About this file

McKim & Creed has submitted a Request for Statement of Qualifications (RSQ 10-22) to the Utilities Commission of the City of New Smyrna Beach, Florida for Continuing Professional Services. The RSQ solicits qualifications for a one-year contract with potential three-year extensions to provide comprehensive civil engineering services for potable water, wastewater, and reuse water projects. The firm will serve as a general engineering consultant to support the Utilities Commission's infrastructure needs, offering services including design, permitting, construction administration, and technical support for various utility system improvements such as lift stations, force mains, water distribution systems, and treatment facility upgrades.

McKim & Creed's proposal emphasizes their local presence, with a Daytona Beach office located just 18 miles from New Smyrna Beach, and highlights their extensive experience with similar continuing services contracts for other Florida municipalities like Daytona Beach, Palm Coast, and Ormond Beach. The firm has completed over 2,000 projects under general engineering contracts and demonstrates a strong track record of cost-effective project delivery, with key personnel having an average of 24-35 years of experience. The proposal includes detailed project examples, team qualifications, and comprehensive insurance coverage, positioning the firm as a multidisciplinary engineering partner capable of handling a wide range of utility infrastructure projects with local expertise and proven performance.

View the file

Other files

File Type Posted
RSQ_09-25_Shortlist_Posting.pdf PDF
RSQ09-25_PROPOSAL_RECEIPT_LOG.xlsx XLSX spreadsheet
RSQ_09-25_Addendum_No_3_PR_Response.pdf PDF
RSQ_09-25_Addendum_No_2.pdf PDF
2022-4-15_Utilities_New_Smyrna_Beach-_Mangan_Qualifications_DP_V1.0.pdf PDF
POPP_20220310_0839-City_of_New_Smyrna_Beach_RSQ_-AST-Final.pdf PDF
RSQ_10-22_Final_Civil_Evaluation_Committee_Results.pdf PDF
Atwell_City_of_New_Smyrna_RSOQ.pdf PDF
RSQ_10-22_NSB_Continuing_Professional_Services_Civil_Engineering_Burns_&_McDonnell.pdf PDF
Hazen_and_Sawyer_UCNSB_Continuing_Professional_Services.pdf PDF
RSQ_10-22_Final_Tab_Survey.pdf PDF
CPH_Response_RSQ_10-22_General_Survey_and_Mapping.pdf PDF
CPH_Response_RSQ10-22_Civil_Engineering.pdf PDF
ETM_Survey_Utiltiies_Commission_Survey_Proposal.pdf PDF
RSQ_10-22_Civil_Eng_Proposal.pdf PDF
RSQ_10-22_Continuing_Professional_Services_Burgess&Niple_Inc..pdf PDF
RSQ-10-22_Continuing_Professional_Services-Electrical_Engineering.pdf PDF
RSQ_09-25_Addendum_No_1_PR_Response.pdf PDF
RSQ-10-22_Continuing_Professional_Services-Survey_and_Mapping.pdf PDF
RSQ_10-22_Tetra_Tech.pdf PDF
lazen_new_smyrna_red_r0.pdf PDF
RSQ_10-22_Final_Tab_Electrical.pdf PDF
RSQ_10-22_NSB_Continuing_Professional_Services_Electrical_Engineering_Burns_McDonnell.pdf PDF
RSQ_10-22_Rummel_Klepper_Kahl_Submittal.pdf PDF
New_Smyrna_RSQ_10-22_Continuing_Professional_Services.pdf PDF
RSQ_10-22_Electrical_Eng_Proposal.pdf PDF
1_Yuro_&_Associates__Submitted_RFQ.pdf PDF
Stantec_UCNSB_RSQ10-22_04.19.22.pdf PDF
SOQ_P&D_Engineers_New_Smyrna_Beach.pdf PDF
DRMP_Inc._SOQ_for_RSQ_10-22.pdf PDF
Stantec__UCNSB_RSQ10-22__Electrical_Engineering.pdf PDF
New_Smyrna_Beach_RSQ_10-22_-_SurvTech_Solutions_Response_20220419.pdf PDF
RSQ_09-25_Continuing_Professional_Services.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTINUING PROFESSIONAL SERVICES

SUBMITTED TO:

UTILITIES COMMISSION, CITY OF NEW SMYRNA BEACH

PO Box 100 | New Smyrna Beach, Florida 386.424.3046

SUBMITTED BY:

MCKIM & CREED

Daytona Beach, Florida

386.274.2828 | mckimcreed.com

RSQ #10-22

ELECTRONIC

April 19, 2022

Maureen Lynch, CPPB Procurement Manager Utilities Commission, New Smyrna Beach New Smyrna Beach, Florida

RE: RSQ #10-22: Request for Statement of Qualifications Continuing Professional Services

Dear Ms. Lynch and Members of the Selection Committee:

The Utilities Commission of New Smyrna Beach (UCNSB) understands the value of partnering with an engineering firm that has demonstrated experience in providing diverse planning, design, construction, and operational support for water, wastewater, and reuse water projects under general engineering contracts. UCNSB also understands that a local, multidisciplinary firm that can be responsive on short duration, small scale assignments and during times of emergency will bring added value to this contract.

McKim & Creed is pleased to present this Statement of Qualifications to provide Civil Engineering for Potable Water, Wastewater and Reuse Water Services.

In order to provide the UCNSB with responsive and cost-effective engineering and consulting services under a continuing services contract, a consultant must present the following:

» Diverse water, wastewater, and reuse water experience

» Proven success in delivering innovative and practical solutions

» Local east coast presence for rapid response

» Ability to execute design and work plans in-house

» Positive relationships with permitting agencies

LOCAL TEAM | McKim & Creed offers these qualifications through our local team of professionals who possess the experience and expertise needed to perform these services, combined with our talented and experienced subconsultant team members, most of whom have worked either directly with the UCNSB in the past or with municipalities in the surrounding area. Project management and a majority of the design services will be performed from our Daytona Beach office.

Our team is deeply committed to meeting the Commission’s needs and has gained working knowledge of the Commission’s procedures as a design partner on the UCNSB’s Western Utility Complex. We look forward to building upon that experience and to continue to deliver quality projects to the UCNSB.

McKim & Creed has long been established on the East Coast of Florida since its acquisition of Briley Wild & Associates in 1994. Through this lineage, we have been providing professional civil and utility engineering services for over 60 years. It is our rich history of local experience and an understanding of the area’s communities that makes our team uniquely qualified to serve the UCNSB’s goals and contract needs . We have the in-house capabilities and local presence to provide the UCNSCB with the responsiveness and attention to detail for all assignments this contract requires.

TEAM AND INDIVIDUAL QUALIFICATIONS| To build on the successful working relationship already established with the UCNSB staff, I will serve as Senior Project Manager. I have gained a working knowledge and understanding of the UCNSB’s various systems and processes based on relationships established with staff and my experience serving as Senior Project Manager for the development of the UCNSB’s Western Utility Complex.

Rankings per Engineering News-Record (ENR)

#26 Overall Design Firm in the Southeast top130 E n v i r o n m e n t a l Firm in the U.S.

top150 Design Firm (top 250 since 1992)

INDUSTRY

RANKINGS

139 Executive Cir #201, Daytona Beach, FL 32114 386.274.2828 mckimcreed.com

139 Executive Cir #201, Daytona Beach, FL 32114 386.274.2828 mckimcreed.com

Our Senior Project Manager’s varied background will result in practical solutions, operator friendly designs, and safe working environments for your staff.

The experienced team is complemented by technical leaders – many recognized as subject matter experts by their peers – to provide all assignments anticipated under this contract in-house. This will allow us to deliver responsive and cost-effective services regardless of the size of the assignment.

Our design efforts are focused on the East Coast of Florida where we provide similar continuing engineering services for numerous government agencies such as the City of Daytona Beach, the City of Ormond Beach, and the City of Palm Coast.

Our team has completed over 2,000 assignments through general engineering contracts, and we have developed an understanding of the operational and regulatory challenges that must be addressed to provide increasingly greater levels of service while maintaining affordable rate structures for your customers.

This local knowledge will directly benefit the UCNSB through cost-effective designs, knowledge of local contractors, experience with local project cost estimating, and an invested interest in the local community.

UNDERSTANDING THE UCNSB NEEDS| McKim & Creed has specific, specialized experience with all types of projects, including those noted within the UCNSB’s latest CIP. Many of the projects listed in the CIP are necessary to maintain and improve many of the UCNSB assets as well as meet new requirements of regulatory agencies. McKim & Creed has the local internal team design talent and project team to assist the Commission with these projects. We have the in-house capabilities to provide Civil, Process Design, Structural Engineering, Instrumentation & Control, and full MEP services for improvements at the Water Reclamation Facility, improvements and equipment replacement at the Water Treatment Plant, reconstruction/improvements to the Lift Stations and improvements /replacement of Utility Pipelines.

McKim & Creed is ready to support the UCNSB with their upcoming projects and is excited to have this opportunity to be considered for the Commission’s list of qualified professional engineering firms for this continuing services contract. I am available to answer any questions the Commission might have about our qualifications and our commitment to serving your utility and infrastructure engineering needs.

Sincerely, McKim & Creed, Inc.

Charles Hill, PE, BCEE Senior Project Manager chill@mckimcreed.com

Table of

CONTENTS

1. Qualifications 05

2. Consultant’s Understanding 22

3. Staffing 30

4. Location 52

5. Financial Stability/Insurance/License 54

6. References 58

7. Past Project Performance 60

8. Forms 72

QUALIFICATIONS1

McKim & Creed | RFQ# 10-22 Continuing Professional Services 5

QUALIFICATIONS

McKim & Creed offers a complete suite of professional engineering services that include all water, wastewater, and reuse engineering services anticipated under this contract. We understand that decisions made on small-scale, short-duration general engineering assignments can have impacts on long-term planning and operational goals. The Utilities Commission of New Smyrna Beach can expect the same level of detail on all assignments under this contract - regardless of size - to meet the objectives of all stakeholders.

Our success with delivering projects under continuing services contracts is due to our overall approach that focuses on working collaboratively and intelligently with our clients, and on providing practical, innovative and sustainable solutions.

McKim & Creed has been providing professional engineering services for wastewater, utility distribution and collection, and facilities building and infrastructure projects for public utilities across Florida for over 60 years. More than 2,000 engineering projects were performed under “as-needed”, continuing service contracts; and many of these projects involved the upgrade, expansion and/ or rehabilitation of our client’s treatment facilities, and utility collection and distribution systems. McKim & Creed has developed a reputation of responsiveness and dependability, as evidenced by our more than 60 engineer of record/general engineering contracts we currently hold throughout Florida and have been serving several of our continuing contracts for decades.

Table 1.1 demonstrates our team’s diverse experience providing services anticipated under this contract on similar continuing professional services contracts. Our team will leverage lessons learned - and success stories - from these contracts to deliver responsive, sustainable, and cost effective services for UCNSB.

CLIENT

CITY OF

DAYTONA

BEACH

CITY OF

ORMOND

BEACH

CITY OF

PALM

COAST

CITY OF ST.

PETERSBURG

CITY OF

CLEARWATER

MANATEE

COUNTY

COLLIER

COUNTY

YEARS OF SERVICE 27 60 10 20 35 25 16

# OF PROJECTS 120+ 130+ 72+ 111+ 240+ 170+ 40+

Project Team Participation l l l l l l l

Ongoing Services Contracts l l l l l l l

Consent Order Addressed l l l

Potable Water Distribution l l l l l l l

Reuse Water Conveyance l l l l l l l

Pump Station & FM Conveyance l l l l l l l

Gravity Sewer Collections l l l l l l l

Rehabilitation/Expansion l l l l l l l

I&I/R&R l l l l l l

Planning & Design l l l l l l l

I&C/SCADA l l l l l l l

Odor Control l l

Alternative Water Supply l l l l l

Maintenance of Plant Operations l l l l l

Hydraulic Modeling l l l l l l l

HDD/Trenchless l l l l

Funding Support l l l l l l

TABLE 1.1 SIMILAR CONTINUING PROFESSIONAL SERVICES CONTRACTS

McKim & Creed | RFQ# 10-22 Continuing Professional Services 6

McKim & Creed has provided services to the City of Ormond Beach for over 60 years, successfully executing over 130+ projects. McKim & Creed professionals have been an integral part of the City's utility systems capital program development and implementation for many years.

130+ Total

Projects

Years Serving the City

McKim & Creed has provided engineering services to the City of Palm Coast under continuing service contracts for the last 10 years. Through these contracts, we have provided a variety of project types including pump stations, potable water sources, and pipeline projects.

CITY OF PALM COAST | CONTINUING SERVICES CONTRACT

72+

Total Projects

Years Serving the City

McKim & Creed has provided services to the City of Daytona Beach for 27 years. Recent project involvement has included the Halifax River Sanitary Sewer Force Main, Lift Station No. 10 Improvements, Orange Avenue Design and Permitting Services, Dr. Martin Luther King Jr. Blvd Reconstruction Improvements, and Lift Station 22 Force Main Replacement.

CITY OF DAYTONA BEACH | CONTINUING SERVICES CONTRACT 160+

Total

Projects

Years Serving the City

CONTINUING SERVICES CONTRACT EXPERTISE

McKim & Creed is committed to providing a high level of service throughout the life of this contract, as we have successfully proven with our ongoing contracts. We currently hold more than 60 general engineering contracts throughout Florida, showcasing our ability to manage and respond to multiple, ongoing, and simultaneous projects. The best indicator of our ability to exceed the expectations of our continuing services clients is that over 90% of our local office work comes from “repeat” clients.

Below are highlights of the City of Ormond Beach, the City of Palm Coast, and the City of Daytona Beach GEC contracts. These contracts are managed and delivered by our local staff.

Over the next few pages, we will provide a more in-depth overlook of projects completed within these three (3) continuing service contracts.

CITY OF ORMOND BEACH | CONTINUING SERVICES CONTRACT

McKim & Creed | RFQ# 10-22 Continuing Professional Services 7

Lift Station 3M: McKim & Creed provided design, bidding and construction services for the improvements to three submersible pump stations located at different sites throughout the city. The scope included electrical upgrades at Lift Station 3M, modifications to the pump discharge pipe and installation of a new valve box at Tomoka Meadows, and the conversion of the Ashford Lakes privately owned lift station into a City of Ormond Beach lift station that met all of the City’s lift station standards. Bypass pumping was specified to ensure all sanitary sewer operations were maintained during the construction. Through a quality design and through estimating, this project was delivered and constructed on time and within the City’s budget.

CITY OF ORMOND BEACH

McKim & Creed has been providing engineering services to the City of Ormond Beach for over 60 years, successfully executing over 130 projects. McKim & Creed professionals have been an integral part of the City’s utility systems capital program development and implementation for many years.

Contact: John Noble, PE, City Engineer Phone: 386.676.3269 Email: noble@ormondbeach.org

TEAM PERSONNEL INVOLVED WITH CONTRACT

NAME ROLE

Charles Hill, PE, BCEE Senior Project Manager

Aubrey Haudricourt, PE Electrical Engineer

A. Emmett Anderson, PE Structural Engineer

David Wehner, PE Project Engineer

Phil Locke, PE Project Engineer

Key Highlights f60 Years of Service to the City of Ormond Beach fProvided a variety of services including:

» Water Resources Engineering

» Electrical Engineering

» Structural Engineering

» Instrumentation & Controls (SCADA)

» Surveying

» Subsurface Underground Exploration (SUE)

SELECT CITY OF ORMOND BEACH PROJECT EXPERIENCE

PROJECT HIGHLIGHTS

Check-Circle Converted privately owned lift station to City standards

Check-Circle Electrical upgrades

Share-square

Innovative client services

FEMA GRANT APPLICATIONS

McKim & Creed supported the City of Ormond Beach with applications for FEMA Hazard Mitigation Grant Program assistance for various stormwater/wastewater projects.

We developed various tasks and supported the City’s preparation and submittal of the HMGP application. During the project, McKim & Creed provided project management, attended meetings, performed quality control, collected and reviewed data, and prepared a Benefit Cost Analysis.

Projects that benefited from the resulting $9 million of FEMA HMGP assistance included Fleming Avenue Stormwater Improvements, Wilmette Avenue Stormwater Pump Station, and Lift Station Back-up Portable Pumps.

Continuing Services Contract

McKim & Creed | RFQ# 10-22 Continuing Professional Services 8

Secondary Raw Water Transmission Main: McKim & Creed provided design, easement preparation, permitting, bidding and construction services for the installation of 17,000 feet of 16-inch raw water main. The main will serve as a secondary, or redundant, water main to the existing 16-inch main that serves as the major feed to the City’s water treatment plant. The raw water main was initially conceived to follow S.R.40 until it reached Booth Road, where it traversed south and connected to Old Tomoka Road. However, due to the numerous utilities present in the right-of-way between Tymber Creek Road and Booth Road, it was decided to install the main along Old TOmoka Road until reached Booth Road.

North Peninsula Water Main Improvements: McKim & Creed provided design & construction services for the replacement of old and dilapidated 2-inch galvanized pipe through various residential streets throughout the city and the upsizing of lines to 6-inch or 8-inch in order to enhance water quality, water pressure and fire fighting capabilities within the residential neighborhoods. The design of this water line system included abandonment or removal of existing galvanized pipe depending on the location and cost-effectiveness of the removal, proposed installation of new water main including new valves and the installation of new service lines from new main to the existing meter boxes at each residential lot. This also required the transfer of the water services to the new water main following the final acceptance and approval and clearance for the proposed water main.

John Anderson Dr. Water Main & Force Main Adjustments:

McKim & Creed provided engineering services to design and permit utility and stormwater infrastructure improvements as additional components of the City’s John Anderson Drive Roadway Improvement Project.

Project included modification of the original designs for the roadways project to include removal of 6- and 8-inch water mains and conversion of residential tie-ins to a 12-inch water main, installation of a 16-inch sanitary force main, and the addition of 10 fire hydrant assemblies.

Lift Station 8M1 Rehab: McKim & Creed designed improvements to Lift Station 8M-1 located within the Tomoka Oaks subdivision of Ormond Beach. The project included electrical improvements;

replacement of the existing perimeter knee wall and wet well improvements. The wet well work included replacement of the existing top slab; lining the existing wet well interior; and replacement of the existing riser pipes, guide rails, brackets and submersible pumps.

Division Ave. Raw Water Transmission Main: McKim & Creed provided design services for the installation of 3,000 feet of 12-inch raw water main, designed specifically so that the raw water from the wells on Division Avenue would be directed to the reverse osmosis portion of the City’s water treatment plant. Before the implementation of the project, the raw water along Division Avenue flowed to both the reverse osmosis and lime softening areas within the plant. The goal of this project was to separate the poorer-gravity Division Avenue well flow, and direct it to the reverse osmosis system. In addition to the raw water main, an 8-inch water main and 2-inch force main were designed to serve a future environmental learning center opened by the City.

LS 10M & 12M Improvements:

McKim & Creed preformed professional engineering services for the rehabilitation of Lift Stations 10M and 12 M for the City of Ormond Beach. This rehabilitation project included a condition assessment of the structural components and an evaluation of the mechanical, electrical, and SCADA/I&C equipment to make a determination on which components were in need of replacement, repair, or could continue to be in service. McKim & Creed performed this site analysis to make the appropriate determinations and worked closely with City staff in order to understand andy budget constraints that might impact the rehabilitation. After the completion of the site analysis, McKim & Creed provided the City with construction documents that moved through the various phases of design and provided construction administration.

PROJECT HIGHLIGHTS

Check-Circle Wet Well Rehabilitation

Check-Circle Electrical Upgrades

Check-Circle Replacement of a settled gravity sewer main and surface restoration.

PROJECT HIGHLIGHTS

Check-Circle 3,000 feet of 12-inch raw water main

Check-Circle Serve as environmental learning center opened by the City.

PROJECT HIGHLIGHTS

Check-Circle Bids came in 20% under estimate

Check-Circle Configuration for the bypass pumping assembly

Check-Circle Flood resistant design considerations

Check-Circle Cost comparisons for repair, rehabilitation and replacement options

PROJECT HIGHLIGHTS

Check-Circle 17,000 feet of 16-inch raw water main

Check-Circle Route analysis and alternative route selection

PROJECT HIGHLIGHTS

Check-Circle Utility coordination services with both public and private utilities

Check-Circle 5,900 LF - 8" HDD

Check-Circle 3,700 LF - 8" pipeline

PROJECT HIGHLIGHTS

Check-Circle Conversion of residential tie-ins to a 12-inch water main

Check-Circle Installation of a 16-inch sanitary force main

Check-Circle 10 fire hydrant assemblies

McKim & Creed | RFQ# 10-22 Continuing Professional Services 9

CITY OF PALM COAST

McKim & Creed has been providing engineering services to the City of Palm Coast under continuing service contracts for the last 10 years. Through these contracts we have provided a variety of project types including pump stations, potable water sources, and pipeline projects.

Contact: Steve Flanagan Phone: 386.986.2354 Email: sflanagan@palmcoastgov.com

TEAM PERSONNEL INVOLVED WITH CONTRACT

Key Highlights f10 Years of Service to the City of Palm Coast fProvided a variety of services including:

» Water Resources Engineering

» Electrical Engineering

» Structural Engineering

» Instrumentation & Controls (SCADA)

» Surveying

» Subsurface Underground Exploration (SUE)

Old Kings Road Force Main:

McKim & Creed provided environmental, survey, geotechnical and engineering design/construction services for the installation of 13,000 feet of 16- and 18-inch force main. The project was located on Old Kings Road from its intersection with Town Center Boulevard (immediately south of Lehigh Canal) to a point of connection where three existing force mains are located. A hydraulic analysis was conducted on the manifold force main system that transmitted flow from approximately 33 lift stations. Based upon the results of the analysis, a new 16-inch force main was designed to work in concert with the existing 8-inch force main in service. The project involved seven directional drills, one jack-and-bore crossing and seven connections to existing force mains.

SELECT CITY OF PALM COAST PROJECT EXPERIENCE

Share-square

Innovative client services

WORKING WITH OTHER

CONSULTANTS

On the Old King’s Road Force Main project, the existing lift stations connected to the manifold were able to reduce pumping time due to the reduced system head curve, which allowed for additional pumping capacity of each station.

To benefit the City, two consultants worked mutually to combine the force main work with a project to design and construct a new master pump station. The pump station project and force main project were combined into one Project Manual, while the technical specifications and drawings were issued separately by each consultant to complement the entire bid package. By combining projects, the City was able to realize significant cost savings.

Continuing Services Contract

PROJECT HIGHLIGHTS

Check-Circle Hydraulic and Water Quality

Modeling

Check-Circle Cost Estimating and CIP Updates

NAME ROLE

Charles Hill, PE, BCEE Contract Manager

Aubrey Haudricourt, PE Electrical Engineer

A. Emmett Anderson, PE Structural Engineer

David Wehner, PE Project Engineer

Phil Locke, PE Project Engineer

McKim & Creed | RFQ# 10-22 Continuing Professional Services 10

Matanzas Woods Parkway Master Pump Station and Force Main: McKim & Creed furnished design, bidding and construction services to update the proposed Matanzas Woods Parkway Master Pump Station and Force Main. The original design, completed and bid in 2008 but never awarded, directed flow from 13 pump stations and connected to a 16-inch force main. This scenario allowed each station to pump increased flow from the wet wells, and reduced the amount of flow directed to a pump station that was experiencing excessive pump run times.

As part of the design review and update, McKim & Creed helped the City conduct a hydraulic flow analysis to determine existing and future flows that may affect pump and force main sizing, reviewed and updated the electrical and instrumentation and control system, reviewed structural design, verified the size of the initial and future pumps, and determined when future pumps should be installed within the wet wells. Our team also oversaw FDEP permitting, provided negotiation and bidding services, and advised and consulted with the city for post-design and construction activities.

Whiteview Parkway Force Main and Pump Station Upgrades: McKim & Creed provided engineering services for the design and construction of a new 16-inch force main that would parallel an existing 12-inch force main from Lift Station 24-2 to Old Kings Road. The double-barreling of force mains was necessary in order to relieve the bend on the existing LS 24-2 pumps. Without the installation of the new force main, the pump station would continue to log excessive run times in order to keep up with the high flow volumes. The directional drill included crossing I-95 and the Belle Ave. Waterway, for a total distance of 1,350 feet.

Monitoring the location and depth of the force main was critical in order to achieve the permitted depth under the interstate, and to provide adequate depth under the waterway, so that the possibility of "fracking" or rising of the drilling fluid to the surface, was kept to a minimum. The project also included connections to existing 16-inch force mains located at Whiteview Parkway and Old Kings Road.

Shallow Well and Raw Water Main: The City of Palm Coast determined to make improvements to the existing raw water supply system in the northern section of the City. Shallow well (SW) 43 was abandoned and replaced with a new well. The new well was drilled, developed and capped following logging and testing. McKim & Creed was tasked by the City to provide permitting, design, bidding, and construction services to install a new pump, piping, and sitework. Before work could begin, the area was evaluated by our environmental subconsultant to determine the extent of wetlands and identify threatened and endangered species.

Once clearances were obtained, the new well was drilled to approximately 100-foot depth. Engineering plans were submitted to FDEP for a construction permit then the project was bid. The project included a new submersible pump capable of pumping 300 gpm at 200 feet of TDH. Site work, yard piping and approximately 1,500 linear feet of new 8-inch PVC raw water main was installed.

Seminole Woods Reclaimed Water Main: McKim & Creed has provided engineering services for various phases of work during a ten-year period for the Seminole Woods Reclaimed Water Main. The first phase of work added 7,500 LF of 16-inch and 18-inch pipe along Seminole Woods Parkway to provide reclaimed water to customers in the Seminole Woods/Grand Landings area.

The second work order involved installation of a one-inch service line to the east side of Seminole Woods Boulevard just south of SR-100. A new FDOT Utility Permit was required for the jack-and-bore install under SR-100. The third work order entailed updating the design as well as bidding, ans construction of Seminole Woods boulevard reclaimed water main.

SR100 Water Main Improvements: McKim & Creed was responsible for designing improvements to the existing potable water distribution system, which included an interconnect between two existing water mains. The 16-inch water main was located along northern side of SR100 between Old Kings Road and Roberts Road, a distance of approximately 10,000 feet. Tasks included project meetings and data collection, surveying, hydraulic model development, design, permitting, bidding services and services during construction.

PROJECT HIGHLIGHTS

Check-Circle Replacement of existing water supply wells

Check-Circle New Water Supply Construction

PROJECT HIGHLIGHTS

Check-Circle 7,500 LF of 16-inch and

18-inch Reclaimed Water Main

Check-Circle Jack-and-Bore install under

PROJECT HIGHLIGHTS

Check-Circle 10,00 LF 16” Water Main

Check-Circle Hydraulic Modeling

PROJECT HIGHLIGHTS

Check-Circle 1,350 LF Directional Drill under Interstate and Waterways

Check-Circle Pump Station Upgrades to Handle Increasing Flows

PROJECT HIGHLIGHTS

Check-Circle Hydraulic Flow Analysis

Check-Circle Reviewed Updated the Electrical and Instrumentation and Control System

Check-Circle Structural Design Review

McKim & Creed | RFQ# 10-22 Continuing Professional Services 11

Lift Station 22 Force Main Replacement: The City of Daytona Beach is modifying the LS 22 Force Main Replacement to replace aging infrastructure.

The existing 8 -inch force main consists of approximately 2000 LF of cast iron pipe under North Beach Street. The current force main has had several breakages allowing raw sewer to spill onto the surface roadway and make its way to subsurface drainage, ultimately creating a health hazard and environmental concern given the proximity to the Halifax River. The City described the breakages of the pipeline as being from the outside of the pipe and not from internal forces. The City of Daytona Beach contracted with McKim & Creed to provide the design engineering to install a new pipeline to replace the old pipeline under North Beach Street between Madison Avenue and Michigan Avenue.

CITY OF DAYTONA BEACH

McKim & Creed has been providing engineering services to the City of Daytona Beach for over 27 years, successfully executing over 160 projects. McKim & Creed professionals have been an integral part of the City’s utility systems capital program development and implementation for many years.

Contact: Jim Nelson, PE Phone:386.671.8613 Email: nelsonj@codb.us

TEAM PERSONNEL INVOLVED WITH CONTRACT

NAME ROLE

Charles Hill, PE, BCEE Senior Project Manager

Aubrey Haudricourt, PE Electrical Engineer

A. Emmett Anderson, PE Structural Engineer

David Wehner, PE Project Engineer

Phil Locke, PE Project Engineer

Key Highlights f27+ Years of Service to the City of Daytona Beach fProvided a variety of services including:

» Water Resources Engineering

» Electrical Engineering

» Structural Engineering

» Instrumentation & Controls (SCADA)

» Surveying

» Subsurface Underground Exploration (SUE)

SELECT CITY OF DAYTONA BEACH PROJECT EXPERIENCE

PROJECT HIGHLIGHTS

Check-Circle New pipeline using HDD and Open Cut

Check-Circle Quality Level B SUE conducted

Share-square

Continuing Services Contract

Bethune Point WWTP Expansion: Because of a recent expansion and upgrade designed by McKim & Creed, the Bethune Point Wastewater Treatment Plant in Daytona Beach is now the largest ultraviolet (UV) disinfection system in the State, the first public reuse system in Florida to receive permitting for unrestricted public access, and the first to use an uninterrupted power supply (UPS) on a UV system to ensure the plant is always 100 percent operational.

Our team increased the Wastewater Treatment Plant’s capacity from 10 to 13 mgd; converted the treatment to a safer, cleaner UV system that eliminates the expensive chemical feeds and disinfection violations; changed the process to a Bardenpho® system; and incorporated a UPS system to ensure the UV system is never without power. All this was accomplished without any major new construction on the site, and at 12 percent below the construction cost estimate.

PROJECT HIGHLIGHTS

Check-Circle Largest UV disinfection system in Florida

Check-Circle First to use an UPS on a UV system

McKim & Creed | RFQ# 10-22 Continuing Professional Services 12 distribution system. Our team conducted scenario workshops with City of Daytona Beach staff and evaluated current conditions and possible solutions. After the completion of the scenario modeling and analysis, a summary was prepared that outlined the analysis and findings, and recommendations for system improvements was provided. Working with City staff directly to solve known pressure and flow issues, we were able to provide solutions to pressure and flow issues throughout the city’s distribution system that had been identified over time by City maintenance staff. The McKim & Creed team supplied practical recommendations on the most cost-effective methods for solving these citywide issues.

Orange Avenue Design and Permitting Services: This is the second phase of a $12 million roadway and stormwater infrastructure improvements project completed for the City of Daytona Beach, the most complex that the City had undertaken. This phase involved replacement of all elements within the roadway corridor including features above and below ground – roadway, sidewalks, curbing, stormwater drainage system, potable water, fire and sanitary sewer systems.

This included replacing approximately 8,000 LF of 8-inch, 10-inch and 12-inch gravity sewer, 1,200 LF of 16-inch force main, 1,000 LF of 18-inch force main and 10-inch reclaimed water main to be installed by HDD under FDOT right-of-way. Extreme coordination and conflict resolution were critical components to successfully completing the utility system upgrades. These resolutions involved all private utilities along the corridor, particularly for the coordination of relocating overhead lines underground. Upsizing the stormwater system further increased the design efforts since the right-of-way was already full of existing utility systems with established connection and interconnection points. Evaluating the existing system in order to design upgrades that worked with all the surrounding elements required a block-by-block analysis. In addition, in order to maintain existing systems while installing replacements, the project team carefully coordinated the construction sequencing for the improvements, developing and implementing detailed maintenance of traffic plans. The team also coordinated permitting through FDEP, FDOT, and USACE agencies.

Palmetto Force Main Model:

McKim & Creed updated the sanitary sewer collection system model that our team previously designed for the City of Daytona Beach. The update added new collection system and lift station information to support the City’s deliberation on an extension to the Palmetto Avenue force main.

Halifax River Sanitary Sewer Force Main Crossing Professional Utility Engineering and Design Services: McKim & Creed provided to the City of Daytona Beach a capacity analysis report, design, permitting and construction services for a new 30-inch subaqueous force main (3,854 LF) that crosses under the Halifax River (Intracoastal Waterway) from the beachside service area to the Bethune Point Wastewater Treatment Plant (BPWWTP). The new force main enables the City of Daytona Beach to manage increasing demands on the system, accommodate planning for two new hotel resorts, provide service through an inter-local agreement with the City of Daytona Beach Shores (CoDBS) and abandon the existing 24-inch force main constructed in 1984. The initial phase of the project entailed the preparation of a preliminary design report, followed by a design phase, and a permitting and construction phase for which McKim & Creed provided construction estimates, surveying, bid preparation, and other services. The project was designed to employ Horizontal Directional Drilling (HDD); the drill crossed under the Intracoastal Waterway to avoid channel markers, and traversed a multi-million-dollar property and a community sports complex and marina. On the barrier island, the force main was installed under a high-traffic city street that included an abundance of existing utilities and obstacles. Our team’s design included pipe vertical and horizontal curve data, utility relocations, maintenance of traffic (MOT) requirements, road restoration and locations of temporary/permanent construction easements.

SCADA System Study and Upgrade Design: McKim & Creed is working with the City to identify aging PLC and SCADA hardware and software and select a migration path to modernize their two wastewater plants and water plant. The selection process includes a detailed audit of current components, working with the City to determine future goals and budget constraints, and the evaluation of hardware and software based on functionality, support, cost and ease of use.

Upon selection of the hardware and software, McKim & Creed is developing design drawings for the PLC upgrades as well as specifications and standards for the SCADA software upgrades.

We are working with the City to develop an RFP for integration services to implement the upgrades.

Potable Water System Water Quality Model: McKim & Creed translated the existing Innovyze H2ONet hydraulic model files to McKim & Creed’s Forcemain software to enable extended period simulations and enhanced graphical illustration of results related to the water quality conditions in the water

PROJECT HIGHLIGHTS

Check-Circle PLC design and upgrades

Check-Circle Electrical Upgrades

Check-Circle SCADA software upgrades Palmetto Avenue Hydraulic Model

Preliminary Summary of Modeling Results December 31, 2015

PROJECT HIGHLIGHTS

Check-Circle Upgrade to sanitary sewer collection system

PROJECT HIGHLIGHTS

Check-Circle Identified low cost options to improve water quality

PROJECT HIGHLIGHTS

Check-Circle 30-inch subaqueous force main (3,854 LF)

Check-Circle HDD crossed under the Intracoastal Waterway

PROJECT HIGHLIGHTS

Check-Circle Utility coordination services with both public and private utilities

Check-Circle 8,000 LF - 8", 10”, 12” pipeline

McKim & Creed | RFQ# 10-22 Continuing Professional Services 13

City of Bunnell Water Treatment Plant ION Exchange Project

McKim & Creed provided engineering services to pilot test chemical treatment options for the City’s co-located nanofiltration/lime softening water treatment plant. The combined water plant is permitted to treat 50 mgd to provide high-quality drinking water to the City’s utility customers. The treatment process included 4- mgd of potable water from lime softening and 10 mgd of potable water from the RO treatment train. Testing w2as performed to acquire permit modifications to address high levels of organics/color on the lime softening- train that was causing periodic exceedances of disinfection byproduct (DBP) levels as regulated but the EPA.

City of Pompano Beach WTP Lime Softening Pilot Study

The City of Bunnell received an FDEP consent order due to the failure to met the maximum containment levels required for disinfection byproducts, specifically TTHMs. McKim & Creed performed screening analyes for various treatment technologies, pilot testing, preliminary design, final design and permitting.

Additionally, we provided bidding, construction and post-construction services. Initial screening analyses and preliminary design indicated the most effective option was an ion exchange water treatment process.

The approach was to implement an ion exchange plant to remove TOC in order for disinfection byproducts to comply with regulatory requirements and address ongoing taste and odor issues.

The design also included an ion exchange softening process, concurrent with the TOC removal, to improve water quality by reducing hardness. In addition to the ion exchange, other design elements included dual media gravity filter, clear well, transfer pumps, chemical feed and disinfection. McKim & Creed also provided assistance to the City for both USDA Rural Grant and SRF funding.

HIGHLIGHTS & BENEFITS:

fHydrogen Sulfide Removal Achieved Using a Cascade Aerator, and Taste/Odor/Color Removal Achieved Using an Anion Exchange Process fFirst-of-its-kind Municipal Co-Removal Ion Exchange Water Treatment Plant f Improved Water Quality and Reduced Hardness

CASE STUDY

CASE STUDYIN-HOUSE CAPABILITIES

McKim & Creed has been providing full-service planning, permitting, design, construction management, and operational support services throughout the east coast of Florida for almost 60 years. A snapshot of our diverse public works services and experience is presented in the following narrative - many of these assignments were initiated or performed through general services contracts.

WATER SUPPLY AND TREATMENT

Our proposed team members have designed three water treatment plants in the area, two with innovative technologies that provided sustainable solutions to address growing water demands.

We also understand the importance of optimizing plant performance and reducing operating costs. Phil Locke, PE developed the innovative zero liquid discharge (ZLD) for Palm Coast’s reverse osmosis plant. The ZLD process recovers and treats nearly 100 percent of the plant’s concentrate, saving up to 1.2 million gallons of water per day, reducing raw water demands, and eliminating the ultimate surface water discharge of the waste streams. The Palm Coast ZLD project was the FWEA Water Reuse Project of the Year. This was the first ZLD facility designed in the State of Florida.

Meeting the commitment of providing water has multiple challenges, requiring the right combination of skills, experience and technology. At McKim & Creed we have the staff and experience to evaluate your specific challenges related to water supply systems and find the appropriate solutions to best meet your needs. We cover all aspects including:

» Water Softening

» Water Storage & Pumping Optimization

» Condition Assessments, Rehabilitation, & Hardening

» Hydraulic & Water Quality Modeling

» Asset Management

» Electrical Design

» Systems Integration & SCADA Programming

» Safety/Risk Management

» Arc Flash

» Consumptive Use Permits

» Chemical Feed Systems

McKim & Creed | RFQ# 10-22 Continuing Professional Services 14

In conjunction with Florida’s City of Bunnell, the Flagler County Utilities Department purchased the 0.475 mgd, maximum three-month average daily flow (MTMADF) Plantation Bay Wastewater Treatment Facility (PBWWTF), a 30-year-old facility, in 2013 from a private land developer. The facility arrangement did not meet Class I Reliability requirements;

redundancy was inadequate for upsets in effluent quality or biological processes. Additionally, the plant lacked reject storage for water falling short of Part III Standards for Beneficial Reuse. The PBWWTF was under consent order by the Florida Department of Environmental Protection (FDEP) to address the outstanding deficiencies. Under a Continuing Utility Engineering Services contract, McKim & Creed provided professional engineering services for the preparation of a State Revolving Fund (SRF) document, preliminary engineering documents of PBWWTF improvements, FDEP operation permitting, and final design services for the reject storage facilities. We coordinated with the County to obtain available information to assist with the development of the SRF Planning Document. Narratives, sketches, cost estimates and calculations as required for the SRF Planning Document were provided. Our team also conducted a project kick off meeting with the County to discuss project direction, a meeting with the county to discuss draft documents, and attended a Board of County Commissioners meeting for public notification.

Plantation Bay WWTP Flagler County

CASE STUDYWASTEWATER/REUSE WATER TREATMENT

Our firm has been a pioneer in providing innovative and reliable wastewater and reuse water treatment services to our Florida clients - services that are unique due to extreme flow and loading fluctuations typically associated with seasonal demands and economic growth for many coastal communities. Services have included:

» Advanced Water Treatment

» Operations Troubleshooting

» Chemical Feed and Storage

» Reverse Osmosis

» Membrane Filtration

» Dewatering, Thickening, Digestion

» Structural Evaluations/Inspections

» Electrical Design

» Systems Integration and SCADA Programming

» Process Optimization

» Residual Management

» Asset Management

» Odor Control Systems

» CFD Modeling

WASTEWATER COLLECTIONS

Whether designing extensions to your collection systems or assisting with repairs to the City’s aging infrastructure, McKim & Creed’s staff will help meet the City’s wastewater collection needs to provide reliable and environmentally sound services.

Our wastewater collection services include:

» Lift Station and Force Main Design

» Gravity Collection System Design

» Hydraulic Modeling

» Pipeline Rehabilitation

» Flow Monitoring

» CCTV Pipeline Inspection

» Sewer System Evaluation Surveys (SSEs)

» Inflow/Infiltration (I&I) Studies

» Repair and Rehabilitation

» Climate Resiliency

The UCNSB will need a consultant who understands the full canvas of construction and rehabilitation options that are available to them and can provide neighborhood friendly and low cost solutions.

The Dale Mabry Diversion Project was the first of four successive, design-build projects included in Hillsborough County’s $250 million wastewater consolidation program.

It was critical for the Dale Mabry project to be completed on time to maintain the start dates of the remaining three projects and to protect the program’s overall schedule. McKim & Creed served as the engineer of record for the design and construction oversight of the 67,200 LF of 24-inch to 36-inch wastewater force mains and a 20-inch reclaimed water main.

The project’s aggressive schedule included 24 months for design, permitting, construction, and commissioning of over 12 miles of large-diameter force mains and reclaimed water mains. The project included the installation of large-diameter utility mains in a congested, multi-lane roadway corridor. Environmental challenges included multiple crossings of wetlands and surface waters. The $25.9 million design-build project was completed on time, within budget, and with minimal community disruption. This was achieved through proactive and creative risk management, community outreach, and construction management practices.

Dale Mabry Diversion Force Main & Reclaimed Water Hillsborough County

CASE STUDY

McKim & Creed | RFQ# 10-22 Continuing Professional Services 15

McKim & Creed provided design services to the City of Daytona Beach’s Reuse Water Master Plan, which identified the need to increase storage capacity and pumping to provide reuse water service tot he rapidly developing areas in the northwest part of the City. The design of the Mason Avenue Reuse Pumping Station and

2.5 million gallon (mg) storage tank fulfilled this need. The pump station was designed to provide maximum flexibility in regards to filling the storage tank and distributing reuse water. A 20-inch diameter- reuse pipeline was designed to connect the tank site and Mason Avenue and the tank site and Williamson Boulevard.

Services for this Work Order Assignment included preparation of final design permitting and construction cost estimating.

This project was a result of McKim & Creed’s Reuse Master Plan for the City that identified the need to increase storage capacity and pumping to provide reuse water service to the rapidly developing areas in the northwest part of the City.

Reuse Water System, Storage Tank and Pump Station City of Daytona Beach

CASE STUDYREUSED WATER STORAGE/DISTRIBUTION

McKim & Creed is a leader in developing wastewater reuse projects locally, regionally and nationally. We provide our clients with a wide array of reuse service offerings including feasibility, planning, alternative evaluation, treatment, public outreach, and alternative water supply.

Our team has experience ranging from advanced treatment for irrigation, surface water recharge, ground water recharge, ASR wells for reuse, pilot studies and the capability to provide a full range of reuse planning for UCNSB. For Manatee County, we developed a water balance model to allow the County to optimize the movement and storage of reclaimed water between service areas. The model predicts wet weather events and user demands based on historical reuse records and meteorological data. This ensures that reclaimed water is available for peak demands but it is not wasted during wet weather events.

» Hydraulic Modeling

» Pipeline Design and Trenchless Technologies

» Booster Pump Station and Storage Tank

» THM Removal Design

» Chemical Feed Systems and Storage

WATER DISTRIBUTION

McKim & Creed has experience designing all components of water supply and distribution systems including booster stations, ground and elevated storage tanks, wells, and waterlines.

Meeting the commitment of providing water has multiple challenges, requiring the right combination of skills, experience and technology. Our staff will evaluate your specific challenges related to water supply systems and recommend the appropriate solutions to best meet your needs. We cover all aspects including:

» Distribution System Planning

» Transmission and Distribution System Design

» Distribution System Modeling

» Asset Management

» Corrosion Control

» Hydraulic Analysis and Modeling

» Pipelines

» Storage Facilities/Booster Stations

» I&C and SCADA

» Leak Detection

» Rate Studies

McKim & Creed provided engineering services to replace the water distribution system in the Pass-A-Grille district from 9th Avenue to 1st Avenue by relocating the pipe to the main streets where feasible, eliminating dead-end runs, eliminating unlined cast iron pipes, and installing new PVC water main to improve water flow.

This project entailed abandoning in place approximately 3,500 LF of 2-, 4-, 6- and 8-inch water and installing approximately 4,400 LF of 2-, 4- and 6-inch water main in the City of St. Pete Beach within an area between Pass-A-Grille Way and Gulf Way from 9th Ave to 1st Ave. The project included replacing the existing water meters and water meter boxes throughout the service area, installing new water service lines where new water mains are installed, and reconnection to the water customers’ service lines.

The McKim & Creed team provided design, modeling, surveying, permitting, bidding, and construction administration services for the Pass-A-Grille Water Main Improvements project.

Pass-a-Grille Water Main improvements Pinellas County

McKim & Creed | RFQ# 10-22 Continuing Professional Services 16

Lift Station 87 handled approximately one-third of the City of Sarasota’s wastewater flow (9.5 mgd), but with a history of mechanical failures and overflows it was at the end of its useful life.

The City retained McKim & Creed to manage its $32-million program, evaluate the original design, propose design revisions, and develop a proactive public outreach program to regain the trust of the elected officials and the residents.

The primary focus of Phase 1 was evaluation and design, and of Phase 2 was redesign and construction. The results of our Phase 1 evaluation determined that the vertical alignment of the gravity main, as designed, could not be constructed. The invert elevation of the 36-inch main was lowered 8 feet to avoid interference with the existing bridge abutment and to minimize potential impacts to the environment during drilling.

Phase 1 also included a review of the previous lift station design and recommendations to increase reliability, improve worker safety and minimize operational issues. Phase 1 condition assessment and design services were completed in only five months to meet an aggressive consent order schedule. Phase 2 consisted of redesigning both the gravity collection system and other systems at the lift station.

Phase 2 consisted of redesigning both the gravity collection system and other systems at the lift station. It also included permitting activities, construction phase activities and continuing public outreach. For construction, McKim & Creed developed three bid packages based on the 30% designs, resulting in $2.5 million in savings for the City.

Lift Station 87 | City of Sarasota

CASE STUDYPUMP/LIFT STATIONS

McKim & Creed collectively offers more than 250 years of pump…