ATTACHMENT 2 SPECS SAT FJRP052994 ADF FJRP199040 Volume 2 of 4.pdf
PDF 2 MB Posted
- Solicitation number
- W50S87-21-B-5005
About this file
This solicitation document requests bids for construction services related to the addition and alteration of a small air terminal building at the 145th Airlift Wing in North Carolina. Interested bidders are encouraged to attend a pre-bid conference on June 2, 2021 for additional details. The solicitation involves constructing additions and making alterations to an existing small air terminal building to support the 145th Airlift Wing mission. The Army National Guard is the issuing agency. The document provides relevant drawings, specifications, and attachments for interested contractors to review in preparation of submitting a bid response by the specified due date.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 078446 - FIRE-RESISTIVE JOINT SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Joints in or between fire-resistance-rated constructions.
2. This installer shall also provide fire-resistive joint systems specified in Section 078413
"Penetration Firestopping." Installer shall be responsible for design and selection of all systems.
B. Related Sections:
1. Section 078413 "Penetration Firestopping" for penetrations in fire-resistance-rated walls.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings: For each condition anticipated.
C. Product Schedule: For each fire-resistive joint system. Include location and design designation of qualified testing agency.
1.3 INFORMATIONAL SUBMITTALS
A. Qualification Data: For qualified Installer.
B. Installer Certificates: From Installer indicating fire-resistive joint systems have been installed in compliance with requirements and manufacturer's written recommendations.
C. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for fire-resistive joint systems.
Addendum #1 Issued March 3, 2021
FIRE-RESISTIVE JOINT SYSTEMS
078446 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
FJRP052994 SMALL AIR TERMINAL
FJRP199040 AIR DROP FACILITY
1.4 QUALITY ASSURANCE
A. Installer Qualifications: A firm experienced in installing fire-resistive joint systems similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful performance. Qualifications include having the necessary experience, staff, and training to install manufacturer's products per specified requirements. Manufacturer's willingness to sell its fire-resistive joint system products to Contractor or to Installer engaged by Contractor does not in itself confer qualification on buyer.
B. Fire-Test-Response Characteristics: Fire-resistive joint systems shall comply with the following requirements:
1. Fire-resistive joint system tests are performed by a qualified testing agency acceptable to authorities having jurisdiction.
2. Fire-resistive joint systems are identical to those tested per testing standard referenced in "Fire-Resistive Joint Systems" Article. Provide rated systems complying with the following requirements:
a. Fire-resistive joint system products bear classification marking of qualified testing agency.
b. Fire-resistive joint systems correspond to those indicated by reference to designations listed by the following:
1) UL in its "Fire Resistance Directory."
1.5 PROJECT CONDITIONS
A. Environmental Limitations: Do not install fire-resistive joint systems when ambient or substrate temperatures are outside limits permitted by fire-resistive joint system manufacturers or when substrates are wet due to rain, frost, condensation, or other causes.
B. Install and cure fire-resistive joint systems per manufacturer's written instructions using natural means of ventilation or, where this is inadequate, forced-air circulation.
1.6 COORDINATION
A. Coordinate construction of joints to ensure that fire-resistive joint systems are installed according to specified requirements.
B. Coordinate sizing of joints to accommodate fire-resistive joint systems.
C. Notify Owner's testing agency at least seven days in advance of fire-resistive joint system installations; confirm dates and times on day preceding each series of installations.
Addendum #1 Issued March 3, 2021
FIRE-RESISTIVE JOINT SYSTEMS
078446 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
PART 2 - PRODUCTS
2.1 FIRE-RESISTIVE JOINT SYSTEMS
A. Where required, provide fire-resistive joint systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of assemblies in or between which fire-resistive joint systems are installed. Fire-resistive joint systems shall accommodate building movements without impairing their ability to resist the passage of fire and hot gases.
B. Joints in or between Fire-Resistance-Rated Construction: Provide fire-resistive joint systems with ratings determined per ASTM E 1966 or UL 2079:
1. Joints include those installed in or between fire-resistance-rated walls.
2. Fire-Resistance Rating: Equal to or exceeding the fire-resistance rating of construction they will join.
C. Exposed Fire-Resistive Joint Systems: Provide products with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84.
D. Accessories: Provide components of fire-resistive joint systems, including primers and forming materials, that are needed to install fill materials and to maintain ratings required. Use only components specified by fire-resistive joint system manufacturer and approved by the qualified testing agency for systems indicated.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements for joint configurations, substrates, and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Surface Cleaning: Clean joints immediately before installing fire-resistive joint systems to comply with fire-resistive joint system manufacturer's written instructions and the following requirements:
Addendum #1 Issued March 3, 2021
FIRE-RESISTIVE JOINT SYSTEMS
078446 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
1. Remove from surfaces of joint substrates foreign materials that could interfere with adhesion of fill materials.
2. Clean joint substrates to produce clean, sound surfaces capable of developing optimum bond with fill materials. Remove loose particles remaining from cleaning operation.
3. Remove laitance and form-release agents from concrete.
B. Priming: Prime substrates where recommended in writing by fire-resistive joint system manufacturer using that manufacturer's recommended products and methods. Confine primers to areas of bond; do not allow spillage and migration onto exposed surfaces.
C. Masking Tape: Use masking tape to prevent fill materials of fire-resistive joint system from contacting adjoining surfaces that will remain exposed on completion of the Work and that would otherwise be permanently stained or damaged by such contact or by cleaning methods used to remove stains. Remove tape as soon as possible without disturbing fire-resistive joint system's seal with substrates.
3.3 INSTALLATION
A. General: Install fire-resistive joint systems to comply with manufacturer's written installation instructions and published drawings for products and applications indicated.
B. Install forming materials and other accessories of types required to support fill materials during their application and in position needed to produce cross-sectional shapes and depths required to achieve fire ratings indicated.
1. After installing fill materials and allowing them to fully cure, remove combustible forming materials and other accessories not indicated as permanent components of fire-resistive joint system.
C. Install fill materials for fire-resistive joint systems by proven techniques to produce the following results:
1. Fill voids and cavities formed by joints and forming materials as required to achieve fire-resistance ratings indicated.
2. Apply fill materials so they contact and adhere to substrates formed by joints.
3. For fill materials that will remain exposed after completing the Work, finish to produce smooth, uniform surfaces that are flush with adjoining finishes.
Addendum #1 Issued March 3, 2021
FIRE-RESISTIVE JOINT SYSTEMS
078446 - 4
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
3.4 IDENTIFICATION
A. Identify fire-resistive joint systems with preprinted metal or plastic labels. Attach labels permanently to surfaces adjacent to and within 6 inches of joint edge so labels will be visible to anyone seeking to remove or penetrate joint system. Use mechanical fasteners or self-adhering-type labels with adhesives capable of permanently bonding labels to surfaces on which labels are placed. Include the following information on labels:
1. The words "Warning - Fire-Resistive Joint System - Do Not Disturb. Notify Building Management of Any Damage."
2. Contractor's name, address, and phone number.
3. Designation of applicable testing agency.
4. Date of installation.
5. Manufacturer's name.
6. Installer's name.
3.5 CLEANING AND PROTECTING
A. Clean off excess fill materials adjacent to joints as the Work progresses by methods and with cleaning materials that are approved in writing by fire-resistive joint system manufacturers and that do not damage materials in which joints occur.
B. Provide final protection and maintain conditions during and after installation that ensure fire-resistive joint systems are without damage or deterioration at time of Substantial Completion. If damage or deterioration occurs despite such protection, cut out and remove damaged or deteriorated fire-resistive joint systems immediately and install new materials to produce fire-resistive joint systems complying with specified requirements.
END OF SECTION 078446
Addendum #1 Issued March 3, 2021
FIRE-RESISTIVE JOINT SYSTEMS
078446 - 5
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
This Page Intentionally Left Blank
Addendum #1 Issued March 3, 2021
FIRE-RESISTIVE JOINT SYSTEMS
078446 - 6
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
SECTION 079200 - JOINT SEALANTS
1.1 SUMMARY
A. Section Includes:
1. Silicone joint sealants.
2. Urethane joint sealants.
3. Latex joint sealants.
4. Acoustical joint sealants.
B. Related Sections:
1. Section 092900 "Gypsum Board" for sealing perimeter joints.
2. Section 095113 "Acoustical Panel Ceilings" for sealing edge moldings at perimeters with acoustical sealant.
1.2 ACTION SUBMITTALS
A. Product Data: For each joint-sealant product indicated.
B. LEED Submittals:
1. Product Data for Credit IEQ 4.1: For sealants and sealant primers used inside the weatherproofing system, documentation including printed statement of VOC content.
C. Samples for Initial Selection: Manufacturer's color charts consisting of strips of cured sealants showing the full range of colors available for each product exposed to view.
D. Samples for Verification: For each kind and color of joint sealant required, provide Samples with joint sealants in 1/2-inch- wide joints formed between two 6-inch- long strips of material matching the appearance of exposed surfaces adjacent to joint sealants.
E. Joint-Sealant Schedule: Include the following information:
1. Joint-sealant application, joint location, and designation.
2. Joint-sealant manufacturer and product name.
3. Joint-sealant formulation.
4. Joint-sealant color.
Addendum #1 Issued March 3, 2021
JOINT SEALANTS
079200 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
1.3 INFORMATIONAL SUBMITTALS
A. Product Certificates: For each kind of joint sealant and accessory, from manufacturer.
B. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, indicating that sealants comply with requirements.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project.
B. Source Limitations: Obtain each kind of joint sealant from single source from single manufacturer.
1.5 PROJECT CONDITIONS
A. Do not proceed with installation of joint sealants under the following conditions:
1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer or are below 40 deg F.
2. When joint substrates are wet.
3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.
4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.
1.6 WARRANTY
A. Special Installer's Warranty: Manufacturer's standard form in which Installer agrees to repair or replace joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period.
1. Warranty Period: Two years from date of Substantial Completion of entire project.
B. Special Manufacturer's Warranty: Manufacturer's standard form in which joint-sealant manufacturer agrees to furnish joint sealants to repair or replace those that do not comply with performance and other requirements specified in this Section within specified warranty period.
1. Warranty Period: Two years from date of Substantial Completion of entire project.
Addendum #1 Issued March 3, 2021
JOINT SEALANTS
079200 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
C. Special warranties specified in this article exclude deterioration or failure of joint sealants from the following:
1. Movement of the structure caused by structural settlement or errors attributable to design or construction resulting in stresses on the sealant exceeding sealant manufacturer's written specifications for sealant elongation and compression.
2. Disintegration of joint substrates from natural causes exceeding design specifications.
3. Mechanical damage caused by individuals, tools, or other outside agents.
4. Changes in sealant appearance caused by accumulation of dirt or other atmospheric contaminants.
PART 2 - PRODUCTS
2.1 MATERIALS, GENERAL
A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer, based on testing and field experience.
B. VOC Content of Interior Sealants: Sealants and sealant primers used inside the weatherproofing system shall comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):
1. Architectural Sealants: 250 g/L.
2. Sealant Primers for Nonporous Substrates: 250 g/L.
3. Sealant Primers for Porous Substrates: 775 g/L.
C. Liquid-Applied Joint Sealants: Comply with ASTM C 920 and other requirements indicated for each liquid-applied joint sealant specified, including those referencing ASTM C 920 classifications for type, grade, class, and uses related to exposure and joint substrates.
D. Stain-Test-Response Characteristics: Where sealants are specified to be nonstaining to porous substrates, provide products that have undergone testing according to ASTM C 1248 and have not stained porous joint substrates indicated for Project.
E. Retain paragraph below if sealant colors are not specified in the Joint-Sealant Schedule in Part 3 or on Drawings.
F. Colors of Exposed Joint Sealants: Refer to Section 090690 Color Schedule.
Addendum #1 Issued March 3, 2021
JOINT SEALANTS
079200 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
2.2 SILICONE JOINT SEALANTS
A. Single-Component, Nonsag, Neutral-Curing Silicone Joint Sealant: ASTM C 920, Type S, Grade NS, Class 50, for Use NT.
B. Mildew-Resistant, Single-Component, Nonsag, Neutral-Curing Silicone Joint Sealant: ASTM C 920, Type S, Grade NS, Class 25, for Use NT.
2.3 JOINT SEALANT BACKING
A. General: Provide sealant backings of material that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.
B. Cylindrical Sealant Backings: ASTM C 1330, Type C (closed-cell material with a surface skin), and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance.
C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint. Provide self-adhesive tape where applicable.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint-sealant performance.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements:
1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.
Addendum #1 Issued March 3, 2021
JOINT SEALANTS
079200 - 4
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
2. Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air.
Porous joint substrates include the following:
a. Concrete.
b. Masonry.
3. Remove laitance and form-release agents from concrete.
4. Clean nonporous joint substrate surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. Nonporous joint substrates include the following:
a. Metal.
b. Glass.
B. Joint Priming: Prime joint substrates where recommended by joint-sealant manufacturer or as indicated by preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.
C. Masking Tape: Use masking tape where required to prevent contact of sealant or primer with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.
3.3 CLEANING
A. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur.
3.4 PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from original work.
Addendum #1 Issued March 3, 2021
JOINT SEALANTS
079200 - 5
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
3.5 JOINT-SEALANT SCHEDULE
A. Joint-Sealant Application: Exterior joints in horizontal traffic surfaces.
1. Joint Locations:
a. Isolation and contraction joints in cast-in-place concrete slabs.
2. Urethane Joint Sealant: Multicomponent, nonsag, traffic grade, Class 25.
3. Joint-Sealant Color: As selected by Architect from manufacturer's full range of colors.
B. Joint-Sealant Application: Exterior joints in vertical surfaces and horizontal nontraffic surfaces.
1. Joint Locations:
a. Control and expansion joints in unit masonry.
b. Joints between different materials listed above.
c. Perimeter joints between materials listed above and frames of doors and windows and louvers.
d. Other joints as indicated.
2. Silicone Joint Sealant: Single component, nonsag, neutral curing, Class 50.
3. Joint-Sealant Color: As selected by Architect from manufacturer's full range of colors.
C. Joint-Sealant Application: Interior joints in horizontal traffic surfaces.
1. Urethane Joint Sealant: Multicomponent, nonsag, traffic grade, Class 25.
2. Joint-Sealant Color: As selected by Architect from manufacturer's full range of colors.
D. Joint-Sealant Application: Interior joints in vertical surfaces and horizontal nontraffic surfaces.
1. Joint Locations:
a. Control and expansion joints on exposed interior surfaces of exterior walls.
b. Perimeter joints of exterior openings where indicated.
c. Vertical joints on exposed surfaces of walls and partitions.
d. Perimeter joints between interior wall surfaces and frames of interior doors and windows.
e. Other joints as indicated.
2. Joint Sealant: Latex, Acrylic based.
3. Joint-Sealant Color: As selected by Architect from manufacturer's full range of colors.
E. Joint-Sealant Application: Mildew-resistant interior joints in vertical surfaces and horizontal nontraffic surfaces.
Addendum #1 Issued March 3, 2021
JOINT SEALANTS
079200 - 6
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
1. Joint Sealant Location:
a. Joints between plumbing fixtures and adjoining walls, floors, and counters.
b. Other joints as indicated.
2. Joint Sealant: Mildew resistant, single component, nonsag, neutral curing, Silicone.
3. Joint-Sealant Color: As selected by Architect from manufacturer's full range of colors.
END OF SECTION 079200
Addendum #1 Issued March 3, 2021
JOINT SEALANTS
079200 - 7
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
Issued March 3, 2021
JOINT SEALANTS
079200 - 8
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
SECTION 079500 - EXPANSION CONTROL
1.1 SUMMARY
A. Section Includes:
1. Interior expansion control systems.
2. Exterior wall expansion control systems.
B. Related Requirements:
1. Section 076200 "Sheet Metal Flashing and Trim"
2. Section 079200 "Joint Sealants" for liquid-applied joint sealants and for elastomeric sealants without metal frames.
1.2 ACTION SUBMITTALS
A. Shop Drawings: For each expansion control system specified. Include plans, elevations, sections, details, splices, attachments to other work, and line diagrams showing entire route of each expansion control system. Where expansion control systems change planes, provide isometric or clearly detailed drawing depicting how components interconnect.
B. Samples: For each exposed expansion control system and for each color and texture specified, full width by 6 inches long in size.
1.3 QUALITY ASSURANCE
A. Details in the Drawings are to convey design intent, type, and location of the major aspects of the expansion joint system.
B. Contractor is to coordinate and provide a complete and watertight expansion joint system between the existing building and new addition.
C. Roof expansion joints are detailed as fabricated sheet metal systems. Prefabricated systems may be considered and require pre-approval during bidding. Sheet metal expansion joints shall be of the same finish as the parapet caps.
Addendum #1 Issued March 3, 2021
EXPANSION CONTROL
079500 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
1.4 ACTION SUBMITTALS
A. Shop Drawings: For each expansion control system specified. Include plans, elevations, sections, details, splices, attachments to other work, and line diagrams showing entire route of each expansion control system. Where expansion control systems change planes, provide isometric or clearly detailed drawing depicting how components interconnect.
PART 2 - PRODUCTS
2.1 SYSTEM DESCRIPTION
A. General: Provide expansion control systems of design, basic profile, materials, and operation indicated. Provide units with capability to accommodate variations in adjacent surfaces.
1. Furnish units in longest practicable lengths to minimize field splicing. Install with hairline mitered corners where expansion control systems change direction or abut other materials.
2. Include factory-fabricated closure materials and transition pieces, corners, and other accessories as required to provide continuous expansion control systems.
B. Coordination: Coordinate installation of exterior wall expansion control systems with roof expansion control systems to ensure that wall transitions are watertight.
2.2 INTERIOR EXPANSION CONTROL SYSTEMS
A. Source Limitations: Obtain expansion control systems from single source from single manufacturer.
B. Wall-to-Wall:
1. Basis-of-Design Product: to meet requirements of this section.
2. Design Criteria:
a. Nominal Joint Width: As indicated on Drawings.
b. Movement Capability: +/- 50%
c. Type of movement: Thermal
3. Type: Preformed cellular foam seal
a. Foam Material: Manufacturer's standard.
b. Face Material: Silicone
Addendum #1 Issued March 3, 2021
EXPANSION CONTROL
079500 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
c. Finish: Refer to Section 090690 Color Schedule.
C. Wall-to-Wall:
1. Basis-of-Design Product: to meet the requirements of this section.
2. Design Criteria:
a. Nominal Joint Width: As indicated on Drawings.
b. Movement Capability: +/- 50%.
c. Type of Movement: Thermal.
3. Type: Cover plate.
a. Metal: Aluminum.
1) Finish: Refer to Section 090690 Color Schedule
2.3 EXTERIOR WALL EXPANSION CONTROL SYSTEMS
A. Source Limitations: Obtain expansion control systems from single source from single manufacturer.
B. Roof-to-Wall : Canted 4" expansion joint system with EPDM bellows supported by Closed Cell Foam.
C. Wall-to-Wall :
1. Basis-of-Design Product: to meet the requirements of this section.
2. Design Criteria:
a. Nominal Joint Width: As indicated on Drawings.
b. Movement Capability: As indicated on Drawings.
c. Type of Movement: Thermal.
3. Type: Preformed cellular foam seal.
a. Foam Material: Manufacturer's standard .
b. Face Material: Silicone.
1) Color: Refer to Section 090690 Color Schedule.
2) 3)
Addendum #1 Issued March 3, 2021
EXPANSION CONTROL
079500 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
2.4 ACCESSORIES
A. Moisture Barriers: Manufacturer's standard moisture barrier consisting of a continuous, waterproof membrane within joint and attached to substrate on sides of joint below the primary cover.
2.5 MATERIALS
A. Aluminum: ASTM B 221, Alloy 6063-T5 for extrusions; ASTM B 209, Alloy 6061-T6 for sheet and plate.
1. Apply manufacturer's standard protective coating on aluminum surfaces to be placed in contact with cementitious materials.
B. Cellular Foam Seals: Extruded, compressible foam designed to function under compression.
C. Accessories: Manufacturer's standard anchors, clips, fasteners, set screws, spacers, and other accessories compatible with material in contact, as indicated or required for complete installations.
2.6 GENERAL FINISH REQUIREMENTS
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.
C. Appearance of Finished Work: Noticeable variations in same piece are not acceptable.
Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine surfaces where expansion control systems will be installed for installation tolerances and other conditions affecting performance of work.
1. Proceed with installation only after unsatisfactory conditions have been corrected.
Addendum #1 Issued March 3, 2021
EXPANSION CONTROL
079500 - 4
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
3.2 PREPARATION
A. Prepare substrates according to expansion control system manufacturer's written instructions.
B. Coordinate and furnish anchorages, setting drawings, and instructions for installing expansion control systems. Provide fasteners of metal, type, and size to suit type of construction indicated and to provide for secure attachment of expansion control systems.
3.3 INSTALLATION
A. Comply with manufacturer's written instructions for storing, handling, and installing expansion control systems and materials unless more stringent requirements are indicated.
B. Foam Seals: Install with adhesive recommended by manufacturer.
C. Terminate exposed ends of expansion control systems with field- or factory-fabricated termination devices.
3.4 PROTECTION
A. Do not remove protective covering until finish work in adjacent areas is complete. When protective covering is removed, clean exposed metal surfaces to comply with manufacturer's written instructions.
B. Protect the installation from damage by work of other Sections. Where necessary due to heavy construction traffic, remove and properly store cover plates or seals and install temporary protection over expansion control systems. Reinstall cover plates or seals prior to Substantial Completion of the Work.
END OF SECTION 079500
Addendum #1 Issued March 3, 2021
EXPANSION CONTROL
079500 - 5
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
Issued March 3, 2021
EXPANSION CONTROL
079500 - 6
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES
1.1 SUMMARY
A. Section Includes:
1. Standard hollow metal doors and frames.
2. Division 08 Section "Door Hardware" for door hardware for hollow metal doors and frames.
3. Division 09 Sections "Exterior Painting" and "Interior Painting" for field painting hollow metal doors and frames.
1.2 DEFINITIONS
A. Minimum Thickness: Minimum thickness of base metal without coatings.
B. Standard Hollow Metal Work: Hollow metal work fabricated according to ANSI/SDI A250.8.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated. Include construction details, material descriptions, core descriptions, fire-resistance rating, and finishes.
B. Shop Drawings: Include the following:
1. Elevations of each door design.
2. Details of doors, including vertical and horizontal edge details and metal thicknesses.
3. Frame details for each frame type, including dimensioned profiles and metal thicknesses.
4. Locations of reinforcement and preparations for hardware.
5. Details of each different wall opening condition.
6. Details of anchorages, joints, field splices, and connections.
7. Details of moldings, removable stops, and glazing.
C. Other Action Submittals:
1. Schedule: Provide a schedule of hollow metal work prepared by or under the supervision of supplier, using same reference numbers for details and openings as those on Drawings.
Coordinate with door hardware schedule.
Addendum #1 Issued March 3, 2021
HOLLOW METAL DOORS AND FRAMES
081113 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
D. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for each type of hollow metal door and frame assembly.
1.4 QUALITY ASSURANCE
A. Source Limitations: Obtain hollow metal work from single source from single manufacturer.
B. Fire-Rated Door Assemblies: Assemblies complying with NFPA 80 that are listed and labeled by a qualified testing agency, for fire-protection ratings indicated, based on testing at positive pressure according to UBC Standard 7-2.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver hollow metal work palletized, wrapped, or crated to provide protection during transit and Project-site storage. Do not use nonvented plastic.
1. Provide additional protection to prevent damage to finish of factory-finished units.
B. Deliver welded frames with two removable spreader bars across bottom of frames, tack welded to jambs and mullions.
C. Store hollow metal work under cover at Project site. Place in stacks of five units maximum in a vertical position with heads up, spaced by blocking, on minimum 4-inch high wood blocking.
Do not store in a manner that traps excess humidity.
1. Provide minimum 1/4-inch space between each stacked door to permit air circulation.
1.6 PROJECT CONDITIONS
A. Field Measurements: Verify actual dimensions of openings by field measurements before fabrication.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B; suitable for exposed applications.
B. Hot-Rolled Steel Sheet: ASTM A 1011/A 1011M, Commercial Steel (CS), Type B; free of scale, pitting, or surface defects; pickled and oiled.
Addendum #1 Issued March 3, 2021
HOLLOW METAL DOORS AND FRAMES
081113 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
C. Metallic-Coated Steel Sheet: ASTM A 653/A 653M, Commercial Steel (CS), Type B; with minimum G60 or A60 metallic coating.
D. Frame Anchors: ASTM A 591/A 591M, Commercial Steel (CS), 40Z coating designation; mill phosphatized.
1. For anchors built into exterior walls, steel sheet complying with ASTM A 1008/A 1008M or ASTM A 1011/A 1011M, hot-dip galvanized according to ASTM A 153/A 153M, Class B.
E. Inserts, Bolts, and Fasteners: Hot-dip galvanized according to ASTM A 153/A 153M.
F. Powder-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hollow metal frames of type indicated.
G. Glazing: Comply with requirements in Division 08 Section "Glazing."
2.2 STANDARD HOLLOW METAL DOORS
A. General: Provide doors of design indicated, not less than thickness indicated; fabricated with smooth surfaces, without visible joints or seams on exposed faces unless otherwise indicated.
Comply with ANSI/SDI A250.8.
1. Design: Flush panel.
2. Core Construction: Manufacturer's standard kraft-paper honeycomb, polystyrene, polyurethane, polyisocyanurate, mineral-board, or vertical steel-stiffener core.
a. Fire Door Core: As required to provide fire-protection ratings indicated.
b. Thermal-Rated (Insulated) Doors: Where indicated, provide doors fabricated with thermal-resistance value (R-value) of not less than 6.0 deg F x h x sq. ft./Btu when tested according to ASTM C 1363.
1) Locations: Exterior doors.
3. Vertical Edges for Single-Acting Doors: Beveled edge.
a. Beveled Edge: 1/8 inch in 2 inches.
4. Top and Bottom Edges: Closed with flush or inverted 0.042-inch thick, end closures or channels of same material as face sheets.
5. Tolerances: Comply with SDI 117, "Manufacturing Tolerances for Standard Steel Doors and Frames."
Addendum #1 Issued March 3, 2021
HOLLOW METAL DOORS AND FRAMES
081113 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
B. Exterior Doors: Face sheets fabricated from metallic-coated steel sheet. Provide doors complying with requirements indicated below by referencing ANSI/SDI A250.8 for level and model and ANSI/SDI A250.4 for physical performance level:
1. Level 2 and Physical Performance Level B (Heavy Duty), Model 2 (Seamless).
C. Hardware Reinforcement: Fabricate according to ANSI/SDI A250.6 with reinforcing plates from same material as door face sheets.
2.3 STANDARD HOLLOW METAL FRAMES
A. General: Comply with ANSI/SDI A250.8 and with details indicated for type and profile.
B. Exterior Frames: Fabricated from metallic-coated steel sheet.
1. Fabricate frames as face welded unless otherwise indicated.
2. Frames for Level 2 Steel Doors: 0.053-inch thick steel sheet.
C. Interior Frames: Fabricated from cold-rolled steel sheet.
1. Fabricate frames with mitered or coped corners.
2. Frames: 0.053-inch thick steel sheet.
D. Hardware Reinforcement: Fabricate according to ANSI/SDI A250.6 with reinforcement plates from same material as frames.
E. Wire anchors in first subparagraph below are often used to permit unobstructed grouting of frames.
2.4 STEEL FINISHES
A. Prime Finish: Apply manufacturer's standard primer immediately after cleaning and pretreating.
1. Shop Primer: Manufacturer's standard, fast-curing, lead- and chromate-free primer complying with ANSI/SDI A250.10 acceptance criteria; recommended by primer manufacturer for substrate; compatible with substrate and field-applied coatings despite prolonged exposure.
Addendum #1 Issued March 3, 2021
HOLLOW METAL DOORS AND FRAMES
081113 - 4
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Remove welded-in shipping spreaders installed at factory. Restore exposed finish by grinding, filling, and dressing, as required to make repaired area smooth, flush, and invisible on exposed faces.
B. Prior to installation, adjust and securely brace welded hollow metal frames for squareness, alignment, twist, and plumbness to the following tolerances:
1. Squareness: Plus or minus 1/16 inch, measured at door rabbet on a line 90 degrees from jamb perpendicular to frame head.
2. Alignment: Plus or minus 1/16 inch, measured at jambs on a horizontal line parallel to plane of wall.
3. Twist: Plus or minus 1/16 inch, measured at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall.
4. Plumbness: Plus or minus 1/16 inch, measured at jambs on a perpendicular line from head to floor.
C. Drill and tap doors and frames to receive nontemplated, mortised, and surface-mounted door hardware.
3.3 INSTALLATION
A. General: Install hollow metal work plumb, rigid, properly aligned, and securely fastened in place; comply with Drawings and manufacturer's written instructions.
B. Hollow Metal Frames: Install hollow metal frames of size and profile indicated. Comply with
ANSI/SDI A250.11.
1. Set frames accurately in position, plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces, leaving surfaces smooth and undamaged.
Addendum #1 Issued March 3, 2021
HOLLOW METAL DOORS AND FRAMES
081113 - 5
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
a. At fire-protection-rated openings, install frames according to NFPA 80.
b. Install frames with removable glazing stops located on secure side of opening.
c. Remove temporary braces necessary for installation only after frames have been properly set and secured.
d. Check plumbness, squareness, and twist of frames as walls are constructed. Shim as necessary to comply with installation tolerances.
e. Field apply bituminous coating to backs of frames that are filled with grout containing antifreezing agents.
2. Floor Anchors: Provide floor anchors for each jamb and mullion that extends to floor, and secure with postinstalled expansion anchors.
a. Floor anchors may be set with powder-actuated fasteners instead of postinstalled expansion anchors if so indicated and approved on Shop Drawings.
3. Metal-Stud Partitions: Solidly pack mineral-fiber insulation behind frames.
4. Masonry Walls: Coordinate installation of frames to allow for solidly filling space between frames and masonry with grout.
5. Installation Tolerances: Adjust hollow metal door frames for squareness, alignment, twist, and plumb to the following tolerances:
a. Squareness: Plus or minus 1/16 inch, measured at door rabbet on a line 90 degrees from jamb perpendicular to frame head.
b. Alignment: Plus or minus 1/16 inch, measured at jambs on a horizontal line parallel to plane of wall.
c. Twist: Plus or minus 1/16 inch, measured at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall.
d. Plumbness: Plus or minus 1/16 inch, measured at jambs at floor.
C. Hollow Metal Doors: Fit hollow metal doors accurately in frames, within clearances specified below. Shim as necessary.
1. Non-Fire-Rated Standard Steel Doors:
a. Jambs and Head: 1/8 inch plus or minus 1/16 inch.
b. Between Edges of Pairs of Doors: 1/8 inch plus or minus 1/16 inch.
c. Between Bottom of Door and Top of Threshold: Maximum 3/8 inch.
d. Between Bottom of Door and Top of Finish Floor (No Threshold): Maximum 3/4 inch.
2. Fire-Rated Doors: Install doors with clearances according to NFPA 80.
D. Glazing: Comply with installation requirements in Division 08 Section "Glazing" and with hollow metal manufacturer's written instructions.
Addendum #1 Issued March 3, 2021
HOLLOW METAL DOORS AND FRAMES
081113 - 6
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
1. Secure stops with countersunk flat- or oval-head machine screws spaced uniformly not more than 9 inches o.c. and not more than 2 inches o.c. from each corner.
3.4 ADJUSTING AND CLEANING
A. Final Adjustments: Check and readjust operating hardware items immediately before final inspection. Leave work in complete and proper operating condition. Remove and replace defective work, including hollow metal work that is warped, bowed, or otherwise unacceptable.
B. Remove grout and other bonding material from hollow metal work immediately after installation.
C. Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas of prime coat and apply touchup of compatible air-drying, rust-inhibitive primer.
D. Metallic-Coated Surfaces: Clean abraded areas and repair with galvanizing repair paint according to manufacturer's written instructions.
END OF SECTION 081113
Addendum #1 Issued March 3, 2021
HOLLOW METAL DOORS AND FRAMES
081113 - 7
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
Issued March 3, 2021
HOLLOW METAL DOORS AND FRAMES
081113 - 8
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
SECTION 081416 - FLUSH WOOD DOORS
1.1 SUMMARY
A. Section Includes:
1. Solid-core doors with wood-veneer faces.
2. Factory finishing flush wood doors.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of door. Include details of core and edge construction and trim for openings. Include factory-finishing specifications.
B. LEED Submittals:
1. Product Certificates for Credit MR 5: For products and materials required to comply with requirements for regional materials, certificates indicating location of material manufacturer and point of extraction, harvest, or recovery for each raw material. Include statement indicating distance to Project, cost for each regional material, and fraction by weight that is considered regional.
2. Certificates for Credit MR 7: Chain-of-custody certificates indicating that flush wood doors comply with forest certification requirements. Include documentation that manufacturer is certified for chain of custody by an FSC-accredited certification body.
Include statement indicating cost for each certified wood product.
3. Product Data for Credit IEQ 4.4: For adhesives and composite wood products, documentation indicating that product contains no urea formaldehyde.
C. Shop Drawings: Indicate location, size, and hand of each door; elevation of each kind of door;
construction details not covered in Product Data; and the following:
1. Dimensions and locations of blocking.
2. Dimensions and locations of mortises and holes for hardware.
3. Dimensions and locations of cutouts.
4. Undercuts.
5. Requirements for veneer matching.
6. Doors to be factory finished and finish requirements.
D. Samples for Initial Selection: For factory-finished doors.
Addendum #1 Issued March 3, 2021
FLUSH WOOD DOORS
081416 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
1.3 INFORMATIONAL SUBMITTALS
A. Sample Warranty: For special warranty.
1.4 QUALITY ASSURANCE
A. Manufacturer Qualifications: A qualified manufacturer that is certified for chain of custody by an FSC-accredited certification body.
B. Vendor Qualifications: A vendor that is certified for chain of custody by an FSC-accredited certification body.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Comply with requirements of referenced standard and manufacturer's written instructions.
B. Package doors individually in plastic bags or cardboard cartons.
C. Mark each door on top and bottom rail with opening number used on Shop Drawings.
1.6 FIELD CONDITIONS
A. Environmental Limitations: Do not deliver or install doors until spaces are enclosed and weathertight, wet work in spaces is complete and dry, and HVAC system is operating and maintaining ambient temperature and humidity conditions at occupancy levels during remainder of construction period.
1.7 WARRANTY
A. A. Special Warranty: Manufacturer agrees to repair or replace doors that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Warping (bow, cup, or twist) more than 1/4 inch in a 42-by-84-inch section.
b. Telegraphing of core construction in face veneers exceeding 0.01 inch in a 3-inch span.
2. Warranty shall also include installation and finishing that may be required due to repair or replacement of defective doors.
3. Warranty Period for Solid-Core Interior Doors: Life of installation.
Addendum #1 Issued March 3, 2021
FLUSH WOOD DOORS
081416 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
PART 2 - PRODUCTS
2.1 FLUSH WOOD DOORS, GENERAL
A. Quality Standard: In addition to requirements specified, comply with ."
1. Contract Documents contain selections chosen from options in quality standard and additional requirements beyond those of quality standard. Comply with those selections and requirements in addition to quality standard.
B. Regional Materials: Flush wood doors shall be manufactured within 500 miles of Project site from materials that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles of Project site.
C. Certified Wood: Flush wood doors shall be certified as "FSC Pure" or "FSC Mixed Credit" according to FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship," and to FSC STD-40-004, "FSC Standard for Chain of Custody Certification."
D. Low-Emitting Materials: Fabricate doors with adhesives and composite wood products that do not contain urea formaldehyde.
E. WDMA I.S.1-A Performance Grade: Heavy Duty.
F. Structural-Composite-Lumber-Core Doors:
1. Structural Composite Lumber: WDMA I.S.10.
a. Screw Withdrawal, Face: 700 lbf.
b. Screw Withdrawal, Edge: 400 lbf.
2.2 VENEER-FACED DOORS FOR TRANSPARENT FINISH
A. Interior Solid-Core Doors :
1. Grade: Premium, with Grade A faces.
2. Species: White oak.
3. Cut: Plain sliced (flat sliced).
4. Match between Veneer Leaves: Book match.
5. Assembly of Veneer Leaves on Door Faces: Center-balance match.
6. Pair and Set Match: Provide for doors hung in same opening or separated only by mullions.
7. Core: Either glued wood stave or structural composite lumber.
Addendum #1 Issued March 3, 2021
FLUSH WOOD DOORS
081416 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
8. Construction: Five or seven plies. Stiles and rails are bonded to core, then entire unit is abrasive planed before veneering. Faces are bonded to core using a hot press.
9. WDMA I.S.1-A Performance Grade: Extra Heavy Duty .
2.3 FABRICATION
A. Factory machine doors for hardware that is not surface applied. Locate hardware to comply with DHI-WDHS-3. Comply with final hardware schedules, door frame Shop Drawings, BHMA-156.115-W, and hardware templates.
B. Openings: Factory cut and trim openings through doors.
1. Light Openings: Trim openings with moldings of material and profile indicated.
2. Glazing: Factory install glazing in doors indicated to be factory finished. Comply with applicable requirements in Section 088000 "Glazing."
2.4 FACTORY FINISHING
A. General: Comply with referenced quality standard for factory finishing. Complete fabrication, including fitting doors for openings and machining for hardware that is not surface applied, before finishing.
1. Finish faces, all four edges, edges of cutouts, and mortises. Stains and fillers may be omitted on top and bottom edges, edges of cutouts, and mortises.
B. Factory finish doors.
C. Transparent Finish:
1. Grade: Premium.
2. Finish: WDMA TR-4 conversion varnish or WDMA TR-6 catalyzed polyurethane.
3. Staining: As selected by Architect from manufacturer's full range.
4. Sheen: Satin.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine doors and installed door frames, with Installer present, before hanging doors.
1. Verify that installed frames comply with indicated requirements for type, size, location, and swing characteristics and have been installed with level heads and plumb jambs.
2. Reject doors with defects.
Addendum #1 Issued March 3, 2021
FLUSH WOOD DOORS
081416 - 4
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Hardware: For installation, see Section 087100 "Door Hardware."
B. Installation Instructions: Install doors to comply with manufacturer's written instructions and referenced quality standard, and as indicated.
C. Factory-Fitted Doors: Align in frames for uniform clearance at each edge.
3.3 ADJUSTING
A. Operation: Rehang or replace doors that do not swing or operate freely.
B. Finished Doors: Replace doors that are damaged or that do not comply with requirements.
Doors may be repaired or refinished if Work complies with requirements and shows no evidence of repair or refinishing.
END OF SECTION 081416
Addendum #1 Issued March 3, 2021
FLUSH WOOD DOORS
081416 - 5
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
Issued March 3, 2021
FLUSH WOOD DOORS
081416 - 6
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 1 OF 2
SECTION 083113 - ACCESS DOORS AND FRAMES
1.1 SUMMARY
A. This Section includes the following:
1. Access doors and frames for walls and ceilings.
1.2 SUBMITTALS
A. Product Data: For each type of access door and frame indicated. Include construction details, fire ratings, materials, individual components and profiles, and finishes.
B. Shop Drawings: Show fabrication and installation details of access doors and frames for each type of substrate. Include plans, elevations, sections, details, and attachments to other work.
1.3 QUALITY ASSURANCE
A. Source Limitations: Obtain access door(s) and frame(s) through one source from a single manufacturer.
B. Size Variations: Obtain Contracting Officer's acceptance of manufacturer's standard-size units, which may vary slightly from sizes indicated.
1.4 COORDINATION
A. Verification: The Contractor shall coordinate with all subcontractors to determine specific locations and sizes for access doors needed to gain access to all service and maintenance points of concealed plumbing, mechanical, electrical, control, moving parts, or other concealed work, and indicate in the schedule specified in "Submittals" Article.
PART 2 - PRODUCTS
2.1 STEEL MATERIALS
A. Steel Sheet: Uncoated cold-rolled steel sheet substrate complying with ASTM A 1008/A 1008M, Commercial Steel (CS), exposed.
Addendum #1 Issued…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .