off Map.pdf PDF
ATTACHMENT 1 SPECS SAT FJRP052994 ADF FJRP199040 Volume 1 of 4.pdf PDF
ATTACHMENT 10 Brand name justification SAT Interior and exterior finishes_Redacted.pdf PDF
ATTACHMENT 8 Brand name justification SAT Alerton - Direct Digital Controls_Redacted.pdf PDF
ATTACHMENT 12 Brand name justification SAT Sika Sarnafil PVC roof membrane_Redacted.pdf PDF
ATTACHMENT 7 STATEMENT OF WORK - Add-Alter Small Air Terminal.pdf PDF
W50S87-21-B-5005.pdf PDF
ATTACHMENT 2 SPECS SAT FJRP052994 ADF FJRP199040 Volume 2 of 4.pdf PDF
ATTACHMENT 16 145 AW Contractor Security Guide.pdf PDF
ATTACHMENT 15 145 AW Contractor Safety Guide.pdf PDF
ATTACHMENT 5 DRAWINGS 145 AW Air Drop Facility Vol 1 of 2.pdf PDF
ATTACHMENT 4 SPECS SAT FJRP052994 ADF FJRP199040 Volume 4 of 4.pdf PDF
ATTACHMENT 9 Brand name justification SAT Best Door hardware_Redacted.pdf PDF
ATTACHMENT 6 DRAWINGS 145 AW Air Drop Facility Vol 2 of 2.pdf PDF
ATTACHMENT 13 Visitor Request Worksheet.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual – Specifications

VOLUME 3 – DIV 23-26

Addendum #2

• C-17 CONV. ADD/ALTER SMALL AIR TERMINAL

BLDG 5, FJRP052994,

AND

• C-17 CONV. CNS AIR DROP FACILITY,

FJRP199040

NGB Contract: W9133L16D0005 Task Order: W9124218F0095, w/Mod #1

PN: FJRP052994 & FJRP199040

Issued June 4, 2021

NORTH CAROLINA AIR NATIONAL GUARD

SMALL AIR TERMINAL ADD/ALTER AIR DROP FACILITY

PROJECT FJRP052994 PROJECT FJRP199040

Addendum #2

Issue Date: June 4, 2021

COMBINED BID PACKAGE PROJECT MANUAL

SEAL

050568

ENGINEE

R

050024

Frankfurt-Short-Bruza Architects Engineers Planners document1 Page 1 of 1 5801 Broadway Extension, Suite 500, Oklahoma City, Oklahoma 73118-7436

Telephone (405) 840-2931 Facsimile (405) 842-7750 Website www.fsb-ae.com

11949

NORTH CAROLINA ANG FJRP052994 SMALL AIR TERMINAL

CHARLOTTE, NC FJRP199040 AIR DROP FACILITY

Addendum #2 Table of Contents June 4, 2021 TOC - 2

TABLE OF CONTENTS

VOLUME 1 OF 4

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

AS PROVIDED BY THE NORTH CAROLINA AIR NATIONAL GUARD

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 011000 – SUMMARY OF THE WORK

SECTION 011416 – COORDINATON WITH NORTH CAROLINA AIR NATIONAL GUARD

SECTION 013100 – PROJECT MANAGEMENT AND COORDINATION

SECTION 013200 – CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 013300 – SUBMITTAL PROCEDURES

SECTION 013329 – SUSTAINABILITY REPORTING

SECTION 014000 – QUALITY CONTROL

SECTION 014200 – REFERENCES

SECTION 015000 – TEMPORARY FACILITIES AND CONTROLS

SECTION 015930 – SECURITY REGULATIONS

SECTION 015950 – SAFETY AND HEALTH

SECTION 015960 – HAZARDOUS MATERIAL STORAGE AND DISTRIBUTION

SECTION 016000 – PRODUCT REQUIREMENTS

SECTION 017000 – EXECUTION REQUIREMENTS

SECTION 017329 – CUTTING AND PATCHING

SECTION 017419 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

SECTION 017700 – CLOSEOUT PROCEDURES

SECTION 017820 – OPERATION AND MAINTENANCE DATA

SECTION 017839 – PROJECT RECORD DOCUMENTS

SECTION 018200 – DEMONSTRATION AND TRAINING

DIVISION 02 - EXISTING CONDITIONS

SECTION 024119 - SELECTIVE DEMOLITION AND REMEDIATION

DIVISION 03 - CONCRETE

SECTION 030130 - MAINTENANCE OF CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

SECTION 042000 - UNIT MASONRY

SECTION 042113 - THIN BRICK MASONRY

SECTION 047315 - MANUFACTURED THIN STONE MASONRY

SECTION 047200 – CAST STONE MASONRY

DIVISION 05 - METALS

SECTION 051200 - STRUCTURAL STEEL FRAMING

Addendum #2 Table of Contents June 4, 2021 TOC - 3

SECTION 052100 – STEEL JOIST FRAMING

SECTION 053100 - STEEL DECKING

SECTION 054000 – COLD FORMED METAL FRAMING

SECTION 055000 - METAL FABRICATIONS

SECTION 055113 - METAL PAN STAIRS

SECTION 055133 - ALTERNATING TREAD STEEL STAIRS

SECTION 055213 - PIPE AND TUBE RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

SECTION 061000 - ROUGH CARPENTRY

SECTION 061600 - SHEATHING

SECTION 064116 - PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

SECTION 068300 - COMPOSITE PANELING

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 072100 - THERMAL INSULATION

SECTION 072119 - FOAMED-IN-PLACE INSULATION

SECTION 072726 - FLUID-APPLIED AIR AND WATER RESISTIVE BARRIER SYSTEM

SECTION 074113.16 – STANDING SEAM METAL ROOF PANLS

SECTION 074213.19 - INSULATED METAL WALL PANELS

SECTION 075419 - POLYVINYL-CHLORIDE (PVC) ROOFING

SECTION 076200 - SHEET METAL FLASHING AND TRIM

SECTION 077200 - ROOF ACCESSORIES

SECTION 077253 – SNOW GUARDS

SECTION 078413 - PENETRATION FIRESTOPPING

SECTION 078446 - FIRE-RESISTIVE JOINT SYSTEMS

SECTION 079200 - JOINT SEALANTS

SECTION 079500 – EXPANSION CONTROL

VOLUME 2 OF 4

DIVISION 08 - OPENINGS

SECTION 081113 - HOLLOW METAL DOORS AND FRAMES

SECTION 081416 - FLUSH WOOD DOORS

SECTION 083113 - ACCESS DOORS AND FRAMES

SECTION 083313 - COILING COUNTER DOORS

SECTION 084113 - ALUMINUM-FRAMED ENTRANCES AND WINDOWS

SECTION 084523 – FIBERGLASS SANDWICH-PANEL ASSEMBLIES

SECTION 086200 – UNIT SKYLIGHTS

SECTION 087100 - DOOR HARDWARE

SECTION 088000 - GLAZING

DIVISION 09 - FINISHES

SECTION 090690 - COLOR SCHEDULE

SECTION 092216 - NON-STRUCTURAL METAL FRAMING

SECTION 092900 - GYPSUM BOARD

SECTION 093013 - CERAMIC TILING

Addendum #2 Table of Contents June 4, 2021 TOC - 4

SECTION 095113 - ACOUSTICAL PANEL CEILINGS

SECTION 096513 - RESILIENT BASE AND ACCESSORIES

SECTION 096519 - RESILIENT TILE FLOORING

SECTION 096723.15 – FUEL RESISTIVE RESINOUS FLOORING

SECTION 096813 - TILE CARPETING

SECTION 097200 - DRY ERASE WALLCOVERING

SECTION 097800 - FIBERGLASS REINFORCED PLASTIC PANELS

SECTION 099113 - EXTERIOR PAINTING

SECTION 099123 - INTERIOR PAINTING

DIVISION 10 - SPECIALTIES

SECTION 101423 - PANEL SIGNAGE

SECTION 102113.19 - PLASTIC TOILET COMPARTMENTS

SECTION 102213 - WIRE MESH PARTITIONS

SECTION 102239 - RETRACTABLE WALL SYSTEM

SECTION 102600 - WALL AND DOOR PROTECTION

SECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES

SECTION 104413 - FIRE EXTINGUISHER CABINETS

SECTION 104416 - FIRE EXTINGUISHERS

SECTION 105113 - METAL LOCKERS

SECTION 107316 - MANUFACTURED CANOPIES

DIVISION 11 - EQUIPMENT

SECTION 111323 - BAGGAGE SCALE EQUIPMENT

SECTION 115213 - PROJECTION SCREENS

DIVISION 12 - FURNISHINGS

SECTION 122413 - ROLLER WINDOW SHADES

SECTION 123661.16 - SOLID SURFACING COUNTERTOPS

SECTION 124813 - ENTRANCE FLOOR MATS AND FRAMES

DIVISION 13 - SPECIAL CONSTRUCTION

SECTION 133419 - METAL BUILDING SYSTEMS

DIVISION 14 - CONVEYING EQUIPMENT

SECTION 142123 - ELECTRIC TRACTION PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

SECTION 211100 - FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING

SECTION 211313 - WET PIPE SPRINKLER SYSTEMS

SECTION 213113 - ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS

SECTION 213119 - CONTROLLERS FOR FIRE-PUMP DRIVERS

SECTION 213413 - PRESSURE-MAINTENANCE PUMPS

DIVISION 22 - PLUMBING

Addendum #2 Table of Contents June 4, 2021 TOC - 5

SECTION 220513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

SECTION 220517 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

SECTION 220518 - ESCUTCHEONS FOR PLUMBING PIPING

SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING

SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING

SECTION 220523.14 - CHECK VALVES FOR PLUMBING PIPING

SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION 220533 - HEAT TRACING FOR PLUMBING PIPING

SECTION 220548.13 - VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION 220716 - PLUMBING EQUIPMENT INSULATION

SECTION 220719 - PLUMBING PIPING INSULATION

SECTION 221116 - DOMESTIC WATER PIPING

SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES

SECTION 221123.13 - DOMESTIC-WATER PACKAGED BOOSTER PUMPS

SECTION 221123.21 - INLINE, DOMESTIC-WATER PUMPS

SECTION 221313 - FACILITY SANITARY SEWERS

SECTION 221316 - SANITARY WASTE AND VENT PIPING

SECTION 221319 - SANITARY WASTE PIPING SPECIALTIES

SECTION 221319.13 - SANITARY DRAINS

SECTION 221413 - FACILITY STORM DRAINAGE PIPING

SECTION 221423 - STORM DRAINAGE PIPING SPECIALTIES

SECTION 221429 - SUMP PUMPS

SECTION 221513 - GENERAL-SERVICE COMPRESSED-AIR PIPING

SECTION 221519 - GENERAL-SERVICE PACKAGED AIR COMPRESSORS AND RECEIVERS

SECTION 223400 - FUEL-FIRED, DOMESTIC-WATER HEATERS

SECTION 224213.13 - COMMERCIAL WATER CLOSETS

SECTION 224213.16 - COMMERCIAL URINALS

SECTION 224216.13 - COMMERCIAL LAVATORIES

SECTION 224216.16 - COMMERCIAL SINKS

SECTION 224223 - COMMERCIAL SHOWERS

SECTION 224713 - DRINKING FOUNTAINS

VOLUME 3 OF 4

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

SECTION 230518 - ESCUTCHEONS FOR HVAC PIPING

SECTION 230523.12 - BALL VALVES FOR HVAC PIPING

SECTION 230523.14 - CHECK VALVES FOR HVAC PIPING

SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 230548.13 - VIBRATION CONTROLS FOR HVAC

SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION 230713 - DUCT INSULATION

SECTION 230719 - HVAC PIPING INSULATION

SECTION 230923 - DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC

SECTION 231123 – FACILITY NATURAL-GAS PIPING

SECTION 230923.11 - CONTROL VALVES

SECTION 230923.12 - CONTROL DAMPERS

SECTION 230923.14 - FLOW INSTRUMENTS

Addendum #2 Table of Contents June 4, 2021 TOC - 6

SECTION 230923.16 - GAS INSTRUMENTS

SECTION 230923.23 - PRESSURE INSTRUMENTS

SECTION 230923.27 - TEMPERATURE INSTRUMENTS

SECTION 231123 - FACILITY NATURAL-GAS PIPING

SECTION 232113 - HYDRONIC PIPING

SECTION 232116 - HYDRONIC PIPING SPECIALTIES

SECTION 232123 - HYDRONIC PUMPS

SECTION 232300 - REFRIGERANT PIPING

SECTION 232513 - WATER TREATMENT FOR CLOSED-LOOP HYDRONIC SYSTEMS

SECTION 233113 - METAL DUCTS

SECTION 233300 - AIR DUCT ACCESSORIES

SECTION 233346 - FLEXIBLE DUCTS

SECTION 233416 - CENTRIFUGAL HVAC FANS

SECTION 233423 - HVAC POWER VENTILATORS

SECTION 233436 – AIR CIRCULATION FANS

SECTION 233600 - AIR TERMINAL UNITS

SECTION 233713.23 – AIR REGISTERS AND GRILLES

SECTION 235123 - GAS VENTS

SECTION 235216 - CONDENSING BOILERS

SECTION 235523.13 - LOW-INTENSITY, GAS-FIRED, RADIANT HEATERS

SECTION 237313.16 - INDOOR, SEMI CUSTOM AIR HANDLING UNITS

SECTION 237423.13 - PACKAGED, DIRECT-FIRED, OUTDOOR, HEATING-ONLY MAKEUP-AIR UNITS

SECTION 238126 - SPLIT-SYSTEM AIR-CONDITIONERS

SECTION 238239.16 - PROPELLER UNIT HEATERS

DIVISION 25 - INTEGRATED AUTOMATION

NOT APPLICABLE

DIVISION 26 - ELECTRICAL

SECTION 260513 – MEDIUM VOLTAGE CABLES

SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

SECTION 260523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLES

SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

SECTION 260543 – UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

SECTION 260544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 260573.13 - SHORT-CIRCUIT STUDIES

SECTION 260573.16 - COORDINATION STUDIES

SECTION 260573.19 - ARC-FLASH HAZARD ANALYSIS

SECTION 260923 - LIGHTING CONTROL DEVICES

SECTION 260943.23 – RELAY BASED LIGHTING CONTROLS

SECTION 261213 – LIQUID-FILLED MEDIUM VOLTAGE TRANSFORMERS

SECTION 262416 – PANELBOARDS

SECTION 262713.10 30 - ELECTRIC METERS

SECTION 262726 - WIRING DEVICES

SECTION 262913.03 - MANUAL AND MAGNETIC MOTOR CONTROLLERS

SECTION 262923 - VARIABLE-FREQUENCY MOTOR CONTROLLERS

SECTION 264113 - LIGHTNING PROTECTION FOR STRUCTURES

SECTION 264313 - SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

Addendum #2 Table of Contents June 4, 2021 TOC - 7

SECTION 265100 - INTERIOR LIGHTING

SECTION 265119 - LED INTERIOR LIGHTING

SECTION 265619 - EXTERIOR LIGHTING

VOLUME 4 OF 4

DIVISION 27 - COMMUNICATIONS

SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS

SECTION 270528 - PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION 270544 - SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS AND CABLING

SECTION 271100 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS

SECTION 271513 - COMMUNICATIONS COPPER HORIZONTAL CABLING

SECTION 275116 - PUBLIC ADDRESS SYSTEMS

SECTION 275313 - CLOCK SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

SECTION 283176 - FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

SECTION 310100 – SUBSURFACE EXPLORATION

SECTION 311000 – SITE CLEARING

SECTION 312000 – EARTH MOVING

SECTION 312319 – DEWATERING

SECTION 316600 - HELICAL PIERS

DIVISION 32 - EXTERIOR IMPROVEMENTS

SECTION 321200 – PAVING AND SURFACING

SECTION 321313 – CONCRETE PAVING

SECTION 323113 - FENCING

SECTION 329113 - SOIL PREPARATION

SECTION 329200 - TURF AND GRASSES

SECTION 329300 - PLANTS

DIVISION 33 - UTILITIES

SECTION 330505 – WATER SANITARY AND DRAINAGE SITE PIPING

DIVISION 34 - TRANSPORTATION

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

Addendum #2 Table of Contents June 4, 2021 TOC - 8

DIVISION 40 - PROCESS INTEGRATION

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

SECTION 412213.15 - BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING

SECTION 4122223.13 – PARACHUTE LIFT SYSTEM

DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT

DIVISION 43 – 99

SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes general requirements for single-phase and polyphase, general-purpose, horizontal, small and medium, squirrel-cage induction motors for use on ac power systems up to 600 V and installed at equipment manufacturer's factory or shipped separately by equipment manufacturer for field installation.

1.2 COORDINATION

A. Coordinate features of motors, installed units, and accessory devices to be compatible with the following:

1. Motor controllers.

2. Torque, speed, and horsepower requirements of the load.

3. Ratings and characteristics of supply circuit and required control sequence.

4. Ambient and environmental conditions of installation location.

PART 2 - PRODUCTS

2.1 GENERAL MOTOR REQUIREMENTS

A. Comply with NEMA MG 1 unless otherwise indicated.

2.2 MOTOR CHARACTERISTICS

A. Duty: Continuous duty at ambient temperature of 40 deg C and at altitude of 3300 feet above sea level.

B. Capacity and Torque Characteristics: Sufficient to start, accelerate, and operate connected loads at designated speeds, at installed altitude and environment, with indicated operating sequence, and without exceeding nameplate ratings or considering service factor.

2.3 POLYPHASE MOTORS

A. Description: NEMA MG 1, Design B, medium induction motor.

Addendum #1 Issued March 3, 2021

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230513 - 1

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

FJRP052994 SMALL AIR TERMINAL

FJRP199040 AIR DROP FACILITY

B. Efficiency: Energy efficient, as defined in NEMA MG 1.

C. Service Factor: 1.15.

D. Multispeed Motors: Variable torque.

1. For motors with 2:1 speed ratio, consequent pole, single winding.

2. For motors with other than 2:1 speed ratio, separate winding for each speed.

E. Multispeed Motors: Separate winding for each speed.

F. Rotor: Random-wound, squirrel cage.

G. Bearings: Regreasable, shielded, antifriction ball bearings suitable for radial and thrust loading.

H. Temperature Rise: Match insulation rating.

I. Insulation: Class F.

J. Code Letter Designation:

1. Motors Smaller than 15 HP: Manufacturer's standard starting characteristic.

K. Enclosure Material: Cast iron for motor frame sizes 324T and larger; rolled steel for motor frame sizes smaller than 324T.

2.4 POLYPHASE MOTORS WITH ADDITIONAL REQUIREMENTS

A. Motors Used with Reduced-Voltage and Multispeed Controllers: Match wiring connection requirements for controller with required motor leads. Provide terminals in motor terminal box, suited to control method.

B. Motors Used with Variable Frequency Controllers: Ratings, characteristics, and features coordinated with and approved by controller manufacturer.

1. Windings: Copper magnet wire with moisture-resistant insulation varnish, designed and tested to resist transient spikes, high frequencies, and short time rise pulses produced by pulse-width modulated inverters.

2. Energy- and Premium-Efficient Motors: Class B temperature rise; Class F insulation.

3. Inverter-Duty Motors: Class F temperature rise; Class H insulation.

4. Thermal Protection: Comply with NEMA MG 1 requirements for thermally protected motors.

Addendum #1 Issued March 3, 2021

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230513 - 2

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

2.5 SINGLE-PHASE MOTORS

A. Motors larger than 1/20 hp shall be one of the following, to suit starting torque and requirements of specific motor application:

1. Permanent-split capacitor.

2. Split phase.

3. Capacitor start, inductor run.

4. Capacitor start, capacitor run.

B. Multispeed Motors: Variable-torque, permanent-split-capacitor type.

C. Bearings: Prelubricated, antifriction ball bearings or sleeve bearings suitable for radial and thrust loading.

D. Motors 1/20 HP and Smaller: Shaded-pole type.

E. Thermal Protection: Internal protection to automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature rating of motor insulation. Thermal-protection device shall automatically reset when motor temperature returns to normal range.

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 230513

Addendum #1 Issued March 3, 2021

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230513 - 3

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

This Page Intentionally Left Blank

Addendum #1 Issued March 3, 2021

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230513 - 4

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

SECTION 230518 - ESCUTCHEONS FOR HVAC PIPING

1.1 SUMMARY

A. Section Includes:

1. Escutcheons.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 ESCUTCHEONS

A. One-Piece, Cast-Brass Type: With polished, chrome-plated finish and setscrew fastener.

B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped brass with chrome-plated finish and spring-clip fasteners.

C. One-Piece, Stamped-Steel Type: With chrome-plated finish and spring-clip fasteners.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install escutcheons for piping penetrations of walls, ceilings, and finished floors.

B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of piping and with OD that completely covers opening.

1. Escutcheons for New Piping:

a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type.

b. Chrome-Plated Piping: One-piece, cast-brass or split-casting brass type with polished, chrome-plated finish.

Addendum #1 Issued March 3, 2021

ESCUTCHEONS FOR HVAC PIPING

230518 - 1

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

c. Insulated Piping: One-piece, stamped-steel type.

d. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, cast-brass type with polished, chrome-plated finish.

e. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, cast-brass type with polished, chrome-plated finish.

f. Bare Piping in Unfinished Service Spaces: One-piece, cast-brass type with polished, chrome-plated finish.

g. Bare Piping in Equipment Rooms: One-piece, cast-brass type with polished, chrome-plated finish.

C. Install floor plates for piping penetrations of equipment-room floors.

3.2 FIELD QUALITY CONTROL

A. Replace broken and damaged escutcheons and floor plates using new materials.

END OF SECTION 230518

Addendum #1 Issued March 3, 2021

ESCUTCHEONS FOR HVAC PIPING

230518 - 2

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

SECTION 230523.12 - BALL VALVES FOR HVAC PIPING

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Brass ball valves.

2. Bronze ball valves.

3. Steel ball valves.

4. Iron ball valves.

1.3 DEFINITIONS

A. CWP: Cold working pressure.

B. SWP: Steam working pressure.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of valve.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Prepare valves for shipping as follows:

1. Protect internal parts against rust and corrosion.

2. Protect threads, flange faces, and weld ends.

3. Set ball valves open to minimize exposure of functional surfaces.

B. Use the following precautions during storage:

1. Maintain valve end protection.

Addendum #1 Issued March 3, 2021

BALL VALVES FOR HVAC PIPING

230523.12 - 1

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

2. Store valves indoors and maintain at higher-than-ambient-dew-point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.

C. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use operating handles or stems as lifting or rigging points.

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS FOR VALVES

A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.

B. ASME Compliance:

1. ASME B1.20.1 for threads for threaded-end valves.

2. ASME B16.1 for flanges on iron valves.

3. ASME B16.5 for flanges on steel valves.

4. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.

5. ASME B16.18 for solder-joint connections.

6. ASME B31.1 for power piping valves.

7. ASME B31.9 for building services piping valves.

C. Bronze valves shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.

D. Refer to HVAC valve schedule articles for applications of valves.

E. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

F. Valve Sizes: Same as upstream piping unless otherwise indicated.

G. Valve Actuator Types:

1. Gear Actuator: For quarter-turn valves NPS 4 and larger.

2. Handlever: For quarter-turn valves smaller than NPS 4.

H. Valves in Insulated Piping:

1. Include 2-inch stem extensions.

2. Extended operating handle of nonthermal-conductive material, and protective sleeves that allow operation of valves without breaking the vapor seals or disturbing insulation.

3. Memory stops that are fully adjustable after insulation is applied.

Addendum #1 Issued March 3, 2021

BALL VALVES FOR HVAC PIPING

230523.12 - 2

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

I. Valve Bypass and Drain Connections: MSS SP-45.

2.2 BRASS BALL VALVES

A. Brass Ball Valves, Two-Piece with Full Port and Brass Trim, Threaded Ends:

1. Description:

a. Standard: MSS SP-110.

b. SWP Rating: 150 psig.

c. CWP Rating: 600 psig.

d. Body Design: Two piece.

e. Body Material: Forged brass.

f. Ends: Threaded.

g. Seats: PTFE.

h. Stem: Brass.

i. Ball: Chrome-plated brass.

j. Port: Full.

2.3 BRONZE BALL VALVES

A. Bronze Ball Valves, Two-Piece with Full Port and Bronze or Brass Trim, Threaded Ends:

1. Description:

a. Standard: MSS SP-110.

b. SWP Rating: 150 psig.

c. CWP Rating: 600 psig.

d. Body Design: Two piece.

e. Body Material: Bronze.

f. Ends: Threaded.

g. Seats: PTFE.

h. Stem: Bronze.

i. Ball: Chrome-plated brass.

j. Port: Full.

2.4 STEEL BALL VALVES

A. Steel Ball Valves with Full Port and Stainless-Steel Trim, Class 150:

1. Description:

a. Standard: MSS SP-72.

Addendum #1 Issued March 3, 2021

BALL VALVES FOR HVAC PIPING

230523.12 - 3

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

b. CWP Rating: 285 psig.

c. Body Design: Split body.

d. Body Material: Carbon steel, ASTM A 216, Type WCB.

e. Ends: Flanged.

f. Seats: PTFE.

g. Stem: Stainless steel.

h. Ball: Stainless steel, vented.

i. Port: Full.

2.5 IRON BALL VALVES

A. Iron Ball Valves, Class 125:

1. Description:

a. Standard: MSS SP-72.

b. CWP Rating: 200 psig.

c. Body Design: Split body.

d. Body Material: ASTM A 126, gray iron.

e. Ends: Flanged.

f. Seats: PTFE.

g. Stem: Stainless steel.

h. Ball: Stainless steel.

i. Port: Full.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.

B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.

C. Examine threads on valve and mating pipe for form and cleanliness.

D. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.

E. Do not attempt to repair defective valves; replace with new valves.

Addendum #1 Issued March 3, 2021

BALL VALVES FOR HVAC PIPING

230523.12 - 4

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

3.2 VALVE INSTALLATION

A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

B. Locate valves for easy access and provide separate support where necessary.

C. Install valves in horizontal piping with stem at or above center of pipe.

D. Install valves in position to allow full stem movement.

E. Install valve tags. Comply with requirements in Section 230553 "Identification for HVAC Piping and Equipment" for valve tags and schedules.

3.3 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service, but before final adjusting and balancing. Replace valves exhibiting leakage.

3.4 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valves with specified SWP classes or CWP ratings are unavailable, the same types of valves with higher SWP classes or CWP ratings may be substituted.

B. Select valves with the following end connections:

1. For Copper Tubing, NPS 2 and Smaller: Threaded ends except where solder-joint valve-end option or press-end option is indicated in valve schedules below.

2. For Copper Tubing, NPS 2-1/2 to NPS 4: Flanged ends except where threaded valve-end option is indicated in valve schedules below.

3. For Copper Tubing, NPS 5 and Larger: Flanged ends.

4. For Steel Piping, NPS 2 and Smaller: Threaded ends.

5. For Steel Piping, NPS 2-1/2 to NPS 4: Flanged ends except where threaded valve-end option is indicated in valve schedules below.

6. For Steel Piping, NPS 5 and Larger: Flanged ends.

3.5 HEATING-WATER VALVE SCHEDULE

A. Pipe NPS 2 and Smaller: Brass or bronze ball valves, two piece with brass or bronze]trim, full port, and threaded -joint ends.

B. Pipe NPS 2-1/2 and Larger:

Addendum #1 Issued March 3, 2021

BALL VALVES FOR HVAC PIPING

230523.12 - 5

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

1. Iron ball valves, Class 125.

a. Iron Valves, NPS 2-1/2 to NPS 4: May be provided with threaded ends instead of flanged ends.

2. Steel ball valves, Class 150.

END OF SECTION 230523.12

Addendum #1 Issued March 3, 2021

BALL VALVES FOR HVAC PIPING

230523.12 - 6

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

SECTION 230523.14 - CHECK VALVES FOR HVAC PIPING

1.1 SUMMARY

A. Section Includes:

1. Bronze swing check valves.

1.2 DEFINITIONS

A. CWP: Cold working pressure.

B. EPDM: Ethylene-propylene-diene monomer.

C. NBR: Nitrile butadiene rubber (also known as "Buna-N").

D. SWP: Steam working pressure.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of valve.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Prepare valves for shipping as follows:

1. Protect internal parts against rust and corrosion.

2. Protect threads, flange faces, grooves, press connections, and weld ends.

3. Block check valves in either closed or open position.

B. Use the following precautions during storage:

1. Maintain valve end protection.

2. Store valves indoors and maintain at higher than ambient dew point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.

C. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use stems or other components as lifting or rigging points unless specifically indicated for this purpose in manufacturer's written instructions.

Addendum #1 Issued March 3, 2021

CHECK VALVES FOR HVAC PIPING

230523.14 - 1

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

PART 2 - PRODUCTS

2.1 SOURCE LIMITATIONS

A. Obtain each type of valve from single source from single manufacturer.

2.2 PERFORMANCE REQUIREMENTS

A. ASME Compliance:

1. ASME B1.20.1 for threads for threaded-end valves.

2. ASME B16.1 for flanges on iron valves.

3. ASME B16.5 for flanges for metric standard piping.

4. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.

5. ASME B16.18 for cast copper solder joint.

6. ASME B16.22 for wrought copper solder joint.

7. ASME B16.51 for press joint.

8. ASME B31.1 for power piping valves.

9. ASME B31.9 for building services piping valves.

B. AWWA Compliance: Comply with AWWA C606 for grooved-end connections.

C. Provide bronze valves made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are unacceptable.

D. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

E. Valve Sizes: Same as upstream piping unless otherwise indicated.

F. Valve Bypass and Drain Connections: MSS SP-45.

2.3 BRONZE SWING CHECK VALVES

A. Bronze Swing Check Valves with Bronze Disc, Class 125:

1. Description:

a. Standard: MSS SP-80, Type 3.

b. CWP Rating: 200 psig.

c. Body Design: Horizontal flow.

d. Body Material: ASTM B62, bronze.

Addendum #1 Issued March 3, 2021

CHECK VALVES FOR HVAC PIPING

230523.14 - 2

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

e. Ends: Threaded.

f. Disc: Bronze.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.

B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.

C. Examine threads on valve and mating pipe for form and cleanliness.

D. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.

E. Examine press fittings to verify they have been properly pressed.

F. Do not attempt to repair defective valves; replace with new valves.

3.2 INSTALLATION OF VALVES

A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

B. Provide support of piping adjacent to valves such that no force is imposed upon valves.

C. Locate valves for easy access and where not blocked by equipment, other piping, or building components.

D. Install valves with stem at or above center of pipe.

E. Install valves in position that does not project into aisles or block access to other equipment.

F. Install valves in position to allow full stem and manual operator movement.

G. Verify that joints of each valve have been properly installed and sealed to ensure that there is no leakage or damage.

H. Install check valves for proper direction of flow and as follows:

Addendum #1 Issued March 3, 2021

CHECK VALVES FOR HVAC PIPING

230523.14 - 3

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

1. Swing Check Valves: In horizontal position with hinge pin level.

2. Center-Guided Check Valves: In horizontal or vertical position, between flanges.

3. Lift Check Valves: With stem upright and plumb.

I. Install valve tags. Comply with requirements for valve tags and schedules in Section 230553 "Identification for HVAC Piping and Equipment."

J. Adhere to manufacturer's written installation instructions. When soldering or brazing valves, do not heat valves above maximum permitted temperature. Do not use solder with melting point temperature above valve of manufacturer's recommended maximum.

3.3 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service, but before final adjusting and balancing. Replace valves if persistent leaking occurs.

3.4 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valve applications are not indicated, use the following:

1. Pump-Discharge Check Valves:

a. NPS 2 and Smaller: Bronze swing check valves with bronze disc.

b. NPS 2-1/2 and Larger: Iron swing check valves with lever and weight or with spring or iron, center-guided, metal-seat check valves.

B. If valves with specified SWP classes or CWP ratings are unavailable, the same types of valves with higher SWP classes or CWP ratings may be substituted.

C. End Connections:

1. For Copper Tubing, NPS 2 and Smaller: Threaded ends, except where solder-joint or press valve-end option is indicated in valve schedules.

2. For Copper Tubing, NPS 2-1/2 to NPS 4: Flanged ends, except where threaded valve-end option is indicated in valve schedules.

3. For Copper Tubing, NPS 5 and Larger: Flanged ends.

4. For Steel Piping, NPS 2 and Smaller: Threaded ends.

5. For Steel Piping, NPS 2-1/2 to NPS 4: Flanged ends, except where threaded valve-end option is indicated in valve schedules.

6. For Steel Piping, NPS 5 and Larger: Flanged ends.

7. For Grooved-End Steel Piping, except Steam and Steam Condensate Piping: Valve ends may be grooved.

8. Wafer-Type Valves: Flanged connections.

Addendum #1 Issued March 3, 2021

CHECK VALVES FOR HVAC PIPING

230523.14 - 4

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

3.5 HEATING-WATER VALVE SCHEDULE

A. Pipe NPS 2 and Smaller:

1. Bronze Valves: May be provided with solder-joint [or press ]ends instead of threaded ends.

2. Bronze swing check valves with bronze disc, Class 125.

END OF SECTION 230523.14

Addendum #1 Issued March 3, 2021

CHECK VALVES FOR HVAC PIPING

230523.14 - 5

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

Issued March 3, 2021

CHECK VALVES FOR HVAC PIPING

230523.14 - 6

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

1.1 SUMMARY

A. Section Includes:

1. Metal pipe hangers and supports.

2. Trapeze pipe hangers.

3. Metal framing systems.

4. Thermal-hanger shield inserts.

5. Pipe stands.

6. Equipment supports.

B. Related Sections:

1. Section 230548.13 "Vibration Controls for HVAC" for vibration isolation devices.

2. Section 233113 "Metal Ducts" for duct hangers and supports.

1.2 DEFINITIONS

A. MSS: Manufacturers Standardization Society of The Valve and Fittings Industry Inc.

1.3 PERFORMANCE REQUIREMENTS

A. Delegated Design: Design trapeze pipe hangers and equipment supports, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.

B. Structural Performance: Hangers and supports for HVAC piping and equipment shall withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI 7.

1. Design supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water.

2. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.

3. Design seismic-restraint hangers and supports for piping and equipment and obtain approval from authorities having jurisdiction.

Addendum #1 Issued March 3, 2021

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230529 - 1

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 METAL PIPE HANGERS AND SUPPORTS

A. Carbon-Steel Pipe Hangers and Supports:

1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.

2. Galvanized Metallic Coatings: Pregalvanized or hot dipped.

3. Nonmetallic Coatings: Plastic coating, jacket, or liner.

4. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.

5. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.

B. Copper Pipe Hangers:

1. Description: MSS SP-58, Types 1 through 58, copper-coated-steel, factory-fabricated components.

2. Hanger Rods: Continuous-thread rod, nuts, and washer made of copper-coated steel.

2.2 TRAPEZE PIPE HANGERS

A. Description: MSS SP-69, Type 59, shop- or field-fabricated pipe-support assembly made from structural carbon-steel shapes with MSS SP-58 carbon-steel hanger rods, nuts, saddles, and U-bolts.

2.3 METAL FRAMING SYSTEMS

A. MFMA Manufacturer Metal Framing Systems:

1. Description: Shop- or field-fabricated pipe-support assembly for supporting multiple parallel pipes.

2. Standard: MFMA-4.

3. Channels: Continuous slotted steel channel with inturned lips.

4. Channel Nuts: Formed or stamped steel nuts or other devices designed to fit into channel slot and, when tightened, prevent slipping along channel.

5. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.

6. Metallic Coating: Hot-dipped galvanized.

Addendum #1 Issued March 3, 2021

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230529 - 2

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

B. Non-MFMA Manufacturer Metal Framing Systems:

1. Description: Shop- or field-fabricated pipe-support assembly made of steel channels, accessories, fittings, and other components for supporting multiple parallel pipes.

2. Standard: Comply with MFMA-4.

3. Channels: Continuous slotted steel channel with inturned lips.

4. Channel Nuts: Formed or stamped steel nuts or other devices designed to fit into channel slot and, when tightened, prevent slipping along channel.

5. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.

6. Coating: Zinc.

2.4 THERMAL-HANGER SHIELD INSERTS

A. Insulation-Insert Material for Cold Piping: ASTM C 552, Type II cellular glass with 100-psig minimum compressive strength and vapor barrier.

B. Insulation-Insert Material for Hot Piping: ASTM C 552, Type II cellular glass with 100-psig minimum compressive strength.

C. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.

D. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.

E. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.

2.5 PIPE STANDS

A. General Requirements for Pipe Stands: Shop- or field-fabricated assemblies made of manufactured corrosion-resistant components to support roof-mounted piping.

B. Compact Pipe Stand: One-piece plastic unit with integral-rod roller, pipe clamps, or V-shaped cradle to support pipe, for roof installation without membrane penetration.

C. Low-Type, Single-Pipe Stand: One-piece stainless-steel base unit with plastic roller, for roof installation without membrane penetration.

D. High-Type, Single-Pipe Stand:

1. Description: Assembly of base, vertical and horizontal members, and pipe support, for roof installation without membrane penetration.

2. Base: Stainless steel.

3. Vertical Members: Two or more cadmium-plated-steel or stainless-steel, continuous-thread rods.

Addendum #1 Issued March 3, 2021

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230529 - 3

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

4. Horizontal Member: Cadmium-plated-steel or stainless-steel rod with plastic or stainless-steel, roller-type pipe support.

E. High-Type, Multiple-Pipe Stand:

1. Description: Assembly of bases, vertical and horizontal members, and pipe supports, for roof installation without membrane penetration.

2. Bases: One or more; plastic.

3. Vertical Members: Two or more protective-coated-steel channels.

4. Horizontal Member: Protective-coated-steel channel.

5. Pipe Supports: Galvanized-steel, clevis-type pipe hangers.

F. Curb-Mounted-Type Pipe Stands: Shop- or field-fabricated pipe supports made from structural-steel shapes, continuous-thread rods, and rollers, for mounting on permanent stationary roof curb.

2.6 EQUIPMENT SUPPORTS

A. Description: Welded, shop- or field-fabricated equipment support made from structural carbon-steel shapes.

2.7 MISCELLANEOUS MATERIALS

A. Structural Steel: ASTM A 36/A 36M, carbon-steel plates, shapes, and bars; black and galvanized.

B. Grout: ASTM C 1107, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications.

1. Properties: Nonstaining, noncorrosive, and nongaseous.

2. Design Mix: 5000-psi, 28-day compressive strength.

PART 3 - EXECUTION

3.1 HANGER AND SUPPORT INSTALLATION

A. Metal Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.

B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated trapeze pipe hangers.

Addendum #1 Issued March 3, 2021

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230529 - 4

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified for individual pipe hangers.

2. Field fabricate from ASTM A 36/A 36M, carbon-steel shapes selected for loads being supported. Weld steel according to AWS D1.1/D1.1M.

C. Metal Framing System Installation: Arrange for grouping of parallel runs of piping, and support together on field-assembled metal framing systems.

D. Thermal-Hanger Shield Installation: Install in pipe hanger or shield for insulated piping.

E. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.

F. Equipment Support Installation: Fabricate from welded-structural-steel shapes.

G. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.

H. Install lateral bracing with pipe hangers and supports to prevent swaying.

I. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through openings at top of inserts.

J. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.

K. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.

L. Insulated Piping:

1. Attach clamps and spacers to piping.

a. Piping Operating above Ambient Air Temperature: Clamp may project through insulation.

b. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.

2. Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation.

Addendum #1 Issued March 3, 2021

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230529 - 5

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.

3. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier. Shields shall span an arc of 180 degrees.

a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.

4. Shield Dimensions for Pipe: Not less than the following:

a. NPS 1/4 to NPS 3-1/2: 12 inches long and 0.048 inch thick.

b. NPS 4: 12 inches long and 0.06 inch thick.

c. NPS 5 and NPS 6: 18 inches long and 0.06 inch thick.

d. NPS 8 to NPS 14: 24 inches long and 0.075 inch thick.

e. NPS 16 to NPS 24: 24 inches long and 0.105 inch thick.

5. Pipes NPS 8 and Larger: Include wood or reinforced calcium-silicate-insulation inserts of length at least as long as protective shield.

6. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.

3.2 EQUIPMENT SUPPORTS

A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.

B. Grouting: Place grout under supports for equipment and make bearing surface smooth.

C. Provide lateral bracing, to prevent swaying, for equipment supports.

3.3 METAL FABRICATIONS

A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers and equipment supports.

B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations.

C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding;

appearance and quality of welds; and methods used in correcting welding work; and with the following:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

Addendum #1 Issued March 3, 2021

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230529 - 6

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

2. Obtain fusion without undercut or overlap.

3. Remove welding flux immediately.

4. Finish welds at exposed connections so no roughness shows after finishing and so contours of welded surfaces match adjacent contours.

3.4 ADJUSTING

A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.

B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches.

3.5 HANGER AND SUPPORT SCHEDULE

A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.

B. Comply with MSS SP-69 for pipe-hanger selections and applications that are not specified in piping system Sections.

C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.

D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.

E. Use carbon-steel pipe hangers and supports metal trapeze pipe hangers and metal framing systems and attachments for general service applications.

F. Use copper-plated pipe hangers and copper or stainless-steel attachments for copper piping and tubing.

G. Use padded hangers for piping that is subject to scratching.

H. Use thermal-hanger shield inserts for insulated piping and tubing.

I. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated, stationary pipes NPS 1/2 to NPS 30.

2. Yoke-Type Pipe Clamps (MSS Type 2): For suspension of up to 1050 deg F, pipes NPS 4 to NPS 24, requiring up to 4 inches of insulation.

3. Carbon- or Alloy-Steel, Double-Bolt Pipe Clamps (MSS Type 3): For suspension of pipes NPS 3/4 to NPS 36, requiring clamp flexibility and up to 4 inches of insulation.

Addendum #1 Issued March 3, 2021

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230529 - 7

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

4. Steel Pipe Clamps (MSS Type 4): For suspension of cold and hot pipes NPS 1/2 to NPS 24 if little or no insulation is required.

5. Pipe Hangers (MSS Type 5): For suspension of pipes NPS 1/2 to NPS 4, to allow off-center closure for hanger installation before pipe erection.

6. Adjustable, Swivel Split- or Solid-Ring Hangers (MSS Type 6): For suspension of noninsulated, stationary pipes NPS 3/4 to NPS 8.

7. Adjustable, Steel Band Hangers (MSS Type 7): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8.

8. Adjustable Band Hangers (MSS Type 9): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8.

9. Adjustable, Swivel-Ring Band Hangers (MSS Type 10): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8.

10. Split Pipe Ring with or without Turnbuckle Hangers (MSS Type 11): For suspension of noninsulated, stationary pipes NPS 3/8 to NPS 8.

11. Extension Hinged or Two-Bolt Split Pipe Clamps (MSS Type 12): For suspension of noninsulated, stationary pipes NPS 3/8 to NPS 3.

12. U-Bolts (MSS Type 24): For support of heavy pipes NPS 1/2 to NPS 30.

13. Clips (MSS Type 26): For support of insulated pipes not subject to expansion or contraction.

14. Pipe Saddle Supports (MSS Type 36): For support of pipes NPS 4 to NPS 36, with steel-pipe base stanchion support and cast-iron floor flange or carbon-steel plate.

15. Pipe Stanchion Saddles (MSS Type 37): For support of pipes NPS 4 to NPS 36, with steel-pipe base stanchion support and cast-iron floor flange or carbon-steel plate, and with U-bolt to retain pipe.

16. Adjustable Pipe Saddle Supports (MSS Type 38): For stanchion-type support for pipes NPS 2-1/2 to NPS 36 if vertical adjustment is required, with steel-pipe base stanchion support and cast-iron floor flange.

17. Single-Pipe Rolls (MSS Type 41): For suspension of pipes NPS 1 to NPS 30, from two rods if longitudinal movement caused by expansion and contraction might occur.

18. Adjustable Roller Hangers (MSS Type 43): For suspension of pipes NPS 2-1/2 to NPS 24, from single rod if horizontal movement caused by expansion and contraction might occur.

19. Pipe Roll and Plate Units (MSS Type 45): For support of pipes NPS 2 to NPS 24 if small horizontal movement caused by expansion and contraction might occur and vertical adjustment is not necessary.

20. Adjustable Pipe Roll and Base Units (MSS Type 46): For support of pipes NPS 2 to NPS 30 if vertical and lateral adjustment during installation might be required in addition to expansion and contraction.

J. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to

NPS 24.

Addendum #1 Issued March 3, 2021

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230529 - 8

NORTH CAROLINA ANG

CHARLOTTE, NC VOLUME 3 OF 4

K. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches for heavy loads.

2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations.

3. Swivel Turnbuckles (MSS Type 15): For use with MSS Type 11, split pipe rings.

4. Malleable-Iron Sockets (MSS Type 16): For attaching hanger rods to various types of building attachments.

5. Steel Weldless Eye Nuts (MSS Type 17): For 120 to 450 deg F piping installations.

L. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction, to attach to top flange of structural shape.

2. Side-Beam or Channel Clamps (MSS Type 20): For attaching to bottom flange of beams, channels, or angles.

3. Center-Beam Clamps (MSS Type 21): For attaching to center of bottom flange of beams.

4. Welded Beam Attachments (MSS Type 22): For attaching to bottom of beams if loads are considerable and rod sizes are large.

5. C-Clamps (MSS Type 23): For structural shapes.

6. Top-Beam Clamps (MSS Type 25): For top of beams if hanger rod is required tangent to flange edge.

7. Side-Beam Clamps (MSS Type 27): For bottom of steel I-beams.

8. Steel-Beam…