This is a Request for Statement of Qualifications (RSQ No. 10-22) from the Utilities Commission of the City of New Smyrna Beach, Florida, soliciting continuing professional electrical engineering services. Stantec Consulting Services Inc. is submitting a proposal to provide comprehensive electrical engineering services including utility power distribution design (overhead and underground), transmission design, substation design, protection and control designs, permitting, standards development, and bid package development and evaluation. The scope covers work for voltage levels ranging from power distribution to transmission, including greenfield projects, expansions, and system modifications. The contract period is anticipated to be one year, with potential extensions.

Stantec demonstrates financial stability as a publicly traded company listed on the New York and Toronto Stock Exchanges, with continuous profitability since 1954. The proposal highlights the firm's local presence in Florida, with 15 offices and over 740 employees, and emphasizes capabilities in carbon-free/reduced initiatives, renewable energy integration, and system studies. The company offers a comprehensive range of services including environmental assessments, geotechnical analysis, transportation infrastructure support, and technical expertise across transmission, distribution, and substation systems. Stantec's team includes experienced engineers with specialized skills in electrical engineering, protection and control, structural design, and environmental compliance, positioning them as a versatile and technically capable service provider for the Utilities Commission.

View the file

Other files

File Type Posted
RSQ_09-25_Shortlist_Posting.pdf PDF
RSQ09-25_PROPOSAL_RECEIPT_LOG.xlsx XLSX spreadsheet
RSQ_09-25_Addendum_No_3_PR_Response.pdf PDF
RSQ_09-25_Addendum_No_2.pdf PDF
2022-4-15_Utilities_New_Smyrna_Beach-_Mangan_Qualifications_DP_V1.0.pdf PDF
POPP_20220310_0839-City_of_New_Smyrna_Beach_RSQ_-AST-Final.pdf PDF
RSQ_10-22_Final_Civil_Evaluation_Committee_Results.pdf PDF
Atwell_City_of_New_Smyrna_RSOQ.pdf PDF
RSQ_10-22_NSB_Continuing_Professional_Services_Civil_Engineering_Burns_&_McDonnell.pdf PDF
Hazen_and_Sawyer_UCNSB_Continuing_Professional_Services.pdf PDF
RSQ_10-22_Final_Tab_Survey.pdf PDF
CPH_Response_RSQ_10-22_General_Survey_and_Mapping.pdf PDF
CPH_Response_RSQ10-22_Civil_Engineering.pdf PDF
ETM_Survey_Utiltiies_Commission_Survey_Proposal.pdf PDF
UCNSB_RFQ_10-22.pdf PDF
RSQ_10-22_Civil_Eng_Proposal.pdf PDF
RSQ_10-22_Continuing_Professional_Services_Burgess&Niple_Inc..pdf PDF
RSQ-10-22_Continuing_Professional_Services-Electrical_Engineering.pdf PDF
RSQ_09-25_Addendum_No_1_PR_Response.pdf PDF
RSQ-10-22_Continuing_Professional_Services-Survey_and_Mapping.pdf PDF
RSQ_10-22_Tetra_Tech.pdf PDF
lazen_new_smyrna_red_r0.pdf PDF
RSQ_10-22_Final_Tab_Electrical.pdf PDF
RSQ_10-22_NSB_Continuing_Professional_Services_Electrical_Engineering_Burns_McDonnell.pdf PDF
RSQ_10-22_Rummel_Klepper_Kahl_Submittal.pdf PDF
New_Smyrna_RSQ_10-22_Continuing_Professional_Services.pdf PDF
RSQ_10-22_Electrical_Eng_Proposal.pdf PDF
1_Yuro_&_Associates__Submitted_RFQ.pdf PDF
Stantec_UCNSB_RSQ10-22_04.19.22.pdf PDF
SOQ_P&D_Engineers_New_Smyrna_Beach.pdf PDF
DRMP_Inc._SOQ_for_RSQ_10-22.pdf PDF
New_Smyrna_Beach_RSQ_10-22_-_SurvTech_Solutions_Response_20220419.pdf PDF
RSQ_09-25_Continuing_Professional_Services.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of New Smyrna Beach RSQ No. 10-22 Professional Services 1

RSQ No. 10-22

Electrical Engineering Services Utilities Commission, City of New Smyrna Beach

April 19, 2022

City of New Smyrna Beach RSQ No. 10-22 Professional Services 2

Table of Contents Letter of Interest

Section 1 Qualifications

Section 2 Consultant’s Understanding

Section 3 Staffing

Section 4 Location

Section 5 Financial Stability/Insurance/Occupational License

Section 6 References

Section 7 Past Project Performance

Section 8 Forms

City of New Smyrna Beach RSQ No. 10-22 Professional Services 1

April 19, 2022

City of New Smyrna Beach Utilities Commission 200 Canal Street New Smyrna Beach, Florida 32168

Attention: Maureen Crossman, CPPB, Procurement Manager

Reference: Statement of Qualifications to Provide Continuting Professional Services - Electrical Engineering RSQ No. 10-22

Dear Ms. Crossman and Members of the Selection Committee:

Stantec Consulting Services Inc. (Stantec) is pleased to submit our RSQ response package for the City of New Smyrna Beach (City) RSQ 10-22, Request for Statement of Qualifications Professional Services. Stantec’s RSQ proposal will provide and if selected, will perform engineering services for the City. The scope of City’s Plan includes:

• Utility power distribution design (overhead and underground), permitting, standards development, bid package development and evaluation.

• Utility power transmission design (overhead and underground).

• Utility Power Substation design (greenfield, expansions and system modifications), protection and control designs (new and upgrades), renewables, permitting, standards development, bid package development and evaluation.

We have the full range of staff and technical expertise to support you and this project. A few key advantages of our team include:

Local presence, national experience. Stantec’s lead office is located in Lake Mary, FL, where our closest team of Power Delivery subject matter experts are located. At the ready to support are over 25 offices located in the Southeast, and 15 in FL alone. Our local offices serve as home base for any team member traveling from outside the area. This will allow any project meetings and coordination to be convenient for all members of the project team throughout the length of the contract.

Consultation for Carbon-Free/Reduced Initiatives. We have experienced professionals that have been supporting our clients their achieving carbon-free / renewable goals. With the increased integration of solar, wind, battery storage, etc., new challenges arise that utilities are trying to solve, efficiently. Several initiatives, for which the Stantec team has been supporting our clients, include performing system studies (using CYMDIST, or equivalent), conducting SCADA/communications testing between renewable devices and control centers, launching standardized electric vehicle charging stations, developing energy storage solutions for renewable energy (or system resiliency), and looking at the potential benefits for zero-emission bus fleets. We have been providing solutions to tomorrows challenges, collaboratively.

Commitment to safety. Safety is a source of pride for our team and our record proves that. We work to incorporate safety into every facet of our work, from incorporating safety concerns into our designs, to our safety-first culture. Integrating practical Health, Safety and Environment (HSE) programs into our design and workplace helps protect our people and communities from injuries, property loss and environmental damage.

As we are all aware, we are working in unprecedented times as a result of the COVID-19 pandemic. The situation is fluid. Our proposal is based on our understanding of performing these services in normal

Stantec Consulting Services Inc.

300 Primera Blvd., Suite 300, Lake Mary, FL 32746

Letter of Interest

City of New Smyrna Beach RSQ No. 10-22 Professional Services 2 conditions. As the nature and extent of the impacts due to this outbreak cannot be fully identified or quantified at this time, we feel it would be prudent to submit this proposal based on normal conditions, without accounting for impacts due this outbreak, and to discuss with you once we are able to evaluate the impacts and to work collaboratively with you on a path forward. We would be pleased to have a further discussion with you to share our respective plans and efforts to help mitigate the impact of this evolving situation on your proposed project.

We look forward to working with the City of New Smyrna Beach team and are available to provide the needed level of support. With an excellent, experienced team of local professionals in electric, civil, and structural engineering, as well as environmental services, we have the resources and technical capabilities to meet or exceed your expectations.

Sincerely, Stantec Consulting Services Inc.

Richard Kodera, PE Vice President

(321) 247-2580 Richard.Kodera@stantec.com

TAB 1

Qualifications We’re active members of the communities we serve. That’s why at Stantec, we always design with community in mind.

City of New Smyrna Beach RSQ No. 10-22 Professional Services 3

Qualifications

The capability of a leading one-stop-shop, the flexibility and accessibility of a boutique firm

With our experience evaluating, designing, and commissioning transmission & distribution projects, we’ve learned how to best partner with our clients to bring them innovation specific to their needs.

We’re flexible in what roles we can assume for our clients. We have experience providing services ranging from Owner’s Engineer services to complete detailed design services to utility clients throughout North America.

Whether you require financial and technical analysis of an existing or proposed system, expansion and modernization of an existing system, or assistance with environmental and permitting issues, we have in-house experts in over 350 local offices offering:

• Transmission line engineering and design

• Substation engineering and design

• Studies and relay setting services

• Distribution engineering and design

• Project construction management services

• Energy storage & grid modernization

Supporting a Clean Energy Future Included on the following page is an outline of the market insight and project services, as well as some experience we can provide to help deliver a clean energy future for New Smyrna Beach and it’s customers.

Additional Integrated Power Delivery Services Our full suite of Power Delivery services means we provide fully integrated project services, all in-house. Our services include:

• Survey & Geomatics

• Environmental Assessments

Permitting & Compliance

• Geotechnical

• Transportation Infrastructure

• Telecom

• Physical Security

• Civil engineering

• A/C Mitigation Design

Relevant Project Experience In Tab 7, we have included relevant project experience all completed within the last 10 years. We’ve included projects for Substations, Transmission Lines, and Distribution Lines. Stantec performs work for several major utilities in Florida and throughout the United States. We strictly comply with all our clients’ confidentiality requirements; therefore, the representative examples of our project expertise are approved for use.

City of New Smyrna Beach RSQ No. 10-22 Professional Services 4

About Stantec The Stantec community unites approximately 22,000 employees working in over 350 locations across six continents. We collaborate across disciplines and industries to bring infrastructure projects to life. Our work—engineering, architecture, landscape architecture, surveying, environmental sciences, project management, and project economics, from initial project concept and planning through design, construction, and commissioning—begins at the intersection of community, creativity, and client relationships.

Stantec is a world-renowned engineering firm that has been providing comprehensive engineering services to public and private clients around the world for almost a century.

Stantec Power at a Glance

>225GW

Thermal Generation Experience

>35,000MW

Renewable Experience

>750,000 Miles Power Delivery Experience with 300+ Utilities and Private Developers

>175GW

Hydro Generation Experience

#1 Top 100 Most Sustainable Corporation in North America by Corporate Knights (2021)

#17 Top 20 Design Firms, Power Sector, by ENR (2021)

#10

Top 10 Design Firms in Power—Co-Generation by

ENR (2020)

Continuous Profitability since 1954

Stantec

INFRASTRUCTURE

WATER

SE

RV

IC

ES

EN

VI

RO

NM

EN

TA

L BUILDINGS

RESOURCES

ENERGY &

Ro ad wa ys

Co m m un ity D ev el op m en t

Tra nsit

& Rail

Bridges

Commercial

Education

Healthcare

Civic

Industrial Science & Technology

Airports & Aviation

W ater Treatm ent

Wate r

Conveyance

Buildings

W astewater Treatm ent

Oil & Gas

W ater Resources Planning

& M anagem ent

Power

W as te M an ag em en t

Transportation

W et

W ea th er

F lo w

Ur ba n St or m wa te r

Community Development

Cl ien t E nt er pr ise S ys te m s

Mining

Waterpower & Dams

Power

Oil & Gas

M ining

City of New Smyrna Beach RSQ No. 10-22 Professional Services 5

Planning, Analysis, & Investigation

Overhead Transmission Line Design – Experience up to 500 kV DC & 765 kV AC

We’ve worked on new construction, rebuild, re-conductor, relocation, maintenance, and reliability projects using the PLS-CADD software suite for conductor clearance evaluations and structural designs.

• Conductor Design – experience with most conductor types (including composite core conductors), electrical clearance evaluations, and thermal ratings analysis

• OPGW/ADSS – new fiber additions or replacement type projects

• Structure Design – extensive experience with concrete, wood, steel, hybrid, or lattice towers

• Tower – experience with tower model creation based upon LiDAR survey data

• Foundation Designs – anchor bolt, piers, piles, vibratory caissons, or direct embed

• DOT Relocation – markups for utility adjustment plans, utility coordination meetings, progress meeting attendance, line relocation design, and foreign utility coordination

• Customer Relocations – preparation of alternative designs and cost estimates, displays for presenting findings to customers, preparation of design, material ordering, cost estimating, and coordination during construction phase

Transmission Services

• NERC assessment planning, remediation, and support

• Conditional Assessments – Stantec has the capability and experience in visually inspecting and structurally analyzing existing structures and foundations for new or existing conditions

• Extensive Storm Restoration – experience following major storms or disasters

• Avian preventative designs – experience with bird diverters, caps, insulation, spikes, nest relocation platforms

Underground Design – Experience up to 345 kV

• Performance of feasibility studies, overhead to underground conversion probability of cost estimates, and route selection

• New construction, upgrades, or relocation type designs

• Construction installations (e.g., concrete-encased duct bank, horizontal directional drill, etc) and utilize CYMCAP software for cable ratings analysis

• Preparation of cost estimates (material and labor) for different routes, cable designs, or installation types

• Preparation of protection schemes for underground cables

• Grounding requirements and specifications

City of New Smyrna Beach RSQ No. 10-22 Professional Services 6

Distribution Services

Planning, Analysis and Coordination

• Design scope development

• Reliability assessments and remediation recommendations

• Route selection and analysis

• Joint use of third party attachment assessments coordination

• Project/program develop/evaluation/coordination

• New lines/feeders

• Voltage conversions

• Grounding studies and design using CDEGS, WINIGS, CYMEGRID and ETAP

• Connection Impact Assessments (CIA) and

Detailed Technical Connection Assessments (DTCA) using

• CYMEDIST and EMTP

• Smart grid device recommendations and installation of End-of- life replacements

Overhead Distribution Services

• Pole replacement

• Single to three phase line rebuilds

• Line extensions

• OH/UG substation getaways

• Line rebuilds switch placement and installation

• Conductor upgrades

• O/H to U/G conversions

• Overhead line design

• PLS-CAD, PLS-POLE and PLS-TOWER for non-linear analysis

• Pole Shoring Analysis for Construction

• Reaction force calculation using PLS-CAD

• Street Lighting Design

• PMA’s utilizing Visual Studio and AGi32

Underground Distribution Services

• OH/UG substation getaways

• Conductor upgrades

• O/H to U/G conversions

• Underground cabling design

• Utilize CYMCAP and ETAP for cable heating analysis

• Structural foundations and duct bank design

City of New Smyrna Beach RSQ No. 10-22 Professional Services 7

Substation Services

Planning, Analysis and Investigation

Substation Siting

• Site reconnaissance and selection

• Coordination between utilities and agencies

• Environmental assessments

• Geotechnical analysis

• Exhibit creation for client, agency, or stakeholder meetings and open houses Electrical Studies

• Ratings

• Lightning protection Field effects (magnetic or electric) analysis

• Grounding

Detailed Engineering & Design

Electrical Apparatus

• Station layout, electrical arrangement and planning including 3D designs

• Gas insulated switchgear configurations

• Equipment specifications and Bill of Materials

Civil and Structural

• Station grading/drainage/access roads/fencing

• Apparatus foundation and oil containment systems and spill pit designs and water supply

• Design of structural and foundation supports, evaluation and rehabilitation of existing structures and foundations

Protection and Control

• Protection and control designs including bus, transfer trip, breaker fail and line protection and all other power equipment protection

• Control and metering systems

• Schematics and wiring drawings

• Supervisory control and data acquisition ( SCADA), SER, and Alarm Systems

• RTU SCADA, Telvent USA integration

• SER alarming and control system selection and integration

• Control system architecture and fiber optic design

SCADA Services

We provide engineering and design services for a wide array of Supervisory Control and Data Acquisition (SCADA) systems ranging from large substation and control center systems to small remote systems. We can help justify, recommend, and provide design, engineering, and plans and specifications for complete data acquisition and control systems; replacement, upgrade, or expansion of existing systems; and operator interface equipment including ergonomic features. Our services include:

• Energy management

• Switchgear control

• Data acquisition and alarm

• Test data analysis

City of New Smyrna Beach RSQ No. 10-22 Professional Services 8

• Position indication for circuit breakers and disconnect switches

• Transformer tap changers

• Electrical analog values including amps, volts, watts, VARs, and power factor

• Sequence of events and trending

Studies and Relay Setting Services

We design protection systems that provide service continuity, safety, and maintenance protection to power delivery assets.

Power system load growth requires periodic evaluation of the utility transmission system to verify its continued capability to reliably maintain service continuity during peak loading conditions. Our services include:

• EHV and HV relay system design

• Transmission planning studies

• Fault current and load flow studies

• Protective system selection and design

• Protective system coordination (e.g., relay selection recommendation and settings)

• Protective equipment specification (e.g., breaker, recloser, fuse, and other device selections)

• System transient analysis

• System component protection

• Distributed generation system analysis

• DC system design

• Substation grounding analysis and design

• Arc flash studies

• Motor starting studies

• Harmonic analysis studies

Power System Studies Capabilities Our team has performed studies on major transmission networks around the world, and as a result we are familiar with the details of many power transmission systems including regional entities (e.g. WECC, MRO and SPP) and RTOs (e.g. MISO and SPP). Our work has been used as the basis for national transmission development programs in countries like China and India.

We can select from a variety of commonly used tools, including the PSSE, PSLF, DIgSILENT PowerFactory, ASPEN, ETAP, PSCAD, RSCAD, PS SINCAL, CDEGS, etc. to optimize the accuracy of your system or equipment study and to make the findings more useful. Teshmont also utilizes software toolsdeveloped in-house to perform studies.

Our services include:

• Bulk transmission planning studies for HVAC and HVDC transmission interconnections

• Project feasibility studies for generation, load, and intertie connections

• Generation Interconnection Studies including SIS and

• Facilities Studies; integration and pre-specification studies for generation, HVDC, interties, FACTS

• Harmonic analysis studies and filter design

• Siting and “sweet spot”/ hosting capacity studies for new facilities

• Techno-economic analysis, including preparing budgetary cost estimates and developing production cost estimates

City of New Smyrna Beach RSQ No. 10-22 Professional Services 9

• HVAC submarine and land cables sizing and ampacity evaluations

• Reactive compensation studies for HVAC cables (land and submarine), and renewable generation in compliance with bulk transmission grid standards

• Sub-synchronous resonance (SSR), control interaction (SSCI), and torque interaction (SSTI) studies

• RTDS / RSCAD studies

• Equipment specification studies and preparation of system dynamic data

• Islanding, load shedding and Remedial Action

Schemes (RAS)

• Reliability and availability analysis for HVAC and

HVDC integration

• Insulation coordination and EMT/PSCAD based studies

• Motor starting and arc flash studies

• FACTS controllers (e.g. SVC, STATCOMS, etc.)

prespecification / sizing studies

• Energy storage and Distributed Energy Resources

• (DERs)planning and integration analysis for offshore oil

/ gas

• Geomagnetic Disturbance (GMD) / Geomagnetic

Induced Current (GIC) studies

Power system studies are performed in accordance with ourclients’ internal policies and procedures.

• Our team possesses a comprehensive understanding of FERC and NERC requirements.

Our recent power system analysis projects have considered standards including:

• NERC TPL-001-4 (transmission system planning performance requirements)

• NERC PRC-024-2 (generator frequency and voltage protective relay settings)

• FERC Order 754 (single point of failure for protection systems)

• NERC TPL-007-1 (GIC analysis)

• NERC MOD-033-1 (SS and dynamic model validation)

• NERC CIP-014-1 (physical security)

• NERC EOP-005-1 (system restoration and black start)

• NERC PRC-027-1 (protection coordination for performance during faults)

• NERC MOD-026, 027, other (verification of generation plant data)

Our work is also performed in compliance with the followingcodes and standards:

• American National Standards Institute (ANSI)

• Institute of Electrical and Electronics

Engineers (IEEE)

• National Electric Safety Code (NESC)

• Occupational Health and Safety Standards

(OHSA)

And, where appropriate, we also refer to the following standards and guides:

• IEC Standards

• CIGRE Guides

Our power system studies team has also provided training and technology transfer services. Our general, intermediate, and advanced courses have included model development andstudies for many clients around the world.

TAB 2

Consultant’s Understanding

City of New Smyrna Beach RSQ No. 10-22 Professional Services 10

CONSULTANT’S UNDERSTANDING

Client Communications Policies Brief weekly internal meetings and regular progress meetings with our clients are important opportunities to monitor cost, schedule, and review goals. These meetings are used to determine team member progress on specific tasks, evaluate progress in terms of scope compliance, facilitate collaboration on interdependent tasks, facilitate integration of results, review schedule timeliness, and identify issues so that you are fully informed and address them before they can impact the project. Should the schedule or project necessities require more frequent meetings, we will communicate this need to your project manager.

Thoroughly documenting meetings is critical to ensuring the project is always moving forward and not revisiting past decisions/direction. This also safeguards project information should a change in team occur with either the consultant team or with New Smyrna Beach.

Management of Staff Workload and Project Schedules Stantec manages resources using our internal resource management process. Our process involves monitoring resource requirements and allocations across all projects and involves all disciplines and resources using our resource report that is updated regularly by our Project Managers to identify resource projections for each project. Our Engineering Management and Project Management teams review individual project resource requirements on a bi-weekly basis.

At Stantec, our local offices have the ability to reach out to other divisions of the company to acquire additional engineering support to meet project demand as needed. We have been successful with this approach and our internal processes and systems allows for collaboration across offices.

Change orders are changes, agreed to by the both parties, made to existing contracts or purchase orders which impact one or several of the following: Contract scope of work, Contract order price, Contract delivery schedule. Change Orders can be initiated from either the client or Stantec. Changes can range from minor administrative clarifications to redesign of equipment being purchased.

When the need for a change has been identified, Stantec’s Project Manager will prepare a Potential Change Notification (PCN) based on input from the project team and issue to client. The PCN shall include description of the change and scope as well as reason for the change.

Once the client has agreed to the scope change Stantec will develop a manhour estimate and Change Order for the additional work identified in the PCN. This Change Order will not only describe the scope of work but also identify schedule and cost impact as well as potential risks and mitigation criteria. This Change Order will be submitted to the client for approval of contract change.

Stantec’s Project Manager maintains a log of all scope changes identified including description of change, dollar amount of the change and the dates submitted and disposition of the client.

Stantec will not perform work out of scope without written authorization.

Schedule Control We work with our clients to identify critical path items specific to their project’s execution. We develop a project schedule in support of the critical completion dates of the project that identifies areas of risk and where there may be opportunity for improvement. We review and refine these schedules on a monthly basis as the project progresses.

Stantec has been providing similar power delivery permitting and engineering services for 25+ years.

City of New Smyrna Beach RSQ No. 10-22 Professional Services 11

As part of the Project Progress Report, we provide updates on project schedule performance, including S curves and schedule variance. S curves indicating schedule earned value versus schedule planned value are provided for engineering, procurement of Engineer Supplied Equipment and commissioning activities.

Schedule variance will be published using key performance indicators (KPI) including number of milestones achieved versus plan and actual critical path float versus budget. We also report on schedule variance by interpreting the S curves’ progress; evaluating the milestone progress against plan; and looking at schedule activity variances, critical path determination and amount of float available.

Billing/Invoicing Practices We use Oracle for our financial systems which includes invoice generation. The use of Oracle helps provide information on the invoices is accurate.

We have a team of financial personnel (Project Administrators) who are dedicated to producing accurate, timely invoices. In accomplishing this goal, they work very closely with our Project Managers who must also review and approve invoices for quality and accuracy before they are sent to clients. Both the Project Managers and the financial team that prepare the invoices review the contracts with the clients to ensure that the clients’ billing guidelines are complied with.

Invoice Submission Stantec provides an Accounts Payable Imaging and Workflow solution whereby vendor invoices are routed electronically for processing, approval, and payment. This solution reduces the impact on the environment of transferring hardcopy invoices between offices and reduces the lag time that is inherent in manual paper-based processes.

We encourage you to support Stantec’s commitment to sustainability by submitting electronic invoices as a PDF attachment to an email and sending it to sapinvoices@stantec.com . Electronic invoices can help reduce the costs and delays associated with printing, processing, mailing, and storing paper invoices. E-invoices will also enable you to deliver your invoices to us immediately, ensuring that they will be processed and approved in a timely manner.

Vendors that do not have electronic invoice capabilities should send hardcopy invoices directly to the office or Stantec employee that ordered the goods or services.

Invoice Payment In addition to payment by check, Stantec offers electronic payments through Electronic Funds Transfer (EFT) or Automated Clearing House (ACH). Electronic payments are not subject to handling and mailing delays and are automatically and securely deposited into your organization’s designated bank account.

A vendor resource page, which will outline electronic invoice submission guidelines, is available on Stantec.

com. This resource page will also provide access to the sign-up forms for you to receive electronic payments from Stantec.

Quality Assurance/Quality Control Policies/Practices We hold ourselves to an exceptionally high standard of professional excellence. We have established effective quality assurance and quality control (QA/QC) protocols that are implemented on all of our projects. Through years of hands-on experience assisting our clients, our QA/QC protocols have been “battle tested” and proven to be highly effective. Our work is routinely subject to third-party, regulatory review, and we consistently achieve approval and compliance in our deliverables.

Stantec has a formal quality management system in use across the organization that is registered to the ISO9001:2008 Quality Management standard. The quality management system promotes quality practices across the organization. This provides the project managers with a uniform framework across the company. If a specialty service is required from another office, we know that the same quality management process will be followed.

City of New Smyrna Beach RSQ No. 10-22 Professional Services 12

With a strong team of experts in a variety of disciplines, QA/QC is built in at multiple stages and engages people not involved in the day-to-day activities of the project assignments. At Stantec, we commit to excellence in everything we do. We believe this helps us keep projects on budget and schedule.

There are three major quality control procedures Stantec uses on each assignment-Planning and Management, Peer Review, and Project Communications. These procedures have been successfully implemented on previous projects.

All projects for design and construction shall pass thru Stantec’s QAQC process prior to being issued to our Client for their review process. Depending on the size and complexity of the project, a typical review cycle shall include some or all the following successive drawing submittals for review: Conceptual Design Drawing Issue; Major Equipment Vendor Drawing Issue; Detailed Engineering Design Drawing Issue; Contingency Design Drawing Issue; Complete Drawing Issue (IFR); Construction Drawing Issue (IFC); and ‘For-Record’ Drawing Issue (As-Built).

Stantec Project Management Framework

Prepare a proposal that includes a preliminary Project Plan including scope, project budget, resources, deliverables, and schedule. Conduct and document an independent review of the final proposal.

Obtain written instructions to proceed and execute an approved written contract. Obtain written subconsultant agreements (if applicable).

Prepare a Project Plan to an appropriate level of detail. Conduct and document an independent review.

Establish hard copy and/or electronic project record directories and file project records accordingly.

Complete a Health, Safety & Environment (HSE) risk management assessment and documentation for all projects involving field work.

Monitor the Project Management Dashboard on a regular basis.

Follow best practices for managing project financials, including time charges, work in progress (WIP), accounts receivable (AR), and estimates to complete (ETC).

Obtain the client’s written approval on scope of service changes in a timely manner.

Conduct and document a quality review of all final* deliverables prior to issue.

Conduct and document an independent review of all final* deliverables prior to issue.

Close off the project financials and close out the project files.

TAB 3

Staffing

City of New Smyrna Beach RSQ No. 10-22 Professional Services 13

STAFFING

The key members of our team bring a diverse background and experience related to professional services.

This combination of our unique strengths and passions, knowledge, and experience makes it possible for us to deliver successful projects and advance the quality of life in our community. We are very proud of our staff, who bring their collective knowledge, experience, and imagination to every project.

This contract will be led by Richard Kodera located in our Lake Mary, FL office, and supported primarily by our Jacksonville, FL office. Our Lake Mary, FL is approximately 41 miles from the City of New Smyrna Beach. Our primary support office Jacksonville office is approximately 152 miles from the City of New Smyrna Beach. Below is a breakdown of the staff in each of these locations.

Stantec has 15 offices in the State of Florida with over 740 employees providing a multitude of services. One of these offices is located in Orlando ( New Broad St.), and have about 80 staff.

Local presence is paramount to successfully being able to respond to and execute projects. Simply put, our depth of resources and technical capabilities and strong local presence means the City receives the right expertise sourced and delivered locally, in a highly responsive and efficient manner.

The most important element to success for a contract of this nature is effective management. We will identify the needs for each task order assignment and develop the right delivery teams from our assembled resource pool. The organizational chart shown on the following page depicts the Stantec team management and reporting structure to facilitate the efficiency your organization demands.

Douglas Sharpe, PE

Mihai Oros, PE

ENGINEERING MANAGER

PROJECT MANAGER

PROTECTION

& CONTROLS

Daniel Mantey, PE

STRUCTURAL

DESIGN LEAD

Steve Patry, PE

PHYSICAL

DESIGN LEAD

Raphael Nunes , PE

City of New Smyrna Beach

Richard Kodera, PE

E XECUTIVE SPONSOR

Rebecca Knowlton Fournier, PE

DISTRIBUTION

MANAGER

Ashok Rajan, PE

SUBSTATION

MANAGER

Ferawati Gani, PhD, PEng

TR ASMISSION

MANAGER

DISCIPLINE

LEAD

Larry McCullum , PE

DISTRIBUTION

DESIGN LEAD

Ryan Toaston

SITE CIVIL

DESIGN LEAD

Ben Quatermaine , PE ADDITIONAL STAFF AVAIL ABLE AS NECESSARY

ENVIRONMENTAL

LEAD

Crystal Clark

City of New Smyrna Beach RSQ No. 10-22 Professional Services 14

Stantec Office Lake Mary, FL

Total Years of Experience 18 years

Education Masters of Engineering, Electrical Engineering, University of Florida, Gainesville, Florida, 2006

Bachelor of Science, Electrical Engineering, University of Florida, Gainesville, Florida, 2002

Licenses / Registrations Professional Engineer #72417, State of Florida

Professional Engineer #083453, Commonwealth of Pennsylvania

Professional Engineer #E21150, State of California

Richard Kodera PE

Circuit 601 69kV Transmission Line Routing Project, Jacksonville, Florida Project Technical Lead tasked with preparing a routing report for two new one (1) mile underground transmission lines with considerations for constructability, cost, safety, regulatory, and environmental considerations.

Evaluations also included providing preliminary schedules, cost estimates, and risk assessments.

Hancock Rd to Montverde 69/115kV 2mi Transmission Line Routing Project, Lake Mary, Florida Project Technical Lead tasked with preparing a routing report for a new two mile transmission line with considerations for constructability, cost, safety, regulatory, and environmental considerations.

Evaluation also considers placement constraints (EMF and wire movement clearances) with co-locating within an existing 230kV corridor.

Northridge to W. Davenport 69/115kV 2mi Transmission Line Routing Project, Lake Mary, Florida Project Technical Lead tasked with preparing a routing report for a new two mile transmission line with considerations for constructability, cost, safety, regulatory, and environmental considerations.

Evaluation also considered recommending a proposed alignment within the proposed route with design considerations relative to DOT requirements based upon the location.

Power Transformer Conditional Study, Lake Mary, Florida Project Manager leading a transformer conditional study, analyzing 13 separate transformers at different substations with the the project objective is to perform the following: (1) conditional assessment study for the each evaluated transformer, (2) mitigation methods (repair, upgrade, or replacement), (3) physical condition of the transformer base on the site visit visual inspection, and (4) condition of the transformer evaluated.

Hardee 230kV Modifications, Tampa, Florida Project Manager leading the detailed design effort related a combined metering unit replacement

Executive Sponsor

Richard has a master’s and bachelor’s degree in Electrical Engineering from the University of Florida with an emphasis in Transmission and Distribution Line Engineering. His expertise encompasses Transmission and Distribution (overhead and underground) Line projects in an engineering or project management capacity — new construction, rebuild, re-conductor, DOT, conductor evaluations, conductor/ cable ratings, customer relocations, underground feasibility assessments, and routing/siting analyses, and projects ranging from 4kV to 500kV.

Relevant Experience Wekiva/North Longwood to FPL, 12mi 230kV Transmission Line, Duke Energy Florida, Lake Mary, Florida, 2012-2019 Project Manager for 230kV transmission line project in Seminole County, Florida, capable to support and provide clearance for a double circuit 3000A equivalent conductor.

One unique component to this project is a series of double circuit structures that turn 90 degrees in a congested corridor with a ground line moment near 25,000 ft-kips.

Rio Pinar to FGT, 10mi 69/230kV Transmission Line Rebuild, Lake Mary, Florida, 2015-2019 Lead Project Manager for a rebuild project which comprises of double (69/230kV) and triple circuit (69/230/230kV) segments, which travels through metro Orlando, with significant project design challenges, such as a six circuit undercrossing, routing through an abandon munitions range, route relocation due to proposed high speed rail, and relocations around the substation due to site expansion efforts.

Imeson 138kV Substation Study, Jacksonville, Florida Project Engineer (Transmission) for a feasibility study with the primary task including providing a few alternative options to improve the site to meet the substation configuration needs.

The study included a cost estimate, schedule, comparison analysis, and risk evaluation.

Central Florida to Continental, 69kV 4mi Transmission Line, Sumterville, Florida Lead Project Manager for a project that entailed reviewing and preparing project bid documents for submittal. The scope of the construction project was to introduce a new transmission line between two existing substations, that will eventually be owned by Duke Energy.

City of New Smyrna Beach RSQ No. 10-22 Professional Services 15

West Lake Wales Substation to Poinsett (FPL) Substation, 18mi 230kV Rebuild & Maintenance Replacement Structure Project, Duke Energy Florida*, Lake Mary, FL Project Engineer for a 230kV transmission line project that spanned a total of 60 miles from Lake Wales to near Cocoa, FL.

The project included replacing a total 105 existing lattice towers for engineered h-frames capable to support and provide proper clearances for a 3000A equivalent conductor(s). Structures were designed with construction equipment, access, environmental, and terrain restrictions in mind.

Vibratory caissons were chosen because the soil conditions permitted the design and it allowed for a more cost efficient installation. Structures were designed to have evenly distributed weights for helicopter installations. Structure tops were designed to have an interchangeable flat cap design or conical cap, depending on whether an avian platform need to be installed or avian preventative measures needed to be addressed. In addition to the structural design considerations, a conductor analysis was performed to determine an optimal configuration between several differing conductor options and sub-conductor quantities. A smaller conductor in a bundled configuration was selected due to longer reel lengths (fewer splices or dead-ends) and least cost structure design. Construction access maps were also created based upon limited access routes, expansive wetlands, and large orange groves, to aid in the construction effort.

500kV Generation Interconnect Project, PA Project Lead performing the analysis of introducing an interconnecting 500kV structure into a new substation general arrangement. The proposed design including six new structures to make a perpendicular approach into the terminal bay with a small property footprint.

138/230kV Underground Route Evaluation, Florida Power and Light, Coral Gables, FL Project Engineer responsible for performing a feasibility study on undergrounding two transmission (1-138kV & 1-230kV) circuits through Coral Gables, FL, that included a cost estimate, risk assessment, design considerations, manhole placements, permitting assessments, and constructability considerations.

project in Hardee County, Florida. The scope of the project is to prepare a spread footing foundation for the new stand based upon provided geotechnical reports, prepare a support stand for manufacturing and eventual installation, check electrical safety clearances, and complete the design with an updated set of drawings to be used for construction purposes.

Inverness to Lecanto, 11.5mi 115kV Transmission Line, Duke Energy Florida, Lake Mary, FL Project Manager for the design of the 115kV transmission line project in Citrus County, Florida, capable to support and provide clearance for a single circuit 2000A equivalent conductor. The project scope included designing a new line along an existing state road and reconfigurations at each substation where the line terminates.

At the substations, construction sequence drawings were prepared to communicate with the team and schedule the construction efforts. One big challenge on this project was to determine structure placement within congested corridors, which was resolved by coordinating subsurface explorations.

138kV and 230kV T-Line Specifications, Tampa, FL Stantec was tasked with developing new specifications, which was used on future design projects. The specifications included the following: Conductor Specifications, Glass Insulator Specifications, Hardware Specifications, Steel Structure Specifications, AutoCAD Specifications.

Undergrounding Opinion of Probable Construction Costs for the Puerto Rico Grid Modernization Program | Puerto Rico Project Technical Lead for developing budgetary estimates for all underground conversions for the grid modernization projects in Puerto Rico. Richard developed proposed duct bank configuration, sized cable, performed an opinion of probable construction cost, and presented the findings to key stakeholders including the local electric authority, FEMA, etc.

Project Development Estimating | California Project Quality Assurance/Control Lead for the development of development of capital opinion of probable construction costs (estimates) for the underground and overhead transmission lines for three project portfolios, at an AACE Class 4 level. The level of effort included preparing a general project plan, constructability review, contingency development, then ultimately combining all details to develop the budget and schedule.

Power Delivery Engineering Basics and Advanced Training Technical Leader / Facilitator | US-East Project technical lead for a Power Delivery basics and advanced course series that has taught 500+ students from various technical backgrounds.

Richard taught the Transmission, Power Systems, Project Management, and Substation topics, for 5+ years and was involved in the initial roll-out and content review. * denotes projects completed prior to Stantec

City of New Smyrna Beach RSQ No. 10-22 Professional Services 16

Douglas Sharpe Engineering Manager

Stantec Office Lake Mary, FL

Total Years of Experience 31 years

Education Bachelor of Science, Electrical Engineering, Iowa State University, Ames, Iowa, United States, 1991

Licenses / Registrations Professional Engineer #E18032, State of California

Riverside Transmission Reliability Project - Phase II Engineering* | Riverside Public Utilities | Riverside, California | Engineering/Program Manager Engineering/program manager responsible for coordination of design teams to provide all aspects of design and material procurement services for the new 69kV Wilderness Substation and additions and upgrades to nine additional substations.

Project scope included providing engineering and construction support services for the Riverside Transmission Reliability Project (RTRP), a major upgrade to the City of Riverside’s electric system.

Phase two provided the city with environmental clearances, substation and transmission line design and construction of 230 kV and 69 kV systems. In addition, conceptual and detailed engineering for two new substations, four new double circuit 69kV transmission line segments, and upgrades to eight existing 69 kV substations was provided.

Riverside Transmission Reliability Project - Phase I Engineering* | Riverside Public Utilities | Riverside, California | Engineering Manager Substation design manager for the project definition phase for a proposed new 230 kV interconnection into the Southern California Edison (SCE) transmission system. Doug’s responsibilities included conceptual design, coordination of substation requirements for system upgrades and system study and design and construction cost estimates. The Riverside Transmission Reliability Project (RTRP) included a new 230 kV transmission line, new 230 kV substation, 69 kV tie lines to the Riverside Public Utilities electrical grid and electrical upgrades to existing 69 kV lines and substations within Riverside’s electrical system. Doug provided project scoping, conceptual engineering and permitting services.

Burbank Substation Owner’s Engineer Support* | City of Burbank Public Utilities | Burbank, California | Project Engineer Project engineer responsible for overseeing all substation design activities. The project included construction of a new 34.5/12.47 kV distribution substation. Major equipment ncluded two 34.5/12.47 kV, 50MVA transformers, 34.5 kV indoor

Doug is the Power Delivery Regional Sector Lead and is a senior associate with over 30 years’ experience in the successful delivery, execution and construction of power delivery projects and programs serving electric utilities and power producers throughout the U.S. Doug provides leadership and support for client and project development, and project proposals, as well as strategic and technical support to engineering, construction management and project management. Doug has extensive experience developing, leading, coordinating and supervising teams of project managers, engineers, designers and drafters performing all aspects of substation, transmission and distribution system design. Projects have included new green-field, existing retrofit, upgrade and replacement, and interconnection projects, utilizing all delivery methods from direct engineering through alternative delivery (EPC). He has also directly managed construction and utility interconnections on numerous projects.

Relevant Experience Ft. White Substation & Autotransformer, Ft. White to Perry Transmission Line, Perry Substation Projects* | Duke Energy Florida | Fort White, Florida | Project Manager Project Manager for the engineering, procurement and construction of the Ft. White to Perry group of projects, including: replacement of the 230 kV Ft. White substation with a new three-bay breaker-and-a-half switchyard and new 230- 115 kV transformer; upgrade and addition of the 2nd 115 kV Ft. White to Perry transmission line; and upgrade and 115 kV addition of a three-bay breaker-and-a-half switchyard.

Freeman Substation 69 kV Circuit Breaker Replacement* | Riverside Public Utilities | Riverside, California | Project Manager As the substation project manager, Doug’s responsibilities included leading the project team to perform all aspects of engineering design for the replacement of five 69 kV circuit breakers and associated upgrades at RPU’s Freeman Substation. The scope included replacement of five 69 kV circuit breakers, replacement of all control and power cable, integration of new circuit breaker controls and protection schemes into the existing substation, addition and integration of the new equipment into the Substation Automation System (SAS), upgrade of all bus and switch connections, design of foundations and below grade design.

City of New Smyrna Beach RSQ No. 10-22 Professional Services 17 extremely aggressive due to permitting requirements, which required the main power transformer foundations and control building foundations to be designed, permitted and installed within three months of contract issuance.

Calipatria Solar Interconnect* | Confidential Client | Calipatria, California, United States | Project Manager Engineering manager responsible for the management of the design and construction of a new 92-34.5 kV substation and 92 kV gen-tie transmission line. The project included a short 92 kV transmission interconnection line to connect the new single bay 92 – 34.5 kV solar collection substation from the Imperial Irrigation District system to the new 20 MW Calipatria Solar plan, Silver State South Solar Project* | Confidential Client | Primm, Nevada | Engineering Manager Project/engineering manager responsible for the management of the design and construction of the new 230-34.5 kV solar collection substation, 1.1 mile 230 kV gen-tie transmission line, and 34.5 kV overhead and underground collection feeders to connect the new 250 MW Silver State South photovoltaic (PV) solar plant to the SCE Primm Substation. The project included the overhead 230 kV transmission line, substation with a 230 KV bus feeding two 230 – 34.5 kV 125 MVA transformers, connected to two 34.5 kV, four-feeder collection buses equipped with four 10 MVAR capacitor banks. The project also included eight 34.5 kV overhead (Hendrix-type cable) and underground collection system to connect the substation to the PV plant.

Substation Master Services Contract* | Southern California Edison | California | Engineering Manager Responsible for leading, coordinating, and supervising a team of engineers, designers, and drafters performing all technical aspects of substation design, including physical design, relaying, and all equipment and material specification and procurement support for Southern California Edison projects. Complete responsibility for profitability, quality and schedule performance for the multiple project teams on design of projects. Also provided leadership and support in the development of project proposals inclusive of strategic and technical support to engineering, construction management and project management for various projects. Responsibilities also included coordination with SCE project managers, RE’s and other design staff, development of project scopes and budgets and coordination of schedules.

Milligan 230-69 kV Substation* | Arizona Public Service | Arizona | Project Engineer Project engineer responsible for coordination of electrical and civil engineering design staff that provided all aspects of design for the new 230-69 kV substation. The project’s scope included substation design, including 2D and 3D physical plans and sections, schematics and wiring, control building and bills of materials.

GIS switchgear, 12.47 kV metalclad switchgear and 34.5 kV and 12.47 kV metal-enclosed capacitor banks.

Pleasant Grove 138-12kV Substation* | Pacificorp | Salt Lake City, Utah | Project Engineer Project engineer responsible for coordination of electrical and civil engineering design staff to provide all aspects of design for the new 138-12 kV substation. The Pleasant Grove Substation project converted the existing 46- 12 kV substation to 138-12 kV by adding a new 138-12 kV transformer and new 138 kV switchyard including terminations for two new 138 kV lines and 138 kV buswork. The project’s scope covered substation design, including physical plans and sections, schematics and wiring, control building and bills of material.

Power Delivery Project* | Colorado River Commission | Las Vegas, Nevada | Project Engineer Project engineer responsible for design and coordination of 69 kV underground transmission design. The Power Delivery Project was the substation, transmission, and distribution portion of a major project to install a new water main from Lake Mead to the Las Vegas water supply.