About this file

This document contains safety requirements for a construction project and details of a related federal contract opportunity to rebalance the HVAC system at a Veterans Affairs medical facility. The safety requirements section lists applicable publications from organizations like ASSE, ASTM, FGI, NFPA on topics including pre-project planning, protection of the public, construction and demolition operations, surface burning characteristics of materials, healthcare facility design guidelines, portable fire extinguishers, flammable liquids, welding safety, electrical codes and equipment maintenance.

The related federal contract opportunity is solicitation number REBALANCE to rebalance the HVAC system at VHA VISN 16. The purpose of the amendment is to provide ninety-one attachments to the solicitation. The contract is with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--CFM - Rebalance HVAC System, newest first.
File Type Posted
VAV DNT 02303-2MH628.pdf PDF
P12-AMS CEP 115-7MH608.pdf PDF
S02-XHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE v2.pdf PDF
VAV DNT 02305-2MH630.pdf PDF
DNT L05 G.pdf PDF
RESEARCH 4th mech plan.pdf PDF
CEP L03.pdf PDF
P12-000110 Table of Contents 4-7-20.pdf PDF
AMS TLR 03470-6MH604.pdf PDF
ICRA ILSM for CFM - Rebalance HVAC System.xlsx XLSX spreadsheet
VAV DNT 02302-2MH627.pdf PDF
OUT L08.pdf PDF
S02-EXHIBIT A PERFORMANCE RELEVANCY SURVEY v2.pdf PDF
PANAM 104.pdf PDF
03503-6EP103-M3.pdf PDF
OUT L06.pdf PDF
OUT L04.pdf PDF
OUT L03.pdf PDF
S02-EXHIBIT E SURETY FORM.pdf PDF
P15-M-2 DNT Building Existing AHU sequence.pdf PDF
AMS Research 348-8MH609.pdf PDF
P14-M-4 OP Building Existing AHU sequence.pdf PDF
P15-M-5 OP Building Existing DOAS sequence.pdf PDF
OUT L02.pdf PDF
VAV Research 352-8MH613.pdf PDF
RESEARCH 5 dixie penthouse.pdf PDF
INP L03.pdf PDF
DNT L02i F-G.pdf PDF
PANAM 103.pdf PDF
230593 Testing Adjusting and Balancing for HVAC.pdf PDF
VAV DNT 02301-2MH626.pdf PDF
M-3 DNT Building Existing DOAS sequence.pdf PDF
OUT L07.pdf PDF
P13-INP L04.pdf PDF
DNT L01i D-E.pdf PDF
230511 Common Work Results for HVAC.pdf PDF
RESEARCH 2nd mech plan.pdf PDF
OUT L05.pdf PDF
390-8EP105-P.pdf PDF
S02-EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY v2.pdf PDF
PANAM 105.pdf PDF
P07-General Decision.pdf PDF
CEP L04.pdf PDF
230800 Commissioning of HVAC Systems.pdf PDF
RESEARCH 1st mech plan.pdf PDF
P15-M-1 Typical Existing Service Bay layout.pdf PDF
AMS PANAM 0243-9MH601.pdf PDF
AMS OP 03027-3MH604.pdf PDF
010000 General Requirements.pdf PDF
013323 Shop Drawings Product Data and Samples.pdf PDF
Show all 50

Z2DA--CFM - Rebalance HVAC System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02-01-20

01 35 26 -1

SECTION 01 35 26

SAFETY REQUIREMENTS

1.1 APPLICABLE PUBLICATIONS:

A. Latest publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.

B. American Society of Safety Engineers (ASSE):

A10.1-2011...........Pre-Project & Pre-Task Safety and Health

Planning

A10.34-2012..........Protection of the Public on or Adjacent to

Construction Sites

A10.38-2013..........Basic Elements of an Employer’s Program to

Provide a Safe and Healthful Work Environment

American National Standard Construction and

Demolition Operations

C. American Society for Testing and Materials (ASTM):

E84-2013.............Surface Burning Characteristics of Building

Materials

D. The Facilities Guidelines Institute (FGI):

FGI Guidelines-2010Guidelines for Design and Construction of

Healthcare Facilities

E. National Fire Protection Association (NFPA):

10-2013..............Standard for Portable Fire Extinguishers

30-2012..............Flammable and Combustible Liquids Code

51B-2014.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work

70-2014..............National Electrical Code

70B-2013.............Recommended Practice for Electrical Equipment

Maintenance

70E-2015 ............Standard for Electrical Safety in the Workplace

File details come from the government source that posted it. Updated .