ATTACHMENT 6 DRAWINGS 145 AW Air Drop Facility Vol 2 of 2.pdf
PDF 4 MB Posted
- Solicitation number
- W50S87-21-B-5005
About this file
This solicitation seeks bids for an add/alter project to convert Small Air Terminal Building 5 at the 145th Airlift Wing in North Carolina into a cargo air drop facility. Key details include converting the existing building into a 12,000 square foot facility to support air drop operations. The pre-bid conference will be held on June 2nd. Bids are due by June 18th and the contract is expected to be awarded by August 2021. The project involves structural modifications, new HVAC, electrical and plumbing systems. The estimated price range is $1-5 million. The solicitation is set aside for small businesses. The Army National Guard is the contracting agency.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2'-6"
4"
1'-2"
2"
1/
2"
PRECAST OR SITE CAST
CONCRETE SPLASH
BLOCK - SET TO INSURE
SLOPE TO DRAIN AWAY
FROM BLDG.
DIMENSION IS 1/2" MIN.
WIDER THAN DOWNSPOUT
SLOPE
SECTION
SIDE VIEW
SSMR1
MOUNTING
PLATE
MOUNTING
CLAMP
SSMR1
MOUNTING PLATE
MOUNTING
CLAMP
PVC ROOFING
SYSTEM
FLASHING MEMBRANE
CLAMPING RING BUTYL SEALANT UNDER
MEMBRANE AT
CLAMPING RING
PRIMARY DRAIN
SUMP
DRAIN PIPE
STRAINER
DECK PLATE
WITH SECURING
BRACKETS
1 1/2" STEEL DECKING
1/2"COVER
BOARD
OVERFLOW DRAIN
ON HIGH SIDE OF ROOF SLOPE
6" - 16 GAUGE CFMF STUDS (2" LEGS)
CLIP AT 12" OC
(PROVIDE BATT INSULATION INFILL)3 LAYERS OF 2"
RIGID INSULATION
1" M
IN
PRE-MOLDED PIPE SEAL
COVER, BUTYL
ADHESIVE TO ATTACH
TO ROOF SURFACE
STAINLESS STEEL
HOSE CLAMP
BUTYL SEALANT
PIPE OR VENT
PENETRATION
VENT CAP
1/2" COVER BOARD
3 LAYERS OF 2"
RIGID INSULATION
PVC ROOFING
SYSTEM
1 1/2" STEEL DECKING
ELEVATION SECTION A-A
A
A
BACKER ROD &
SEALANT 12
" M
AX
. W
IT
H O
U T
SU
PP
O R
T
(MV1) MODULAR
BRICK VENEER
INTERIOREXTERIOR
CONT SEALANTCONT SEALANT
1' - 3"
PVC ROOFING SYSTEM
MOUNTING BASE, ADHERE
PER MANUFACTURER'S
RECOMMENDATIONS.
MEMBRANE
PROTECTION PAD, SET
IN FLASHING CEMENT.
ADJUSTABLE HEIGHT PIPE
SUPPORT - SIM: MIRO MODEL
16, SECURE TO MEMBRANE
PROTECTION PAD PER
MANUFACTURER'S
RECOMMENDATIONS
PIPE CLAMP
1/
4" M
IN
7" M
AX
1 1/2" STEEL DECKING
GROMMETED FASTENER 12" OC
1 1/2" STEEL DECK
PREFABRICATED
RAISED METAL CURB
TREATED 2X
WOOD BLOCKING
8"
FLASHING MEMBRANE
PVC ROOFING SYSTEM
1/2" COVER BOARD
FLASHING STRIP
HOT-AIR WELDED
6" - 16 GAUGE CFMF STUDS (2"
LEGS) CLIP AT 12" OC
(PROVIDE BATT INSULATION
INFILL)
3 LAYERS OF 2" RIGID
INSULATION
AIR HANDELING UNIT
RE: MECHANICAL
1 1/2"x 14GA
SQUARE TUBE
STEEL ANGLE
RE:STRUCTURAL
GALVANIZED CAP
FLASHING
1 1/2" STEEL DECKING
PRE-MANUFACTURED
RAIL BY OTHERS, RE:
MECHANICAL
FLASHING MEMBRANE
PVC ROOFING
SYSTEM
1" INSULATION
WOOD NAILER
5 1/2"
1/2" PROTECTION BOARD
3 LAYERS OF 2"
RIGID INSULATION
GROUND FLOOR
100' - 0"
A'
EXISTING SLAB
ON GRADE
GROUT FILL
CELLULAR WEEPS AT
24" OC WITH MEMBRANE
THROUGH FLASHING
MORTAR CONTROL MESH
N
EW
W
AL
L
IN
FI
LL
7' -4
EXISTING
MASONRY WALL
10"
8" CMU
FLUID APPLIED
AIR/WATER BARRIER
EXISTING SMALL AIR
TERMINAL (SAT)
GROUND FLOOR LEVEL
8"
EX
IS
TI
N G
M
AS
O N
R Y
W
AL
L
PAINT NEW BRICK
INFILL TO MATCH
EXISTING MASONRY
WALL COLOR & FINISH
PAINT EXISTING
MASONRY WALL AS
SCHEDULED
NEW CONCRETE SLAB
EXPANSION MATERIAL
WATERPROOFING
CONT SEALANT
AA
2" EXPANSION JOINT
EXISTING MASONRY
WALL
NEW CONSTRUCTION
(MV1) MODULAR BRICK
VENEER
8" CFMF
1" RIGID INSULATION
BOARD
FLUID APPLIED
AIR/WATER BARRIER
5/8" GYP BD
EX
IS
TI
N
G B
U
IL
D
IN
G
1'
4" 8"
EXISTING
STRUCTURE
SEALANT
AE504A
NEW CONSTRUCTION
1" RIGID INSULATION BOARD
FLUID APPLIED
AIR/WATER BARRIER
8" CMU
EXISTING WALL
NEW BRICK VENEER TO MATCH
EXISTING. PAINT BRICK VENEER
COLOR & FINISH TO MATCH
ADJACENT PAINTED BRICK
VENEER FINISH
3'-4"SEALANT
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\ses\D o cum ents\M y
R evit\91200_Arch_S
ES15.rvt 3/10/2021
4:46: 58
PM
MARCH 3, 2021
DETAILS
AE504A
DLM
JDB
MBP
SCALE: 1 1/2" = 1'-0"
SPLASH BLOCK DETAIL6
SCALE: 3" = 1'-0"
FALL PROTECTION MOUNTING DETAIL7
SCALE: 3" = 1'-0"
ROOF DRAIN DETAIL1 SCALE: 3" = 1'-0"
PIPE PENETRATION DETAIL2
SCALE: 3" = 1'-0"
PIPE PENTRATION DETAIL - BRICK8
SCALE: 3" = 1'-0"
PIPE SUPPORT DETAIL4
SCALE: 3" = 1'-0"
CURB DETAIL3
SCALE: 3" = 1'-0"
EQUIPMENT RAIL DETAIL5
6" 1'-6"1'0
1 1/2" = 1'-0"
3" 9"6"0
3" = 1'-0"
SCALE: 1 1/2" = 1'-0"
WALL SECTION9
SCALE: 1 1/2" = 1'-0"
PLAN DETAIL10
1194911949
D O
O R
H
EI
G H
T
DOOR WIDTH
SFX STEEL, EXTERIOR
SFI STEEL, INTERIOR
D O
O R
H
EI
G H
T
DOOR WIDTH
OCDX OVERHEAD COILING DOOR, EXTERIOR
D O
O R
H
EI
G H
T
DOOR WIDTH
GLAZING
REF DOOR
SCHEDULE
FOR TYPE
SGX STEEL, EXTERIOR S2 STEEL
D O
O R
H
EI
G H
T 2"
2" 2" 2" 2"DOOR WIDTH DOOR WIDTH
D2 STEEL
D O
O R
H
EI
G H
T 2"
S4 STEEL
D O
O R
H
EI
G H
T 4"
2" 2"DOOR WIDTH 2" 2"DOOR WIDTH
D4 STEEL
D O
O R
H
EI
G H
T 4"
2"
SCHEDULED FRAME
RUNNER TRACK
(PROVIDE STUD BOX
HEADER FOR OPENINGS
MORE THAN 3'-0" WIDE)1/2"
CONT SEALANT
BOTH SIDES
1/2"
PARTITION TYPE PER
FLOOR PLANS
EQ EQ
CONT SEALANT BOTH SIDES
SCHEDULED
FRAMEDOUBLE JAMB STEEL STUDS
TYP AT ALL JAMBS (CLIP
TOGETHER AT 12" OC VERT)
FRAME ANCHOR
PERPENDICULAR
PARTITIONS PER
FLOOR PLANS
4" MIN 2"
1/ 2"
1/ 2"
EQ
EQ
PARTITION TYPE
PER FLOOR PLANS
2" 3'
8"
2"
2" 3' - 0" 2"
TYP NOTE
HEAD
JAMB
SILL
A
7/AE602A
8/AE602A
9/AE602A
100'-0"
FINISH FLOOR
A
W1
TYP NOTE
HEAD
JAMB
SILL
W1
1/AE502A
7/AE502A
2/AE502A
141'-6"
TOP SILL
7'
8"
29'-4"
EQ EQ EQEQ
W2
TYP NOTE
HEAD
JAMB
SILL
W2
1/AE502A
7/AE502A
2/AE502A
143'-4"
TOP SILL
21' - 4"
'-8
7' -8
EQ EQ EQ
W4
TYP NOTE
HEAD
JAMB
SILL
W4
1/AE502A
7/AE502A
2/AE502A
'-8
29' - 4"
141'-6"
TOP SILL
EQ EQ EQ EQ
W3
TYP NOTE
HEAD
JAMB
SILL
W3
1/AE502A
7/AE502A
2/AE502A
141'-6"
TOP SILL
21'-4"
EQ EQ EQ
1 1/2" CURB
EXTRUDED
ALUMINUM FRAME
18 GA GALVANIZED
STEEL CURB
1 1/2" STEEL DECK
PVC ROOFING SYSTEM
1/2" COVER BOARD
FLASHING STRIP
HOT-AIR WELDED
6" - 16 GA CFMF STUDS
(2" LEGS) CLIP AT 12" OC
(PROVIDE BATT
INSULATION INFILL)
3 LAYERS OF 2" RIGID
INSULATION
STEEL ANGLE RE :
STRUCTURAL
1 1/2"x 14GA
SQUARE TUBE
EXTERIOR DOME SKYLIGHT
1' -3
1'-11"
1' -3
4'-1"
107' - 10 1/2" 114' - 9 7/8"
3'-0"
3' -9
TYP NOTE
HEAD
JAMB
SILL
4/AE503A
5/AE503A
TYP NOTE
HEAD
JAMB
SILL
4/AE503A
5/AE503A
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\ses\D o cum ents\M y
R evit\91200_Arch_S
ES15.rvt 3/10/2021
4:46: 04
PM
MARCH 3, 2021
SCHEDULES AND GLAZING
ELEVATIONS
AE601A
DLM
JDB
MBP
DOOR SCHEDULE
MARK
DOOR
STC
FRAME
DOOR
HARDWARE DOOR SCHEDULE NOTES
SIZE DOOR
TYPE TYPE
DETAIL
WD HGT THK HEAD JAMB SILL
101AA 6' - 0" 7' - 0" 1 3/4" (2)SFX D4 4/AE602 5/AE602 6/AE602 C794M 1,2,3,5
102AA 14' - 0" 16' - 0" 3/4" OCDX S2 1/AE602 2/AE602 3/AE602 D001
102AB 14' - 0" 16' - 0" 3/4" OCDX S2 1/AE602 2/AE602 3/AE602 D001
103AA 3' - 0" 7' - 0" 1 3/4" SFX S4 4/AE602 5/AE602 6/AE602 C795 7
103AB 14' - 0" 16' - 0" 3/4" OCDX 1/AE602 2/AE602 3/AE602 D001
103AC 14' - 0" 16' - 0" 3/4" OCDX 1/AE602 2/AE602 3/AE602 D001
106AA 3' - 0" 7' - 0" 1 3/4" SFI S2 3/AE601 4/AE601 301
108AA 3' - 0" 7' - 0" 1 3/4" SFI S2 3/AE601 4/AE601 203
109AA 4' - 0" 7' - 0" 1 3/4" SFX S4 4/AE602 5/AE602 6/AE602 C715
110AA 6' - 0" 7' - 0" 1 3/4" (2)SFX D4 4/AE602 5/AE602 6/AE602 C715
111AA 3' - 0" 7' - 0" 1 3/4" SGX S2 4/AE602 5/AE602 6/AE602 C795 1,2,3,5
112AA 6' - 0" 7' - 0" 1 3/4" (2)SFI D2 3/AE601 4/AE601 6/AE602 D714M
112AB 10' - 0" 10' - 0" 3/4" OCDX 1/AE602 2/AE602 3/AE602 D001
ROOM FINISH SCHEDULE
ROOM
NUMBER ROOM NAME
FLOOR
FINISH
BASE
FINISH
WALL FINISHES CEILING
FINISH
CEILING
HEIGHT
ROOM FINISH
SCHEDULE NOTESNORTH SOUTH EAST WEST
101A STORAGE SC1 RB1 PT4 PT4 PT4 PT4 EXP - PT6 EXP 2
102A PALLET ROLLERS SC1 RB1 PT4 PT4 PT4 PT4 EXP - PT6 EXP 2
103A OFF LOAD SC1 RB1 PT4 PT4 PT4 PT4 EXP - PT6 EXP 2
104A PARACHUTE TABLES SC1 RB1 PT4 PT4 PT4 PT4 EXP - PT6 EXP 2
105A PARACHUTE STRETCHING SC1 RB1 PT4 PT4 PT4 PT4 EXP - PT6 EXP 2
106A TOILET CT4 CT5 CT5/PT4 CT5/PT4 CT5/PT4 CT5/PT4 ACT1 8'-0" 3
107A BREAK SC1 RB1 PT4 PT4 PT4 PT4 ACT1 8'-0" 2
108A JAN SC1 RB1 FRP1/PT4 FRP1/PT4 FRP1/PT4 FRP1/PT4 EXP - PT6 EXP 1
109A ELEC/COMM SC1 RB1 PT4 PT4 PT4 PT4 EXP - PT6 EXP 2
110A FP/MECH SC1 RB1 PT4 PT4 PT4 PT4 EXP - PT6 EXP 2
111A CORRIDOR SC1 RB1 PT4 PT4 PT4 PT4 EXP - PT6 EXP 2
112A DRYING TOWER EP1 EP1 PT4 PT4 PT4 PT4 EXP - PT6 EXP
SCALE: NTS
DOOR TYPES
SCALE: NTS
FRAME TYPES
SCALE: 3" = 1'-0"
HEAD DETAIL4 SCALE: 3" = 1'-0"
JAMB DETAIL5
DOOR SCHEDULE NOTES
1. (CR) CARD READER ACCESS CONTROL.
2. (DS) ELECTRIC DOOR STRIKE.
3. (REX) REQUEST TO EXIT PUSH BUTTON.
4. (HSS) HIGH SECURITY SWITCH
5. MAXIMUM DUTY DOOR - LEVEL 4.
6. EXISTING DOOR TO REMAIN.
7. EMERGENCY EGRESS DOOR. NO EXTERIOR DOOR
HARDWARE.
FINISH SCHEDULE NOTES
1. FRP STOPS AT 4' FROM TOP OF RESILIENT BASE
2. BID OPTION #1: EPOXY FLOOR COATING TO
REPLACE SEALED CONCRETE.
3. TILE INSTALLED TO 5'-0" AFF WITH PAINT ABOVE.
3" 9"6"0
3" = 1'-0"
0 2' 4' 8'
1/4" = 1'-0"
ABBREVIATION LEGEND
ACT ACOUSTIC CEILING TILE
CT CERAMIC TILE
EXP EXPOSED CEILING
FRP FIBERGLASS REINFORCED PANELS
GYP BD GYPSUM BOARD
PL PLASTIC LAMINATE
PT PAINT
RB RESILIENT BASE
SC SEALED CONCRETE
EP1 EPOXY COATED FLOORING
SCALE: 1/4" = 1'-0"
GLAZING ELEVATIONS6
SCALE: 3" = 1'-0"
SKLYLIGHT CURB DETAIL3
SCALE: 1/4" = 1'-0"
LOUVER ELEVATIONS7
BOX HEADER OVER
WINDOW OPENING
CONT SEALANT
ALUM FRAME AND
GLAZING CONT SEALANT &
BACKER ROD
1" RIGID INSULATION
5/8" GYP BD
8" CFMF @ 16" OC
FLUID APPLIED
AIR/WATER BARRIER
(MV1) BRICK VENEER
5 1/2" 4 1/2" 6"
1/4" STEEL BENT
PLATE, PRIME AND
PAINT TO MATCH
BRICK VENEER
1/2" EXTERIOR
SHEATHING
118' - 8"
8" 8"
CAVITY PROTECTION
MATERIAL
CELLULAR WEEPS
@ 32" OC
STAINLESS STEEL
DRIP EDGE
FLEX FLASHING
114'-8"
SILL
8" CFMF @ 16" OC
ALUM WINDOW
FRAME AND GLAZING
(MV1) ROWLOCK
BRICK VENEER
5/8" GYP BD
SEALANT ALL AROUND
1/
2"
SOLID SURFACE
MATERIAL
1/2" PLYWOOD
FLUID APPLIED
AIR/WATER BARRIER
1" RIGID INSULATION
CONT SEALANT &
BACKER ROD
5 1/2" 4 1/2"
8" 8"
6"
1' - 4"
4"X 4X 5/16" ANGLE
1/2" EXTERIOR
SHEATHING
BATT INSULATION
114' - 0"
BRICK JAMB BEYOND
PREFINISHED METAL
FLASHING W/ SEALANT
SEALANT
ALL AROUND
5/8" GYP BD
8" CFMF @ 16" OC
1/2" EXTERIOR
SHEATHING
FLUID APPLIED
AIR/WATER BARRIER
(MV1) BRICK VENEER
CONT SEALANT AND
BACKER ROD
ALUM FRAME AND
GLAZING
1" RIGID INSULATION
6"4 1/2"5 1/2"
1' - 4"
BACKER ROD & CONT
SEALANT, EA. SIDE
SCHEDULED
DOOR & FRAME
1" RIGID INSULATION
5/8" GYP BD
8" CFMF AT 16" OC
TO DECK - INFILL
BETWEEN GIRTS
1/2" EXTERIOR
SHEATHING
CONT SEALANT
(MV1) BRICK VENEER
5" 6" 5"
8" 8"
1/4" STEEL BENT
PLATE, PRIME AND
PAINT TO MATCH
BRICK VENEER
BATT INSULATION
CAVITY PROTECTION
MATERIAL
CELLULAR WEEPS
@ 32" OC
STAINLESS STEEL
DRIP EDGE
FLEX FLASHING
FLUID APPLIED
AIR/WATER BARRIER
STEEL ANGLE JAMB GUIDES
ROLLING DOOR HOOD
OVERHEAD COILING DOOR SLATS
STRUCTURAL STEEL
(MV1) MODULAR
BRICK VENEER
1" RIGID INSULATION
STEEL ANGLE, PRIME
AND PAINT TO MATCH
BRICK VENEER
1/2" EXT SHEATHING
FLUID APPLIED
AIR/WATER BARRIER
CONT SEALANT
1/2" TREATED PLYWOOD
SPRAY FOAM
INSULATION
116' - 0"
BO STEEL
116' - 0"
HEAD R.O
8" 5 1/2"
8"1' - 4"
5/8" WATER RESISTANT
GYP BOARD - PAINTED
CAVITY PROTECTION
MATERIAL
CELLULAR WEEPS
@ 32" OC
STAINLESS STEEL
DRIP EDGE
FLEX FLASHING
(PROVIDE 3/4" DIA HOLES AT
5'-0" OC HORIZONTALLY FOR
SPRAY FOAM INSULATION)
B.2B.2
STRUCTURAL
STEEL
WEATHER SEAL
FLUID APPLIED
AIR/WATER BARRIER
8" CFMF @ 16" OC
1/2" EXTERIOR
SHEATHING
SECTIONAL OH
DOOR GUIDES
SECTIONAL OH DOOR
1" RIGID INSULATION
CONT BACKER ROD
AND SEALANT
(MV1) MODULAR BRICK
VENEER
8" 8" 8"
GALV STEEL ANGLE
ATTACHED TO STRUCTURE
PER MANUFACTURER'S
INSTRUCTIONS
SPRAY FOAM
INSULATION
3' - 6" 1' - 6"
1' - 6"
1'
4"
CL
LC
6" CONCRETE FILLED
STEEL PIPE BOLLARD
1'
4"
5 1/2"
L
C
C
L
1'
4"
6" CONCRETE FILLED
STEEL PIPE BOLLARD
EXTERIOR INTERIOR
EDGE OF
BUILDING SLAB
EDGE OF SLAB DEPRESSION
RE STRUCTURAL 1/SB102
SEALANT
SCHEDULED FRAME
1" RIGID INSULATION
5/8" GYP BD
8" CFMF AT 16" OC TO
DECK - INFILL BETWEEN
GIRTS
1/2" GYP SHEATHING
CONT SEALANT
FLUID APPLIED
AIR/WATER BARRIER
CONT SEALANT
(MV1) MODULAR
BRICK VENEER 5"
6" 5"
1'
4"
BATT INSULATION
B B
SCHEDULED
DOOR
BATT INSULATION
(MV1) MODULAR
BRICK VENEER
STRUCTURAL STEEL
5/8" GYP BD
FLUID APPLIED
AIR/WATER BARRIER
8" CFMF AT 16" OC TO DECK -
INFILL BETWEEN GIRTS
BATT INSULATION
8"
1/2" SHEATHING 1" RIGID
INSULATION
8" 4"
6" 6"
GROUND FLOOR
100' - 0"
CONCRETE SLAB
OVERHEAD COILING
DOOR GUIDES
OVERHEAD
COILING DOOR
1/2"
EXPANSION JOINT
MATERIAL
CONT
SEALANT
1/ 2"
3/
4"PAVEMENT RE:CIVIL
CONT BACKER ROD
AND SEALANT
SCHEDULED DOOR,
PROVIDE 1/2" UNDERCUT
SCHEDULED FRAME BEYOND
4" 1" 1/2"
EDGE OF FOUNDATION
PROVIDE ALUMINUM OFFSET SADDLE
THRESHOLD OR APPROVED EQUAL.
INSTALL IN FULL BED OF SILICONE
SEALANT
OFFSET T.O. SIDEWALK 1/4"
FROM T.O. FOUNDATION
EXPANSION MATERIAL
1/ 2"
M
AX
1/ 4"
1/ 4"
SLOPE
PROVIDE INVERTED ALUMINUM
DOOR SHOE WITH RAIN DRIP
OR APPROVED EQUAL
TERMINATE FLOORING AT
THRESHOLD EDGE
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\ses\D o cum ents\M y
R evit\91200_Arch_S
ES15.rvt 3/10/2021
4:46: 51
PM
MARCH 3, 2021
DOOR DETAILS
AE602A
DLM
JDB
MPB
SCALE: 3" = 1'-0"
HEAD DETAIL7
SCALE: 3" = 1'-0"
SILL DETAIL9
SCALE: 3" = 1'-0"
JAMB DETAIL8
SCALE: 3" = 1'-0"
HEAD DETAIL4
SCALE: 3" = 1'-0"
HEAD DETAIL1
SCALE: 3" = 1'-0"
JAMB DETAIL2
3" 9"6"0
3" = 1'-0"
SCALE: 3" = 1'-0"
JAMB DETAIL5
SCALE: 3" = 1'-0"
PLAN DETAIL10SCALE: 3" = 1'-0"
SILL DETAIL3
SCALE: 3" = 1'-0"
SILL DETAIL6
REF
ELEC/COMM
109A
FP/MECH
110ABREAK
107A
JAN
108A
TOILET
106A
PARACHUTE
STRETCHING
105A
DRYING
TOWER
112A
PARACHUTE
TABLES
104A
STORAGE
101A
PALLET
ROLLERS
102A
OFF LOAD
103A
CORRIDOR
111A
SA.1 TYPE 1
SA.2 TYPE 1
SA.3 TYPE 3 SA.5 TYPE 4
SA.6 TYPE 2 SA.7 TYPE 1
SA.8 TYPE 4
SA.4 TYPE 4
SA.9 TYPE 2
9"
EXIT
REMOVABLE END CAPS,
SILVER
1 1/2" RAISED COPY,
HELVETICA REG, WHITE
1/4" 8 1/2" 1/4"
3"
BACKGROUND, DURADONIC
BROWN
GRADE II BRAILLE
10"
FIRE
RISER
ROOM
1 1/2" COPY HELVETICA REG.,
WHITE8"
EXTERIOR GRADE METAL SIGN W/
RED BACKGROUND
9"
3" 6"
3" 206 1/4" 8 1/2" 1/4"
1'
0"
RESTROOM
REMOVABLE END CAPS,
SILVER
RAISED SYMBOL, WHITE
GRADE II BRAILLE
GRADE II BRAILLE
1 1/2" RAISED COPY,
HELVETICA REG, WHITE
BACKGROUND, DURADONIC
BROWN
BACKGROUND, DURADONIC
BROWN
3/4" RAISED COPY,
HELVETICA REG, WHITE
9"
1/4" 8 1/2" 1/4"
3" 3"
JANITOR
GRADE II BRAILLE
REMOVABLE END CAPS,
SILVER
1 1/2" RAISED COPY,
HELVETICA REG, WHITE
BACKGROUND, DURADONIC
BROWN
3/4" RAISED COPY,
HELVETICA REG, WHITE
GRADE II BRAILLE
9" CENTERLINE OF
TACTILE CHARACTERS
SIGNAGE
EQ EQ
1'
6"
1' - 6"
ELEVATION
PLAN
18"x18" CLEAR FLOOR AREA
CENTERED ON SIGN
4'
0"
9"
SIGNAGE
EQ EQ
1'
6" 1' - 6"
ELEVATION
PLAN
18"x18" CLEAR FLOOR AREA
CENTERED ON CENTERLINE
OF SIGN
4'
0"
LEGEND
EXISTING BUILDING
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\ses\D o cum ents\M y
R evit\91200_Arch_S
ES15.rvt 3/10/2021
4:46: 42
PM
MARCH 3, 2021
SIGNAGE PLAN
IG101A
DLM
TCC
TCC
SCALE: 1/8" = 1'-0"
SIGNAGE PLAN1
0 4' 8' 16'
1/8" = 1'-0"
N
SCALE: 3" = 1'-0"
EXIT - TYPE 12 SCALE: 3" = 1'-0"
FIRE RISER - TYPE 23 SCALE: 3" = 1'-0"
UNISEX RESTROOM - TYPE 34 SCALE: 3" = 1'-0"
ROOM ID - TYPE 45
SCALE: 1/2" = 1'-0"
MOUNTING TYPE - SINGLE DOOR6 SCALE: 1/2" = 1'-0"
MOUNTING TYPE - DOUBLE DOORS - TWO ACTIVE LEAFS7
GENERAL NOTES
A. CONTRACTOR IS TO VERIFY FINAL DIMENSIONS,
MATERIALS, FINISHES, AND ROOM NAMES /
NUMBERS WITH OWNER PRIOR TO
PROCUREMENT OF SIGNAGE.
B. SIGNS MUST MEET ABA REQUIREMENTS
SIGNAGE SCHEDULE
Mark SIGN MESSAGE SIGN TYPE
SA.1 EXIT TYPE 1
SA.2 EXIT TYPE 1
SA.3 RESTROOM TYPE 3
SA.4 BREAK ROOM TYPE 4
SA.5 JANITOR TYPE 4
SA.6 FIRE RISER ROOM TYPE 2
SA.7 EXIT TYPE 1
SA.8 DRYING TOWER TYPE 4
SA.9 ELECTRICAL/ TELECOM TYPE 2
0 1' 2' 4'
1/2" = 1'-0"
3" 9"6"0
3" = 1'-0"
ABBREVIATIONS
............................................................ ABOVE
....................................... ADMINISTRATIVE
.............................. ABOVE FINISHED FLOOR
...................................................... BUILDING
............................... BACKFLOW PREVENTER
....................... CONTINUE, CONTINUATION
............................................... DEPARTMENT
........................................ DETECTOR, DETAIL
.................................................... DUCTILE IRON
................................................. DISCHARGE
................................................. EXTRA HAZARD
................................................. EQUIPMENT
....................................................... FIRE ALARM
FACU
.............. FIRE DEPARTMENT CONNECTION
...................... FIRE PROTECTION, FIRE PUMP
....................................................... FOOT, FEET
................ INSPECTOR'S TEST CONNECTION
.................................................... LIGHT HAZARD
................................................. MECHANICAL
........................................ NORMALLY CLOSED
........................... OUTSIDE STEM AND YOKE
................................. POST INDICATING VALVE
........................................... ORDINARY HAZARD
................................................... PRESSURE
........................... POUNDS PER SQUARE INCH
....................................... REFERENCE, REFER
.................................................... SQUARE FOOT
................................. GALLONS PER MINUTE
............................................................. TYPICAL
.............................................. TEMPERATURE
.................................... UNDERGROUND
............................ WET PIPE, WEATHERPROOF
..................................................................... WITH
........................................................... WITHOUT
........................................................... HAZARD
............................................... NOT APPLICABLE
................................................................ EQUAL
......................... FIRE ALARM ANNUNCIATOR
...................... MASS NOTIFICATION SYSTEM
................................................. NOT TO SCALE
................................................................ SHEET
........................ UNLESS NOTED OTHERWISE
.......................................................... CANDELA
................................................................ FLOOR
.......................................... FIRE DEPARTMENT
..................................................... TRANSMIT
............................................................. SYSTEM
................................................................. PUMP
................................................ SUPERVISORY
............................................................ STATION
.............................................. AUTOMATION
.............................................. INPUT / OUTPUT
................................................... SUPERVISION
........................................................ SCHEDULE
ABV
ADMIN
AFF
BLDG
BFP
.......................... CONNECT, CONNECTION
CONT
DEPT
DET
DI
DISCH
EH
EQUIP
FA
...................... FIRE ALARM CONTROL UNIT
FDC
FP
FT
ITC
LH
MECH
N.C.
OS&Y
PIV
OH
PRESS
PSI
REF
SF
GPM
TYP
TEMP
UGND, UG
WP
W/ W/O
HAZ
NA
EQ
FAA
MNS
NTS
SHT
UNO
CD
FL
FD
TRANS
SYS
PMP
SUPV
STA
AUTO
I / O
........................................ CARBON MONOXIDE
SUP
SCH
CONN
CO
LOC...........................LOCAL OPERATING CONSOLE
PULL DOWN
FIRE ALARM
I R E
F
" M
IN
" M
IN
NOTES:
A. VERIFY EXACT MOUNTING
HEIGHTS WITH PROJECT
REQUIREMENTS. DEVICES MAY
OR MAY NOT APPLY TO THIS
PROJECT. REFER TO PLANS.
B. ALL NEW DEVICES SHALL BE
INSTALLED ACCORDING TO THE
MOUNTING HEIGHTS INDICATED
U.N.O.
AUDIBLE/VISUAL
UNIT
VISUAL
ONLY UNIT
MANUAL PULL
STATION
TOP OF
PULL
STATION
HANDLE
FINISHED FLOOR
I R E
F
I R E
F
AUDIBLE
ONLY UNIT
TEXT SIGN
0"
M
AX
SYMBOL
WALL MOUNTED FIRE ALARM/MNS
SPEAKER/STROBE, XX INDICATES CD
RATING
CEILING MOUNTED FIRE ALARM SPEAKER
CEILING MOUNTED FIRE ALARM/MNS
SPEAKER/STROBE, XX INDICATES CD
RATING
WALL MOUNTED FIRE ALARM SPEAKER
F
C
XX
P
S C
XX
S
DESCRIPTION SYMBOL DESCRIPTION
FIRE ALARM LEGEND
SMOKE DETECTOR TRANSCEIVER ANTENNA
SYMBOL DESCRIPTION
END OF LINE RESISTOREOL
SYMBOL DESCRIPTION
FAA
EMERGENCY TEXT SIGNET
MM MONITOR MODULE
LOC
SPD
FIRE ALARM MANUAL PULL STATION
FIRE ALARM ANNUNCIATOR SURGE PROTECTION DEVICE
LOCAL OPERATING CONSOLE
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\ghg\D o cum ents\M y
R evit\91200_FP_G
G agliardi.rvt
3/9/2021 12:01: 14
PM
MARCH 3, 2021
LEGEND & ABBREVIATIONS
F-001A
LFO
GHG
GHG
FIRE SUPPRESSION
A. PROVIDE AUTOMATIC WET PIPE SPRINKLER
SYSTEM IN ACCORDANCE WITH UFC 3-600-01
REQUIREMENTS WITH DESIGN DENSITY AND
DESIGN AREA FOR THE HAZARD CLASSIFICATION
LISTED IN THE FIRE PROTECTION DESIGN
SCHEDULE.
B. HISTORIC HYDRANT FLOW TEST CONDUCTED
12/09/2019 INDICATED A WATER SUPPLY WITH A
STATIC PRESSURE OF 53 PSI AND RESIDUAL
PRESSURE OF 46 PSI FLOWING 507 GPM.
CONTRACTOR SHALL PERFORM THEIR OWN
HYDRANT FLOW TEST ON WHICH THE HYDRAULIC
CALCULATIONS ARE BASED.
C. THE INSPECTOR'S TEST VALVES SHALL BE
LOCATED NO MORE THAN 7 FEET AFF.
D. ALL HANGERS SHALL BE PROVIDED AND
INSTALLED IN ACCORDANCE WITH NFPA 13.
E. ALL VALVES (DRAINS, INSPECTOR'S TEST,
CONTROL) SHALL BE IDENTIFIED BY SIGNAGE AS
REQUIRED BY NFPA 13.
F. ALL SPRINKLERS SHALL BE INSTALLED IN THE
CENTER OF THE CEILING TILES +/- 6 INCHES.
G. ALL DRAINS AND TEST CONNECTIONS SHALL
DISCHARGE TO THE EXTERIOR OF THE BUILDING
ONTO CONCRETE SPLASH BLOCK OR PAVEMENT.
H. ALL CONTROL VALVES SHALL BE SUPERVISED BY
THE FIRE ALARM SYSTEM.
I. HISTORIC FLOW TEST DATA STATE THAT THE
STATIC PRESSURE IS 53 PSI AND THE RESIDUAL
PRESSURE IS 46 PSI AT 507 GPM. BASE
HYDRAULIC CALCULATIONS OFF OF A RECENT
PUMP OR HYDRANT FLOW TEST.
J. THE VERTICAL INLINE FIRE PUMP FOR THE SMALL
AIR TERMINAL IS RATED AT 60 FOOT OF HEAD AT
TWO HUNDRED AND FIFTY GALLONS PER MINUTE.
K. PROVIDE SPRINKLERS BELOW ALL
OBSTRUCTIONS TO DISCHARGE PER NFPA 13.
L. ALL SYSTEM COMPONENTS SHALL BE U.L. LISTED
OR F.M. APPROVED.
SCALE: NTS
FIRE ALARM MOUNTING HEIGHT DETAIL1
FIRE ALARM
A. FIRE ALARM AND MASS NOTIFICATION DEVICES
SHOWN TO ILLUSTRATE DESIGN INTENT ONLY.
FINAL DEVICE LOCATION AND QUANTITY SHALL BE
DETERMINED BY THE FIRE ALARM & MASS
NOTIFICATION SYSTEM DESIGNER TO PROVIDE
VISUAL AND INTELLIGIBLE COVERAGE PER NFPA
72 AND UFC 4-021-01 REQUIREMENTS.
B. PROVIDE AUTOMATIC FIRE ALARM/MASS
NOTIFICATION SYSTEM WITH VISUAL/AUDIO
NOTIFICATION APPLIANCES IN ACCORDANCE WITH
UFC 3-600-01, UFC 4-021-01, ECB 2018-17, AND
NFPA 72 REQUIREMENTS.
C. VISUAL NOTIFICATION SHALL BE PROVIDED IN ALL
EMPLOYEE WORK, COMMON, AND PUBLIC AREAS.
D. SPEAKERS AND VISUAL NOTIFICATION SHALL BE
PROVIDED THROUGHOUT THE BUILDING FOR
VOICE INTELLIGIBILITY AND OCCUPANT
NOTIFICATION. EXTERIOR SPEAKER SHALL BE
PROVIDED IN PUBLIC AREAS AND ANY AREAS
COMMONLY USED BY OCCUPANTS.
E. COORDINATE SPEAKER LOCATIONS WITH LOC'S IN
ORDER TO PREVENT FEEDBACK.
F. PROVIDE SMOKE DETECTION AT EACH POWER
EXTENDER PANEL.
G. INSTALL SURGE PROTECTION DEVICES
EVERYWHERE FIRE ALARM WIRING ENTERS AND
EXITS THE BUILDING.
H. ALL FIRE ALARM CIRCUITS SHALL BE INSTALLED IN
RED CONDUIT AND SHALL BE SECURELY
FASTENED TO THE STRUCTURE.
I. MANUAL PULL STATIONS SHALL BE PROVIDED AT
THE BUILDING EXITS, AND SHALL BE EASILY
ACCESSIBLE, UNOBSTRUCTED, AND VISIBLE.
J. ALL SYSTEM COMPONENTS SHALL BE U.L. LISTED
OR F.M. APPROVED.
S
S
S
FF
F
F
F
ET
ET
ET
LO
C
1 2 3 4 5 6 7
D
C.3
C
A.7
B
B.2
A
A'
102 103
107 108 109 110 111
WP
WP
WP
SUPPLY NEW WET PIPE FIRE SUPPRESSION
SPRINKLERS AND PIPING FROM EXISTING
FIRE SUPPRESSION MAIN IN THE SMALL AIR
TERMINAL BUILDING. FIELD VERIFY
CONNECTION POINT.
TO WP-1
SPRINKLERS
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\ghg\D o cum ents\M y
R evit\91200_FP_G
G agliardi.rvt
3/9/2021 12:01: 15
PM
MARCH 3, 2021
FIRE PROTECTION FLOOR
PLAN
FP101A
LFO
NRS
NRS
0 4' 8' 16'
1/8" = 1'-0"
N
SCALE: 1/8" = 1'-0"
FIRE PROTECTION FLOOR PLAN1
FIRE PROTECTION DESIGN SCHEDULE
NUMBER NAME HAZARD NOTES
101 STORAGE OH 3
102 PALLET ROLLERS OH
103 OFF LOAD OH
104 PARACHUTE TABLES OH 2
105 PARACHUTE STRETCHING OH
106 TOILET LH
107 BREAK LH
108 JAN OH
109 ELEC/COMM OH 1
110 FP/MECH OH
111 CORRIDOR LH
112 DRYING TOWER OH
NOTES:
1. PROVIDE CONCEALED SIDEWALL SPRINKLERS. DO NOT
ROUTE PIPING INTO THIS ROOM.
2. DO NOT RUN PIPING ABOVE ELECTRICAL EQUIPMENT.
3. DESIGN FIRE SUPPRESSION SYSTEM TO ACCOMMODATE
CLASS IV COMMODITIES STORED ON PALLETS AT 12 FOOT
MAXIMUM IN THIS AREA.
60cd
101110
120VSPD
60cd
60cd
60cd
60cd
60cd
103109110111
BLDG.
EXTERIOR
BLDG.
EXTERIOR
BLDG.
EXTERIOR
EOL
SPD EOL
ETETETEOL
101103111
(EXISTING) FIRE ALARM
CONTROL UNIT (FACU)
ROOM (SMALL AIR
TERMINAL)
15cd
60cd
109 110
15cd 15cd
SYSTEM INPUTS
MANUAL FIRE ALARM PULL STATIONS1
AC
TU
AT
E
CO
M
M
ON
AL
AR
M
SI
GN
AL
IN
DI
CA
TO
R
A
AC
TU
AT
E
AU
DI
BL
E
AL
AR
M
SI
GN
AL
B
AC
TU
AT
E
CO
M
M
ON
SU
PE
RV
IS
O
RY
SI
GN
AL
IN
DI
CA
TO
R
C
AC
TU
AT
E
AU
DI
BL
E
SU
PE
RV
IS
OR
Y
SI
GN
AL
D
AC
TU
AT
E
CO
M
M
ON
TR
OU
BL
E
SI
GN
AL
IN
DI
CA
TO
R
E
AC
TU
AT
E
AU
DI
BL
E
TR
OU
BL
E
SI
GN
AL
F
AC
TU
AT
E
AU
DI
BL
E
NO
TI
FI
CA
TI
ON
AP
PL
IA
NC
ES
G
AC
TU
AT
E
VI
SI
BL
E
NO
TI
FI
CA
TI
ON
AP
PL
IA
NC
ES
H
DI
SP
LA
Y/
PR
IN
T
CH
AN
GE
O F
ST
AT
US
I
TR
AN
SM
IT
FI
RE
AL
AR
M
SI
GN
AL
TO
SU
PE
RV
IS
IN
G
ST
AT
IO
N
J
TR
AN
SM
IT
FI
RE
SU
PE
RV
IS
OR
Y
SI
G
NA
L
TO
SU
PE
RV
IS
IN
G
ST
AT
IO
N
K
TR
AN
SM
IT
FI
RE
TR
O
UB
LE
SI
GN
AL
TO
SU
PE
RV
IS
IN
G
ST
AT
IO
N
L M N O P Q
SH
UT
DO
W
N
AS
SO
CI
AT
ED
AI
R
HA
ND
LI
NG
UN
IT
R
AC
TU
AT
E
PR
IM
AR
Y
FL
OO
R
EL
EV
AT
OR
RE
CA
LL
U
AC
TU
AT
E
AL
TE
RN
AT
E
FL
OO
R
EL
EV
AT
OR
RE
CA
LL
V
AC
TU
AT
E
EL
EV
AT
O
R
SH
UN
T
TR
IP
CI
RC
UI
T
BR
EA
KE
R
W X Y Z
AC
TU
AT
E
AS
SO
CI
AT
ED
M
AS
S
NO
TI
FI
CA
TI
O
N M
ES
SA
GE
AA BB CC
DE
-A
CT
IV
AT
E
FI
RE
AL
AR
M
NO
TI
FI
CA
TI
ON
AP
PL
IA
NC
ES
IF
AC
TI
VE
(V
IS
UA
L)
AC
TI
VA
TE
M
AS
S
NO
TI
FI
CA
TI
ON
ST
RO
BE
S
TR
AN
SM
IT
M
AS
S
NO
TI
FI
CA
TI
O N
SI
GN
AL
TO
SU
PE
RV
IS
IN
G
ST
AT
IO
N
DE
-A
CT
IV
AT
E
M
AS
S
NO
TI
FI
CA
TI
O N
SI
GN
AL
AF
TE
R
M
IN
UT
ES
SMOKE DETECTOR - PANEL
HEAT DETECTOR
WATERFLOW SWITCH
DUCT SMOKE DETECTOR
SMOKE DETECTOR - 1ST FLOOR ELEVATOR LOBBY
SMOKE DETECTOR - ALL OTHER ELEVATOR LOBBIES
SMOKE DETECTOR - ELEVATOR EQUIPMENT ROOM
HEAT DETECTOR - ELEVATOR EQUIPMENT ROOM
SHUNT TRIP BREAKER - CONTROL POWER SUPERVISION
VALVE TAMPER SWITCH
FIRE ALARM CONTROL PANEL AC POWER FAILURE
FIRE ALARM CONTROL PANEL LOW BATTERY
OPEN CIRCUIT
GROUND FAULT
NOTIFICATION APPLIANCE CIRCUIT SHORTED
ALL OTHER TROUBLES
ACU MICROPHONE KEYED-ALL CALL
LOC MICROPHONE KEYED-ALL CALL
MASS NOTIFICATION SYSTEM SWITCH INPUT 1
MASS NOTIFICATION SYSTEM SWITCH INPUT 2
MASS NOTIFICATION SYSTEM SWITCH INPUT 3
MASS NOTIFICATION SYSTEM SWITCH INPUT 4
MASS NOTIFICATION SYSTEM SWITCH INPUT 5
MASS NOTIFICATION SYSTEM SWITCH INPUT 6
MASS NOTIFICATION SYSTEM SWITCH INPUT 7
MASS NOTIFICATION SYSTEM SWITCH INPUT 8
MASS NOTIFICATION SYSTEM ACTIVATED DURING FIRE EVENT
TS
AC
TU
AT
E
AS
SO
CI
AT
ED
M
AS
S
NO
TI
FI
CA
TI
O
N M
ES
SA
GE
AC
TU
AT
E
AS
SO
CI
AT
ED
M
AS
S
NO
TI
FI
CA
TI
O
N M
ES
SA
GE
AC
TU
AT
E
AS
SO
CI
AT
ED
M
AS
S
NO
TI
FI
CA
TI
O
N M
ES
SA
GE
AC
TU
AT
E
AS
SO
CI
AT
ED
M
AS
S
NO
TI
FI
CA
TI
O
N M
ES
SA
GE
AC
TU
AT
E
AS
SO
CI
AT
ED
M
AS
S
NO
TI
FI
CA
TI
ON
M
ES
SA
GE
AC
TU
AT
E
AS
SO
CI
AT
ED
M
AS
S
NO
TI
FI
CA
TI
O
N M
ES
SA
GE
AC
TU
AT
E
AS
SO
CI
AT
ED
M
AS
S
NO
TI
FI
CA
TI
O
N M
ES
SA
GE
ALARM CONDITIONS
SUPERVISORY CONDITIONS
TROUBLE CONDITIONS
MASS NOTIFICATION CONDITIONS
A B C D E F G H I J K L M N O P Q R U V W X Y Z AA BB CCTS
AC
TU
AT
E
W
AT
ER
FL
O W
HO
RN
/S
TR
OB
E
SYSTEM OUTPUTS
CONTROL UNIT
ANNUNCIATION NOTIFICATION AUXILIARY FUNCTIONS MASS NOTIFICATION SYSTEM
DD
DD
EE
EE FF GG HH II JJ KK LL MM
FF GG HH II JJ KK LL MM NN
NN
FIRE PUMP RUNNING
FIRE PUMP CONTROLLER MAIN SWITCH NOT IN AUTO
FIRE PUMP ALTERNATE POWER SOURCE
FIRE PUMP ROOM LOW TEMPERATURE
FIRE PUMP REVERSAL
HVAC EMERGENCY SHUT DOWN SWITCH
SH
UT
DO
W
N
AL
L
HE
AT
IN
G, VE
NT
IL
AT
IN
G , A
ND
AI
R
CO
ND
IT
IO
NI
NG
PE
R
UF
C
4-
1-
SE
CT
IO
N
4- 4.
EMERGENCY SHOWER/EYEWASH STATION
PP QQ RR SS TT UU VV
PP QQ RR SS TT UU VV
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\ghg\D o cum ents\M y
R evit\91200_FP_G
G agliardi.rvt
3/9/2021 12:01: 15
PM
MARCH 3, 2021
FIRE ALARM & MASS
NOTIFICATION SYSTEM INPUT /
OUTPUT MATRIX AND RISER
DIAGRAM
FA701A
LFO
GHG
GHG
SCALE: NTS
FIRE ALARM & MASS NOTIFICATION SYSTEM RISER DIAGRAM2
SCALE: NTS
FIRE ALARM & EMERGENCY COMMUNICATIONS INPUT/OUTPUT MATRIX1
CO
HB
CO
Ø.................................ROUND
..................................PHASE
Ø............................DIAMETER
°...............................DEGREE
..................................ANGLE
%.............................PERCENT
TEXT SYMBOLS
CHECK VALVE (SWING GATE)
(GPM)
WH
A
ABBREVIATIONSDESCRIPTIONSYMBOL
NPW NON-POTABLE WATER (MAKE-UP)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
SOIL OR WASTE VENTV
SOIL OR WASTE - ABOVE FLOORSS
COMPRESSED AIR - ABOVE FLOORA
SOIL OR WASTE - BELOW FLOOR
OR GRADESS
COMPRESSED AIR - BELOW FLOOR
OR GRADEA
DRAIND
NATURAL GAS, LOW
PRESSURE (0.5 PSI)G
NATURAL GAS, MEDIUM
PRESSURE (50 PSIG)MG
FIRE PROTECTION MAINFP
CONDENSATE DRAINCD
RISER DOWN (ELBOW)
RISER UP (ELBOW)
RISE OR DROP
TEE DOWN
TEE UP
TOP CONNECTION
BOTTOM CONNECTION
SIDE CONNECTION
BALL VALVE
GATE VALVE OR ISOLATION VALVE
CIRCUIT BALANCING VALVE -
SET FOR GPM SHOWN IN ().
ANGLE VALVE
CHECK VALVE (STRAIGHT)
GLOBE VALVE
PRESSURE REDUCING VALVE
ASME RELIEF VALVE
PRESSURE AND
TEMPERATURE RELIEF
REDUCER, ECCENTRIC
REDUCER, CONCENTRIC
CLEANOUT, FLOOR
CLEANOUT, WALL
WATER HAMMER ARRESTOR
STRAINER, "Y" TYPE
DOUBLE CHECK VALVE BACKFLOW
PREVENTION DEVICE
REDUCED PRESSURE BACKFLOW
PREVENTER W/STRAINER
HOSE BIBB
WALL HYDRANT
PIPE ANCHOR
PIPE SLEEVE THRU
WALL, FOOTING ETC
FLOW IN DIRECTION OF ARROW
PIPE SLOPE IN
DIRECTION OF ARROW
T
THERMOMETER
THERMOMETER WELL
TW
P
PRESSURE GAUGE
LUBRICATED PLUG VALVE
UNION
BLIND FLANGE
CAP
COMPRESSED AIR RELIEF VALVE
RELIEF VALVE
PIPE ROUTED TO FLOOR DRAIN
LAVATORY
WATER CLOSET
URINAL
SERVICE SINK/BASIN
SINK
SHOWER HEAD
DRINKING FOUNTAIN
FLOOR DRAIN
COMPRESSED AIR OUTLET STATION
ABV* ABOVE
AFF ABOVE FINISHED FLOOR
AGA AMERICAN GAS ASSOCIATION
ALT ALTERNATE
APPROX APPROXIMATE
ARCH ARCHITECT,ARCHITECTURAL
AUTO AUTOMATIC
AUX AUXILIARY
AVG AVERAGE
B/B BACK TO BACK
BFF BELOW FINISHED FLOOR
BFP BACKFLOW PREVENTER
BLDG BUILDING
BTU BRITISH THERMAL UNIT
BTUH BTU/HOUR
CA* COMPRESSED AIR
CAP CAPACITY
CBV* CIRCUIT BALANCING VALVE
CFH* CUBIC FEET PER HOUR
CI CAST IRON
CL CENTER LINE
CLG CEILING
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONN CONNECT
CONT CONTINUE, CONTINUOUS
CORD COORDINATE
CORR CORRIDOR
CP* CHROME PLATED
CTR CENTER
CW COLD WATER
D DRAIN
DEG DEGREE
DEMO DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGRAM, DIAGRAMMATIC
DN DOWN
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWV DRAIN, WASTE, VENT
E EAST
EA EACH
EL ELEVATION
ELEC ELECTRIC
ELL* ELBOW
EMER EMERGENCY
EQUIP EQUIPMENT
EQUIV EQUIVALENT
EST ESTIMATE
ETC ET CETERA (AND SO FORTH)
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXT EXTERIOR
F FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FF* FINISHED FLOOR
FFA FROM FLOOR ABOVE
FFB FROM FLOOR BELOW
FH FIRE HYDRANT
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FLR FLOOR
FM FACTORY MUTUAL
FP FIRE PROTECTION
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FOOT, FEET
FTG FOOTING
FURN FURNISHED
FV FLUSH VALVE
FIG FIGURE
FIXT FIXTURE
G NATURAL GAS
GA GAGE, GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPH GALLON PER HOUR
GPM GALLON PER MINUTE
HB HOSE BIBB
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HORSEPOWER
HR* HOUR
HSKPG HOUSEKEEPING
HT HEIGHT
HW HOT WATER
HWR HOT WATER RETURN
HYD HYDRAULIC
HYD HYDRANT
Hz HERTZ
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN WC INCHES WATER COLUMN
IN* INCHES
INFO INFORMATION
INSUL INSULATION
INV EL INVERT ELEVATION
IPC* INTERNATIONAL PLUMBING CODE
IPS IRON PIPE SIZE
ISO ISOMETRIC
JAN CLO JANITOR'S CLOSET
K THOUSAND
KW KILOWATT
KWH KILOWATT HOUR
L LITER
LAV LAVATORY
LBS POUNDS
LF LINEAR FEET (FOOT)
LKR LOCKER
MA* MEDICAL AIR
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MC MECHANICAL CONTRACTOR
MECH MECHANICAL
MED MEDIUM
MEZZ MEZZANINE
MFG MANUFACTURING
MFR MANUFACTURER
MG* MEDIUM PRESSURE NATURAL GAS
MIN MINIMUM
MISC MISCELLANEOUS
MOD MODIFY
MTD MOUNTED
MULT MULTIPLE
N NORTH
NA NOT APPLICABLE
NCS* NATIONAL CAD STANDARDS
NEG NEGATIVE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPW NONPOTABLE WATER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPT OPTIONAL
DESCRIPTIONSYMBOL
OPP OPPOSITE
ORIG ORIGINAL
OUT OUTLET
OZ OUNCE
PCT PERCENT
PH PHASE
PKG PACKAGE
PLBG PLUMBING
PPM PARTS PER MILLION
PRELIM PRELIMINARY
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQ. IN. ABSOLUTE
PSIG POUNDS PER SQ. IN. GAGE
PVC POLYVINYL CHLORIDE
PWR POWER
QA QUALITY ASSURANCE
QTY QUANTITY
RD ROOF DRAIN
REF REFERENCE
REQD REQUIRED
REV REVISE, REVISION
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RM ROOM
RPBP* REDUCED PRESSURE
BACKFLOW PREVENTER
RPM REVOLUTIONS PER MINUTE
RPS REVOLUTIONS PER SECOND
S SOUTH
s* SECOND
SCHED SCHEDULE
SCHEM SCHEMATIC
SECT SECTION
SF SQUARE FEET (FOOT)
SPEC SPECIFICATION
SQ SQUARE
STOR STORAGE
STRUCT STRUCTURAL
SYS SYSTEM
T&P TEMPERATURE AND PRESSURE
TECH TECHNICAL
TEMP TEMPERATURE
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
THRU THROUGH
TSTAT THERMOSTAT
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
V* VOLT
VOL VOLUME
VTR VENT THRU ROOF
W WATT
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSE
WC WATER COLUMN
WG WATER GAGE
WH WATER HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WT WEIGHT
XFMR TRANSFORMER
YH YARD HYDRANT
YR YEAR
NOTES:
1. NOT ALL SYMBOLS OR ABBREVIATIONS ARE USED ON THIS PROJECT.
2. ABBREVIATIONS WITH * PREFIX ARE NOT INCLUDED IN THE CURRENT NATIONAL CAD STANDARDS.
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\w bb\D ocum ents\M y R evit\91200_Plbg_ w bb.rvt
2/23/2021 12:13 :10
PM
MARCH 3, 2021
LEGEND & ABBREVIATIONS
P-001A
RRS
WBB
WBB
GENERAL NOTES
(APPLIES TO ALL SHEETS)
A. SLOPE SOIL AND WASTE PIPE 3" AND LARGER AT
1/8" PER FT. MINIMUM, SIZE LESS THAN 3" SLOPE
1/4" PER FT. MINIMUM, UNLESS NOTED
OTHERWISE.
B. SLOPE STORM DRAINAGE PIPING AT 1/8" PER FT.
MINIMUM UNLESS NOTED OTHERWISE.
C. ALL PIPING SHALL BE COORDINATED WITH CIVIL
UTILITY PIPING, FIRE PROTECTION, DUCTWORK,
MECHANICAL PIPING, LIGHTING, STRUCTURAL AND
ARCHITECTURAL SYSTEMS.
D. PIPE CLEANOUTS SHALL BE LINE SIZE (4" MAX.).
LOCATE 100' APART MAXIMUM FOR SIZES UP
THROUGH 6".
E. INSTALL VENT THRU ROOF (VTR) PENETRATIONS
PER ARCH DETAILS.
F. ACCESS PANELS SHALL BE PROVIDED FOR ALL
WATER HAMMER ARRESTORS LOCATED IN WALLS
TO ACCESS EQUIPMENT. PANEL SHALL BE AS
LARGE AS PRACTICAL FOR THE FUNCTION THEY
ARE INTENDED.
PALLET
ROLLERS
102A
BREAK
107A
PARACHUTE
STRETCHING
105A
DRYING
TOWER
112A
PARACHUTE
TABLES
104A
STORAGE
101A
TOILET
106A
ELEC/COMM
109AJAN
108A
FP/MECH
110A
OFF LOAD
103A
CO
R
R
ID
O R
1A
SS SS
3" TRAP3" TRAP
A
6 7
D
C
B
A'
A.7
B.2
C.3
3" SS UP
SS SS
3"
3"
3" SS UP
3" TRAP
3"
3"
3" SS UP
3" 4"
REFER TO 1 / P-401A
1 1 1
REF CIVIL
SHEET
C110A
SDSDSD
IE = 98' - 4 1/4" IE = 98' - 4 1/4" IE = 98' - 4 1/4"
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\w bb\D ocum ents\M y R evit\91200_Plbg_ w bb.rvt
2/23/2021 12:13 :09
PM
MARCH 3, 2021
UNDERFLOOR PLUMBING PLAN
P-101A
RRS
WBB
WBB
SCALE: 1/8" = 1'-0"
UNDERFLOOR PLUMBING PLAN1
N 0 4' 8' 16'
1/8" = 1'-0"
GENERAL NOTES
A. REFER TO SHEET P-001A FOR GENERAL NOTES
THAT APPLY TO THIS SHEET
SHEET KEYNOTES
1. 5" STORM DRAIN FROM ABOVE.
V
PALLET
ROLLERS
102A
BREAK
107A
PARACHUTE
STRETCHING
105A
DRYING
TOWER
112A
PARACHUTE
TABLES
104A
STORAGE
101A
TOILET
106A
ELEC/COMM
109A
JAN
108A
FP/MECH
110A
OFF LOAD
103A
CORRIDOR
111A
UP TO PRD
UP TO SRD
AA
A
HR
COMPRESSED
AIR DROP
A
A A
3" FD-2A
3/4" DOWN THRU
BALL VALVE TO HB
1 1
A
6 7
D
C
B
A'
A.7
B.2
C.3
3" FCO-2A
3" FCO-2A3" FD-2A
3" FD-2A
3" FCO-2A
REFER TO 2 / P-401A
1/2"
1/2"
3/4"
1/2"
3/4"
HR HR
WH
3/4" DOWN THRU BALL
VALVE TO WH
WH
3/4" DOWN THRU BALL
VALVE TO WH
3 UP TO PRD 3
UP TO PRD 3
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\w bb\D ocum ents\M y R evit\91200_Plbg_ w bb.rvt
2/23/2021 12:13 :12
PM
MARCH 3, 2021
GROUND FLOOR PLUMBING
PLAN
P-102A
RRS
WBB
WBB
SCALE: 1/8" = 1'-0"
GROUND FLOOR PLUMBING PLAN1
GENERAL NOTES
SHEET KEYNOTES
A. REFER TO SHEET P-001A FOR GENERAL NOTES
THAT APPLY TO THIS SHEET.
1. DOWN AT WALL TO BELOW FLOOR, INSTALL
PIPE CLEANOUT APPROX 2' AFF.
2. TURN SD OUT AT 1' 6" ABOVE GRADE AND
DISCHARGE THRU DOWNSPOUT NOZZLE.
3. REFER TO ROOF MECHANICAL PLAN MH102A.
4. SLOPE ABOVE FLOOR PIPING @ 1/4" PER FOOT
MINIMUM TO EXTERIOR WALL, COORDINATE
WITH BRIDGE CRANE AND WINDOWS, TYPICAL
OF 6.
N 0 4' 8' 16'
1/8" = 1'-0"
A
6 75
B
A'
A.7
B.2
BREAK
107A
PARACHUTE
STRETCHING
105A
DRYING
TOWER
112A
ELEC/COMM
109A
JAN
108A
FP/MECH
110A
CORRIDOR
111A
4" TRAP
4" SS UP
SS
4" TRAP
3" TRAP2" SS UP
2" SS UP
2" VENT UP
3" SS UP
SS
5" SD
FROM
ABOVE
1 1/2" DOMESTIC
WATER, REF CIVIL
SHEET C110A
2" VENT UP
DOMESTIC
WATER UP
CONNECT TO 4"
SS FROM SMALL
AIR TERMINAL
4"
5" SD
FROM
ABOVE
IE = 96' - 11 1/2"
4" TRAP
SS
4"
4" SS UP
2" TRAP3" SS UP
2" SS UP
4"
4"
4"
SS
SD SD
4" SS
REF CIVIL
SHEET
C110A
REF CIVIL
SHEET
C110A
SD
8"
8" SD
CONNECT TO 8"
SD FROM SMALL
AIR TERMINAL
IE = 98' - 4 1/4"
IE = 98' - 4 1/4"
8"
SD
3"2"
3" 2"
2"
3"
4"10
IE = 97' - 2 1/4"
A
6 75
B
A'
A.7
B.2
4" FCO-2A
5" UP TO PRD
2" FD-1A
5" UP TO SRD
V
3" VENT UP, 3" VTR
BREAK
107A
PARACHUTE
STRETCHING
105A
DRYING
TOWER
112A
TOILET
106A
ELEC/COMM
109A
JAN
108A
FP/MECH
110A
CORRIDOR
111A
1 1
HB
2 2 3
AA
4" FCO
P-1A
P-4
P-6A
P-8
P-9
WH
1/2"
4" FD-2A 4" FD-2A
4" FD-2A
UB
HR
1/2" 1/2"
5" UP TO PRD
5" UP TO
SRD
3/4" CW UP TO
WALL HYDRANT
BALL VALVE, TYP
3/4" CW UP TO 18'-0"
AFF (APPROX)
1/2" CA UP TO 18'-0"
AFF (APPROX)
3/4"
1/2"
A
1/2" 1"
1/2" CA & 1" CW
UP TO 18'-0" AFF
(APPROX)
2"2"
FCO
1 1/2"
1/2"
1/2" 3/4"
3/8"
2" VENT FROM
BELOW
2"
2"
1 1/2" VENT 3"
3"
3/4"1"
3/4" 3/4" 3/4"
1 1/2"
2"
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\w bb\D ocum ents\M y R evit\91200_Plbg_ w bb.rvt
2/23/2021 12:13 :16
PM
MARCH 3, 2021
ENLARGED PLUMBING PLANS
P-401A
RRS
WBB
WBB
SCALE: 1/4" = 1'-0"
ENLARGED UNDERFLOOR PLUMBING PLAN1
0 2' 4' 8'
1/4" = 1'-0"
N
GENERAL NOTES
A. REFER TO SHEET P-001A FOR GENERAL NOTES
THAT APPLY TO THIS SHEET
SHEET KEYNOTES
1. DOWN AT WALL TO BELOW FLOOR, INSTALL PIPE
CLEANOUT APPROX 3' AFF.
2. TURN SD OUT AT 1' 6" ABOVE GRADE AND
DISCHARGE THRU DOWNSPOUT NOZZLE.
3. 1 1/2" CW UP THRU BUILDING SHUTOFF VALVE.
4. WATER METER (WM).
5. BACKFLOW PREVENTER (BFP3).
6. TANKLESS NATURAL GAS WATER HEATER
(DWHA) MOUNTED ON WALL.
7. AIR COMPRESSOR (AC-1) - SINGLE STAGE BELT
DRIVE, 60 GALLON VERTICAL ASME TANK, 3 HP,
208V, SINGLE PHASE, 135 PSI MAX, 11.3 CFM @ 90
PSI. REFER TO DETAIL 9 / P-501A.
8. 3/4" DOWN THRU BALL VALVE TO WH.
9. REFER TO ROOF MECHANICAL PLAN MH102A.
10. 2" VENT UP AT 45° THEN UP IN WALL.
11. 2" VENT UP.
12. 1/2" CW, 1/2" HW & 1 1/2" VENT.
13. SLOPE AT 1/4" / FOOT MINIMUM.
14. 36" X 36" X 4" HIGH HOUSEKEEPING PAD, REFER
TO STRUCTURAL DETAIL 3 / S-002A.
SCALE: 1/4" = 1'-0"
ENLARGED GROUND FLOOR PLUMBING PLAN2
VARIES; PROVIDE
EXTENSION PIECE
AS REQUIRED
FINISHED FLOOR
CLEANOUT COVER
COUNTER SUNK SCREW
CONCRETE SURFACE
OR FLOOR COVERING
AS REQUIRED
CAULKING
FERRULE
CLEANOUT PLUG
CLEANOUT
TEE
VARIES
STAINLESS STEEL
CLEANOUT COVER
COUNTER SUNK SCREW
COUNTER SUNK
BRASS PLUG
FINISHED WALL
DEEP SEAL
P-TRAP
FINISHED FLOORFLOOR DRAIN
CWCW
STRAINER
REDUCED PRESSURE ZONE BACKFLOW PREVENTER BFP-1A
CONNECT 3/4" DRAIN
LINE TO RELIEF
DISCHARGE
2" DRAIN LINE
SUPPORT FROM STRUCTURE WITH
FOUR (4) 1/2" ANCHOR BOLTS WITH
LOCK NUTS AND WASHERS (TYPICAL).
AIR GAP FITTING
2" DRAIN LINE . ROUTE TO
NEAREST FLOOR DRAIN.
REFER PLAN 1/P-401A.
DRAIN PAN. (60"x15"x2-1/2" DEEP, 12 GAUGE
PLATE PAN WITH CORNERS WELDED WATERTIGHT)
TWO (2) 1"x1"x1/2" ANGLE SUPPORTS
WELDED TO PAN ON 10" CENTERS,
FROM CENTER OF PAN.
CONNECT 3/4" DRAIN LINE
TO OUTLET IN PAN.
3/4" DRAIN LINE
BEARING PLATE
FLASHING RING
& GRAVEL STOP
INSULATION
STANDARD DECK
CLAMP
GRAVEL
ROOFING FELT
STEEL DECK
INSULATION
FINISHED EXTERIOR WALL
APPROVED MASONRY
ANCHOR AND FASTENER
(TYP. OF 3)
DOWNSPOUT NOZZLE
TACK WELD
WIRE MESH
INSECT SCREEN
GRADE
CONCRETE
SPLASH BLOCK
SD PIPE
AC-1
FLOOR DRAIN
1/2"
4" CONCRETE
PAD (TYP)FLOOR
FLEXIBLE
METAL
HOSE
VIBRATION
DAMPERS
(TYP)
COMPRESSED AIR FILTER &
REGULATOR; 1/2" CONNECTION,
35 CFM, 20 MICRON, 175 PSI
MAX INPUT/OUTPUT
1/2"
REFER TO PLAN
PRESSURE GUAGE
P
48" AFF
1/2" AIR LINE
ANCHOR PIPE TO WALL
WITH PIPE STRAP
BALL VALVE WITH SAFETY
VENT.
1/2"
DIRT LEG WITH
PIPE CAP
TO HOSE REEL OR
QUICK CONNECT
C W
H W
D
3/4"
3/4"
DWHA
SHUTOFF VALVE
PRESSURE RELIEF VALVE
ROUTE TO CONDENSATE
NEUTRALIZER THEN
DISCHARGE TO MOP SINK
THRU AIR GAP
DISCHARGE TO MOP
SINK THRU AIR GAP
REFER TO 7 / M-501A
FOR AIR INTAKE,
EXHAUST FLUE & GAS
PIPING
C D
SHUTOFF VALVE
T
THERMOMETER
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\w bb\D ocum ents\M y R evit\91200_Plbg_ w bb.rvt
2/23/2021 12:13 :16
PM
MARCH 3, 2021
PLUMBING DETAILS
P-501A
RRS
WBB
WBB
SCALE: NTS
FLOOR CLEANOUT DETAIL5
SCALE: NTS
WALL CLEANOUT DETAIL4SCALE: NTS
FLOOR DRAIN DETAIL3
SCALE: NTS
BACKFLOW PREVENTER DETAIL6 SCALE: NTS
ROOF DRAIN DETAIL7
SCALE: NTS
DOWNSPOUT NOZZLE DETAIL8 SCALE: NTS
AIR COMPRESSOR DETAIL9
SCALE: NTS
COMPRESSED AIR OUTLET DETAIL2SCALE: NTS
TANKLESS GAS FIRED WATER HEATER1
MARK FIXTURE
PIPING ROUGH-IN
DESCRIPTION
W V CW HW
P-1A WATER CLOSET (ABA) 3" 2" 3/4" - - - FLOOR MOUNT, WHITE, VITREOUS CHINA, ELONGATED BOWL, TANK TYPE, ABA HEIGHT. PROVIDE TOILET SEAT WITH OPEN
FRONT LESS COVER, EXTRA HEAVY DUTY, WITH STAINLESS STEEL CHECK HINGE.
P-4 LAVATORY (ABA) 1 1/4" 1 1/4" 1/2" 1/2"
19" X 17" WALL HUNG, WHITE VITREOUS CHINA LAVATORY WITH FRONT OVERFLOW, SINGLE FAUCET HOLE AND ABA GRID STRAINER. PROVIDE POLISHED CHROME SINGLE HOLE FAUCET, WITH 0.5 GPM FLOW & BUILT-IN ASSE 1070 THERMOSTATIC
MIXING VALVE. SEE NOTE 1 AND 2.
DUAL EWC WITH
BOTTLE FILLER (ABA) 1 1/2" 1 1/4" 1/2" - - -
DUAL UNIT, ADULT/ABA MODEL, WALL MOUNTED, LEAD FREE DESIGN ELECTRIC WATER COOLER WITH BOTTLE FILLING STATION, PUSH BUTTON ACTUATION ON FRONT AND SIDES, 8.0 GALLON, 120 VOLT, 5.0 FLA, 370 WATTS. BOTTLE FILLING UNIT SHALL INCLUDE AN ELECTRONIC SENSOR FOR TOUCHLESS ACTIVATION WITH AUTO SHUT-OFF TIMER. SEE NOTE 1 AND 2.
P-8
NOTES:
1. CONTRACTOR SHALL PROVIDE C.P. SUPPLIES W/LOOSE-KEY STOPS, C.P. 'P' TRAP W/CLEANOUT, AND WALL ESCUTCHEONS AS REQUIRED.
2. ALL ACCESSIBLE PLUMBING FIXTURES SHALL MEET ANSI A117.1-2003.
PLUMBING FIXTURE SCHEDULE
P-6A SINK (ABA) 1 1/2" 1 1/4"
25" x 21" x 5.5", 18 GAUGE, 304 STAINLESS STEEL, SINGLE BOWL, 3-HOLE, DROP-IN SINK COMPLETE WITH DRAIN AND STRAINER BASKET. PROVIDE POLISHED CHROME, 3-HOLE, GOOSENECK FAUCET WITH 1.5 GPM AERATOR & BUILT-IN ASSE 1070
THERMOSTATIC MIXING VALVE. NOTE 1 AND 2.
1/2" 1/2"
P-9 MOP SERVICE BASIN 3" 2" 3/4" 3/4"
24" X 24" TERRAZZO MOP BASIN WITH 6" DROP FRONT, STAINLESS STEEL CAPS ON ALL CURBS, HOSE & HOSE BRACKET, WALL GUARDS AND CHROME PLATED FAUCET WITH VACUUM BREAKER, INTEGRAL STOPS, ADJUSTABLE WALL BRACE, PAIL HOOK AND 3/4” HOSE THREAD ON SPOUT. BODY INLETS 8” CENTER TO CENTER, FOUR ARM HANDLES. VALVES CONTAIN RENEWABLE HUB, RENEWABLE SEATS, SWIVEL DISCS, ENCASED WASHERS AND BRASS WASHER SCREWS.
MISCELLANEOUS EQUIPMENT SCHEDULE
MARK FIXTURE LOCATION SIZE DESCRIPTION
BFP3 REDUCED PRESSURE
BACKFLOW PREVENTER FP/MECH 110 1" LEAD FREE FOR POTABLE WATER, WITH STRAINER, QUARTER-TURN BALL VALVES, REPLACEABLE SEATS AND UNION CONNECTIONS
WH WALL HYDRANT EXTERIOR - - -
WM WATER METER 1 1/2"
ELECTRONIC REGISTER, AMR RESOLUTION UNITS THAT ARE FULLY PROGRAMMABLE WITH FULLY PROGRAMMABLE PULSE OUTPUT FREQUENCY, CUSTOMER DATA LOGGING CAPABILITY AND LARGE EASY TO READ LCD DISPLAY. READOUT IN GPM AND TOTAL GALLONS TO
BUILDING MANAGEMENT SYSTEM.
HB HOSE BIBB SEE PLANS - - -
AUTOMATIC DRAINING, FREEZELESS, BACKFLOW PROTECTION, MODEL 50HA - 3/4" HOSE CONNECTION, ASSE 1052 LISTED WITH LOOSE KEY.
ANTI-SIPHON FAUCET, VACUUM BREAKER PROTECTED, NIDEL 34HF - 3/4" HOSE CONNECTION, ASSE 1011 LISTED.
PRD SEE PLANS 5"PRIMARY ROOF DRAIN CAST IRON ROOF DRAIN WITH FLANGE, FLASHING RING, GRAVEL STOP AND CAST IRON DOME
SRD SEE PLANS 5"SECONDARY ROOF DRAIN CAST IRON ROOF DRAIN WITH FLANGE, FLASHING RING, GRAVEL STOP, 2" DAM AND CAST IRON DOME
UB 1/2"UTILITY CONNECTION BOX BREAK 107 WHITE POWDER COATED ICE MAKER OUTLET BOX WITH WATER HAMMER ARRESTOR.
FP/MECH 110
HR COMPRESSED AIR
HOSE REEL SEE PLANS - - - 1/2" I.D., 30 FT 300 PSI HOSE, SOLID BRASS 90° FULL-FLOW NPT SWIVEL INLET, ADJUSTABLE SOLID RUBBER HOSE STOP, 4-WAY ROLLER
BRACKET AND 1/2" I.D. INLET HOSE ASSEMBLY.
FLOOR DRAIN / CLEANOUT SCHEDULE
MARK FIXTURE LOCATION SIZE DESCRIPTION
NOTES:
FCO FLOOR CLEANOUT SEE PLANS SEE PLANS
FD-1A FLOOR DRAIN CAST IRON BODY WITH FLANGE, INTEGRAL CLAMPING COLLAR, BARRIER TRAP SEAL DEVICE AND 5" ROUND THREADED ADJUSTABLE
SATIN FINISH NICKEL BRONZE TOP.
CAST IRON WITH ADJUSTABLE HOUSING, FLANGED FERRULE AND ROUND SATIN FINISH NICKEL BRONZE TOP.
1. ALL P-TRAPS (DEEP SEAL TYPE), MOUNTING HARDWARE, ETC. CONTRACTOR FURNISHED, CONTRACTOR INSTALLED.
SEE PLANS SEE PLANS
FD-2A FLOOR DRAIN CAST IRON BODY WITH FLANGE, 1/2" PRIMER TAP WITH PLUG, BARRIER TRAP SEAL DEVICE AND 8" ROUND THREADED ADJUSTABLE
DUCTILE IRON TOP.SEE PLANS SEE PLANS
FCO-2A FLOOR CLEANOUT SEE PLANS SEE PLANS CAST IRON WITH ADJUSTABLE HOUSING, FLANGED FERRULE AND ROUND DUCTILE IRON TOP.
TANKLESS NATURAL GAS WATER HEATER SCHEDULE
MARK FIXTURE DESCRIPTIONBTU/H INPUT
DWHA WATER HEATER
CONDENSING WATER HEATER WITH MODULATING BURNER, COPPER PRIMARY HEAT EXCHANGER,
STAINLESS STEEL SECONDARY HEAT EXCHANGER, INLET GAS PRESSURE SHALL BE 4.0 - 10.5 INCH WC.
PROVIDE CONCENTRIC VENT KIT AND CONDENSATE NEUTRALIZATION KIT. INSTALL PER MFR
INSTRUCTIONS.
15,000 - 199,000
ELEC
120 VOLT/
60 HZ
UEF
0.93
FLOW RATE
@ 96° RISE
4.0 GPM
PRESSURE LOSS
@ 4.0 GPM
5.0 PSI
2000 East Lamar Blvd, Suite 600 Arlington, TX 76006 fsb-ae.com
4930 MINUTEMAN WAY
CHARLOTTE, NC 28208
Architecture Engineering Planning Frankfurt Short Bruza / Texas
817.588.3010
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20191200
LLP
Pr oj ec t N o:
F
JR
P
C ha rlo tte A
N G
B as e, C
D
IA
, N C
N or th C ar ol in a
A ir
N at io na l G ua rd C
-1
C on ve rs io n:
C N
S Ai r D ro p Fa ci lit y
C :\U sers\w bb\D ocum ents\M y R evit\91200_Plbg_ w bb.rvt
2/23/2021 1:17: 20
PM
MARCH 3, 2021
PLUMBING SCHEDULES
P-701A
RRS
WBB
WBB
GENERAL PROJECT NOTES
A. MECHANICAL PLANS AND SECTIONS ARE
INTENDED TO ILLUSTRATE THE SCOPE OF WORK
ACCURATELY, HOWEVER THEY ARE STILL
DIAGRAMMATIC IN NATURE. REPRESENTATIONS
OF EQUIPMENT, VALVES, FITTINGS, ETC. SHOWN
ON THESE DRAWINGS MAY NOT REFLECT THE
LOOK OR SIZE OF THE ACTUAL MATERIALS
SPECIFIED.
B. MECHANICAL DRAWINGS DO NOT SHOW ALL
MINOR ITEMS THAT MUST BE INSTALLED. THE
CONTRACTOR SHALL PROVIDE ALL LABOR AND
MATERIALS REQUIRED FOR A FULLY FUNCTIONING
SYSTEM COMPLIANT WITH ALL APPLICABLE
CODES AND LAWS.
C. PLAN AND SECTION DRAWINGS DO NOT SHOW ALL
REQUIRED BRANCH PIPING OR VALVES AND
GAUGES. REFER TO FLOW DIAGRAMS, DETAILS
AND PROJECT SPECIFICATIONS FOR REQUIRED
PIPING, VALVES AND GAUGES.
D. SECTION DRAWINGS DO NOT SHOW ALL
REQUIRED WORK IN THE AREA THEY ARE CUT.
SECTION DRAWINGS ARE PROVIDED TO
ILLUSTRATE ONLY CERTAIN CONDITIONS THAT
MAY BE TOO CONGESTED TO ILLUSTRATE IN A
PLAN VIEW.
E. MECHANICAL DRAWINGS DO NOT SHOW ALL
REQUIRED OFFSETS IN PIPING AND DUCTWORK
REQUIRED FOR INSTALLATION COORDINATED
WITH ALL OTHER DISCIPLINES SUCH AS
STRUCTURAL STEEL. THE CONTRACTOR SHALL
PROVIDE ELBOWS IN PIPING AND DUCTWORK,
ONLY WHEN ABSOLUTELY REQUIRED, TO AVOID
CONFLICT WITH OTHER MECHANICAL
COMPONENTS OR WORK OF OTHER TRADES.
OFFSETS SHALL USE ELBOWS OF LEAST DEGREE
TURN AS POSSIBLE.
F. ALL DUCT SIZES INDICATED REPRESENT INSIDE
CLEAR DIMENSIONS. CONTRACTOR SHALL
ADJUST SHEET METAL SIZE TO ACCOUNT FOR
LINER THICKNESS WHEN LINER IS REQUIRED PER
THE CONTRACT DOCUMENTS.
G. ALL EXPOSED PIPING NOT REQUIRED BY THE
SPECIFICATIONS TO BE INSULATED SHALL BE
PAINTED PER THE SPECIFICATION SECTIONS
099113 & 099123 "PAINTING".
H. MODIFY ROUTING OF PIPING AT EQUIPMENT
CONNECTION POINTS FROM THAT SHOWN TO
MATCH ACTUAL LOCATION OF CONNECTION
POINTS FOR SPECIFIC EQUIPMENT PURCHASED.
CONNECT ALL EQUIPMENT IN ACCORDANCE WITH
EQUIPMENT MANUFACTURER’S INSTRUCTIONS.
I. ALL FLUE PIPES FROM GAS-FIRED EQUIPMENT
AND ASSOCIATED DIRECT VENT COMBUSTION AIR
PIPES (IF USED) SHALL BE SIZED BY THE GAS-
FIRED EQUIPMENT MANUFACTURER BASED ON
THE SPECIFIC PIPE ROUTING AND ELEVATIONS
FOR THIS PROJECT. LIKEWISE THE MATERIALS OF
ALL FLUE PIPING AND DIRECT VENT COMBUSTION
AIR PIPING SHALL BE AS REQUIRED BY THE
MANUFACTURER OF THE GAS-FIRED EQUIPMENT
THE PIPING IS CONNECTED TO. FLUE PIPING
SHALL BE INSTALLED PER CODE.
J. PIPING, DUCTWORK AND EQUIPMENT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .