About this file

This notice provides draft documents for a future request for proposal for the Type I Family of All Terrain Crane program, including a draft Section C (Scope of Work), draft attachments, and draft Contract Data Requirement Lists. Industry may submit comments on the draft documents to the Army Materiel Command by 5:00 pm eastern standard time on December 11, 2020. The final RFP incorporating revisions will be posted to Beta.SAM for the Type I FOATC program managed by the Department of the Army under contract number W56HZV-19-R-0118.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A062 _ Bill of Materials Report.pdf PDF
A052 _ NMWR Technical Manual.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
Attachment 0012 _ Risk Management Scoring Criteria and Reporting Template.xlsx XLSX spreadsheet
A067 _ Field Level Maintenance New Equipment Training.pdf PDF
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPE I FOATC

STATEMENT OF WORK

C.0 DEFINITIONS

C.1 SYSTEM DESCRIPTION

C.2 SYSTEMS ENGINEERING

C.3 LOGISTICS

C.4 EQUIPMENT PUBLICATIONS

C.5 WARRANTY

C.6 STORAGE, EXERCISE, CARE AND MAINTENANCE OF THE TYPE I FOATC

C.7 MAINTAINABILITY EVALUATION

C.8 PROVISIONING

C.9 PACKAGING

C.10 TRAINING

C.11 ITEM UNIQUE IDENTIFICATION

C.12 FIELD SERVICE REPRESENTATIVES EXECUTION OF INTERIM CONTRACT LOGISTICS SUPPORT

C.13 SPECIAL TOOLS AND TEST EQUIPMENT

C.14 SHIPPING AND FIELDING

C.15 DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES MANAGEMENT PROGRAM

D.1 PRESERVATION AND PACKAGING

D.3 HEAT TREATMENT OF WOOD

E.1 QUALITY PROGRAM

H.1 DELIVERY OF LOGISTICS PRODUCTS

H.2 TRAVEL

H.3 FSR TRAVEL ZONES

H.4 QUANTITY RANGES

C.0 DEFINITIONS

For purposes of this contract, day is defined as a calendar day unless otherwise specified in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 2.1 – Definitions.

C.1 SYSTEM DESCRIPTION

The Type I FOATC shall perform IAW the Type I Family of All Terrain Cranes (FOATC) Purchase Description (PD) AT-PRF- 0001 (Version 1.1), dated 08 October 2020. (Attachment 0001 – Type I FOATC PD – AT-PRF-0001)

C.1.1 HARDWARE DELIVERIES

The contractor shall manufacture and deliver a Type I FOATC meeting all technical requirements set forth in Attachment 0001 – Type I FOATC PD – AT-PRF-0001 - 2020-10-08. Delivery Orders will specify the quantity, delivery dates, destinations, packaging requirements and required paint color (34094 - Green or 33446 - Tan IAW FED-STD-595).

Deliveries shall be IAW FAR 52.211-8 – Time of Delivery. (Attachment 0001 – Type I FOATC PD – AT-PRF-0001 -2020-10- 08)

C.1.2 BASIC ISSUE ITEMS

The contractor shall provide Basic Issue Items (BIIs) for each production Type I FOATC, unless otherwise specified in the delivery order. The BII shall consist of all items essential for an operator or crew to place the Type I FOATC into initial operation to accomplish its intended operational function. The contractor shall over-pack (box and strap) one complete BII for each production Type I FOATC. The contractor shall prepare and deliver the list of BII, by National Stock Number

Type I FOATC SOW

(NSN), in a separate appendix to the Operator's manual IAW Contractor Data Requirements List (CDRL) A001 – Basic Issue Items (BII) List. (CDRL A001 – Basic Issue Items (BII) List)

C.1.2.1 INITIAL SERVICE PACKAGE

The contractor shall prepare and deliver an Initial Service Package (ISP) Inventory List IAW CDRL A002 – Initial Service Package (ISP) Inventory List for each production Type I FOATC, unless otherwise specified in the delivery order. The contractor shall over-pack (box and strap) the ISP and its components with each production vehicle. The ISP shall consist of all service parts required to meet warranty service intervals and to perform the first scheduled maintenance. The contractor shall mark each item with the nomenclature, part number, Commercial and Government Entity (CAGE) code, and NSN (if and when assigned). (CDRL A002 – Initial Service Package (ISP) Inventory List).

C.1.2.2 SPARE PARTS KIT

The contractor shall develop and provide recommended initial spares to support the Type I FOATC. In addition, the contractor shall prepare and deliver a recommended initial spares list of support items IAW CDRL A003 – Initial Spares List. Spare parts are repairable components or assemblies used for maintenance replacement purposes in the end items of equipment. They are articles identical to or interchangeable with the components of end items on contract, which are procured over and above the quantity needed for initial installation for support of a system. The contractor shall update the list of spare parts quarterly; updates shall be based on the number of cranes fielded in the year following production and account for any change. (CDRL A003 – Initial Spares List)

C.1.2.3 SPECIAL TOOLS KIT

The contractor shall provide a Special Tools and Test Equipment (STTE) kit with every third production Type I FOATC, unless otherwise specified by the delivery order. The kit shall contain all Government approved special tools for the Type I FOATC. The contractor shall provide the kit a unique part number and CAGE code which encompasses all tools within the kit. The special tools shall be packed in hard plastic, weather resistant container(s) with custom foam inserts to meet the requirements in MIL-STD-2073-1E with Change 4. The contractor shall prepare and deliver an itemized STTE list IAW CDRL A004 – Special Tools and Test Equipment (STTE) List. (CDRL A004 – Special Tools and Test Equipment (STTE) List)

C.1.2.4 SLING LEGS

The contractor shall provide sling legs IAW Attachment 0001 – Type I FOATC PD – AT-PRF-0001 -2020-10-08, section

3.9.3 for each production Type I FOATC.

C.1.2.5 CONCRETE BARRIER LIFT

The contractor shall provide a concrete barrier lift IAW Attachment 0001 – Type I FOATC PD – AT-PRF-0001- 2020-10-08, section 3.9.5. for each production Type I FOATC.

C.1.3 PROGRAM SCHEDULE AND DATA

C.1.3.1 INTEGRATED MASTER SCHEDULE

The contractor shall develop, maintain, and deliver an Integrated Master Schedule (IMS) for the Type I FOATC program IAW CDRL A005 – Integrated Master Schedule (IMS). The IMS is used to verify attainability contract objectives, to evaluate progress toward meeting program objectives, and to integrate the program schedule activities with all related components. The intent of the program IMS is to provide a time-based schedule containing the networked, detailed tasks necessary to ensure successful program/contract execution. The contractor’s IMS shall contain all the deliverables (including hardware and CDRLs) and events identified in this contract. The contractor shall also develop a Logistics-specific IMS detailing all deliverables with a Logistics focus such as logistics events (Validation, Verification, and Maintainability Evaluation), logistics-focused document generation, provisioning efforts, and publications. The two IMS schedules shall correspond concurrently and shall be interoperable with Microsoft Project. (CDRL A005 – Integrated Master Schedule (IMS))

C.1.3.1.1 INTEGRATED PRODUCT SUPPORT

The contractor shall manage and develop a Product Support Package to support updates to the Type I FOATC system in current Department of the Army Technical Manuals (DATMs) and IAW the current version of MIL-STD 40051-2 at the time of contract award (CDRL A006 – Product Support Package). The contractor shall appoint an Integrated Product Support Manager (IPSM) responsible for the logistics package update. The contractor shall prepare and deliver the Integrated Product Support (IPS) schedule at the Start of Work Meeting (SOWM) IAW CDRL A007 – Integrated Product Support (IPS). The contractor shall appoint an IPSM before the Logistics Start of Work Meeting (LSOWM). The IPSM shall participate in the initial LSOWM, and develop a Logistics Product Sequence Event Schedule/Logistics Integrated Master Schedule (LIMS) in an electronic form. The IPSM shall participate in all necessary Type I FOATC Integrated Product Teams (IPTs) and shall establish a separate follow-on Logistics IPT, will be the contractor Logistics Lead, and shall be able to discuss all ongoing/current Logistics actions with the Government Logistics Team and the Government IPSM. (CDRL A006

– Product Support Package; CDRL A007 – Integrated Product Support (IPS))

C.1.3.1.2 PRODUCT SUPPORT PLAN DEVELOPMENT

The IPSM shall reference Attachment 0002 - Department of the Army Pamphlet (DA PAM) 700-127 to prepare and deliver a Product Support Plan (PSP) Logistics Management Information (LMI) IAW CDRL A008 – Product Support Plan (PSP), Attachment 0003 – DD Form 1692 and Attachment 0004 – DA Form 2028 – Recommended Changes to Publications and Blank Forms after award of a delivery order that changes the current PSP. The IPSM shall discuss the ongoing and current PSP actions during the Logistics Integrated Product Teams (IPTs) and be ready to discuss the PSP actions with the Government IPSM. The PSP update shall consist of four primary areas (Maintenance, Equipment Publications, Packaging, and Training) and shall also address all 12 Integrated Logistics Support (ILS) elements:

- Product Support Management

- Supply Support

- Packaging, Handling, Storage, & Transportation

- Maintenance, Planning & Management

- Design Interface

- Sustaining Engineering

- Technical Data

- Information Technology (IT) Systems Continuous Support

- Facilities & Infrastructure

- Manpower & Personnel

- Support Equipment

- Training & Training Support

The contractor shall provide a PSP update using the following information:

a) All Engineering Change Proposals (ECPs) implemented by the contractor.

b) All DA Form 2028 Recommended Changes to Publications and Blank Forms provided by the Government.

c) Any ECPs initiated by the Government.

(CDRL A008 – Product Support Plan (PSP), Attachment 0003 – DD Form 1692; Attachment 0004 – DA Form 2028 – Recommended Changes to Publications and Blank Forms)

C.1.3.1.2.1 INTEGRATED PRODUCT SUPPORT DEVELOPMENT

The contractor shall use Society of Automotive Engineers (SAE) Government Electronic and Information Technology Association (GEIA) STD-0007 Revision C. Performance Specification, and LMI for use in identifying content, delivery and related guidance for logistics data. Additionally, the contractor shall develop any operation tasks (Operator COTS manual section), maintenance tasks/troubleshooting tasks (maintainer COTS manual section to include all trouble shooting procedures), and Repair Parts and Special Tools List (RPSTL COTS manual section). Figures missing from the COTS TM sections, but deemed necessary for use by the Target Audience (Soldier) shall be considered supplemental data. All supplemental data shall be created using eXtensible Mark-up Language (XML), current Document Type Definitions (DTDs) and Style Sheet and follow MIL-STD-40051-2C. Warranty information shall be included in the Operator section. (Attachment 0005 – COTS Publications Requirements)

C.1.4 CONTRACT EXECUTION

C.1.4.1 GOVERNMENT-FURNISHED PROPERTY (GFP)

The Government may provide Government Furnished Property (GFP) as identified in Attachment 0006 – Government Furnished Property (GFP) List for performance of this contract IAW DFARS 245.103-72. All GFP shall be documented using the GFP List. (Attachment 0006 – Government Furnished Property (GFP) List)

C.1.4.1.1. GFP MANAGEMENT

The Government may provide the contractor with GFP to support efforts under this contract. This may include but may not be restricted to the series of GFP such as the General Mechanics Tool Kit (GMTK) tool box, the Forward Repair System (FRS, or FRESH) tool box and the Maintenance Support Device (MSD) troubleshooting interactive tool, which are governed under the Sets, Kits, Outfits and Tools (SKOT). All GFP under this contract shall be managed IAW FAR 52.245-1.

C.1.4.1.2.2 INVENTORY CHECKLIST REPORT

The contractor’s accountability extends from the initial acquisition and receipt of property, through stewardship, custody, and use until formally relieved of responsibility by authorized means, including delivery, consumption, expending, sale (as surplus property), or other disposition, or via a completed investigation, evaluation, and final determination for lost property. This requirement applies to all Government property under the contractor’s accountability, stewardship, possession or control, including its vendors or subcontractors. The contractor shall physically inventory the GFP in its possession using CDRL A009 – Inventory Checklist Report; subcontractors are required to do the same. A component hand receipt for the appropriate SKOT will be provided to the contractor. The contractor shall inventory the GFP list provided prior to an event such as the Maintainability Evaluation and Verification. Upon receipt if any deficiencies are found the contractor shall notify the Government in writing within seven days. (CDRL A009

– Inventory Checklist Report)

C.1.4.2 DATA PROTECTION

The contractor shall establish appropriate administrative, technical, and physical safeguards to protect all Government data, to ensure the confidentiality, integrity, and availability of Government data IAW DFARS 252.204-7012 and FAR 52.204-21.

C.1.4.3 DATA DELIVERABLES

The contractor shall deliver all data in English IAW the requirements established each individual Contract Data List Requirements (CDRL) by referencing Attachment 0007 – Exhibit A, CDRL DD Form 1423. Distribution shall be IAW each CDRL and Attachment 0008 – Type I FOATC Point of Contact (POC) List. The contractor shall submit documentation on or before the required due date as detailed in eachCDRL.. The contractor shall validate all documentation prior to submittal to the Government. Government receipt of data deliverables does not constitute acceptance. Government acceptance of data deliverables hinges on the completeness, accuracy, and compatibility of submitted documentation, and the applicable military standards and specifications as detailed in each Data Item. Government acceptance of data deliverables will be communicated to the contactor by the Contracting Officer’s Representative (COR) or as otherwise specified per individual CDRL Data Items. (Attachment 0007 – Exhibit A, CDRL DD Form 1423; Attachment 0008 – Type I FOATC Point of Contact (POC) List)

C.1.5 MEETINGS

C.1.5.1 MEETINGS AND REVIEWS

The contractor and Government will periodically have meetings and reviews during this contract's performance period.

Meetings are used to review progress and provide guidance on technical, logistics, contractual or other issues that arise during contract performance. Prior to meetings, the Government and contractor will jointly develop an agenda.

Meetings may be be at the contractor’s facility, the Detroit Arsenal or via approved conference channels as mutually agreed upon by both parties within 30days of the meeting or event except as otherwise provided. When meetings are at the contractor’s facility, the contractor shall deliverfor the Government's use: production or other required versions for the Type I FOATC needed for viewing; Quality Management System documentation and records, required technical, logistics or other documentation (including drawings, computer data bases, publications, and other data); and computer resources, as needed.

C.1.5.2 PARTICIPATION AND ADMINISTRATION

In the event a meeting is to be hosted by the contractor, hosting duties and responsibilities shall consist of all functions related to the preparation and execution of the meetings to include providing facilities, sending invitations, media resources, security, minutes, and hard copy materials. The contractor shall also make available personnel for Government scheduled meetings at no additional cost to the Government.

C.1.5.3 AGENDA AND READ AHEAD PACKAGES

The contractor shall prepare and deliver an agenda and read-ahead package for all contractor-led meetings identified in this contract IAW CDRL A010 – Agenda and Read-Ahead Package)

C.1.5.4 MINUTES

The contractor shall prepare and deliver minutes for all meetings, IPRs, conferences and reviews IAW with CDRL A011 – Meeting Minutes for meetings described in section C.1.5 and otherwise called out in this contract. The contractor shall ensure the action items include the name or agency responsible and date to be completed, as agreed during the review.

The contractor shall also add a copy of all material presented at the review. (CDRL A011 – Meeting Minutes)

C.1.5.5 PROGRAM REVIEWS

C.1.5.5.1 START OF WORK MEETING

The contractor shall conduct a Contract SOWM within 30 calendar days after contract award IAW CDRL A012 – Start of Work Meeting(s). This meeting will introduce and align the Government and contractor teams. The contractor shall, at a minimum, brief:

a. Scope of Work (SOW) Review

b. IMS Review

c. Organizational Key Roles

d. Maintainability Evaluation

e. Technical Manual (TM) Validation

f. TM Verification

g. Requirement Review

h. Test Schedule

i. Risk Status

The contractor shall present organizational key roles and discuss the plan for communicating and transitioning personnel changes. The contractor shall be prepared for a detailed discussion with the Government. For planning purposes, this meeting is anticipated to be between two to four business days. (CDRL A012 – Start of Work Meeting(s))

C.1.5.5.1.1 REQUIREMENTS REVIEW

The contractor shall conduct a Requirement Review concurrent to the SOWM. The Requirement Review will be a line-by-line review of Attachment 0001 – Type I FOATC PD – AT-PRF-0001 - 2020-10-08. The Requirement Review is considered complete once all the requirements are reviewed and discrepancies are resolved. (Attachment 0001 – Type I FOATC PD –

AT-PRF-0001 - 2020-10-08)

C.1.5.5.2 PROGRAM MANAGEMENT REVIEW

The contractor shall conduct quarterly Program Management Reviews (PMRs) with the Government at the contractor’s production facility. The first PMR shall be concurrent with the SOWM. At each PMR, the contractor shall present the cost, schedule, performance, supportability status and risk assessment and risk mitigation initiatives. These meetings shall also include separate discussions for safety, engineering, logistics, production, contracting, test, and product assurance.

C.1.5.6 LOGISTICS REVIEWS

C.1.5.6.1 LOGISTICS START OF WORK MEETING

The contractor shall host a Logistics SOWM in conjunction with the contract SOWM referenced in C.1.5.5.1. This meeting shall be strictly a Logistics discussion, an in-depth review of contract requirements and CDRLs and a venue to discuss Product Support Package development. For planning purposes, the participants should anticipate this SOWM to be a one to two day event. In addition, the contractor shall discuss in-depth the logistics areas of TM Validation, TM Verification, and the Maintainability Evaluation IAW the Logistics-specific IMS and overall program IMS. This Logistics SOWM event shall introduce and align the Government and contractor Logistics teams. (CDRL A005 – Integrated Master Schedule (IMS)); CDRL A012 – Start of Work Meeting(s))

C.1.5.6.1.1 PROVISIONING AND PUBLICATIONS START OF WORK MEETINGS

The contractor shall host concurrently Provisioning and Publications SOWMs immediately following the Logistics SOWM referenced in C.1.5.6.1. The purpose of the Provisioning SOWM is to ensure the contractor has a clear understanding of the contractual provisioning requirements and to identify and reinforce the requirement for accurate, complete, and timely submission of provisioning data and information. The contractor shall present a provisioning schedule for Government concurrence and input into the IMS IAW CDRL A005 – Integrated Master Schedule (IMS). The purpose of this meeting is to review publications contract requirements, establish lines of communications, answer all questions, and develop a publications schedule based on the requirements of the program and the contract. (CDRL A005 – Integrated Master Schedule (IMS)).

C.1.5.6.1.1.1 PROVISIONING GUIDANCE CONFERENCE

The contractor shall host a Provisioning Guidance Conference IAW ANSI-TA-STD-0017 Activity 3.4.1 and Attachment 0009 – Provisioning Requirements Statement. Government representatives from the Tank-automotive and Armaments Command (TACOM) shall attend from the Program Management (PM) office and the Integrated Logistics Support Center (ILSC). This Provisioning Guidance Conference may run concurrent/combined with the Provisioning and Publications SOWMs referenced in C.1.5.6.2. The ILSC will include subject matter experts (SMEs) in the fields of Provisioning and Publications. (Attachment 0009 – Provisioning Requirements Statement)

C.1.5.6.2 IN-PROCESS REVIEWS

In-Process Reviews (IPRs) shall be held after award of a delivery order requiring development or updates to the Type I FOATC LMI. The Government anticipates conducting IPRs on a monthly basis. The Government reserves the right to combine IPRs or keep them separate.

C.1.5.6.2.1 LOGISTICS IN-PROCESS REVIEWS

The contractor shall host Logistics IPR which encompass the progress on all logistics and publications requirements under the purview of the Supportability Integrated Product Team (SIPT). The SIPT shall address all supportability issues concerning Publications, Training, and Maintenance, Operator procedutes and Supply Support. The contractor shall host IPRs at the contractor’s facility, making available adequate space, facilities, personnel and a production Type I FOATC.

IPRs may also be accomplished via teleconference if approved by the Government. The Government will provide the initial draft agenda ten days prior to the first IPR. The contractor shall provide draft agendas for each subsequent Logistics IPR five business days prior to the review. The contractor shall make available all information necessary to address issues and concerns in the agenda. (CDRL A010 – Agenda and Read-Ahead Package)

C.1.5.6.2.1.1 MAINTENANCE ANALYSIS REVIEW

The contractor shall participate in a joint Government-contractor Maintenance Analysis (MA) Review to review the maintenance planning and analysis results IAW the IMS. MA reviews shall be held using the following planning schedule:

a. The Initial MA Review shall be held after contract award to review the draft MA.

b. The Intermediate MA Reviews shall be held IAW the IMS 45 calendar days after the conclusion of First Article Test (FAT).

c. The Final MA Review shall be held at the conclusion of the Government TM Verification.

The contractor shall update and deliver the MA and provide it for Government acceptance IAW CDRL A013 – Maintenance Analysis (MA). The contractor shall update the MA prior to all provisioning conferences. (CDRL A005 – Integrated Master Schedule (IMS); Attachment 0010 – LMI Summary Worksheet – Maintenance Analysis; CDRL A013 – Maintenance Analysis (MA))

C.1.5.6.2.1.1.1 MAINTENANCE AND SUPPLY SUPPORT IN-PROCESS REVIEW

During development and Analysis of Maintenance and Supply Support IPRs shall be held after award of delivery order requiring development or updates to the Type I FOATC LMI to clarify issues and concerns related to data received to support Maintenance Concept and Supply Support development. The Maintenance and Supply Support IPRs are not a part of the Provisioning Conferences.

C.1.5.6.2.1.1.1.1 NATIONAL MAINTENANCE WORK REQUIREMENT (NMWR) CANDIDATES LIST

The contractor shall develop a NMWR Candidate List. The NMWR Candidate List shall consist of repairable assemblies.

The NMWR candidate list shall be a product of the Maintenance Analysis. All components coded for repair at the sustainment level of maintenance shall be a NMWR candidate. The contractor shall annotate these components on the Maintenance Analysis and provide them as a separate list at each Maintenance Analysis review. The Government will review and approve the final list of NMWR candidates at the final Maintenance Analysis review. The contractor shall prepare and deliver a NMWR Candidate List IAW CDRL A013 – Maintenance Analysis. (CDRL A013 – Maintenance Analysis)

C.1.5.6.2.1.1.1.1.1 TRAINING IN-PROCESS REVIEW

The contractor shall host a Training In-Process Review (TIPR) at the contractor facility IAW the schedule in the IMS. The contractor shall provide a comprehensive review of the status of training development and issues requiring Government intervention. The contractor shall make available at each TIPR all training documentation for Government review.

C.1.5.6.2.2 PUBLICATIONS IN-PROCESS REVIEW

The contractor shall schedule and attend five Publications IPRs, at the contractor's facility, IAW the key milestones identified in the IMS. Frequency shall be coordinated with the COR. The meetings shall encompass the progress on all logistics requirements under the purview of the SIPT. The SIPT shall address all supportability issues concerning Publications, Maintenance, and Operator procedures. The contractor shall provide properly formatted representative samples of every deliverable required to address issues and concerns in the Government agenda sent ten business days prior to the IPR. The contractor shall be prepared to answer questions from the Government about publications work processes, provide records of Quality Assurance (QA) reviews, and respond to Government comments regarding publications processes or work samples. The samples will be reviewed for compliance with the applicable standards for the deliverable as provided in this (CDRL A005XX – Integrated Master Schedule (IMS)); CDRL A014 – Operator Technical Manual; CDRL A015 – Field Maintenance Manual; Attachment 0005 –COTS Publications Requirements).

C.1.5.7 PROVISIONING REVIEW

C.1.5.7.1 PROVISIONING CONFERENCES

Provisioning Conferences shall be separate and distinct events from the Provisioning SOWM referenced in C.1.5.6.2 and the Provisioning Guidance Conference referenced in C.1.5.7.1. The number of Provisioning Conferences is based on 800 Provisioning Line Item Sequence Numbers (PLISNs) of data, but no more than 1,200 PLISNs of data, in addition to the initial and cleanup conference.

The contractor shall host Provisioning Conferences at the contractor’s facility, or a suitable facility where a Type I FOATC is located and can be accessed for maintenance purposes. The contractor shall provide 30 days in advance of the Provisioning Conferences the following data to support the conferences: the Provisioning Parts List (PPL) (LSA-036) IAW CDRL A016 – Provisioning Parts List (PPL) and Reviews, CDRL A017 – Provisioning Pre-Procurement Screening (PPS), and CDRL A018 – Engineering Data for Provisioning (EDFP). The contractor shall also provide copies of technical data to include the Maintenance Allocation Chart (MAC) IAW CDRL A019 – Maintenance Allocation Chart (MAC) (reference C.4.3.2), Failure Modes, Effects and Criticality Analysis (FMECA) IAW CDRL A020 – Failure Modes, Effects and Criticality Analysis (FMECA) (reference C.3.4), Repair Parts and Special Tools List (RPSTL) IAW CDRL A021 – Repair Parts and Special Tools List (RPSTL), and Level of Repair Analysis (LORA) IAW CDRL A022 – Level of Repair Analysis (LORA) Report (reference C.3.5). The contractor shall present its data, rationale, and supporting documentation to the Government team for each PLISN. (CDRL A016 – Provisioning Parts List (PPL) and Reviews; CDRL A017– Provisioning Pre-Procurement Screening (PPS); CDRL A018 – Engineering Data for Provisioning (EDFP); CDRL A019 – Maintenance Allocation Chart (MAC); CDRL A020 – Failure Modes, Effects and Criticality Analysis (FMECA) CDRL A021 – Repair Parts and Special Tools List (RPSTL); CDRL A022 – Level of Repair Analysis (LORA) Report)

C.1.5.8 QUALITY REVIEWS

C.1.5.8.1 CORRECTIVE ACTION REVIEW BOARD

The Government will schedule Corrective Action Review Board (CARB) meetings after the completion of testing (reference paragraph C.1.5.9). CARB Meetings shall review the functional and performance failure data and contractor's Failure Analysis Corrective Action Report. The contractor shall attend all CARB meetings via teleconference and present findings that the Government may consider when assessing corrective actions. The Government CARB, as applicable, reflects all relevant CARB functions which include Quality, Test, Logistics, Maintenance, Systems Engineering, Safety, Transportability and Manpower and Personnel Integration (MANPRINT) Human Factors. (CDRL A023 – FACAR)

C.1.5.9 TEST REVIEWS

C.1.5.9.1 CONTRACTOR PRE-TEST READINESS REVIEW

The contractor shall conduct a Pre-Test Readiness Review (Pre-TRR) to present to the Government the readiness of the Type I FOATC to enter into Government Testing and discuss contractor support. For planning purposes, this meeting will be a one day event and will take place at contractor's facility at least five days prior to the Government Test Readiness Review (TRR).

C.1.5.9.2 GOVERNMENT TEST READINESS REVIEW

The contractor shall attend the Government TRR to be held at or in the vicinity of Aberdeen Proving Ground, MD. The contractor shall be prepared to present information from the Pre-TRR. The Government TRR is anticipated to be held no more than five days prior to delivery of the first test system. For planning purposes, this meeting is anticipated to be a one day event.

C.2 SYSTEMS ENGINEERING

C.2.1 CONFIGURATION MANAGEMENT

The contractor shall be responsible for maintaining configuration control of the Type I FOATC delivered under this contract. The contractor shall manage all configurations including documentation, electronic media, and parts representing or comprising the Type I FOATC. The contractor shall apply Configuration Management (CM) functions, including process, responsibilities, resources, and metrics throughout the program lifecycle, and flow down these CM functions to the subcontractors and entire supply chain.

C.2.1.1 CONFIGURATION BASELINE

The Type I FOATC shall be baselined and put under formal CM after successful completion of FAT. This baseline will identify and formally document the functional and physical characteristics of the Type I FOATC. The Government shall be the approver of all changes to the configuration baseline through Engineering Change Proposal (ECP) process (reference Section C.2.1.3).

C.2.1.2 CONFIGURATION MANAGEMENT PLAN

The contractor shall make available to the Government an existing corporate Configuration Management Plan (CMP) upon request. The contractor may use Government Electronics and Information Technology Association (GEIA) EIA-649- A, National Consensus Standard for Configuration Management; GEIA-859, Data Management (DM); and DoD MIL- HDBK-61, Configuration Management Guidance.

C.2.1.3 ENGINEERING CHANGE PROPOSAL

The contractor shall notify and receive approval from the Government prior to implementing any configuration change via preparation and delivery of an Engineering Change Proposal (ECP) IAW CDRL A024 - Engineering Change Proposal (ECP). Impact statements and supporting data sufficient to evaluate the change shall accompany each request to include engineering, safety, quality, cost, schedule, MANPRINT, packaging, provisioning, maintenance, TM, and training data.

Government approval of the ECP does not constitute relief from Type I FOATC performance requirements. (CDRL A024 – Engineering Change Proposal - ECP)

C.2.1.4 REQUEST FOR DEVIATION

The contractor may request to temporarily deviate from the Type I FOATC PD by submitting a Request for Deviation (RFD) IAW CDRL A025 - RFD. All permanent changes shall require an ECP to the Type I FOATC. (Attachment 0001 – Type I FOATC PD – AT-PRF-0001 - 2020-10-08; CDRL A025 – Request for Deviation - RFD)

C.2.1.5 FAT AND LOGISITICS VEHICLES REFURBISHMENT

Upon successful completion of any required FAT and satisfying all logistics requirements the FAT Type I FOATC and the Logistics Type I FOATC shall be refurbished and shipped as part of the production quantity. The contractor shall transport the FAT Type I FOATC assets used for testing from the Government test site at the contractor’s expense. The Logistics Type I FOATC assets shall be shipped from the logistics facility, at the contractor’s expense. The contractor shall completely inspect the refurbished Type I FOATC assets and submit a detailed proposal for refurbishment of the Type I FOATC to a full mission capable (FMC) condition. The proposal shall detail all repairs that are required. The proposal shall be submitted within 20 days after FAT approval. The Government will negotiate the refurbishment effort after contractor proposal submittal. The negotiated refurbishment effort will not include any configuration changes required as a result of test failures. These changes are the contractor’s responsibility. Upon PCO acceptance of the contractor’s proposal, the contractor shall make the repairs specified in the proposal. The cost for refurbishment as a result of a contractor initiated ECP shall be at no additional cost to the Government.

C.2.1.4.1 FULLY MISSION CAPABLE (FMC) DEFINITION

FMC is defined as vehicle and all components, BII, subassemblies, and systems are fully functional and Meet all performance requirements for which they were originally designed, configured and delivered to the Army. Any missing items or items that are leaking, damaged, cut, defective, or expected to fail within 12 months after delivery are not acceptable and shall be replaced IAW applicable technical manuals and work packages. Vehicle paint shall be inspected by the contractor, all defects shall be repaired by the contractor IAW contractors approved paint process.

Tires shall be inspected by the contractor and repaired or replaced IAW TM 9-2610-200-14.

C.2.2 RISK MANAGEMENT

The contractor shall perform Risk Management activities identified in this section.

C.2.2.1 RISK MANAGEMENT PLAN

The contractor shall develop a risk management plan IAW CDRL A026 – Contractor Risk Management Plan, the Type I FOATC Program Risk Management Plan (reference Attachment 0011 - Type I FOATC Program Risk Management Plan (RMP)), and best commercial practices. The plan shall be used by the contractor to monitor management, cost, and schedule of the contract efforts and technical risks relative to contract performance. The contractor risks shall be briefed and displayed in all technical reviews, Program Management Reviews, and IPT meetings. (CDRL A026 – Contractor Risk Management Plan; Attachment 0011 - Type I FOATC Program Risk Management Plan (RMP))

C.2.2.2 RISK TRACKING REPORTS

The contractor shall develop and deliver Risk Tracking Reports based on the scoring criteria and template in the Type I FOATC Template and Instruction (Attachment 0012 - Risk Management Scoring Criteria and Reporting Template). The contractor shall systematically identify and analyze all risks, and shall develop mitigation plans for all red and yellow risks scored IAW Attachment 0012 - Risk Management Scoring Criteria and Reporting Template. (CDRL A027 - Risk Tracking Report)

C.2.3 SAFETY ENGINEERING

C.2.3.1 SYSTEM SAFETY PROGRAM

The contractor shall establish and implement a System Safety Program to identify, assess, and manage safety, health and environmental hazards IAW MIL-STD-882E to ensure the safety-related requirements specified in the Type I FOATC PD are met. (Attachment 0001 – Type I FOATC PD – AT-PRF-0001 - 2020-10-08)

C.2.3.2 HAZARD TRACKING SYSTEM

The contractor shall deliver a Hazard Tracking System (HTS), which includes the process to identify, document and track Environmental, Safety, and Occupational Health (ESOH) hazards until they are eliminated or the associated risk is reduced to a level acceptable to the Government. The contractor shall identify ESOH hazards associated with the system to include any modifications. The HTS shall contain the fields identified in MIL-STD-882 Task 106 for each potential or actual ESOH hazard of the system and when the hazard may be expected to occur under both usual and unusual operating and maintenance conditions. The contractor shall categorize the risk before and after mitigation IAW MIL-STD- 882E. The contractor shall identify if the hazard is hardware, software or environmental related. Mitigation actions include redesign, recommended engineering controls, safety features or devices, warning devices and procedures and training. Hazards to be identified in the HTS include, but are not limited to: sharp edges/moving parts hazards, physical hazards (e.g. extreme temperatures, acoustical energy, ionizing and non-ionizing radiation), chemical hazards (e.g.

flammables, corrosives, carcinogens), toxic fumes (exhaust emissions), electrical hazards, whole-body vibration, compliance issues with regulatory organizations, generation of hazardous wastes, air/water/soil pollution hazards, biological hazards, fire prevention issues, and ergonomic hazards. (CDRL A028 – Hazard Tracking System - HTS).

C.2.3.3 SAFETY ASSESSMENT REPORT

The contractor shall deliver a Safety Assessment Report (SAR) for the Type I FOATC IAW MIL-STD-882E Task 301. The SAR shall include the results of a Software System Safety Assessment (SSSA). The SSSA shall be executed IAW MIL-STD-882E terms, definitions and risk matrices, unless tailored alternative matrices are formally approved IAW DoD Component policy, to assess the Software contribution to system risk. Additional guidance on how to conduct required SSSAs are provided in the Joint Software System Safety Engineering Handbook and Software System Safety Implementation Process and Tasks Supporting MIL-STD-882E. The SAR shall address safety impacts to maintenance, operation, installation, and removal. Safety Data Sheets (SDS) shall be included in each assessment. As an appendix to the SAR, the contractor shall identify and incorporate a Hazard Tracking System IAW MIL-STD 882E Task 106.2. The contractor shall provide a description and discussion of each potential or actual health hazard of concern for each subsystem/component/item/etc. The SAR, including the health hazards, shall identify all known safety and health features of the hardware, firmware, software, system design, and inherent hazards and shall establish operational and maintenance procedures and precautions to be observed by Government test agencies and system users. (CDRL A029 – Safety Assessment Report - SAR)

C.2.3.4 FUNCTIONAL HAZARD ANALYSIS

The contractor shall conduct a Functional Hazard Analysis (FHA) IAW MIL-STD-882E Task 208. The FHA shall identify failure conditions of each function (loss of function, malfunction, or degraded function), identify the effects of that failure condition, and identify the severity of the effects. The FHAs shall also identify the SwCI associated with each function, Computer Software Configuration Items (CSCIs), Computer Software Units (CSUs) and each Package, software contributions to the system level hazards, and safety-critical software requirements to mitigate the identified hazards.

The contractor shall document the results of the FHA in the Hazards Report (contractor hazard log) of the SAR. The contractor shall deliver the FHA as an appendix to the Hazard Tracking System. (CDRL A028 – Hazard Tracking System -

HTS)

C.2.3.5 SOFTWARE SYSTEM SAFETY

The contractor shall conduct a Software System Safety (SSS) Program IAW MIL-STD-882E, the Joint Software System Safety Engineering Handbook, and the Software System Safety Implementation Process and Tasks Supporting MIL-STD 882E. The contractor shall include SSS as an integral part of the system safety program. The contractor software technical specialists, to include system safety and SSS specialists, shall support the software system safety effort during the development of the SSS Assessment and shall participate in System Safety Working Group. The plan for all SSS activities and Level of Rigor (LOR) tasks shall be included in the SSPP. Results, evidence, and residual safety risk from SSS shall be included in the SAR. (CDRL A029 – Safety Assessment Report - SAR)

C.2.3.6 NDI, COTS, RE-USE, AND GOVERNMENT FURNISHED SOFTWARE SYSTEM SAFETY

The contractor shall conduct a complete SSS assessment to define, evaluate and test the safety-significant functionality associated with the integration of the NDI, COTS, re-used, and Government-furnished (GF) software/firmware. The SSS assessment shall list both safety-critical and safety-related functions that the proposed NDI, COTS, GF and re-use application will perform, list of safety requirements to be included in the specifications and LOR required. The contractor shall employ techniques to reduce the risk of NDI, COTS, GF, and re-use software/firmware in safety-significant applications. Results, evidence, and residual safety risk from NDI, COTS, GF, and re-use software/firmware shall be included in the SAR. (CDRL A029 – Safety Assessment Report - SAR)

C.2.3.7 SOFTWARE SYSTEM SAFETY TESTING

The contractor shall prepare and deliver software test evidence that the software does not pose an unacceptable or undesirable risk as determined by the System Safety Working Group IAW CDRL A030 – System Safety Program Plan - SSPP. The contractor shall conduct safety-specific testing and provide the results in the SAR to verify that the design and implementation of the software mitigates all of the identified software related hazards. LOR activities shall be conducted to ensure that the software will perform as specified in software requirements, while reducing the number of contributors to hazards that may exist. The plan for LOR tasks shall be included in the SSPP. Evidence of test LOR task completion shall be included in the Software Test Plan/Description/Report. If the software design does not provide evidence as defined by the LOR activities that it meets safety requirements IAW MIL-STD-882E, an assessment must be conducted by the Government's Safety Engineer or Government System Safety Working Group to determine the risk associated with inadequately verified and satisfied LOR activities. (CDRL A029 – SAR; CDRL A030 – System Safety Program Plan – SSPP)

C.2.4 ENVIRONMENTAL MANAGEMENT

C.2.4.1 ENVIRONMENTAL COMPLIANCE

The contractor shall ensure that all aspects of contract execution in this agreement are in compliance with applicable International, United States Federal, State, interstate and/or local environmental regulations and requirements. Such regulations, conditions, or instructions in effect or prescribed by any International, Federal, State, interstate or local governmental agency are hereby made a condition of this agreement. The contractor shall immediately notify the COR if the Government gives any instruction or direction the contractor believes may result in violation of applicable law(s) and/or regulation(s). For contractor activities conducted at a Government facility or installation, the contractor shall immediately notify the Government of any nonconformance and/or noncompliance related to this SOW.

C.2.4.2 HAZARDOUS MATERIALS MANAGEMENT

For the purposes of this contract, hazardous materials shall be defined by FED-STD-313. A Radioactive material is defined as any source material, as defined by Title 10, Code of Federal Regulations, Part 40, "Domestic Licensing of Source Material," in excess of 0.05 percent by weight. Specific prohibited hazardous materials for the Type I FOATC are identified in Section 3.2.10 of the Type I FOATC PD. Prohibited materials requirements shall apply to all components, parts, and materials provided under this contract, including items purchased through a subcontractor or supplier, COTS components, Original Equipment Manufacturer (OEM) parts, and manufactured parts. (Attachment 0001 – Type I FOATC

PD – AT-PRF-0001 - 2020-10-08)

C.2.4.3 PROHIBITED MATERIALS WAIVER

Waivers from the prohibited materials requirements shall not be permissible except where a suitable alternative does not exist. The contractor shall provide a list of anticipated waiver requests no later than (NLT) 14 business days prior to the SOWM or, if no SOWM will occur, NLT 30 business days after contract award. As part of proposal submission thecontractor shall submit waiver requests using Attachment 0013 – Prohibited Materials Waiver (see Section L.XXXX).

Waiver requests shall include detailed technical justification for the use of prohibited hazardous materials. The Government will make the final determination on whether sufficient justification has been provided to support approval of any waiver requests. Government response will be provided to the contractor within 30 business days of receiving sufficient justification for the waiver request. The contractor shall not deliver any items containing prohibited materials without the Government approval of the waiver request. This includes purchased parts or components such as fasteners, electrical connectors, and lubrication fittings. (Attachment 0013 – Prohibited Materials Waiver)

C.2.4.4 HAZARDOUS MATERIALS MANAGEMENT REPORT

The contractor shall prepare and deliver a Hazardous Materials Management Report (HMMR) IAW CDRL XXXX – HMMR and using Attachment 0014 – Hazardous Materials Management Report (HMMR). The contractor shall discuss status, changes, or issues with the HMMR as part of the IPT meetings. (CDRL A031 – HMMR; Attachment 0014 – HMMR)

The HMMR shall include all hazardous materials (hazmat):

1. Delivered on or embedded in the system, specifying the part number and quantity of parts

2. Used in final system manufacture and assembly, specifying the process(es) using the hazardous materials

3. Produced by the system

4. Required for maintenance of the system

5. Used for operation of the system, including quantities or fluid volumes required.

For each hazmat identified:

1. Provide the information and format specified in Attachment 0014 (HMMR).

2. Provide Safety Data Sheets (SDSs) either by embedding in the Excel File or attaching separately.

C.2.5 CORROSION

C.2.5.1 CORROSION PREVENTION AND CONTROL PLAN

The contractor shall develop, maintain, implement and deliver a Corrosion Control Report for the Type I FOATC IAW CDRL XXXX – Corrosion Control Report. The contractor shall identify corrosion risks, recommend mitigation measures, and implement mitigation measures related to system design and production. The contractor shall provide associated test results, certificates of conformance, engineering and quality documents, or other data as needed to verify compliance with coatings and corrosion related system performance requirements. The contractor shall inform the Government COR via e-mail of corrosion issues that impact system performance or requirements compliance as they arise during the execution of this contract. (CDRL A032 – Corrosion Control Report)

C.2.5.2 QUALITY PAINT SYSTEM

The contractor shall develop, maintain, implement and deliver a Pre-production and Sustaining Quality Paint System for the Type I FOATC IAW CDRL A033 – FOATC CARC Paint Process Report and CDRL A034 – FOATC Commercial Paint Process and Quality report. The test report shall show that the paint process system or systems was tested and performs as intended for application per contractor defined Commercial Standards. Process parameters shall include coating types and suppliers. Process and quality parameters shall include surface cleaning, pretreatment, primer and topcoat;

Objective Quality Evidence shall include assurance of pretreatment, primer film thickness and top coat film thickness, overall coating adhesion per ASTM D3359 Method B minimum Grade 4B, salt spray test IAW ASTM B117, and 1000 hours evaluated IAW ASTM D1659 minimum Rust Grade 8. Unless otherwise specified, standard test panels of cold-rolled low carbon steel and 6061-T6 aluminum may be used instead of parts. Test surfaces on representative steel "Q" panels approximately 4 x 12 inches (10.16 x 30.48 cm) for each coating shall be prepared. Test panels shall be kept available for government inspection and comparison. Suggested test format shall follow that given in DWG 12564646 FMTV A2 TREATMENT and FINISH REQUIREMENTS, Hex Note 12 Paint System Qualification. (CDRL A033 – FOATC CARC Paint Process Report, CDRL A034 – FOATC Commercial Paint Process and Quality report and Attachment 0015 - Treatment and Finish Requirements for paint system quality and performance metrics)

C.2.6 DIAGNOSTICS

C.2.6.1 ELECTRONIC DIAGNOSTICS TESTABILITY ANALYSIS

The Contractor shall perform a testability analysis of the FOATC TYPE 1 diagnostics capability, to include number and types of diagnostic fault codes and special tests available for all Type I FOATC components, assemblies, systems and subsystems used by the OEM. This analysis is geared towards electronic drive train components, braking systems, suspension and steering, hydraulic and any other heavy duty truck and bus electronically controlled components.

a. The analysis shall identify all diagnostic fault codes (SAE or Proprietary) for each component, assemblies, systems and subsystems and place them on a tabular format spread sheet. The codes shall be called out with the component, assemblies, systems and subsystems they support. The columns of the spread sheet shall consist of component, fault code/description, tests being performed, test equipment required and parameters.

b. The report shall include a detailed description of on-board electronic diagnostic systems that may be interrogated for the purpose of maintenance and troubleshooting via an on-board diagnostic display screen. The report shall also provide a detailed description of the Intrusive diagnostics (Laptops, special tools, and test equipment.) that will be available through the OEM diagnostic connector. This report should also provide details on how firmware and software updates are installed to the Type I FOATC.

c. The report shall identify all the commercially available OEM diagnostic software for all electronically controlled systems, subsystems, components and assemblies.

d. The report shall identify all OEM used (SAE or proprietary) electronic diagnostic special tests (cylinder cutout, injector misfire, compression unbalance, hydraulic shift solenoid tests etc.) for each component, assemblies, systems and subsystems they support and place them on a spread sheet.

e. The contractor shall maximize the use of embedded Built-in-Test (BIT)/ Built-in Test Equipment (BITE) diagnostic capabilities, and fully document and support embedded system software.

f. For the report: All data buses and diagnostic connectors for each electronic control module shall be identified in detail to include all SAE or ISO standards being utilized.

The contractor shall prepare the analysis and deliver in an Electronic Diagnostics Testability Analysis Report IAW CDRL

A035 - Electronic Diagnostics Testability Analysis Report. (CDRL A035 - Electronic Diagnostics Testability Analysis Report)

C.2.7 PROGNOSTIC PREDICTIVE MAINTENANCE (PPMX)

The contractor shall equip the Type I FOATC with the contractor’s Prognostic Predictive Maintenance (PPMx) system, which consists of encrypted data storage and encrypted data transfer through a cellular based device and a secure data tunnel between the cellular provider and the contractors’ corporation.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .