This solicitation is for a 145 Airlift Wing addition and alteration to a small air terminal building. Key details include the project involves constructing additions and making alterations to an existing small air terminal building. The pre-bid conference will be held on June 2, 2021 at 1:00pm EDT. Bids are due by June 21, 2021. The solicitation, drawings, specifications and attachments provide additional details on the project requirements. The federal agency involved is the Department of the Army North Carolina Army National Guard.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 221319.13 - SANITARY DRAINS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Floor drains.
2. Floor sinks.
1.3 DEFINITIONS
A. ABS: Acrylonitrile-butadiene styrene.
B. FRP: Fiberglass-reinforced plastic.
C. HDPE: High-density polyethylene.
D. PE: Polyethylene.
E. PP: Polypropylene.
F. PVC: Polyvinyl chloride.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
PART 2 - PRODUCTS
2.1 DRAIN ASSEMBLIES
A. Sanitary drains shall bear label, stamp, or other markings of specified testing agency.
Addendum #1 Issued March 3, 2021
SANITARY DRAINS
221319.13 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
FJRP052994 SMALL AIR TERMINAL
FJRP199040 AIR DROP FACILITY
B. Comply with NSF 14 for plastic sanitary piping specialty components.
2.2 FLOOR DRAINS
A. Cast-Iron Floor Drains <FD>:
1. Standard: ASME A112.6.3.
2. Body Material: Gray iron.
3. Seepage Flange: Required.
4. Clamping Device: Required.
5. Outlet: Bottom.
6. Top Dimension, Shape, and Strainer Material and Finish: 5 inch, Round, Nickel bronze with Satin finish.
7. Adjustable Top: Required.
8. Top Loading Classification: Medium Duty.
9. Inlet Fitting: Gray iron, with threaded inlet, and trap seal primer valve tap with plug.
B. Cast-Iron Floor Drains <FD-1A>:
1. Standard: ASME A112.6.3.
2. Body Material: Gray iron.
3. Seepage Flange: Required.
4. Clamping Device: Required.
5. Outlet: Bottom.
6. Top Dimension, Shape, and Strainer Material and Finish: 5 inch, Round, Nickel bronze with Satin finish.
7. Adjustable Top: Required.
8. Top Loading Classification: Medium Duty.
9. Inlet Fitting: Gray iron, with threaded inlet, and barrier trap seal device.
C. Cast-Iron Floor Drains <FD-2A>:
1. Standard: ASME A112.6.3.
2. Body Material: Gray iron.
3. Seepage Flange: Required.
4. Clamping Device: Required.
5. Outlet: Bottom.
6. Top Dimension, Shape, and Strainer Material and Finish: 8 inch, Round, Ductile Iron with durable Paint finish.
7. Adjustable Top: Required.
8. Top Loading Classification: Medium Duty.
9. Inlet Fitting: Gray iron, with threaded inlet, and barrier trap seal device.
Addendum #1 Issued March 3, 2021
SANITARY DRAINS
221319.13 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
2.3 FLOOR SINKS
A. Cast-Iron Floor Sinks <FS>:
1. Standard: ASME A112.6.7.
2. Body Material: Cast iron.
3. Seepage Flange: Required.
4. Clamping Device: Required.
5. Outlet: Bottom.
6. Coating on Interior Surfaces: Acid-resistant enamel.
7. Internal Strainer and Material: Plastic Dome strainer.
8. Top Grate Material: Cast Iron.
9. Top of Body and Grate Finish: Acid-resistant enamel.
10. Sink Shape and Dimensions: Square Top, 12 inch x 12 inch x 6 inches deep.
11. Grate: half-grate.
12. Top Loading Classification: No traffic.
13. Inlet Fitting: Trap seal primer valve tap with plug.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install floor drains at low points of surface areas to be drained. Set grates of drains flush with finished floor, unless otherwise indicated.
1. Position floor drains for easy access and maintenance.
2. Set floor drains below elevation of surrounding finished floor to allow floor drainage.
3. Set with grates depressed according to the following drainage area radii:
a. Radius, 30 Inches or Less: Equivalent to 1 percent slope, but not less than 1/4-inch total depression.
b. Radius, 30 to 60 Inches: Equivalent to 1 percent slope.
c. Radius, 60 Inches or Larger: Equivalent to 1 percent slope, but not greater than
1-inch total depression.
4. Install floor-drain flashing collar or flange, so no leakage occurs between drain and adjoining flooring.
a. Maintain integrity of waterproof membranes where penetrated.
5. Install individual traps for floor drains connected to sanitary building drain, unless otherwise indicated.
Addendum #1 Issued March 3, 2021
SANITARY DRAINS
221319.13 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
B. Install trench drains at low points of surface areas to be drained.
1. Set grates of drains flush with finished surface, unless otherwise indicated.
C. Comply with ASME A112.3.1 for installation of stainless-steel channel drainage systems.
1. Install on support devices, so that top will be flush with adjacent surface.
D. Install FRP channel drainage system components on support devices, so that top will be flush with adjacent surface.
E. Install plastic channel drainage system components on support devices, so that top will be flush with adjacent surface.
F. Install open drain fittings with top of hub 2 inches above floor.
3.2 CONNECTIONS
A. Comply with requirements in Section 221316 "Sanitary Waste and Vent Piping" for piping installation requirements. Drawings indicate general arrangement of piping, fittings, and specialties.
B. Comply with requirements in Section 221319 "Sanitary Waste Piping Specialties" for backwater valves, air admittance devices and miscellaneous sanitary drainage piping specialties.
C. Comply with requirements in Section 221323 "Sanitary Waste Interceptors" for grease interceptors, grease-removal devices, oil interceptors, sand interceptors, and solid interceptors.
D. Install piping adjacent to equipment to allow service and maintenance.
E. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems."
F. Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables."
3.3 LABELING AND IDENTIFYING
A. Distinguish among multiple units, inform operator of operational requirements, indicate safety and emergency precautions, and warn of hazards and improper operations, in addition to identifying unit. Nameplates and signs are specified in Section 220553 "Identification for Plumbing Piping and Equipment."
Addendum #1 Issued March 3, 2021
SANITARY DRAINS
221319.13 - 4
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
3.4 PROTECTION
A. Protect drains during remainder of construction period to avoid clogging with dirt or debris and to prevent damage from traffic or construction work.
B. Place plugs in ends of uncompleted piping at end of each day or when work stops.
END OF SECTION 221319.13
Addendum #1 Issued March 3, 2021
SANITARY DRAINS
221319.13 - 5
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
This Page Intentionally Left Blank
Addendum #1 Issued March 3, 2021
SANITARY DRAINS
221319.13 - 6
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
SECTION 221413 - FACILITY STORM DRAINAGE PIPING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Hub-and-spigot, cast-iron soil pipe and fittings.
2. Hubless, cast-iron soil pipe and fittings.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.4 QUALITY ASSURANCE
A. Piping materials shall bear label, stamp, or other markings of specified testing agency.
1.5 FIELD CONDITIONS
A. Interruption of Existing Storm Drainage Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirements indicated:
1. Notify Construction Manager no fewer than two days in advance of proposed interruption of storm drainage service.
2. Do not proceed with interruption of storm drainage service without Construction Manager's written permission.
Addendum #1 Issued March 3, 2021
FACILITY STORM DRAINAGE PIPING
221413 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Components and installation shall be capable of withstanding the following minimum working pressure unless otherwise indicated:
1. Storm Drainage Piping: 10-foot head of water.
2.2 HUB-AND-SPIGOT, CAST-IRON SOIL PIPE AND FITTINGS
A. Pipe and Fittings:
1. Marked with CISPI collective trademark and NSF certification mark.
2. Class: ASTM A 74, Service class(es).
B. Gaskets: ASTM C 564, rubber.
2.3 HUBLESS, CAST-IRON SOIL PIPE AND FITTINGS
A. Pipe and Fittings:
1. Marked with CISPI collective trademark and NSF certification mark.
2. Standard: ASTM A 888 or CISPI 301.
B. Heavy-Duty, Hubless-Piping Couplings:
1. Standard: ASTM C 1540.
2. Description: Stainless-steel shield with stainless-steel bands and tightening devices; and
ASTM C 564, rubber sleeve with integral, center pipe stop.
PART 3 - EXECUTION
3.1 EARTH MOVING
A. Comply with requirements for excavating, trenching, and backfilling specified in Section 312000 "Earth Moving."
Addendum #1 Issued March 3, 2021
FACILITY STORM DRAINAGE PIPING
221413 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
3.2 PIPING INSTALLATION
A. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems.
1. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations.
2. Install piping as indicated unless deviations from layout are approved on coordination drawings.
B. Install piping in concealed locations unless otherwise indicated and except in equipment rooms and service areas.
C. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
D. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.
E. Install piping to permit valve servicing.
F. Install piping at indicated slopes.
G. Install piping free of sags and bends.
H. Install fittings for changes in direction and branch connections.
I. Install piping to allow application of insulation.
J. Make changes in direction for piping using appropriate branches, bends, and long-sweep bends.
1. Do not change direction of flow more than 90 degrees.
2. Use proper size of standard increasers and reducers if pipes of different sizes are connected.
a. Reducing size of drainage piping in direction of flow is prohibited.
K. Lay buried building piping beginning at low point of each system.
1. Install true to grades and alignment indicated, with unbroken continuity of invert. Place hub ends of piping upstream.
2. Install required gaskets according to manufacturer's written instructions for use of lubricants, cements, and other installation requirements.
3. Maintain swab in piping and pull past each joint as completed.
Addendum #1 Issued March 3, 2021
FACILITY STORM DRAINAGE PIPING
221413 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
L. Install piping at the following minimum slopes unless otherwise indicated:
1. Building Storm Drain: 2 percent downward in direction of flow for piping NPS 3 and smaller; 1 percent downward in direction of flow for piping NPS 4 and larger.
2. Horizontal Storm Drainage Piping: 2 percent downward in direction of flow.
M. Install cast-iron soil piping according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook," Chapter IV, "Installation of Cast Iron Soil Pipe and Fittings."
N. Plumbing Specialties:
1. Install cleanouts at grade and extend to where building storm drains connect to building storm sewers in storm drainage gravity-flow piping.
a. Comply with requirements for cleanouts specified in Section 221423 "Storm Drainage Piping Specialties."
2. Install drains in storm drainage gravity-flow piping.
a. Comply with requirements for drains specified in Section 221423 "Storm Drainage Piping Specialties."
O. Do not enclose, cover, or put piping into operation until it is inspected and approved by authorities having jurisdiction.
P. Install sleeves for piping penetrations of walls, ceilings, and floors.
1. Comply with requirements for sleeves specified in Section 220517 "Sleeves and Sleeve Seals for Plumbing Piping."
Q. Install sleeve seals for piping penetrations of concrete walls and slabs.
1. Comply with requirements for sleeve seals specified in Section 220517 "Sleeves and Sleeve Seals for Plumbing Piping."
R. Install escutcheons for piping penetrations of walls, ceilings, and floors.
1. Comply with requirements for escutcheons specified in Section 220518 "Escutcheons for Plumbing Piping."
3.3 JOINT CONSTRUCTION
A. Hub-and-Spigot, Cast-Iron Soil Piping Gasketed Joints: Join according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook" for compression joints.
Addendum #1 Issued March 3, 2021
FACILITY STORM DRAINAGE PIPING
221413 - 4
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
B. Hubless, Cast-Iron Soil Piping Coupled Joints:
1. Join according to CISPI 310 and CISPI's "Cast Iron Soil Pipe and Fittings Handbook" for hubless-piping coupling joints.
C. Joint Restraints and Sway Bracing:
1. Provide joint restraints and sway bracing for storm drainage piping joints to comply with the following conditions:
a. Provide axial restraint for pipe and fittings 5 inches and larger, upstream and downstream of all changes in direction, branches, and changes in diameter greater than two pipe sizes.
b. Provide rigid sway bracing for pipe and fittings 4 inches and larger, upstream and downstream of all changes in direction 45 degrees and greater.
c. Provide rigid sway bracing for pipe and fittings 5 inches and larger, upstream and downstream of all changes in direction and branch openings.
3.4 INSTALLATION OF HANGERS AND SUPPORTS
A. Comply with requirements for seismic-restraint devices specified in Section 220548 "Vibration and Seismic Controls for Plumbing Piping and Equipment."
B. Comply with requirements for hangers, supports, and anchor devices specified in Section 220529 "Hangers and Supports for Plumbing Piping and Equipment."
1. Install carbon-steel pipe hangers for horizontal piping in noncorrosive environments.
2. Install stainless-steel pipe hangers for horizontal piping in corrosive environments.
3. Install carbon-steel pipe support clamps for vertical piping in noncorrosive environments.
4. Install stainless-steel pipe support clamps for vertical piping in corrosive environments.
5. Vertical Piping: MSS Type 8 or Type 42, clamps.
6. Install individual, straight, horizontal piping runs:
a. 100 Feet and Less: MSS Type 1, adjustable, steel clevis hangers.
b. Longer Than 100 Feet: MSS Type 43, adjustable roller hangers.
c. Longer Than 100 Feet if Indicated: MSS Type 49, spring cushion rolls.
7. Multiple, Straight, Horizontal Piping Runs 100 Feet or Longer: MSS Type 44, pipe rolls.
Support pipe rolls on trapeze.
8. Base of Vertical Piping: MSS Type 52, spring hangers.
C. Install hangers for soil piping, with maximum horizontal spacing and minimum rod diameters, to comply with MSS-58, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.
Addendum #1 Issued March 3, 2021
FACILITY STORM DRAINAGE PIPING
221413 - 5
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
D. Install hangers for piping, with maximum horizontal spacing and minimum rod diameters, to comply with manufacturer's written instructions, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.
E. Support horizontal piping and tubing within 12 inches of each fitting and coupling.
F. Support vertical piping to comply with MSS-58, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent, but as a minimum at base and at each floor.
G. Support vertical piping with manufacturer's written instructions, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.
3.5 CONNECTIONS
A. Drawings indicate general arrangement of piping, fittings, and specialties.
B. Connect interior storm drainage piping to exterior storm drainage piping. Use transition fitting to join dissimilar piping materials.
C. Connect storm drainage piping to roof drains and storm drainage specialties.
1. Install test tees (wall cleanouts) in conductors near floor, and floor cleanouts with cover flush with floor.
D. Where installing piping adjacent to equipment, allow space for service and maintenance.
E. Make connections according to the following unless otherwise indicated:
1. Install unions, in piping NPS 2 and smaller, adjacent to each valve and at final connection to each piece of equipment.
2. Install flanges, in piping NPS 2-1/2 and larger, adjacent to flanged valves and at final connection to each piece of equipment.
3.6 IDENTIFICATION
A. Identify exposed storm drainage piping.
B. Comply with requirements for identification specified in Section 220553 "Identification for Plumbing Piping and Equipment."
Addendum #1 Issued March 3, 2021
FACILITY STORM DRAINAGE PIPING
221413 - 6
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
3.7 FIELD QUALITY CONTROL
A. During installation, notify authorities having jurisdiction at least 24 hours before inspection must be made. Perform tests specified below in presence of authorities having jurisdiction.
1. Roughing-in Inspection: Arrange for inspection of piping before concealing or closing-in after roughing-in.
2. Final Inspection: Arrange for final inspection by authorities having jurisdiction to observe tests specified below and to ensure compliance with requirements.
B. Test storm drainage piping according to procedures of authorities having jurisdiction or, in absence of published procedures, as follows:
1. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired.
a. If testing is performed in segments, submit separate report for each test, complete with diagram of portion of piping tested.
2. Leave uncovered and unconcealed new, altered, extended, or replaced storm drainage piping until it has been tested and approved.
a. Expose work that was covered or concealed before it was tested.
3. Test Procedure:
a. Test storm drainage piping on completion of roughing-in.
b. Close openings in piping system and fill with water to point of overflow, but not less than 10-foot head of water. From 15 minutes before inspection starts until completion of inspection, water level must not drop. Inspect joints for leaks.
4. Repair leaks and defects with new materials and retest piping, or portion thereof, until satisfactory results are obtained.
5. Prepare reports for tests and required corrective action.
C. Piping will be considered defective if it does not pass tests and inspections.
D. Prepare test and inspection reports.
3.8 CLEANING AND PROTECTION
A. Clean interior of piping. Remove dirt and debris as work progresses.
Addendum #1 Issued March 3, 2021
FACILITY STORM DRAINAGE PIPING
221413 - 7
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
B. Protect drains during remainder of construction period to avoid clogging with dirt and debris and to prevent damage from traffic and construction work.
C. Place plugs in ends of uncompleted piping at end of day and when work stops.
3.9 PIPING SCHEDULE
A. Aboveground storm drainage piping NPS 6 and smaller shall be any of the following:
1. Service class, cast-iron soil pipe and fittings; gaskets; and gasketed joints.
2. Hubless, cast-iron soil pipe and fittings; heavy-duty, hubless-piping couplings; and coupled joints.
B. Aboveground, storm drainage piping NPS 8 and larger shall be any of the following:
1. Service class, cast-iron soil pipe and fittings; gaskets; and gasketed joints.
C. Underground storm drainage piping NPS 6 and smaller shall be the following:
1. Service class, cast-iron soil pipe and fittings; gaskets; and gasketed joints.
D. Underground, storm drainage piping NPS 8 and larger shall be the following:
1. Service class, cast-iron soil pipe and fittings; gaskets; and gasketed joints.
END OF SECTION 221413
Addendum #1 Issued March 3, 2021
FACILITY STORM DRAINAGE PIPING
221413 - 8
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
SECTION 221423 - STORM DRAINAGE PIPING SPECIALTIES
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Metal roof drains.
2. Miscellaneous storm drainage piping specialties.
3. Cleanouts.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.4 QUALITY ASSURANCE
A. Drainage piping specialties shall bear label, stamp, or other markings of specified testing agency.
PART 2 - PRODUCTS
2.1 METAL ROOF DRAINS
A. Cast-Iron, Large-Sump, General-Purpose Primary Roof Drains <PRD>:
1. Standard: ASME A112.6.4.
2. Body Material: Cast iron.
3. Dimension of Body: Nominal 14-to 16-inch diameter.
4. Combination Flashing Ring and Gravel Stop: Required.
B. Cast-Iron, Large-Sump, General-Purpose Secondary Roof Drains <SRD>:
Addendum #1 Issued March 3, 2021
STORM DRAINAGE PIPING SPECIALTIES
221423 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
1. Standard: ASME A112.6.4.
2. Body Material: Cast iron.
3. Dimension of Body: Nominal 14-to 16-inch diameter.
4. Combination Flashing Ring and Gravel Stop: Required.
5. Outlet: Bottom.
6. Outlet Type: No hub.
7. Extension Collars: Required.
8. Underdeck Clamp: Required.
9. Dome Material: Cast iron.
10. Water Dam: 2 inches high.
2.2 MISCELLANEOUS STORM DRAINAGE PIPING SPECIALTIES
A. Conductor Nozzles :
1. Description: Bronze body with threaded inlet and bronze wall flange with mounting holes.
2. Size: Same as connected conductor.
2.3 CLEANOUTS
A. Cast-Iron Wall Cleanouts:
1. Standard: ASME A112.36.2M. Include wall access.
2. Size: Same as connected drainage piping.
3. Body: No-hub, cast-iron soil pipe test tee as required to match connected piping.
4. Closure Plug:
a. Brass.
b. Countersunk or raised head.
c. Drilled and threaded for cover attachment screw.
d. Size: Same as, or not more than, one size smaller than cleanout size.
5. Wall Access: Round, deep, chrome-plated bronze cover plate with screw.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install roof drains at low points of roof areas according to roof membrane manufacturer's written installation instructions.
Addendum #1 Issued March 3, 2021
STORM DRAINAGE PIPING SPECIALTIES
221423 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
1. Install flashing collar or flange of roof drain to prevent leakage between drain and adjoining roofing. Maintain integrity of waterproof membranes where penetrated.
2. Install expansion joints, if indicated, in roof drain outlets.
3. Position roof drains for easy access and maintenance.
B. Install conductor nozzles at exposed bottom of conductors where they spill onto grade.
C. Install cleanouts in aboveground piping and building drain piping according to the following instructions unless otherwise indicated:
1. Use cleanouts the same size as drainage piping up to NPS 4. Use NPS 4 for larger drainage piping unless larger cleanout is indicated.
2. Locate cleanouts at each change in direction of piping greater than 45 degrees.
3. Locate cleanouts at minimum intervals of 50 feet for piping NPS 4 and smaller and 100 feet for larger piping.
4. Locate cleanouts at base of each vertical storm piping conductor.
D. For floor cleanouts for piping below floors, install cleanout deck plates with top flush with finished floor.
E. For cleanouts located in concealed piping, install cleanout wall access covers, of types indicated, with frame and cover flush with finished wall.
F. Install test tees in vertical conductors and near floor.
G. Install wall cleanouts in vertical conductors. Install access door in wall if indicated.
3.2 CONNECTIONS
A. Comply with requirements for piping specified in Section 221413 "Facility Storm Drainage Piping." Drawings indicate general arrangement of piping, fittings, and specialties.
3.3 FLASHING INSTALLATION
A. Fabricate flashing from single piece of metal unless large pans, sumps, or other drainage shapes are required.
B. Install sheet flashing on pipes, sleeves, and specialties passing through or embedded in floors and roofs with waterproof membrane.
C. Set flashing on floors and roofs in solid coating of bituminous cement.
D. Secure flashing into sleeve and specialty clamping ring or device.
Addendum #1 Issued March 3, 2021
STORM DRAINAGE PIPING SPECIALTIES
221423 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
3.4 PROTECTION
A. Protect drains during remainder of construction period to avoid clogging with dirt or debris and to prevent damage from traffic or construction work.
B. Place plugs in ends of uncompleted piping at end of each day or when work stops.
END OF SECTION 221423
Addendum #1 Issued March 3, 2021
STORM DRAINAGE PIPING SPECIALTIES
221423 - 4
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
SECTION 221429 - SUMP PUMPS
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Submersible sump pumps.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.
1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For pumps and controls, to include in operation and maintenance manuals.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Retain shipping flange protective covers and protective coatings during storage.
B. Protect bearings and couplings against damage.
C. Comply with manufacturer's written instructions for handling.
Addendum #1 Issued March 3, 2021
SUMP PUMPS
221429 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
B. UL Compliance: Comply with UL 778 for motor-operated water pumps.
2.2 SUBMERSIBLE SUMP PUMPS
A. Submersible, Fixed-Position, Single-Seal Sump Pumps <ESP>:
1. Description: Factory-assembled and -tested sump-pump unit.
2. Pump Type: Submersible, end-suction, single-stage, close-coupled, overhung-impeller, centrifugal sump pump as defined in HI 1.1-1.2 and HI 1.3.
3. Pump Casing: Cast iron, with strainer inlet, legs that elevate pump to permit flow into impeller, and vertical discharge for piping connection.
4. Impeller: Statically and dynamically balanced, ASTM A 532/A 532M, abrasion-resistant cast iron, design for clear wastewater handling, and keyed and secured to shaft.
5. Pump and Motor Shaft: Stainless steel, with factory-sealed, grease-lubricated ball bearings.
6. Seal: Mechanical.
7. Motor: Hermetically sealed, capacitor-start type; with built-in overload protection; lifting eye or lug; and three-conductor, waterproof power cable of length required and with grounding plug and cable-sealing assembly for connection at pump.
8. Controls:
a. Enclosure: NEMA 250, Type 4X; wall mounted.
b. Switch Type: Mechanical-float type, in NEMA 250, Type 6 enclosures with mounting rod and electric cables.
c. High-Water Alarm: Rod-mounted, NEMA 250, Type 6 enclosure with mechanical-float, mercury-float, or pressure switch matching control and electric bell; 120 V ac, with transformer and contacts for remote alarm bell.
9. Control-Interface Features:
a. Remote Alarm Contacts: For remote alarm interface.
b. Building Automation System Interface: Auxiliary contacts in pump controls for interface to building automation system and capable of providing the following:
Addendum #1 Issued March 3, 2021
SUMP PUMPS
221429 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
1) On-off status of pump.
2) Alarm status.
2.3 SUMP-PUMP CAPACITIES AND CHARACTERISTICS
A. Unit Capacity: 50 gpm.
B. Number of Pumps: One.
C. Each Pump:
1. Capacity: 50 gpm.
2. Total Dynamic Head: 14 feet.
3. Discharge Size: 2 NPS.
4. Electrical Characteristics:
a. Motor Horsepower: 1/2 hp.
b. Volts: 120 V ac.
c. Phases: Single.
d. Hertz: 60.
D. Unit Electrical Characteristics:
1. Full-Load Amperes: 8 A.
2. Maximum Overcurrent Protection: 15 A.
2.4 MOTORS
A. Comply with NEMA designation, temperature rating, service factor, enclosure type, and efficiency requirements for motors specified in Section 220513 "Common Motor Requirements for Plumbing Equipment."
1. Motor Sizes: Minimum size as indicated. If not indicated, large enough so driven load will not require motor to operate in service factor range above 1.0.
B. Motors for submersible pumps shall be hermetically sealed.
PART 3 - EXECUTION
3.1 EARTHWORK
A. Excavation and filling are specified in Section 312000 "Earth Moving."
Addendum #1 Issued March 3, 2021
SUMP PUMPS
221429 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
3.2 EXAMINATION
A. Examine roughing-in for plumbing piping to verify actual locations of storm drainage piping connections before sump pump installation.
3.3 INSTALLATION
A. Pump Installation Standards: Comply with HI 1.4 for installation of sump pumps.
3.4 CONNECTIONS
A. Comply with requirements for piping specified in Section 221413 "Facility Storm Drainage Piping." Drawings indicate general arrangement of piping, fittings, and specialties.
B. Where installing piping adjacent to equipment, allow space for service and maintenance.
3.5 FIELD QUALITY CONTROL
A. Manufacturer's Field Service: Engage a factory-authorized service representative to test, inspect, and adjust components, assemblies, and equipment installations, including connections.
B. Perform the following tests and inspections:
1. Perform each visual and mechanical inspection.
2. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist.
3. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.
4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
C. Pumps and controls will be considered defective if they do not pass tests and inspections.
D. Prepare test and inspection reports.
3.6 STARTUP SERVICE
A. Perform startup service.
1. Complete installation and startup checks according to manufacturer's written instructions.
Addendum #1 Issued March 3, 2021
SUMP PUMPS
221429 - 4
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
3.7 ADJUSTING
A. Adjust pumps to function smoothly, and lubricate as recommended by manufacturer.
B. Adjust control set points.
3.8 DEMONSTRATION
A. Train Owner's maintenance personnel to adjust, operate, and maintain controls and pumps.
END OF SECTION 221429
Addendum #1 Issued March 3, 2021
SUMP PUMPS
221429 - 5
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
Issued March 3, 2021
SUMP PUMPS
221429 - 6
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
SECTION 221513 - GENERAL-SERVICE COMPRESSED-AIR PIPING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes piping and related specialties for general-service compressed-air systems:
1. Pipes, tubes, and fittings.
2. Joining materials.
3. Valves.
4. Dielectric fittings.
5. Flexible pipe connectors.
6. Specialties.
7. Quick couplings.
8. Hose assemblies.
B. Related Sections include the following:
1. Section 221519 "General-Service Packaged Air Compressors and Receivers" for general-service air compressors and accessories.
1.3 DEFINITIONS
A. ABS: Acrylonitrile-butadiene-styrene plastic.
B. CR: Chlorosulfonated polyethylene synthetic rubber.
C. EPDM: Ethylene-propylene-diene terpolymer rubber.
D. HDPE: High-density polyethylene plastic.
E. NBR: Acrylonitrile-butadiene rubber.
F. PE: Polyethylene plastic.
G. PVC: Polyvinyl chloride plastic.
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE COMPRESSED-AIR PIPING
221513 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
H. Low-Pressure Compressed-Air Piping: System of compressed-air piping and specialties operating at pressures of 150 psig or less.
1.4 ACTION SUBMITTALS
A. Product Data: For the following:
1. Pipes, fittings, and valves.
2. Dielectric fittings.
3. Flexible pipe connectors.
4. Safety valves.
5. Pressure regulators. Include rated capacities and operating characteristics.
6. Automatic drain valves.
7. Filters. Include rated capacities and operating characteristics.
8. Quick couplings.
9. Hose assemblies.
PART 2 - PRODUCTS
2.1 PIPES, TUBES, AND FITTINGS
A. Copper Tube: ASTM B 88, Type K or L seamless, drawn-temper, water tube.
1. Wrought-Copper Fittings: ASME B16.22, solder-joint pressure type or MSS SP-73, wrought copper with dimensions for brazed joints.
2. Copper Unions: ASME B16.22 or MSS SP-123.
2.2 JOINING MATERIALS
A. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to
ASTM B 813.
B. Brazing Filler Metals: AWS A5.8/A5.8M, BCuP Series, copper-phosphorus alloys for general-duty brazing, unless otherwise indicated.
2.3 VALVES
A. Metal Ball, Butterfly, Check, and Gate Valves: Comply with requirements in Section 220523.12 "Ball Valves for Plumbing Piping," and Section 220523.14 "Check Valves for Plumbing Piping."
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE COMPRESSED-AIR PIPING
221513 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
2.4 DIELECTRIC FITTINGS
A. General Requirements: Assembly of copper alloy and ferrous materials with separating nonconductive insulating material. Include end connections compatible with pipes to be joined.
B. Dielectric Unions:
1. Description:
a. Standard: ASSE 1079.
b. Pressure Rating: 150 psig.
c. End Connections: Solder-joint copper alloy and threaded ferrous.
2.5 FLEXIBLE PIPE CONNECTORS
A. Bronze-Hose Flexible Pipe Connectors: Corrugated-bronze tubing with bronze wire-braid covering and ends brazed to inner tubing.
1. Working-Pressure Rating: 200 psig minimum.
2. End Connections, NPS 2 and Smaller: Threaded copper pipe or plain-end copper tube.
2.6 SPECIALTIES
A. Safety Valves: ASME Boiler and Pressure Vessel Code: Section VIII, "Pressure Vessels," construction; National Board certified, labeled, and factory sealed; constructed of bronze body with poppet-type safety valve for compressed-air service.
1. Pressure Settings: Higher than discharge pressure and same or lower than receiver pressure rating.
B. Air-Main Pressure Regulators: Bronze body, direct acting, spring-loaded manual pressure-setting adjustment, and rated for 250-psig inlet pressure, unless otherwise indicated.
1. Type: Pilot operated.
C. Automatic Drain Valves: Stainless-steel body and internal parts, rated for 200-psig minimum working pressure, capable of automatic discharge of collected condensate. Include mounting bracket if wall mounting is indicated.
D. Mechanical Filters: Two-stage, mechanical-separation-type, air-line filters. Equip with deflector plates, resin-impregnated-ribbon-type filters with edge filtration, and drain cock. Include mounting bracket if wall mounting is indicated.
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE COMPRESSED-AIR PIPING
221513 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
2.7 QUICK COUPLINGS
A. General Requirements for Quick Couplings: Assembly with locking-mechanism feature for quick connection and disconnection of compressed-air hose.
B. Valveless Quick Couplings: Straight-through brass body with stainless-steel or nickel-plated-steel operating parts.
1. Socket End: With O-ring or gasket seal, without valve, and with barbed inlet for attaching hose.
2.8 HOSE ASSEMBLIES
A. Description: Compatible hose, clamps, couplings, and splicers suitable for compressed-air service, of nominal diameter indicated, and rated for minimum working pressure, unless otherwise indicated.
1. Hose: Reinforced single- or double-wire-braid, CR-covered hose for compressed-air service.
PART 3 - EXECUTION
3.1 PIPING APPLICATIONS
A. Low-Pressure Compressed-Air Distribution Piping: Use the following piping materials for each size range:
1. NPS 2 and Smaller: Type K or L, copper tube; wrought-copper fittings; and brazed or soldered joints.
3.2 VALVE APPLICATIONS
A. Metal General-Duty Valves: Comply with requirements and use valve types specified in "Valve Applications" Articles in Section 220523.12 "Ball Valves for Plumbing Piping," and Section 220523.14 "Check Valves for Plumbing Piping," according to the following:
1. Low-Pressure Compressed Air: Valve types specified for low-pressure compressed air.
2. Equipment Isolation NPS 2 and Smaller: Safety-exhaust, copper-alloy ball valve with exhaust vent and pressure rating at least as great as piping system operating pressure.
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE COMPRESSED-AIR PIPING
221513 - 4
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
3.3 PIPING INSTALLATION, GENERAL
A. Drawing plans, schematics, and diagrams indicate general location and arrangement of compressed-air piping. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, air-compressor sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.
B. Install piping concealed from view and protected from physical contact by building occupants, unless otherwise indicated and except in equipment rooms and service areas.
C. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited, unless otherwise indicated.
D. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal and to coordinate with other services occupying that space.
E. Install piping adjacent to equipment and machines to allow service and maintenance.
F. Install air and drain piping with 1 percent slope downward in direction of flow.
G. Install nipples, flanges, unions, transition and special fittings, and valves with pressure ratings same as or higher than system pressure rating, unless otherwise indicated.
H. Equipment and Specialty Flanged Connections:
1. Use cast-copper-alloy companion flange with gasket and brazed or soldered joint for connection to copper tube. Do not use soldered joints for connection to air compressors or to equipment or machines producing shock or vibration.
I. Flanged joints may be used instead of specified joint for any piping or tubing system.
J. Extended-tee outlets with brazed branch connection may be used for copper tubing, within extruded-tee connection diameter to run tube diameter ratio for tube type, according to Extruded Tee Connections Sizes and Wall Thickness for Copper Tube (Inches) Table in ASTM F 2014.
K. Install eccentric reducers where compressed-air piping is reduced in direction of flow, with bottoms of both pipes and reducer fitting flush.
L. Install branch connections to compressed-air mains from top of main. Provide drain leg and drain trap at end of each main and branch and at low points.
M. Install thermometer and pressure gage on discharge piping from each air compressor and on each receiver. Comply with requirements in Section 220519 "Meters and Gages for Plumbing Piping."
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE COMPRESSED-AIR PIPING
221513 - 5
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
N. Install piping to permit valve servicing.
O. Install piping free of sags and bends.
P. Install fittings for changes in direction and branch connections.
Q. Install sleeves for piping penetrations of walls, ceilings, and floors. Comply with requirements for sleeves specified in Section 220517 "Sleeves and Sleeve Seals for Plumbing Piping."
R. Install escutcheons for piping penetrations of walls, ceilings, and floors. Comply with requirements for escutcheons specified in Section 220518 "Escutcheons for Plumbing Piping."
3.4 JOINT CONSTRUCTION
A. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.
C. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.
2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.
D. Brazed Joints for Copper Tubing: Join according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter.
E. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Join according to ASTM B 828 or CDA's "Copper Tube Handbook."
F. Dissimilar Metal Piping Material Joints: Use dielectric fittings.
3.5 VALVE INSTALLATION
A. General-Duty Valves: Comply with requirements in Section 220523.12 "Ball Valves for Plumbing Piping," and Section 220523.14 "Check Valves for Plumbing Piping."
B. Install shutoff valves and unions or flanged joints at compressed-air piping to air compressors.
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE COMPRESSED-AIR PIPING
221513 - 6
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
C. Install shutoff valve at inlet to each automatic drain valve, filter, lubricator, and pressure regulator.
D. Install check valves to maintain correct direction of compressed-air flow to and from compressed-air piping specialties and equipment.
3.6 DIELECTRIC FITTING INSTALLATION
A. Install dielectric fittings in piping at connections of dissimilar metal piping and tubing.
B. NPS 2 and Smaller: Use dielectric unions.
3.7 FLEXIBLE PIPE CONNECTOR INSTALLATION
A. Install flexible pipe connectors in discharge piping of each air compressor.
B. Install bronze-hose flexible pipe connectors in copper compressed-air tubing.
3.8 SPECIALTY INSTALLATION
A. Install safety valves on receivers in quantity and size to relieve at least the capacity of connected air compressors.
B. Install air-main pressure regulators in compressed-air piping at or near air compressors.
C. Install automatic drain valves on aftercoolers, receivers, and dryers. Discharge condensate onto nearest floor drain.
D. Install mechanical filters in compressed-air piping at or near air compressors and downstream from coalescing filters. Mount on wall at locations indicated.
E. Install quick couplings at piping terminals for hose connections.
F. Install hose assemblies at hose connections.
3.9 CONNECTIONS
A. Install unions, in piping NPS 2 and smaller, adjacent to each valve and at final connection to each piece of equipment and machine.
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE COMPRESSED-AIR PIPING
221513 - 7
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
3.10 HANGER AND SUPPORT INSTALLATION
A. Comply with requirements in Section 220548 "Vibration and Seismic Controls for Plumbing Piping and Equipment" for seismic-restraint devices.
B. Comply with requirements in Section 220529 "Hangers and Supports for Plumbing Piping and Equipment" for pipe hanger and support devices.
C. Vertical Piping: MSS Type 8 or 42, clamps.
D. Individual, Straight, Horizontal Piping Runs:
1. 100 Feet or Less: MSS Type 1, adjustable, steel clevis hangers.
2. Longer Than 100 Feet: MSS Type 43, adjustable roller hangers.
E. Multiple, Straight, Horizontal Piping Runs 100 Feet or Longer: MSS Type 44, pipe rolls.
Support pipe rolls on trapeze.
F. Base of Vertical Piping: MSS Type 52, spring hangers.
G. Support horizontal piping within 12 inches of each fitting and coupling.
H. Rod diameter may be reduced 1 size for double-rod hangers, with 3/8-inch minimum rods.
I. Install hangers for copper tubing with the following maximum horizontal spacing and minimum rod diameters:
1. NPS 1/4: 60 inches with 3/8-inch rod.
2. NPS 3/8 and NPS 1/2: 72 inches with 3/8-inch rod.
3. NPS 3/4: 84 inches with 3/8-inch rod.
4. NPS 1: 96 inches with 3/8-inch rod.
5. NPS 1-1/4: 108 inches with 3/8-inch rod.
6. NPS 1-1/2: 10 feet with 3/8-inch rod.
7. NPS 2: 11 feet with 3/8-inch rod.
J. Install supports for vertical copper tubing every 10 feet.
3.11 LABELING AND IDENTIFICATION
A. Install identifying labels and devices for general-service compressed-air piping, valves, and specialties. Comply with requirements in Section 220553 "Identification for Plumbing Piping and Equipment."
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE COMPRESSED-AIR PIPING
221513 - 8
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
3.12 FIELD QUALITY CONTROL
A. Perform field tests and inspections.
B. Tests and Inspections:
1. Piping Leak Tests for Metal Compressed-Air Piping: Test new and modified parts of existing piping. Cap and fill general-service compressed-air piping with oil-free dry air or gaseous nitrogen to pressure of 50 psig above system operating pressure, but not less than 150 psig. Isolate test source and let stand for four hours to equalize temperature. Refill system, if required, to test pressure; hold for two hours with no drop in pressure.
2. Repair leaks and retest until no leaks exist.
3. Inspect filters and pressure regulators for proper operation.
C. Prepare test reports.
END OF SECTION 221513
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE COMPRESSED-AIR PIPING
221513 - 9
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
Issued March 3, 2021
GENERAL-SERVICE COMPRESSED-AIR PIPING
221513 - 10
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
SECTION 221519 - GENERAL-SERVICE PACKAGED AIR COMPRESSORS AND RECEIVERS
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Lubricated, reciprocating air compressors.
2. Inlet-air filters.
1.3 DEFINITIONS
A. Actual Air: Air delivered from air compressors. Flow rate is delivered compressed air measured in acfm.
B. Standard Air: Free air at 68 deg F and 1 atmosphere before compression or expansion and measured in scfm.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Air-Compressor, Inlet-Air-Filter Elements: Equal to 150 percent of amount installed, but no fewer than 2 units.
2. Belts: Two for each belt-driven compressor.
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE PACKAGED AIR COMPRESSORS AND RECEIVERS
221519 - 1
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
1.6 COORDINATION
A. Coordinate sizes and locations of concrete bases with actual equipment provided.
PART 2 - PRODUCTS
2.1 SYSTEM DESCRIPTION
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
B. ASME Compliance: Fabricate and label receivers to comply with ASME Boiler and Pressure Vessel Code.
2.2 GENERAL REQUIREMENTS FOR PACKAGED AIR COMPRESSORS AND RECEIVERS
A. General Description: Factory-assembled, -wired, -piped, and -tested; electric-motor-driven;
air-cooled; continuous-duty air compressors and receivers that deliver air of quality equal to intake air.
B. Control Panels: Automatic control station with load control and protection functions. Comply with NEMA ICS 2 and UL 508.
1. Enclosure: NEMA ICS 6, Type 12 control panel unless otherwise indicated.
2. Instrumentation: Include discharge-air pressure gage, air-filter maintenance indicator, hour meter, compressor discharge-air and coolant temperature gages, and control transformer.
3. Alarm Signal Device: For connection to alarm system to indicate when backup air compressor is operating.
C. Receivers: Steel tank constructed according to ASME Boiler and Pressure Vessel Code:
Section VIII, Division 1.
1. Pressure Rating: At least as high as highest discharge pressure of connected compressors, and bearing appropriate code symbols.
2. Interior Finish: Corrosion-resistant coating.
3. Accessories: Include safety valve, pressure gage, drain, and pressure-reducing valve.
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE PACKAGED AIR COMPRESSORS AND RECEIVERS
221519 - 2
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
2.3 LUBRICATED, RECIPROCATING AIR COMPRESSORS
A. Compressor(s): Lubricated, reciprocating-piston type with lubricated compression chamber and crankcase.
1. Submerged gear-type oil pump.
2. Oil filter.
3. Combined high discharge-air temperature and low lubrication-oil pressure switch.
4. Belt guard totally enclosing pulleys and belts.
B. Capacities and Characteristics:
1. Air Compressor(s): One; single stage.
2. Standard-Air Capacity of Each Air Compressor: 11.3 scfm free air.
3. Discharge-Air Pressure: 135 psig.
4. Mounting: Tank mounted.
5. Motor (Each Air Compressor):
a. Horsepower: 3.
6. Electrical Characteristics:
a. Volts: 208.
b. Phase(s): Single.
c. Hertz: 60.
7. Receiver: ASME construction steel tank.
a. Arrangement: Vertical.
b. Capacity: 60 gal..
c. Interior Finish: Epoxy coating.
d. Pressure Rating: 250 psig minimum.
e. Pressure Relief Valve Setting: 135 psig.
f. Drain: Manual valve.
2.4 INLET-AIR FILTERS
A. Description: Combination inlet-air filter-silencer, suitable for remote installation, for each air compressor.
1. Construction: Weatherproof housing for replaceable, dry-type filter element, with silencer tubes or other method of sound reduction.
Addendum #1 Issued March 3, 2021
GENERAL-SERVICE PACKAGED AIR COMPRESSORS AND RECEIVERS
221519 - 3
NORTH CAROLINA ANG
CHARLOTTE, NC VOLUME 2 OF 2
2. Capacity: Match capacity of air compressor, with filter having collection efficiency of 99 percent retention of particles larger than 10 micrometers.
PART 3 - EXECUTION
3.1 EQUIPMENT INSTALLATION
A. Equipment Mounting:
1. Install air compressors on cast-in-place concrete equipment base(s). Comply with requirements for equipment bases and foundations specified in Section 033000 "Cast-in-Place Concrete."
2. Comply with requirements for vibration isolation devices specified in Section 220548.13 "Vibration Controls for Plumbing Piping and Equipment."
B. Install compressed-air equipment anchored to substrate.
C. Arrange equipment so controls and devices are accessible for servicing.
D. Maintain manufacturer's recommended clearances for service and maintenance.
E. Install the following devices on compressed-air equipment:
1. Thermometer, Pressure Gage, and Safety Valve: Install on each compressed-air receiver.
2. Pressure Regulators: Install downstream from…