About this file
This document is a Statement of Qualifications (SOQ) submitted by Tetra Tech to the Utilities Commission of the City of New Smyrna Beach, Florida for Continuing Professional Services (RSQ No. 10-22) in the Civil Engineering category. The SOQ covers a one-year continuing contract for professional engineering services, with the potential to extend up to three additional years. Tetra Tech proposes to provide comprehensive civil engineering services including water distribution, wastewater transmission, lift station design, water and wastewater treatment, hydraulic modeling, and related technical support. The services will be delivered on an as-needed basis through task orders, with Tetra Tech offering expertise in preliminary engineering, field services, final design, permitting, bidding assistance, and construction administration.
Tetra Tech demonstrates extensive experience with municipal utilities, having completed over 13 projects for the New Smyrna Beach Utilities Commission and serving over 50 public entities in Florida. The firm highlights its financial stability as a publicly traded company (NASDAQ: TTEK) with $3.21 billion in annual revenue and 21,000 global employees. The proposal emphasizes the company's local knowledge, established relationships with UCNSB staff, comprehensive in-house capabilities across multiple engineering disciplines, and proven track record in water and wastewater infrastructure projects. Tetra Tech's key personnel have significant experience with similar municipal utility projects, and the company maintains strong insurance coverage and professional licensing in Florida.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
April 19, 2022
Maureen Lynch, CPPB Procurement Manager Utilities Commission, City of New Smyrna Beach, Florida 200 Canal Street New Smyrna Beach, Florida 32168
RE: REQUEST FOR STATEMENT OF QUALIFICATIONS CONTINUING PROFESSIONAL
SERVICES RSQ 10-22. Category - Civil Engineering
Tetra Tech is excited to submit our response to the Request for Statement of Qualifications for Continuing Professional Services with the Utilities Commission, City of New Smyrna Beach (UCNSB). We are so appreciative of the opportunity to serve the customers, staff, and commission again!
As demonstrated by our proven successes in serving the UCNSB, we share your commitment of being the best possible stewards of your customers’ resources. This begins with the commitment of a qualified and experienced team that offers exceptional project management, technical expertise, and a unique understanding of the UCNSB’s service area, history, and goals. Key attributes enabling our continued exceptional service to the UCNSB include:
Local Knowledge. We have worked with UCNSB staff to successfully complete more than 13 recent projects and have a unique understanding of the local area. Also, our local office philosophy allows the UCNSB to benefit from the best of both worlds; local, personalized service with nationally recognized resources.
Familiarity with UCNSB Staff. We have a strong working relationship with the UCNSB’s directors, project managers, and operations and maintenance staff. We keenly understand the UCNSB’s goals and objectives. This has enabled us to work together with the UCNSB to achieve some long-sought capital improvements.
In-House Services. Tetra Tech has comprehensive in-house capabilities to continue serving the UCNSB for this contract. Our staff includes professional civil, environmental, electrical, mechanical, and structural engineers; architects; surveyors; hydraulic modeling; and cybersecurity experts. With over 740 professionals in Florida, Tetra Tech has the resources to complete any project assigned through this contract.
Track Record. Tetra Tech has been recognized by Engineering News-Record as a front-runner in the industry, most recently being ranked as the #1 design firm in Water, #2 in Consulting/Studies, #2 in Sewer and Waste, and #4 in the Top 500 Design Firms. Tetra Tech has held the #1 ranking in Water for 18 consecutive years, which speaks to the reputation that we have built in the industry, both locally and nationally, as a leader in developing effective solutions to constantly changing, difficult engineering challenges.
Project Team. Tetra Tech is committed to providing the UCNSB with the most qualified staff to complete any assignment. As detailed in this proposal, our local project team has continued experience working on UCNSB projects and we will continue to commit the same project team members who have worked on previous assignments for the UCNSB.
Tetra Tech’s passion for this contract derives from our excitement to better our communities. We believe that Tetra Tech will continue to offer unparalleled service to the UCNSB for all of your project needs, and we are committed to continuing our strong relationship built on history, trust, and professionalism. Our entire team is committed to serving as an extension of the UCNSB’s staff, and we look forward to maintaining our years of experience, local knowledge, and dedication to provide great service to the Utilities Commission, City of New Smyrna Beach!
Sincerely, Jon D. Fox, PE Vice President / Principal-in-Charge
Michael D. Thatcher, PE Project Manager
TOP 500
DESIGN FIRMS
#4
SEWER AND
WASTE
#2
CONSULTING
STUDIES
#2
WATER
#1 18 consecutive years!
Rankings for 2021
201 E. Pine Street, Suite 1000, Orlando, FL 32801
Tel: (407) 839-3955 Fax: (407) 839-3790 tetratech.com
Qualifications Data
Consultant’s Understanding
Staffing
Location
Financial Stability
Insurance / Occupational License
References
Past Project Performance
TABLE OF
CONTENTS
OFFERING UNPARALLELED VALUE TO THE
UCNSB THROUGH...
Comprehensive Civil Services from a trusted project team with localized in-house resources
Immediate Responsiveness mitigating project issues through experience and familiarity with your facilities
National Leadership developing cutting-edge solutions through state-of-the-art science and technology
| 4UTILITIES COMMISSION, City of New Smyrna Beach TETRA TECH
QUALIFICATIONS DATA
Continuing Professional Services - RSQ No. 10-22
TETRA TECH
OVERVIEW
Our firm specializes in long-term partnerships with municipal clients including over four years of service for the UCNSB — Tetra Tech is a full service engineering consulting firm that has been working as an extension of the UCNSB for the past four years. For over five decades, Tetra Tech has been providing world class engineering services tackling similar projects of varying size and scope throughout Central Florida and the nation. We offer proven experience and demonstrated excellence in professional civil engineering services in water, wastewater, and reclaimed water utilities, hydraulic modeling, roadway, stormwater, geotechnical, and environmental disciplines.
In Florida, Tetra Tech has served over 50 public entities under continuing services contracts having designed, permitted, and assisted with the construction of almost half a million feet of pipelines along with numerous lift stations, plant expansions, management systems, distribution systems, and other infrastructure.
We place a large emphasis on serving the specific project needs and tasks of the UCNSB, while maintaining and updating our in-depth knowledge of the UCNSB’s various systems. As part of our commitment to the UCNSB, our staff will dedicate time and effort to further build upon our team’s existing working relationship with your staff and facilities to be proactive in our approach and assistance for each assigned task order.
OUR COMMITMENT
TO UCNSB
Tetra Tech’s established relationship with the UCNSB and our existing knowledge of your facilities and systems, combined with our experience designing and constructing similar civil engineering projects for other local municipalities, allows for a streamlined process in implementing any assignment.
Our expertise and established knowledge base provides the UCNSB with quality, cost-effective engineering services.
In the state of Florida, Tetra Tech has provided preliminary engineering, final design, permitting, and construction services for numerous complex and high-profile civil and utility projects.
Many of our professionals in the past have served the UCNSB on a variety of utility projects, most notably as the engineer-of-record for the UCNSB’s
7.0 MGD Advanced Treatment
Water Reclamation Facility as well as improvements to more than 7 UCNSB lift stations. Our team will leverage this unique knowledge of your systems and standards to all future assignments.
Table 1, presented on the following page, illustrates the vast recent civil project experience which Tetra Tech has provided to the UCNSB.
WHY TETRA TECH?
QUALIFICATIONS AT A
GLANCE
13+ Recent projects completed for
UCNSB
50+ Florida clients served through continuing services contracts
Offices throughout the state of
Florida
3,500+ Florida Water, Wastewater, and
Utility Projects Completed
30+ Years of similar civil continuing services contract experience in
Florida
1,500+ Completed task order assignments through general engineering services contracts
740+ Florida Professionals
Category: Civil Engineering
| 5UTILITIES COMMISSION, City of New Smyrna Beach
Continuing Professional Services - RSQ No. 10-22
TETRA TECH
SERVICES AS RELEVANT TO SCOPE OF WORK
Tetra Tech brings a proven track record of planning effectively, responding quickly, and managing efficiently a multitude of task orders — Our projects have included master planning, studies, preliminary design reports, final design, permitting, construction management and operation start-up services associated with various utility related assignments. Our engineers have provided services for some of the largest water systems in the US, ranging up to 540.0 MGD capacity. Our services also include:
INDUSTRY LEADERSHIP
Tetra Tech has significant expertise and proven experience in all areas of civil engineering including water and wastewater system services. This is best represented by our recognition as front-runner in the industry with over five number 1 rankings by Engineering- News Record (ENR), including our #1 ranking in Water for 18 consecutive years. Our award-winning team has been recognized for innovation and dedication over the years, and we will continue to bring that unique and valued perspective to the UCNSB.
2022 Lift Station No. 2 Generator Improvements Addition of a permanent diesel-powered site generator at the triplex (three 75 hp pumps) lift station
2022 Lift Station No. 10 Rehabilitation Rehabilitation of a triplex (three 100 hp pumps) lift station
2022 Lift Station No. 15 Preliminary Engineering Preliminary engineering to determine relocating an existing lift station out of the City of New Smyrna Beach roadway median on Wayne Avenue
2021 Lift Station No. 3 Rehabilitation Rehabilitation of a triplex (three 20 hp pumps) lift station
2021 Lift Station No. 12 Replacement Design of a duplex (two 10 hp pumps) lift station to replace the existing station. Project included 1,000 LF of wastewater force main improvements
2021 Lift Station No. 5 Replacement Design of a duplex (two 5 hp pumps) lift station to replace the existing station. Project included 2,300 of gravity wastewater improvements
2020 Baseline Wetland Monitoring Report Preparation of a report to detail field work activities required to meet requirements of the UCNSB’s CUP
Standards and Construction Specifications Update
Update to the UCNSB standards and construction specifications for water, wastewater, and reclaimed water
Consumptive Use Permit (CUP) Permit 8747 Renewal
Renewal of the UCNSB’s CUP to 2040
2019 Lift Station No. 9 Replacement Design of a duplex (two 10 hp pump) lift station to replace the existing station
2019 Quay Assisi Water Main Improvements 4,000 LF of water main improvements to replace the existing asbestos-cement water main
2018 Barracuda Bridge Utility Improvements 1,900 LF of potable water main improvements, 1,400 LF of wastewater force main improvements, and 500 LF of reclaimed water improvements, including two horizontal directional drills
2016 Islesboro Subdivision Utility Improvements 3,000 LF of water main improvements, 4,300 LF of gravity wastewater improvements and expansion, as well as wastewater assessment services
TETRA TECH’S RECENT UCNSB PROJECT EXPERIENCE
Ta b le
OVERVIEW OF SERVICES / EXPERTISE
| 6UTILITIES COMMISSION, City of New Smyrna Beach
TETRA TECH
� Wastewater collection system and lift station inspections, condition assessment and rehabilitation
� Design, permitting, and construction of water, wastewater, and reclaimed water pipelines utilizing the latest construction methods, including utility relocations due to transportation improvements
� Lift Station improvements and rehabilitations
� Potable water and reclaimed water storage and re-pump facilities and booster pump station design
� Design of new groundwater wells, rehabilitation of existing wells, and well abandonment
� Water and wastewater plant expansions, upgrades, and modifications
� Hydraulic modeling and analysis of water, reclaimed water and wastewater distribution/transmission systems, and wastewater collection systems using the latest software to evaluate water quality and “water wheeling”
� In-house hydraulic modeling, treatment process modeling, GIS analysis for operations optimization and planning, national water security, SCADA, electrical, and instrumentation capabilities
� Value engineering and constructability reviews
In addition to the services above, Tetra Tech provides additional services related to geographic information systems (GIS), civil/site, electrical, environmental, structural, SCADA, cybersecurity, plumbing, and mechanical engineering disciplines. Utilizing our robust and comprehensive library of resources allows us to provide all of these general support-type services in-house.
UTILITY INFRASTRUCTURE ENGINEERING
WASTEWATER COLLECTION, TREATMENT,
AND RECLAIMED WATER ENGINEERING
Tetra Tech’s award-winning wastewater treatment plant (WWTP) designs result from the synergy of hands-on experience, technical expertise, and respect for our clients. Our innovative engineering includes biological nutrient removal and active sludge processes, membrane bioreactors, and biofilm processes such as Integrated Fixed-Film Activated Sludge (IFAS) and Moving Bed Biofilm Reactor (MBBR). Tetra Tech also designs clarification and filtration processes, disinfection (including UV and hypochlorite), headworks, and sludge management processes.
Our extensive experience includes both new facilities and existing plant upgrades.
These projects have included the planning, permitting, design, construction management, and operation start-up services associated with various related wastewater, sludge, and effluent disposal projects completed by Tetra Tech. In addition, our firm maintains a library of all applicable State and Federal regulations regarding wastewater collection, transmission, treatment, and effluent disposal, and we understand their impacts on utility systems.
PUMPING FACILITIES AND LIFT STATIONS
Tetra Tech’s experience also includes the design and construction management of hundreds of water, wastewater, combined sewer, and stormwater pump stations; lift stations; and storage projects ranging from 1 MGD up to 206 MGD.
Tetra Tech’s wastewater engineers specialize in wastewater collection, transmission, treatment, effluent disposal and reuse, and other wastewater utility related services. Our extensive background has been focused throughout the state of Florida in a variety of projects.
These projects have included the planning, permitting, design, construction management, and operation start-up services associated with various related continuing services.
WATER SUPPLY, TREATMENT, DESIGN,
AND DISTRIBUTION
In the state of Florida, Tetra Tech has designed more than 20 water treatment facilities in the last 10 years. We have significant expertise and experience in the areas of water supply, distribution, treatment, storage, and other miscellaneous water utility related services. This experience includes construction through complex corridors including roadway, railroad, and even water body crossings and environmentally sensitive areas. Our team has provided master planning, process evaluation, testing, conceptual design, final design, permitting, bidding assistance, construction administration, start-up assistance, and testing at all of these facilities.
PROJECT HIGHLIGHT:
UCNSB 7 MGD ATWRF
Tetra Tech provided design, permitting, bidding, and construction administration support services for this facility.
TETRA TECH
| 7UTILITIES COMMISSION, City of New Smyrna Beach
TETRA TECH
A detailed list of selected project experience performed for similar municipalities in addition to other specialized services can be found within the proceeding pages of this section.
RELEVANT PROJECT & CONTINUING CONTRACT EXPERIENCE
Tetra Tech has built a strong history of executing on-call projects capitalizing on our strategic and innovative capabilities — Our clients benefit from effective, efficient program delivery through Tetra Tech’s responsiveness, flexibility, and project management. Our proven track record of success is highlighted by 80 percent of our work coming from repeat clients. The remaining 20 percent is a result of positive reference referrals given to new prospective clients. The experience, safety record, organizational capability, project management, and technical approaches presented in this proposal will demonstrate our performance.
Tetra Tech has demonstrated, progressed, and maintained consistency with the following key elements.
� Our team’s longevity is proven by their years of experience at Tetra Tech and is showcased in their resumes. Not only do we provide superior client service, we focus internally on providing quality work environments for our staff.
� Safety through all project phases, our experience modification rate, total record-able incident rate, and days away, restricted, or transfer are at least 25 percent below the industry average, demonstrating our industry leadership in safety.
� On-time and within budget delivery of greater than 90 percent of our projects demonstrate that we meet our client’s delivery needs with no surprises.
Through efficient management and leadership, our professionals have worked as an extension of our client’s staff on providing similar engineering services on an as-needed basis for more than 50 clients across Florida under continuing services contracts including the UCNSB. We understand the unique nature of these types of contracts and the necessity to provide timely responses while maintaining tight schedules and limited budgets. Figure 1, below, highlights selected clients that Tetra Tech is currently serving and the number of years we’ve provided continuing services.
Select Florida Continuing Contracts
C it y of
O ra ng e
C it y y ea rs
C it y of
L ak el an d y ea rs
C it y of
C ap e C or al y ea rs
C it y of
L ak e C it y
C it y of
N ap le s
T oh o W at er
A ut ho ri ty y ea rs
C it y of
B ar to w y ea rs
C it y of
N ew
Sm yr na
B ea ch ye ar s
C it y of
O rl an d o y ea rs
C it y of
D el to na
C it y of
M in ne ol a
C it y of
D ay to na
B ea ch
Fo rt
M ye rs
Be ac h
U C
N
SB
C ol lie r
C ou nt y
L ee
C ou nt y y ea rs
H en d ry
C ou nt y y ea rs
O ra ng e
C ou nt y
U ti lit ie s ye ar s6 ye ar s
Figure 1 y ea rs y ea rs y ea rs y ea rs y ea rs y ea rs ye ar s
| 8UTILITIES COMMISSION, City of New Smyrna Beach
TETRA TECH
SIMILAR EXPERIENCE AND REFERENCES
In the following section, we have highlighted project details for a selected number of continuing service projects currently held by Tetra Tech. To select our most relevant examples we have highlighted contracts with similar scope of services as projected to be requested by the UCNSB.
Tetra Tech is proud to provide a detailed list of similar project experience providing continuing and varied engineering services. Our client references are also included at the top of each continuing services contract description of services. We encourage you to contact these references for proof of our excellent record of superior services performed for similar public and municipal utilities.
Figure 2, below, details our experience with similar expertise and scope of services that we have provided over the years across hundreds of projects for these featured contracts.
CLIENT
ST
U
D
IE
S
E V
A
LU
A
TI
O N
S
PR
E
LI
M
IN
A
RY
E
N G
IN
E
E R
IN
G
FI
N
A L
D E
SI
G
N
PE
R
M
IT
TI
N
G
BI
D
D
IN
G A
SS
IS
TA
N
C E
C O
N
ST
R U
C
TI
O N
A D
M
IN
IS
TR
A
TI
O N
D
IS
TR
IB
U
TI
O N
S Y
ST
E
M
TR
A
N
SM
IS
SI
O N
S Y
ST
E
M
LI
FT
S
TA
TI
O
N D
E
SI
G N
W A
TE
R
T R
E A
TM
E
N T
PL
A
N
TS
W A
ST
E
W A
TE
R
T R
E A
TM
E
N T
PL
A
N
TS
M E
P D
E
SI
G N
S E
RV
IC
E S
IN
ST
R U
M E
N
TA
TI
O
N A
N D
C O
N
TR
O
LS
SC
A D
A
UCNSB ü ü ü ü ü ü ü ü ü ü ü ü Toho Water
Authority ü ü ü ü ü ü ü ü ü ü ü ü ü Orange County
Utilities ü ü ü ü ü ü ü ü ü ü ü ü ü City of Orlando ü ü ü ü ü ü ü ü ü ü ü ü ü
City of Lakeland ü ü ü ü ü ü ü ü ü ü ü ü ü City of New
Smyrna Beach ü ü ü ü ü ü
Detailed Project Description and Client References on the proceeding pages uuu
Scope of Services
Figure 2
| 9UTILITIES COMMISSION, City of New Smyrna Beach
TETRA TECH
CONTINUING PROFESSIONAL
ENGINEERING SERVICES
Tetra Tech has provided continuing professional engineering services to the Toho Water Authority since 1995. Projects have included numerous lift station upgrades and refurbishments, pipelines, and other engineering services. Our services have included:
� Alternative water supply exploration and water use permitting
� Water distribution (up to 24-inch) design, permitting, and construction
� Wastewater and reclaimed water/transmission (up to 24-inch) design, permitting, and construction
� Wastewater gravity system collection rehabilitation
� Water use permitting and compliance
� Wastewater lift station upgrades and refurbishments
� Raw water supply wells and transmission mains
� SRF loan application and supporting documents
� Permitting was required through FDEP, FDOT, SJRWMD, ACOE, Osceola County, and City of Kissimmee
Specific projects include:
1.3 MGD Harmony WTP Upgrades for the Addition of Sulfide
Treatment. Tetra Tech performed a disinfection byproduct (DBP) study and technology review that helped confirm that specific treatment of the groundwater supply required the removal of hydrogen sulfide and mitigation of DBPs in order to meet regulatory requirements and enhance the performance of the existing treatment processes at the WTP. As there is no one-treatment-solution for the removal of both sulfides and DBP precursors, Tetra Tech proposed a two-phase approach for implementation of upgrades at the Harmony WTP. This included the design, permitting and installation of
OWNER:
Tohopekaliga Water
Authority 951 Martin Luther King Blvd
Kissimmee, FL, 34741
TERM OF CONTRACT:
1995 - Present
PROJECT #1
Toho Water Authority, Kissimmee, FL
SELECTED PROJECT
HIGHLIGHTS /RELEVANCY
TO UCNSB:
REFERENCE:
Deb Beatty, PE Senior Project Manager
( 407.944.5023
* dbeatty@tohowater.com
Wastewater gravity system collection rehabilitation
Water use permitting and compliance
Wastewater lift station upgrades and refurbishments
Raw water supply wells and transmission mains
SRF loan application and supporting documents
P
P
P
P
| 10UTILITIES COMMISSION, City of New Smyrna Beach TETRA TECH sulfide treatment as a part of Phase I, which has been completed to date, and the installation of TOC removal treatment processes as Phase II (future). Tetra Tech assisted Toho Water Authority with the selection of the CMAR and provided construction administration services, working alongside the selected CMAR for Phase I.
Lift Station Rehabilitation: Lift Stations 13P, 26B, 35P, 48, 87, 93, 101P and 124. Tetra Tech is providing electrical engineering services for the power and control panel upgrades of listed lift stations throughout the service area.
16-Inch Celebration Force Main Replacement.
Tetra Tech provided Surveying, Geotechnical Engineering, Pipeline Design, Permitting and Construction Administration services for the replacement of three segments of 16-inch force main along West Irlo Bronson Memorial Highway totaling approximately 5,550 LF. The existing main had been inspected and identified gas pockets and/or thinning pipe wall thickness. In addition to the pipe replacement, eight air release valves were installed.
Richard McLaughlin WTP Well and Raw Water Main. This project included construction of a new raw water supply well RM-3 and 16” raw water transmission main to serve the Richard McLaughlin Water Treatment Plant (RMcWTP). The vertical turbine well pump was rated at 3,500 gpm and connected to the RMcWTP via 4,900 linear feet of 16-inch diameter raw water transmission piping. The pipeline construction included approximately 720 linear feet of horizontal directional drilling installation and 4,180 linear feet of open-cut installation.
Cypress West WRF Upgrade and Expansion.
The Cypress West WRF has a permitted capacity of 3.0 MGD and utilizes the Modified Ludzack Ettinger (MLE) process. Previously, preliminary treatment improvements were implemented in conjunction with conversion to the MLE Process and construction of external clarifiers.
This project expanded the facility capacity to 6.00 MGD via construction of aeration, filtration, chlorine contact, effluent storage, and reclaimed water pumping improvements.
Western Reuse Service Area Storage and Pumping Facility. Designed to provide 4.0 MGD of reclaimed water storage and pumping facilities in the vicinity of the Champions Gate Development. Facility is designed to provide 6.6 MGD, based on average day demand, of reclaimed water and will be a major distribution center, providing customers with reclaimed water at pressures minimizing the need for booster pumping.
WIFIA Letter of Interest and Loan Application.
Tetra Tech assisted with preparation of a Water Infrastructure Finance and Innovation Act (WIFIA) Letter of Interest to the United States Environmental Protection Agency for Toho Water Authority’s Accelerated Gravity Sewer Assessment and Rehabilitation project. This project span includes over 65 wastewater pumping station basins with over 900,000 feet of gravity mains, of which 44 percent were considered to have a higher consequences of failure. Tetra Tech helped Toho Water Authority receive $81.5M in funding approval.
Parkway WRF Influent Screen Replacement.
Tetra Tech assisted with establishing performance criteria and construction documents for replacement of their existing mechanical bar screen at the Parkway Water Reclamation Facility. Also assisting TWA with construction administration services including document conforming, shop drawing review and inspection prior to and during startup.
Parkway WRF Filter System RAS/WAS Pumping System Evaluation. Tetra Tech evaluated the current return and waste activated sludge (RAS/WAS) pump station configuration in an effort to eliminate clogging and over pumping and compare it to simple pump replacement since the existing pumps have exceeded their useful lives and need to be replaced. Tetra Tech has provided a present worth cost evaluation preliminary and final design services, and the rehabilitation will be implemented later this year with Tetra Tech providing construction administration services. The two alternatives evaluated included: 1) replacement of existing pumps with identical equipment within current configuration and 2) modification of the piping and pump replacement to facilitate direct withdrawal of sludge from the clarifiers.
CONTINUING PROFESSIONAL ENGINEERING SERVICES
PROJECT #1
Toho Water Authority, Kissimmee, FL
| 11UTILITIES COMMISSION, City of New Smyrna Beach
TETRA TECH
UTILITIES CONTINUING
ENGINEERING SERVICES
Tetra Tech has provided continuing professional engineering services directly to Orange County Utilities (OCU) since 2016 (with an average annual contract amount of $1.07M). Projects have included numerous wastewater pump station refurbishments, utility infrastructure improvements, and other utilities engineering services. Services provided include Water Distribution Improvements, Water, Wastewater, and Reclaimed Water Hydraulic Evaluations, Wastewater Pump Station Upgrades, Permitting Services, Construction Administration and CEI, Surveying / GIS Planning.
Specific project information is as follows:
Eastern Regional Water Supply Facility Sodium Hypochlorite System Conversion to Bulk. Tetra Tech is providing design, permitting, bidding assistance and construction administration services related to replacing the County’s existing sodium hypochlorite generation system with a bulk storage and feed system. This includes demolition of the existing generation equipment, replacing the existing storage tanks, replacing metering pumps and replacing piping.
New piping and feed pumps will be sized for a sodium hypochlorite strength of 12 percent. The sodium hypochlorite storage and feed system will be separated in to pre and post storage and feed areas in existing buildings to keep minimize the feed piping to each location. The design includes provision for a temporary storage and feed system to maintain treatment capabilities during construction.
The project will include expanding the plant from 50.0 MGD to 62.5 MGD as the existing sodium hypochlorite generation system is the limiting factor in the existing capacity following expansion of the treatment process under a separate contract.
All American Boulevard Utility Adjustments. Orange County Public Works (OCPW) is preparing the design for the relocation and widening of All American Boulevard near Clarcona-Ocoee Road and Edgewater Drive.
OWNER:
Orange County Utilities
9150 Curry Ford Road Orlando, FL 32825
TERM OF CONTRACT:
2016 - Present
PROJECT #2
Orange County
Utilities, Orlando, FL
SELECTED PROJECT
HIGHLIGHTS /RELEVANCY
TO UCNSB:
REFERENCE:
Tad Parker, PE Assistant Manager
( 407.254.9729
* Parker2@ocfl.net
Water Treatment Plants
Wastewater Treatment Plants
Reclaimed Water Hydraulic Evaluations
Pump Station Upgrades
Construction Administration and
CEI
Lift Station Design
P
P
P
P
| 12UTILITIES COMMISSION, City of New Smyrna Beach TETRA TECH
The project includes the replacement of 915 feet of 8-inch and 6-inch water main and 1,200 feet of 4-inch wastewater force main. The utilities improvements will be bid and constructed with the OCPW road improvement project.
■South WRF Solids Building HVAC Improvement.
The operator’s control room for the biosolids building at the South Water Reclamation Facility was not air conditioned and the electrical and SCADA systems were corroding to the high moisture in the building.
HVAC was added to cool these rooms and protect the equipment.
Pump Station Emergency Response Plan. This study identified and recommended backup power/ diesel pumping at high risk pump stations with a strong potential to result in overflows during power outages.
The project focused on developing a hydraulic model of gravity sewer system to identify the high-risk pump stations with strong potential to result in overflows during power outages. Developed computer hydraulic model using the Innovyze™ InfoSWMM® software that encompasses OCU’s entire wastewater collection system. Used the existing GIS data to complete a geometric network for the gravity sewer system of 33,000 conduits and 36,000 nodes, which is a tributary to 791 pump stations. Used parcel data and water use records to estimate flows in the sewer system. The existing force main hydraulic model, was used to aid in developing a pump station flow hierarchy to aid in the prioritizing pump stations recommended for backup power/diesel pumping. Included preliminary layouts of the standby pumping systems at 20 pump stations.
Town Center and South Central Master Pump Stations Improvements. Tetra Tech provided preliminary design, final design, permitting, and construction management services for a complete renovation of the County’s Town Center Master Pump Station (MPS) and replacement of the South Central MPS. The Town Center MPS is a triplex pump station, and the improvements included removal of all equipment and facilities except the wet well, which was rehabilitated and coated, new odor control system, standby power generation, and three 90 hp submersible pumps. This station capacity was designed for 5.5 MGD. The new South Central MPS replaced the existing
26-year-old station. The South Central MPS included duel wet wells, odor control, standby power, electrical building and six 140 hp submersible pumps. The South Central MPS station capacity was designed for a pumping capacity of 26.1 MGD.
Alternative Water Supply Blending Study. This study included an evaluation of the potential impacts for the County to purchase a surface water supply source to be blended in the Eastern Service Area which is currently supplied by groundwater sources and provides recommendations and the basis of design for any facilities required for the alternative water supply to be implemented. Technologies evaluated include granular activated carbon, ion exchange, and nanofiltration for DBP formation potential control. The evaluation also includes a route study, review of regulatory impacts, hydraulic evaluation, and finished water stability and blending evaluation.
Additional Projects Include:
� All American Boulevard Utility Adjustments
� Eastern Regional WSF Hypochlorite Conversion
� South WRF Solids Building HVAC Improvement
� Admin Bldg Computer Rm Backup Power/HVAC Study
� Solid Waste Bldg Backup Power/HVAC Study
� University Boulevard and Presidents Drive Sewer System Studies
� South WRF Meter Improvements
� Eastern, NW and South WRF Scum Pumping Improvements
� Eastern Laboratory Improvements
� Northwest WRF Solar Plant
� Pump Station Improvements R/R Pkg 38
� Pump Station Improvements R/R Pkg 40
� Pump Station Improvements R/R Pkg 42
� Pump Station Improvements R/R Pkg 43
UTILITIES CONTINUING ENGINEERING SERVICES
PROJECT #2
Orange County
Utilities, Orlando, FL
| 13UTILITIES COMMISSION, City of New Smyrna Beach TETRA TECH
CONTINUING PROFESSIONAL
ENGINEERING SERVICES
Tetra Tech has provided continuing professional engineering services to the City of Orlando Water Reclamation Division since 2000. Projects have included treatment facilities and process improvements/evaluations, lift station improvement projects, force main replacements, sewer system studies, asset management, and other engineering services.
Services provided including but not limited to:
� Wastewater Transmission Improvements
� Lift Station Upgrades
� Permitting Services and SRF Loan Applications
� Construction Administration and Conceptual Studies
Specific project information is as follows:
State Revolving Loan Asset Management Plan Preparing documentation for a system wide asset management plan to meet the fiscal sustainability requirements of the FDEP SRF Loan Program. Coordinate and document the City’s existing asset management and provide recommendations on other plan requirements to support the City’s SRF loans.
Lift Stations 28, 54, 60, and 67 Upgrades. Preliminary and final design, permitting, bidding and construction services for replacement of four existing wet-dry pit pump stations with new submersible stations meeting City standards.
Iron Bridge Regional Water Reclamation Facility Aeration System Improvements Evaluated four diffuser replacement options at the City’s 40 MGD Water Reclamation Facility including efficiency and life cycle costs, UV and chlorine resistance, and warranty.
OWNER:
City of Orlando
400 S. Orange Avenue, Fourth Floor
Orlando, FL 32801
TERM OF CONTRACT:
2000 - Present
PROJECT #3
City of Orlando, Orlando, FL
SELECTED PROJECT
HIGHLIGHTS /RELEVANCY
TO UCNSB:
REFERENCE:
Hector Sanchez, PE Project Manager
Lift Station Design and Upgrades
Wastewater Treatment Plants
Water Treatment Plants
Lift Station Design
MEP Design Service
Transmission System
Distribution System
P
P
P
P
P
( 407.246.3756
* hector.sanchez@cityoforlando.net
| 14UTILITIES COMMISSION, City of New Smyrna Beach TETRA TECH
Lift Station 201 and Lift Station 205 Force Main Replacements The City has experiences multiple failures on the existing 8- and 10-inch asbestos cement force mains from these lift stations. Evaluated the service areas of the lift stations to size the new force mains and design replacement mains. Replace 6,100 feet of 8-inch and 10-inch force main.
Lift Station 139 Force Main Replacement, City of Orlando, FL. Tetra Tech is providing preliminary engineering, final design, permitting, bid assistance and construction administration for the replacement of the force mains between Lift Station 139 and Boggy Creek Road. The project includes approximately 5,400 LF of 24-inch force main to be installed within an easement.
The project includes open cut of herbaceous wetlands and coordination with other utility owners who share access to the easement.
Water Conserv I WRF Consolidation Study Performed a present-worth cost evaluation to estimate capital costs for improvements associated with the two options for planning the future of the Water Conserve I WRF. Tetra Tech recommended the City refurbish, upgrade, and expand the WC1WRF and subsequently operate this facility well into the future.
State Revolving Fund (SRF) Facilities Plan. The City requested and obtained funding for seven projects through the State Clean Water SRF Program. Prepared alternative analysis, cost estimates, implementation plan, capital financial plan and other documentation required to meet FDEP requirements for funding of $66 million in loans for the seven projects.
Water Conserv II WRF Filter Study. The City’s Water Conserv II Water Reclamation Facility (WRF) has a permitted design capacity of 21 MGD on an annual average daily flow (AADF) basis. The City planned to stress test the facility and expected to increase the permitted capacity to 25 MGD. The existing filtration at the Water Conserv II WRF consisted of six traveling bridge sand filters that had been in service for approximately 30 years. Due to the age and condition of the filters, as well as performance considerations, the City wanted to replace the traveling bridge sand filters with deep bed sand filters similar to those installed at the City’s Iron Bridge Regional WRF. The City retained Tetra Tech to identify acceptable approaches to address the challenges associated with this concept (space constraints, hydraulic profile considerations, maintenance of treatment during construction, and potential presence of soils unsuitable for support of the proposed structures) and to establish a capital budget for implementation of the proposed improvements.
The scope of services was divided into two steps: an initial evaluation to develop the basis of design, sizing of the filters, and filter layout location, followed by development of the feasibility study, which included conceptual drawings, piping layout, construction sequencing and cost.
Central Boulevard Gravity Sewer. Fast track design and permitting for proposed sewer along Central Blvd.
to be completed ahead of the aggressive schedule for the new Orlando City Major League Soccer (MLS) Stadium. The I-4 Ultimate project is under construction and the project construction and MOT plans required close coordination through FDOT’s design-build contractor.
Lift Station No. 69 Upgrades Preliminary and final design, permitting, bidding and construction services to replaced 3,000 gpm dry pit pumps with equally sized dry pit submersible pumps, electrical systems including the addition of three variable frequency drives, existing standby generator and miscellaneous influent chamber improvements.
Downtown District Sewer Master Plan. Master planning analysis of the gravity sewer collection system tributary to Lift Station Nos. 1 and 7 and Lift Station No.
5 that serve the Downtown and Parramore areas of Orlando. Completed an hydraulic analysis of over 32 miles of gravity sewer and identified areas of excess capacity capable of accommodating the Orlando City MLS Stadium.
Lift Station Nos. 29, 65, and 78 Upgrades. The improvements to the three lift stations were completed on an accelerated schedule to meet SRF funding deadlines. These wet/dry pit-can lift stations were replaced with new submersible stations meeting current City standards. Upgrades were completed ahead of schedule.
CONTINUING PROFESSIONAL ENGINEERING SERVICES
PROJECT #3
City of Orlando, Orlando, FL
| 15UTILITIES COMMISSION, City of New Smyrna Beach TETRA TECH
ENGINEERING SERVICES
Tetra Tech has provided continuing miscellaneous professional engineering services to the City of Lakeland since 1991. Our services have included:
� Surface Water Control Structures SCADA
� Master plans - wastewater collection, treatment and reclaimed water reuse system
� Hydraulic modeling - potable water, wastewater, and reclaimed water
� Utility system expansion - potable water distribution and transmission system design
� Wastewater treatment plant pretreatment analysis
� Permitting through FDEP, Polk County, FDOT and SWFWMD
� Utility system financing, bonds and State Revolving Fund program
� Inter-local agreements and negotiations
Specific project information is as follows:
Northeast Wellfield Wetlands Monitoring and Restoration. Tetra Tech was engaged by the City to conduct the hydrologic and hydraulic (H&H) modeling, prepare construction drawings, obtain permits and provide construction administration services for construction of the structural improvements to divert surface flows into the wetlands. Using one-foot LiDar topographic data, Tetra Tech’s biologist established the location for placement of ditch blocks, pipes and weirs. An ecological assessment of the site yielded a total of 17 structures to construct around the site to improve on-site hydrologic conditions.
Glendale Wastewater Treatment Plant Dewatering Improvements.
The City of Lakeland retained Tetra Tech for the design of the Glendale WWTP Dewatering Improvements project, which included the design of a centrifuge
OWNER:
City of Lakeland
501 E. Lemon Street Lakeland, FL 33801
TERM OF CONTRACT:
1991 - Present
PROJECT #4
City of Lakeland, Lakeland, FL
SELECTED PROJECT
HIGHLIGHTS /RELEVANCY
TO UCNSB:
REFERENCE:
Tom Mattiacci, PE Manager of Water Utilities
Utility system expansion - potable water distribution and transmission system design
Wastewater Treatment Plants
Utility system financing, bonds and State Revolving Fund program
Lift Station Design
MEP Design Service
P
P
P
P
P
( 863.834.6173
* tom.mattiacci@lakelandgov.net
| 16UTILITIES COMMISSION, City of New Smyrna Beach TETRA TECH sludge dewatering system. To visualize the new system’s layout in an existing structure, the Tetra Tech team created a series of three-dimensional models using the Revit® software. Tetra Tech also provided permitting, bidding, and construction assistance.
Skyview Utilities Water and Wastewater Improvements. Tetra Tech was chosen to provide engineering support for the replacement and rehabilitation of approximately 23,000 linear feet of gravity sewer piping and 78 associated manholes, as well as the demolition of the existing Skyview WWTP.
Northeast Water Transmission System – Southern Route. The Tetra Tech project team provided route planning, preliminary design, surveying, final design, permitting and construction administration services for 228 linear feet (LF) of 8-inch water main, 57 LF of 12-inch water main, and 21,706 LF of contiguous 30-inch water main. Over 8,000 LF of the 30-inch water main was installed, by directional drilling, in the public road right-of-way for Fish Hatchery Road. Over 200 LF of 30-inch HDPE water main was for a non-perpendicular crossing of Fish Hatchery Road. Approximately 54 LF of 48-inch steel casing was installed by boring and jacking methods for crossing State Road 33A with a 30-inch ductile iron water main.
T.B. Williams WTP Filter Improvements. Tetra Tech was chosen to perform this project based on the team’s experience working on previous improvements to this 51 MGD plant. The previous project involved evaluation of the gravity filtration and chemical feed systems at the plant. Tasks associated with the project included upgrading the backwash system from surface water agitation to the combination air/water, installing media retaining effluent launders, and recoating basin interiors.
Northwest Wellfield Wetlands Monitoring.
Permit issuance conditions for the WUP require that an ecological monitoring program be established for the wellfield property in order to detect any effects that groundwater withdrawals from the wellfield may have on the onsite wetlands. Tetra Tech staff has been responsible for the bi-annual monitoring events since 1993. This consists of individual monitoring programs for vegetation, soil subsidence, water levels, and general vegetative trends. Vegetative monitoring includes the use of meter square plots to analyze the subcanopy and groundcover, as well as observe general trends in the canopy. Tetra Tech also performs photographic monitoring at each wetland within the wellfield.
City of Lakeland Edgewood Irrigation Well Improvements. The City of Lakeland owns and operates the Edgewood Irrigation well that provides irrigation water to the Cleveland Heights Golf Course.
The Edgewood Irrigation Well Improvements project included the demolition of the existing well building, the exiting pump and motor, and the existing electrical equipment. A new well pump and motor, discharge piping, building, and electrical service were constructed as part of the improvements. Services provided by Tetra Tech included preliminary design, final design, permitting, bidding and construction administration.
Aquifer Performance Test. As required by Special Condition 5 of the City’s consumptive use permit, Tetra Tech was retained by the City of Lakeland to design, conduct, and analyze the data from a long-term aquifer performance test at the City’s Northeast Wellfield.
Although an APT had been conducted in 1989 at the wellfield, and the CUP issued for 9 MGD average and 16 MGD maximum daily flow, the SWFWMD did not accept the results of the 1989 APT were correct, due to the short-duration of the test (which they had approved) and the wet conditions prior to starting the test. The SWFWMD therefore required the City to run another test, and determine the hydraulic properties of the Upper Floridan aquifer, and the leakance value of the confining units that overly the Upper Floridan aquifer.
A 7-day constant rate discharge test was conducted, and ten wells located throughout the 880 acre wellfield and completed into the Upper Floridan, intermediate, and surficial aquifers were monitored before, during and after the constant rate test. Electronic data loggers programmed to sample the water levels at one second up to one hour intervals were installed in the monitor wells, such that a detailed record of pre-pumping, pumping, and recovery data could be collected in sufficient quantity to use several methods of analysis.
Rainfall monitoring was also included, but none occurred during the test.
CONTINUING PROFESSIONAL ENGINEERING SERVICES
PROJECT #4
City of Lakeland, Lakeland, FL
| 17UTILITIES COMMISSION, City of New Smyrna Beach TETRA TECH
ENGINEERING SERVICES
Tetra Tech understands the inherent value that teaming with other local municipalities can have on a project’s overall success. Tetra Tech has held a strong working relationship with both the City of New Smyrna Beach and UCNSB, which has allowed for both utility and stormwater/roadway infrastructure to be implemented concurrently; increasing collaboration, as well as saving time, money, and resources for both parties.
Tetra Tech has provided professional engineering services to the City of New Smyrna Beach since 2013. The broad range of services has included studies, design, permitting and construction administration.
Our scope of services under this contract includes: Engineering Analysis / Preliminary Design, Preparation of Construction Documents, Environmental Permitting, Structural Engineering, Surveying / GIS, Public Involvement, Construction Administration and Construction Engineering Inspections, and Local Government, FDOT, other Coordination.
Specific project information is as follows:
Islesboro Subdivision Stormwater and Paving Improvements.
Tetra Tech was retained by the City to investigate and execute the design for improvements to the existing stormwater system. Tetra Tech provided surveying and engineering services necessary to develop alternative solutions, prepare construction documents, conduct permitting services, provide bid support and assist the City with the administration of construction. As part of the Preliminary Design Report Study, the Interconnected Channel and Pond Routing Model version 4.0 (ICPRv4) was used to simulate the water quantity hydrograph and routing. Tetra Tech also performed the design storm calibration as part of this project.
Historic Northwest Area Stormwater Improvements. The historic Northwest Area is one of the older sections of the City. The study area included 540 acres. It was constructed with minimal stormwater management
OWNER:
City of New Smyrna
Beach 210 Sams Avenue
New Smyrna Beach, FL 32168
TERM OF CONTRACT:
2013 - Present
PROJECT #5
City of New Smyrna Beach, New Smyrna
Beach, FL
REFERENCE:
Kyle W. Fegley, PE City Engineer
Local Teaming Partner
Final Design & Permitting
Construction Administration
Bidding Assistance
Grant Funding Assistance
Value Engineering
P
P
P
P
P
P
( 386.410.2811
* kfegley@cityofnsb.com
SELECTED PROJECT
HIGHLIGHTS /RELEVANCY
TO UCNSB:
| 18UTILITIES COMMISSION, City of New Smyrna Beach TETRA TECH infrastructure and very little topographic relief. It floods frequently due to these substandard conditions. Tetra Tech prepared a 2D ICPR Hydrologic and Hydraulic model to develop alternative retrofit solutions to reduce flooding. Green Infrastructure and Low Impact Development solutions were analyzed to help the City stay on schedule with their BMAP obligations for the Indian River Lagoon.
Corbin Area Stormwater Improvements. The Corbin Area is located in the southwest section of the City. The study area encompasses 474 acres. It was constructed with minimal stormwater management infrastructure and very little topographic relief. It floods frequently due to these substandard conditions. Tetra Tech prepared a 2D ICPR Hydrologic and Hydraulic model to develop alternative retrofit solutions to reduce flooding. Green Infrastructure (GI) and Low Impact Development (LID) solutions were analyzed to help the City stay on schedule with their BMAP obligations for the Indian River Lagoon.
Gateway Beautification Projects. Tetra Tech was selected as the prime consultant to provide full service construction engineering and inspection services on these two Gateway Beautification Local Agency Program projects at I-95 at State Road 44 and West Canal Street at State Road 44. Our team provided Construction Engineering and Inspection services for the construction of landscaping, sidewalks, aesthetic walls, and lighting.
Since this project was funded by the State, all project elements met FDOT standards.
Ester Street Park. Tetra Tech provided site and environmental planning for a vacant beach front property in New Smyrna Beach for the development of the Ester Street Park. The project included the design and replacement of a 246 linear feet seawall (bulkhead) system and related site permitting seaward of the coastal construction control line. The shoreline was diminishing quickly due to the loss of the existing seawall from recent tropical storm damage. Integration and tie-ins to the adjacent properties existing seawalls was a main priority for this project. In addition, the park site had significant environmental concerns with a saturated population of active gopher tortoises and protected sea oats on the remaining dunes. The project entailed the oceanographic engineering and modeling necessary to design the pre-cast concrete seawall for a 100-year storm surge event.