ATTACHMENT 9 Brand name justification SAT Best Door hardware_Redacted.pdf
PDF 85 KB Posted
- Solicitation number
- W50S87-21-B-5005
About this file
This document contains a justification for a brand name sole source procurement and the related federal contract solicitation. The justification provides details on a project to add and alter a small air terminal building at an Air National Guard base in North Carolina, requiring Best brand door hardware cores to maintain the base standard and ensure compatibility. The solicitation is identified as number W50S87-21-B-5005 issued by the Department of the Army for the 145th Airlift Wing. Interested vendors are encouraged to attend a pre-bid conference on June 2, 2021 to learn more about the opportunity, which will be set aside for small businesses and posted on SAM.gov.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control No: 07-21a Program/Equipment: Add Alter Small Air Terminal Bldg. 5 – W50S87-21-B-5005
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
JUSTIFICATION REVIEW DOCUMENT
FAR PART 6 JUSTIFICATION AND APPROVAL FOR OTHER THAN
FULL AND OPEN COMPETITION
Program/Equipment: Add Alter Small Air Terminal Bldg. 5 construction project, Solicitation number W50S87-21-B-5005, Best - door hardware
Authority: 10 U.S.C. 2304(c)(1) as implemented by FAR Part 6.302-1 – Only one responsible source and no other supplies or services will satisfy agency requirements.
Reviews: I have reviewed this justification and find it adequate to support other than full and open competition.
Program Manager:
Name: Lemuel J. Rios Title: Program Director/Contracting Officer Representative
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
FAR Part 6 Justification and Approval for Other than
Full and Open Competition
1. Contracting Activity: 145th Airlift Wing MSG/MSC
2. Description of Action: 145th Civil Engineer Squadron requests the inclusion of brand name Best equipment in solicitation W50S87-21-B-5005 for the Add/Alter Small Air Terminal project at the 145th Airlift Wing located in Charlotte, NC. The Government projects award for 2021 and a combination of fiscal year 2021 Operations and Maintenance and Military Construction funds will be used.
3. Description of Supplies/Services: The item required to be brand name is Best Cormax Door Hardware Cores. These are the door hardware cores that will be installed on all doors of the facility.
4. Authority Cited: 10 U.S.C. 2304(c)(1), as implemented by FAR 6.302-1, Only one responsible source and no other supplies or services will satisfy agency requirements.
5. Reason for Authority Cited: As described at FAR 6.302-1(a)(2), when the supplies or services required by the agency are available only from one responsible source, or for DoD, NASA and the Coast Guard, from only one or a limited number of responsible sources, and no other types of supplies or services will satisfy agency requirements, full and open competition need not be provided for. As further described in FAR 6.302-1(c), an acquisition or portion of an acquisition that uses a brand-name description or other purchase description to specify a particular brand-name, product, or feature of a product, peculiar to one manufacturer does not provide for full and open competition, regardless of the number of sources solicited; and shall be justified and approved in accordance with FAR 6.303 and 6.304.
The 145th Airlift Wing currently employs base standards in door hardware cores to reduce cost for the maintenance and repair of existing facilities. Additionally, maintaining a base standard for door hardware cores keeps key duplication cost down, while providing emergency services (security forces, fire department, and civil engineers) with a single grand master key that will open all facilities in case of an emergency. There are currently 36 buildings at the 145th Airlift Wing, all of which contain the Best door hardware cores. To install other manufacturer's door hardware cores would require substantial duplication of cost to the Government not expected to be recovered through competition. In addition, unacceptable delays in fulfilling the agency’s requirements would result. Converting the entire installation to new door hardware is estimated to cost .
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
6. Efforts to Obtain Competition: As this is a brand name requirement, this justification will be included with the solicitation as required by FAR 5.102(a)(6).
Solicitation W50S87-21-B-5005 for the subject project will be issued as a small business set-aside and will be posted through the Government-wide point of entry located at www.beta.sam.gov.
7. Actions to Increase Competition: The Government will continue to seek out vendors proposing cost-effective solutions that meet the Government's needs.
Additionally, we will continue to conduct market research to find equipment/systems that are not proprietary in nature.
8. Market Research: For the reasons stated in paragraph 5, it is unreasonable to consider switching to another door hardware. For this reason, no additional market research was conducted.
9. Interested Sources: Not applicable
10.Other Facts: All recent construction projects which include the installation of doors and the associated hardware include the Best door hardware cores.
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
11.Technical/Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
Typed Name: Date:
Title: Signature:
12.Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable.
This determination will be made using the following: cost analysis price analysis should cost IGCE audit: other:
As a part of this basis, certified cost or pricing data:
will be required.
will not be required and the following exception applies (FAR 15.403): The estimated cost of the contract action is less than the threshold for certified cost or pricing data.
13. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Typed Name: Date:
Title: Signature:
File details come from the government source that posted it. Updated .