ATT_0007_SITE_LANE_PREPARATION.pdf

PDF 993 KB Posted

Attached to
Contractor Logistics Support Federal contract opportunity
Solicitation number
W15QKN-17-R-0006
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

Attachment 0007 Site Lane Preparation Instructions

View the file

Other files for this federal contract opportunity

Other files attached to Contractor Logistics Support, newest first.
File Type Posted
W15QKN17R0006-0003.pdf PDF
W15QKN17R0006-0002.pdf PDF
dd1423-1_-_A007_Report,_Record_of_Meeting_Minutes_rev2signed.pdf PDF
ATT_0016_PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
Task_Order_0001_Performance_Work_Statement_(PWS)_FOR_INFORMATIONAL_PURPOSES_ONLY.pdf PDF
dd1423-1_-_F001_Funds_and_Man-Hour_Expenditure_Report_rev2signed.pdf PDF
ATT_0062_CLS_PRICING_WORKBOOK.xlsx XLSX spreadsheet
ATT_0063_TASK_ORDER_0001_PERFORMANCE_WORK_STATEMENT_(PWS)-_FOR_INFORMATIONAL_PURPOSES_ONLY.pdf PDF
ATT_0015_DD_254,_DEPARTMENT_OF_DEFENSE_CONTRACT_SECURITY_CLASSIFICATION_SPECIFICATION.pdf PDF
ATT_0003_Labor_Category_Definitions.pdf PDF
W15QKN17R0006-0001.pdf PDF
ATT_0016_PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
ATT_0001_PM_CCS_Systems.pdf PDF
ATT_0022_PHRASELATOR_P2_TSP.pdf PDF
ATT_0003_LABOR_CATEGORY_DEFINITIONS.pdf PDF
ATT_0011_DD2345,_MILITARILY_CRITICAL_TECHNICAL_DATA_AGREEMENT.pdf PDF
ATT_0062_CLS_PRICING_WORKBOOK.xlsx XLSX spreadsheet
ATT_0024_VLAD_TSP.pdf PDF
ATT_0009_PROCEDURES_TO_DESIGNATE_A_US_INVITED_CONTRACTOR_UNDER_THE_US_ROK_SOFA.pdf PDF
ATT_0025_MAGNUM_SPIKE_STRIP_TSP.pdf PDF
ATT_0010_NON_DISCLOSURE_AND_NON_USE_AGREEMENT_for_W15QKN-17-R-0006.pdf PDF
ATT_0002_GOVERNMENT_LOCATIONS.pdf PDF
ATT_0012_AMSTA-AR_1350_TECHNICAL_DATA_AGREEMENT.pdf PDF
ATT_0020_ACOUSTIC_HAILING_DEVICE_(MAD)_TSP.pdf PDF
ATT_0008_QUALITY_ASSURANCE_SURVEILLANCE_PLAN_(QASP).pdf PDF
ATT_0006_SAMPLE_FORMAT_FOR_FIELD_SERVICE_REPRESENTATIVE_(FSR)_EVENT_TRACKER.pdf PDF
ATT_0023_EPVK_TSP.pdf PDF
ATT_0029_MAGNUM_SPIKE_STRIP_Draft_TM_5-5340-101-10_-_20_Sep_2010.pdf PDF
ATT_0028_VLAD_TM_5-4240-536-10_-_30_Jun_2005.pdf PDF
ATT_0019_HAND_HELD_METAL_DETECTOR_Draft_TM_5-6350-312-10_-_20_Sep_2010.pdf PDF
ATT_0021_AHD_(MAD)_Draft_TM_5-5965-1934-10_-_20_Sep_2010.pdf PDF
ATT_0004_TSP_TMS_INSTALL_DEINSTALL_INSTRUCTIONS_AND_POI.pdf PDF
ATT_0015_DD_254,_DEPARTMENT_OF_DEFENSE_CONTRACT_SECURITY_CLASSIFICATION_SPECIFICATION.pdf PDF
ATT_0014_INME-PIC-IM_Form_3002,_CLEARANCE_OF_TECHNICAL_INFORMATION_FOR_PUBLIC_RELEASE.pdf PDF
ATT_0013_STANDARD_FORM_LLL,_DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
ATT_0063_TASK_ORDER_0001_PWS.pdf PDF
ATT_61_Tech_Manual_TM_9-2330-392-14&P.pdf PDF
W15QKN-17-R-0006.pdf PDF
ATT_0017_MISSION_ESSENTIAL_CONTRACTORS.pdf PDF
DD_1423_CDRLs.pdf PDF
ATT_0018_HAND_HELD_METAL_DETECTOR_TSP.pdf PDF
ATT_0027_EPVK_Draft_TM_5-2590-536-10_-_20_Sep_2010.pdf PDF
ATT_0026_PHRASELATOR_Draft_TM_5-5805-901-13.pdf PDF
ATT_0005_GOVERNMENT_FURNISHED_PROPERTY.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Contract – CLS SUPPORT 1/20/17

Attachment 7: AN/PSS-14 Site Lane Preparation Instructions

AN/PSS-14 Site Lane Prep Instructions

Attachment 7

AN/PSS-14 Site Training Lane Preparation Instructions

This attachment is written as a stand-alone document and describes the instructions for preparing Explosive Hazard Detection Lanes for the AN/PSS-14 program.

SITE PLANNING AND PREPARATION

The sites chosen will be part of the Urban Assault Course (UAC) identified in Training Circular 90-1, Training for Urban Operations. The training lanes will be installed and identified as Station 6 Explosive Hazard Detection. Government personnel will coordinate with the installation Range Control to ensure area is appropriate to install training lanes, be fairly level and free of heavy vegetation, and obtain necessary permits. Grass is tolerable, but will have to be mowed with brush and trees removed by Range Control. The size of the area depends on the number of training lanes to be installed with the standard configuration as 12 lanes. If a location does not have the available real estate, less than 12 lanes will be installed. Figure 1 depicts typical examples of 12 lane configurations that require an area of 25 meters by 140 meters or 50 meters by 70 meters. To prevent the AN/PSS-14 detectors from interfering with each other, each lane must be at least 10 meters apart from adjacent lanes.

Figure 1. Typical Training Lane and Footprint Area Layout

The lanes and footprints will have to be sanitized of all metal debris using the AN/PSS- 14 metal detector (see Figure 2). The beginning and end borders of a lane should be sanitized at least one meter beyond their border. Also, half a meter of the outside lateral limits of each lane should be clear and sanitized. A one meter distance around each footprint shall be free of clutter. Metal detector sensitivity or ability to detect metal objects is directly correlated with the AN/PSS-14 sensor head height off the ground. The higher the sensor head the less metal the metal detector detects. To ensure metal debris is removed consistently, the sensor head must be placed on the ground when sweeping to locate and remove metal objects. Native soil from the site shall be used when filling in holes where metallic clutter was removed. Do not introduce different soil such as top soil since that will introduce false alarms from the ground penetrating radar.

Figure 2. Metal Free Lane and Footprints

Equipment necessary for lane preparation is listed below:

a. PM Furnished equipment that will be sent to site location address per Range Control Guidance (Per site):

i. Plastic chain to identify left and right lateral limits (30 meters for each lane).

ii. Nonmetallic twine to build 3 grading matrixes

iii. Zip ties to identify separation of cells

iv. Nylons screw inserted in wood to insert in PVC Pipe Corners (4 for each lane).

Not needed for footprint

v. Mine Simulants (Contractor picks up from Training Support Center at each site)

vi. IED Targets except plastic jug

vii. Metallic clutter

b. Government Furnished Equipment (GFE) to the contract:

i. AN/PSS-14 systems (w/2 rechargeable batteries) to sanitize and clear the training area. Contractor shall ensure availability during lane installation.

ii. Battery charger to recharge AN/PSS-14 batteries. Contractor shall ensure availability during lane installation.

c. Contractor Furnished (Per Site):

i. Rent Auger to dig lane corners and footprints and to dig deep targets.

ii. Rent, buy or hand receipt from Department of Public Works: Shovels, pick mattocks, hammer, wheel barrel, rakes, and tape measures.

iii. 4 inch diameter Polyvinyl chloride (PVC) by 12 inch for each corner of the lane and footprints. Four each for lane and four each per footprint.

iv. 1-1/2 to 2 inches in diameter PVC pipe (20 feet for each grading matrix). PVC elbows to match the PVC pipe (4 for each matrix). Quantity of 3 grading matrix per site.

v. PVC Glue to attached PVC pipe to PVC elbows

vi. Hacksaw, drill, and bits to build the grading matrix and to drill hole in wood to insert nylon screw.

vii. Commercial Standard 2 inch by 4 inch by 12 inch pressure treated wood to insert in PVC Pipe Corners (4 for each lane); not required for footprint.

viii. Plastic Jug (i.e. approximately 35 pound sealed cat litter container; remove metal handle as applicable): Quantity 13

The Contractor shall store equipment and material at a secure location provided by the UAC manager.

TRAINING SITE PREPARATION

1. The typical AN/PSS-14 training site will contain twelve training lanes, and eight footprint pits. Training lanes will be used to train new operators and validate current operators. To maintain a high quality and consistent training program, all training lanes must be prepared to exact dimensions, and the placement of the training targets must comply with standards. Footprint pits are used to train new operators on the proper detection techniques and how to pinpoint Explosive Hazard locations. Figure 1 shows two examples of training lane layout based on available real estate. The site survey with the Government representative will be performed to determine the appropriate number of lanes and layout based on available real estate at each location.

2. The training lane overall dimensions are 1.5 meters by 15 meters. They are made up of ten cells. Each cell is 1.5 meters by 1.5 meters. To avoid electronic interference between detectors, training lanes must be at least 10 meters apart. Each lane must be designated as A, B, and so forth, and each cell should be numbered 1, 2, 3, and so forth for key reference and grading purposes. Footprint pits can be located near the starting point of the training lanes or in between lanes. Their dimensions are 1.5 meters by 1.5 meters.

3. The training lanes and footprint pits are constructed of 4" PVC Pipe buried in ground at beginning of lane left (BOLL), beginning of lane right (BOLR), end of lane left (EOLL), end of lane right (EOLR). 2"x4"x12” pressure treated wood with nylon screws will be inserted in the PVC Pipe. Plastic chain will then be linked to nylon screw to identify left (Orange chain) and right (Yellow Chain) lateral limits. Black zip ties will be used to mark 1.5 meter downtrack location on the plastic chain to identify the beginning or end of each cell in a lane. Figure 3 shows Final Lane

Construction.

Figure 3. Laying out a Training Lane

GRADING MATRIX CONSTRUCTION

1. The grading matrix will be used during lane preparation when placing training targets (simulated mines or IED training targets) in the lanes and to grade students’ performance during practical exercises and certification. It must be made to exact specifications.

2. The grading matrix is a square frame, made from 1 ½-inch or 2-inch PVC pipe and 90-degree elbows. The PVC pipe must be cut so the distance between the inside corners of the elbows are 1.5 meters. Cut four equal lengths of pipe and assemble the four elbows into a square frame. Use glue to assemble the frame. Drill nine holes through each side of the frame at 15- centimeter intervals so twine can be strung through to make a grid pattern in the frame (see Figure 4). Label the frame vertically 1 through 10 and horizontally L, then A through I. These reference numbers will be used to specify the location of training targets and clutter in each cell.

Figure 4. Grading Matrix

TRAINING TARGET INSTALLATION

1. Training targets are a combination of simulated mines and simulated Improvised Explosive Devices (IED) (identified in Table 1). None of these targets have or will contain explosive materials. The UAC range manager will sign for long-term loan or complete ownership of the AN/PSS-14 Training Target Set (TTS), which are the mine simulants, from the base Training Support Center. The PM will send the IED components to the site per Range Control guidance. A complete set of 119 simulated mines/IEDs and metallic clutter, sufficient for 12 training lanes and 8 footprint pits will be available from the Training Support Center and PM.

Target Burial

Depth Lanes

(inches)

Qty of targets for Footprint

(burial depth flush with ground)

Qty of targets for Lanes

Total

Training Target-06 cm- Antipersonnel, Low Metal (TT-06-

AP)

1 12 12

Training Target-09 cm- Antipersonnel, Low Metal (TT-09-

AP)

1 1 4 5

Training Target-12 cm- Antipersonnel, Low Metal (TT-12-

1 1 4 5

Target Burial

Lanes

(inches)

Qty of targets for Footprint

(burial depth flush with ground)

Qty of targets for Lanes

Total

AP)

Training Target-20 cm- Antitank, Low Metal (TT-20- AT)

3 8 8

Training Target-25 cm- Antitank, Low Metal (TT-25- AT)

3 1 11 12

Training Target-30 cm- Antitank, Low Metal (TT-30- AT)

2 1 4 5

Training Target-High Metal, Antipersonnel (TT-M- AP)

2 1 4 5

Training Target-High Metal, Antitank

(TT-M- AT)

4 1 4 5

18 Gauge Wire 1 6 6 22 Gauge Wire 1 6 6 Pressure Cooker 8 1 4 5 Artillery Sim (81mm) 8 1 4 5 Plastic Jug (Sealed Cat Litter Container)

6 1 12 13

Zig Zag Pressure Plate 2 1 6 7 Saw Blade Pressure Plate 2 1 6 7 Carbon Rod Pressure Plate 2 1 12 13 Metallic Clutter 2 or 3 186 186

Table 1. Training Target Set

Figure 5. Training Target Set

2. The training targets are buried at a specified depth measured from the top of the target in accordance with Table 1 for the 12 lanes. The training targets are buried flush to the surface in the footprints. The lanes should simulate the combat environment as much as possible, and when sweeping for Explosive Hazards the Soldier may detect a target at the edge of their sweeping area. Therefore, the contractor shall place at least one training target per lane on the inside edge of the training lane. Figure 6 below illustrates a complete, 12-lane training area of target and clutter locations with a legend listing the 16 different types of training targets.

3. The training targets and clutter quantity are specified for each cell.

Emplacement of the items can be anywhere within the cell for training lanes. The training targets emplaced in the footprints need to be located as shown in Figure 7.

4. The depth and location of the training targets and clutter items in the cell must also be recorded using the grid marks on the grading matrix. Figure 8 shows a simulated mine a n d clu tte r i tems being emplaced. Its depth and location will be recorded on the lane key using the grading matrix as a reference.

Figure 6. Training Lane Lay-out

Figure 7. Typical Footprints Layout

Figure 8. Mine and Clutter Emplacement

LANE KEYS

1. Each training location must have a lane key. The lane key is a record of the location of each training target and pieces of clutter in the lane. The contractor shall generate the lane key while emplacing training targets and clutter using the grading matrix. Table 2 shows a sample lane key for lane A with the training target identification and location in each cell, along with the description and location of each clutter item.

STUDENT SCORE SHEET

NINI= No Impact No Idea STUDENT'S NAME CM= Center Mass 1. Sweep Technique DATE LANE VERIFIED Location: Fort Leonardwood, TA 190 2. Lane Coverage April 2016 3. Chasing Metal 4. Not listening to metal Date of Training: 5. Sloppy short sweep 6.Outside the Halo

TA 190

Target Location in Cell

Lane Grid Cell

Target

Min Type

Column

Row

Hit Y/N

Miss in Inches

Clutter

NOTES GO / NO GO DAY

A 1 6 APLM 1 I 1

A 2 5GAL 6 J 2 LANE#

A 3 CR PP 2 H 2

A 4 9 APLM 1 C 2 CHIP

A 5 SB PP 2 I 2

A 6 20 ATLM 3 B 3 HIT

A 7 18ga W ire 1 D1 D7 Horizontal

A 8 30 ATLM 3 J 4 MISS

A 9 AT M 4 B 6

A 10 B L A N K INITIALS FALSE

GO / NO GO DAY

B 1 5GAL 6 H 4

B 2 25 ATLM 3 D 6 LANE#

B 3 ZZ PP 2 H 7

B 4 6 APLM 1 C 5 CHIP

B 5 CR PP 2 C 6

B 6 12 APLM 1 G 4 HIT

B 7 PC 8 E 8

B 8 B L A N K MISS

B 9 30 ATLM 3 H 4

B 10 22GA W IRE 1 A Vertical INITIALS FALSE

Table 2. Sample Lane Key