VAV Research 353-8MH614.pdf
PDF 158 KB Posted
- Attached to
- Z2DA--CFM - Rebalance HVAC System Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document package includes drawings and schedules for an HVAC system rebalance project. The project involves rebalancing air handling terminals, valves, fan coil units, and computer room AC units on the fifth and fifth mezzanine floors of Building 8MH614 at the New Orleans VA Medical Center. Key details include specifications for over 25 exhaust air valves, 20 supply air valves, 4 supply terminal units, over 30 fan coil units, and 5 units on the fifth mezzanine floor. Control types and sequences are defined. The related federal contract opportunity is solicitation number REBALANCE for rebalancing the HVAC system at the facility. The purpose is to attach 91 additional documents to the solicitation. The agency is the Department of Veterans Affairs Veterans Health Administration VISN 16.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--CFM - Rebalance HVAC System has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H A L
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
E E T
(1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
X T
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
BUILDING NUMBER
8MH614
BLDG 08 HVAC AIR TERMINAL/VALVES AND FAN
COIL UNIT SCHEDULE
BE RPBJuly 16, 2012
8629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
NEW ORLEANS, LOUISIANA
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECTURAL ENGINEERING / PLUMBING
SCALES ASSOCIATES / FIRE PROTECTION
BR+A CONSULTING ENGINEERS / LOW VOLTAGE
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
WP_09B
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED
EXHAUST AIR VALVES SCHEDULE - FIFTH FLOOR
MARK LOCATION
AREA AND/OR
BLDG SERVED SIZE Max CFM Min CFM
Min DCV
CFM
VALVE SOUND
ATTENUATOR
IN-DUCT AIR
FILTER NO.
GPM
(Flow)
CONTROL
TYPE CONTROL SEQUENCE Remarks
EV-1 08-5P CEAV-2 400 CFM 400 CFM N/A SAD-52 F-1 N/A CV TRACKS SV-1 NOTE (4)
EV-2 08-5P EAV-2 500 CFM 500 CFM N/A SAD-52 - N/A CV TRACKS SV-1 NOTE (4)
EV-3 08-5P CEAV-2 400 CFM 400 CFM N/A SAD-52 F-1 N/A CV TRACKS SV-2 NOTE (4)
EV-4 08-5P EAV-2 500 CFM 500 CFM N/A SAD-52 - N/A CV TRACKS SV-2 NOTE (4)
EV-5 08-5P HV-3 725 CFM 725 CFM N/A SAD-63 - N/A CV TRACKS SV-4 NOTE (4)
EV-6 08-5P HV-2 450 CFM 450 CFM N/A SAD-62 - N/A CV TRACKS SV-4 NOTE (4)
EV-7 08-5P HV-2 450 CFM 450 CFM N/A SAD-62 - N/A CV TRACKS SV-3 NOTE (4)
EV-8 08-5P HV-3 725 CFM 725 CFM N/A SAD-63 - N/A CV TRACKS SV-3 NOTE (4)
EV-9 08-5P HV-2 450 CFM 450 CFM N/A SAD-62 - N/A CV TRACKS SV-6 NOTE (4)
EV-10 08-5P HV-3 725 CFM 725 CFM N/A SAD-63 - N/A CV TRACKS SV-6 NOTE (4)
EV-11 08-5P EAV-2 400 CFM 400 CFM N/A SAD-52 - N/A CV TRACKS SV-8 NOTE (4)
EV-12 08-5P EAV-2 500 CFM 500 CFM N/A SAD-52 - N/A CV TRACKS SV-7 NOTE (4)
EV-13 08-5P CEAV-2 400 CFM 400 CFM N/A SAD-52 F-1 N/A CV TRACKS SV-7 NOTE (4)
EV-14 08-5P HV-3 725 CFM 725 CFM N/A SAD-63 N/A CV TRACKS SV-16 NOTE (4)
EV-15 08-5P EAV-2 400 CFM 400 CFM N/A SAD-52 - N/A CV TRACKS SV-9 NOTE (4)
EV-16 08-5P HV-2 450 CFM 450 CFM N/A SAD-62 - N/A CV TRACKS SV-16 NOTE (4)
EV-17 08-5P HV-2 450 CFM 450 CFM N/A SAD-62 N/A CV TRACKS SV-9 ON LEVEL 4 NOTE (4)
EV-18 08-5P EAV-2 500 CFM 500 CFM N/A SAD-52 - N/A CV TRACKS SV-10 NOTE (4)
EV-19 08-5P EAV-2 400 CFM 400 CFM N/A SAD-52 - N/A CV TRACKS SV-11 NOTE (4)
EV-20 08-5P EAV-3 525 CFM 525 CFM N/A SAD-53 - N/A CV TRACKS SV-13 NOTE (4)
EV-21 08-5P EAV-2 400 CFM 400 CFM N/A SAD-52 - N/A CV TRACKS SV-12 NOTE (4)
EV-22 08-5P EAV-1 200 CFM 200 CFM N/A SAD-51 - N/A CV TRACKS SV-14 NOTE (4)
EV-23 08-5P CEAV-1 200 CFM 200 CFM N/A SAD-51 F-1 N/A CV TRACKS SV-14 NOTE (4)
EV-24 08-5P EAV-2 500 CFM 500 CFM N/A SAD-52 - N/A CV TRACKS SV-17 NOTE (4)
EV-25 08-5P EAV-5 1700 CFM 1700CFM N/A SAD-55 - N/A CV TRACKS SV-5 NOTE (4)
EV-26 08-5P CEAV-2 400 CFM 400 CFM N/A SAD-52 F-1 N/A CV TRACKS SV-17 NOTE (4)
SUPPLY AIR VALVES SCHEDULE - FIFTH FLOOR
MARK LOCATION
AREA AND/OR
BLDG SERVED SIZE Max CFM Min CFM
Min DCV
CFM
VALVE SOUND
ATTENUATOR
AIR VALVE
REHEAT NO.
GPM
(Flow)
CONTROL
TYPE
CONTROL
SEQUENCE Remarks
SV-1 08-5P SAV-3 1000 CFM 1000 CFM N/A SAD-43 RHC-3 1.75 CV 2/8MH813 NOTE (4)
SV-2 08-5P SAV-3 1000 CFM 1000 CFM N/A SAD-43 RHC-3 1.75 CV 2/8MH813 NOTE (4)
SV-3 08-5P SAV-4 1075 CFM 1075 CFM N/A SAD-44 RHC-4 1.75 CV 4/8MH814 NOTE (4)
SV-4 08-5P SAV-4 1075 CFM 1075 CFM N/A SAD-44 RHC-4 1.75 CV 4/8MH814 NOTE (4)
SV-5 08-5P SAV-3 950 CFM 950 CFM N/A SAD-43 RHC-3 1.75 CV 3/8MH814 NOTE (4)
SV-6 08-5P SAV-4 1075 CFM 1075 CFM N/A SAD-44 RHC-4 1.75 CV 4/8MH814 NOTE (4)
SV-7 08-5P SAV-3 1000 CFM 1000 CFM N/A SAD-43 RHC-3 1.75 CV 2/8MH813 NOTE (4)
SV-8 08-5P SAV-2 500 CFM 500 CFM N/A SAD-42 RHC-2 1.00 CV 3/8MH814 NOTE (4)
SV-9 08-5P SAV-2 500 CFM 500 CFM N/A SAD-42 RHC-2 1.00 CV 3/8MH814 NOTE (4)
SV-10 08-5P SAV-2 500 CFM 500 CFM N/A SAD-42 RHC-2 1.00 CV 3/8MH814 NOTE (4)
SV-11 08-5P SAV-2 500 CFM 500 CFM N/A SAD-42 RHC-2 1.00 CV 3/8MH814 NOTE (4)
SV-12 08-5P SAV-2 500 CFM 500 CFM N/A SAD-42 RHC-2 1.00 CV 3/8MH814 NOTE (4)
SV-13 08-5P SAV-2 425 CFM 425 CFM N/A SAD-42 RHC-2 0.75 CV 3/8MH814 NOTE (4)
SV-14 08-5P SAV-2 500 CFM 500 CFM N/A SAD-42 RHC-2 1.00 CV 1/8MH813 NOTE (4)
SV-15 08-5P SAV-3 750 CFM 750 CFM N/A SAD-43 RHC-3 1.25 CV 3/8MH814 NOTE (4)
SV-16 08-5P SAV-4 1075 CFM 1075 CFM N/A SAD-44 RHC-4 1.75 CV 4/8MH814 NOTE (4)
SV-17 08-5P SAV-3 1000 CFM 1000 CFM N/A SAD-43 RHC-3 1.75 CV 2/8MH813 NOTE (4)
SUPPLY TERMINAL UNIT SCHEDULE - FIFTH FLOOR DIXIE
MARK LOCATION
AREA AND/OR
BLDG SERVED SIZE Max CFM Min CFM GPM (Flow)
CONTROL
TYPE
CONTROL
SEQUENCE Remarks
S-1 08-5P E2 1150 CFM 575 CFM 1.0 VCV 3/8MH806 NOTE (1)
S-2 08-5P C2 450 CFM 450 CFM 1.0 CV 1/8MH806 NOTE (1)
S-3 08-5P C3 550 CFM 275 CFM 0.5 VCV 3/8MH806 NOTE (1)
S-4 08-5P B2 375 CFM 200 CFM 0.5 VCV 3/8MH806 NOTE (1)
FAN COIL UNIT/ COMPUTER ROOM AC SCHEDULE - FIFTH FLOOR
MARK LOCATION
AREA AND/OR
BLDG SERVED SIZE
CONTROL
TYPE CONTROL SEQUENCE Remarks
FCU-1 08-5P 4F6 - 2/8MH805 NOTE (3)
FCU-2 08-5P 4F6 - 2/8MH805 NOTE (3)
FCU-3 08-5P 4F6 - 2/8MH805 NOTE (3)
FCU-4 08-5P 4F6 - 2/8MH805 NOTE (3)
FCU-5 08-5P 4B5 - 2/8MH805 NOTE (3)
FCU-6 08-5P 4F6 - 2/8MH805 NOTE (3)
FCU-7 08-5P 4F6 - 2/8MH805 NOTE (3)
FCU-8 08-5P 4F6 - 2/8MH805 NOTE (3)
FCU-9 08-5P 4F6 - 2/8MH805 NOTE (3)
FCU-10 08-5P 4B5 - 2/8MH805 NOTE (3)
FCU-11 08-5P 4F6 - 2/8MH805 NOTE (3)
FCU-12 08-5P 4B5 - 2/8MH805 NOTE (3)
FCU-13 08-5P 4B5 - 2/8MH805 NOTE (3)
FCU-14 08-5P 4B5 - 2/8MH805 NOTE (3)
FCU-15 08-5P 4F6 - 2/8MH805 NOTE (3)
FCU-16 08-5P 4F6 - 2/8MH805 NOTE (3)
FAN COIL UNIT/ COMPUTER ROOM AC SCHEDULE - FIFTH MEZZANINE FLOOR
MARK LOCATION
AREA AND/OR
BLDG SERVED SIZE
CONTROL
TYPE CONTROL SEQUENCE Remarks
FCU-1 08-5.5P 4B3 - 2/8MH805 NOTE (3)
FCU-2 08-5.5P 2H6 - 1/8MH805 NOTE (2, 5)
FCU-3 08-5.5P 2H7 - 1/8MH805 NOTE (2, 5)
FCU-4 08-5.5P 2H7 - 1/8MH805 NOTE (2, 5)
FCU-5 08-5.5P 2H7 - 1/8MH805 NOTE (2, 5)
GENERAL NOTES:
1. REFER TO DRAWINGS 8MH610 AND 8MH611 FOR
SUPPLY AND RETURN TERMINAL UNIT SCHEDULES.
2. REFER TO DRAWING 8MH611 FOR CAC UNIT
SCHEDULE.
3. REFER TO DRAWINGS 8MH605 AND 8MH606 FOR FCU
SCHEDULE.
4. REFER TO DRAWING 8MH607 FOR SUPPLY AND EXAHUST
AIR VALVES SCHEDULES.
5. ON EMERGENCY POWER.
1 Addendum 1 9/21/12
6 RFI-4199 9/16/14
File details come from the government source that posted it. Updated .