About this file

This document contains a third floor lighting plan for Building 6 at a medical center replacement project located in New Orleans, Louisiana. The plan provides specifications for lighting fixture locations and types throughout Area M3. Key details include lighting notes regarding fixture mounting heights and locations per architectural drawings, occupancy sensor operation and wiring, as well as lighting control requirements involving time schedules, relays, and interfaces with the building automation system. The related federal contract opportunity is an amendment to solicitation number REBALANCE for rebalancing the HVAC system at a Veterans Health Administration facility. The amendment provides ninety-one attachments to the original solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--CFM - Rebalance HVAC System, newest first.
File Type Posted
VAV DNT 02303-2MH628.pdf PDF
P12-AMS CEP 115-7MH608.pdf PDF
S02-XHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE v2.pdf PDF
VAV DNT 02305-2MH630.pdf PDF
DNT L05 G.pdf PDF
RESEARCH 4th mech plan.pdf PDF
CEP L03.pdf PDF
P12-000110 Table of Contents 4-7-20.pdf PDF
AMS TLR 03470-6MH604.pdf PDF
ICRA ILSM for CFM - Rebalance HVAC System.xlsx XLSX spreadsheet
013526 Safety Requirements.pdf PDF
VAV DNT 02302-2MH627.pdf PDF
OUT L08.pdf PDF
S02-EXHIBIT A PERFORMANCE RELEVANCY SURVEY v2.pdf PDF
PANAM 104.pdf PDF
03503-6EP103-M3.pdf PDF
OUT L06.pdf PDF
OUT L04.pdf PDF
OUT L03.pdf PDF
S02-EXHIBIT E SURETY FORM.pdf PDF
P15-M-2 DNT Building Existing AHU sequence.pdf PDF
AMS Research 348-8MH609.pdf PDF
P14-M-4 OP Building Existing AHU sequence.pdf PDF
P15-M-5 OP Building Existing DOAS sequence.pdf PDF
OUT L02.pdf PDF
VAV Research 352-8MH613.pdf PDF
RESEARCH 5 dixie penthouse.pdf PDF
INP L03.pdf PDF
DNT L02i F-G.pdf PDF
PANAM 101.pdf PDF
DNT L06 D.pdf PDF
P12-230593 Testing Adjusting and Balancing for HVAC 4-7-20.pdf PDF
DNT L01i F-G.pdf PDF
VAV Research 353-8MH614.pdf PDF
AMS DNT 02288-2MH613.pdf PDF
014219 Reference Standards.pdf PDF
RESEARCH 3rd mech plan.pdf PDF
AMS DNT 02289-2MH614.pdf PDF
PANAM 102.pdf PDF
INP L04.pdf PDF
S05- AMENDMENT- 0001.pdf PDF
S02-EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT v2.pdf PDF
CEP L02.pdf PDF
DNT L02i D-E.pdf PDF
AMS IP 01414-1MH604.pdf PDF
P12-VAV PANAM 0252-9MH610.pdf PDF
INP L05.pdf PDF
VAV CON -00MH602.pdf PDF
CEP L01.pdf PDF
382-8EL105-P.pdf PDF
Show all 50

Z2DA--CFM - Rebalance HVAC System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

6E L1

-M

6E

L1

-M

E a b

06 3

06 4

06 5

06 6

M

06 9

XA

06 P 06 R

XB

06 Q06 N

9.5

10.7

06 S

06-3M3

AHU-2

S3 S3

S3

S3

S3

S3

S3

S3

S3

S3

S3

PC

b a 8 b b a

R

TS

TS

b a a a a a a a a b b

ELS6421-29

2#10 & 1#10G-3/4"C

FTR2a

FTR2a

E

E

E

FCZ2c

E

E

E

E

E

ELSL6421-25

ELSL6421-27

ECL6421-21

21 21

E

GENERAL NOTES:

1. REFER TO LEGEND AND GENERAL NOTES ON DRAWING 0ES001.

2. THE ELECTRICAL CONTRACTOR SHALL COORDINATE MOUNTING OF LIGHTING

FIXTURES WITH ARCHITECTURAL REFLECTED CEILING PLAN AND ELEVATIONS PRIOR

TO INSTALLATION.

3. REFER TO LIGHTING FIXTURES SCHEDULE ON DRAWINGS.

4. EXIT SIGNS SHALL BE CONNECTED TO UNSWITCHED EMERGENCY CIRUIT.

5. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL LIGHTING IN MECHANICAL

SPACES AND LOCATE LIGHTING AROUND DUCTWORK AND PIPING TO ALLOW PROPER

ILLUMINATION AND AVOID CONFICTS WITH OTHER TRADES.

6. REFER TO THE RESPECTIVE POWER PLAN FOR PANEL LOCATIONS.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION AND

QUABITY OF FIXTURES.

UNLESS OTHERWISE NOTED, ALL OCCUPANCY SENSORS SHALL BE FIELD

SET FOR VACANCY MODE/MANUAL "ON" VIA LOW VOLTAGE WALL SWITCH.

REFER TO REFERENCE DETAIL FOR SPECIFIC SEQUENCE OF OPERATION.

LIGHTING CONTROL GENERAL NOTES:

1.

OCCUPANCY SENSOR NUMBER DENOTES DETAIL REFERENCE ON

DRAWING 0ES514, E.G. '02' DENOTES DETAIL 2/0ES514. REFER TO

ASSOCIATED DETAIL FOR USE,WIRING, AND CONTROL INTENT.

2.

LOWER CASE LETTER INDICATES ASSOCIATED ROOM CONTROL/SWITCH

LEGS. "Rx" NUMBERS INDICATE ASSOCIATED RELAY CONTROL. REFER TO

LIGHTING CONTROL PANEL SCHEDULES FOR RELAY REQUIREMENTS.

3.

RQUIRED POWER PACKS, ROOM CONTROLLERS, AND LOW VOLTAGE

WIRING AND INTERCONNECTIONS NOT SHOWN ON PLANS. REFER TO

DETAILS, DRAWING 0ES514 AND 0ES515 FOR RQUIREMENTS.

4.

REFER TO LIGHTING CONTROL RISER DIAGRAM AND SCHEDULES FOR

LIGHTING CONTROL PANEL AND RELAY CHANNEL GROUPING

REQUIREMENTS.

5.

ALL TIME SCHEDULED EVENTS SHALL BE INITIATED BY THE BAS VIA

LIGHTING CONTROL PANEL BACNET INTERFACE. LIGHTING CONTROL

RELAYS SHALL DEFAULT TO THE 'ON' POSITION IN THE EVENT OF

NETWORK TROUBLE OR LOSS OF CONNECTION TO THE BAS.

6.

WHERE SHOWN ON PLANS, PUBLIC AREAS SPACES WITH SUFFICIENT

GLAZING SHALL INCLUDE PHOTCELL OVERRIDE TO SHUT OFF INDIVIDUAL

LIGHTING ZONES WHEN DAYLIGHT PENETRATION IS SUFFICIENT. REFER

TO LIGHTING CONTROL PANEL SCHEDULES AND RISER DIAGRAMS FOR

REQUIREMENTS.

7.

CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIRED MODULES,

INTERFACES, AND CONTROL INTERCONNECTIONS AS REQUIRED BY

MANUFACTURER TO MEET SPACIFIED CONTROL INTENT.

8.

PROVIDE UL924 BYPASS RELAY FOR EACH SWITCHED LIFE SAFETY ZONE.

REFER TO DETAILS ON DWG 7ES507 AND 7ES508.

9.

UNDER NO CIRCUMSTANCES SHALL LINE VOLTAGE LIFE SAFETY WIRING BE

LOCATED WITHIN THE SAME JUCNTION BOX WITH OTHER SYSTEMS WIRING

WITH THE EXCEPTION OF WITHIN UL924 DEVICES.

10.

Q D2 D1

E2 E1

F2 F1

G2 G1

A2

A4

A5

A1

A6

B1

C1 C2

B2

H

J1 J2

L

K

M1 M2 M3

N1 N2

A7

D3

E3

F3

R1

R4

R2 R3

A3

08 P

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

T E

R

IN

C H

O

N E

FO

O

T O

N E

H

AL

F I N

C H

O

N E

FO

O

T

TH

R

EE

Q U

A R

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

EE

T

( 1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

XT

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

E S

O N

E

FO

O T

6"

BUILDING NUMBER

NEW ORLEANS, LOUISIANA

6EL103-M3

BLDG 6 THIRD FLOOR LIGHTING PLAN - AREA

M3

SMAC AVFebruary 29, 2012

6629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING / PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

BR+A CONSULTING ENGINEERS / LOW VOLTAGE

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

I.S.C. GROUP, INC./ IRRIGATION

DAN EUSER WATER ARCHITECTURE, INC./ WATER FEATURE

Department of Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

WP_08

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"

1 6-L3 - Lighting-Area M3

THIS DRAWING HAS BEEN AFFECTED BY THE BIM

COORDINATION PROCESS. PLEASE REFER TO THE

BIM COORDINATED SHOP DRAWINGS FOR DETAILS.

RFI 5554: Mount per specs. Bottom of fixture to be 6" above door frame, centered on door. Photocell to match height and be centered in MP-1 panel.