A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf
PDF 410 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This Contract Data Requirements List (CDRL) requires the contractor to develop and deliver a Failure Mode, Effects and Criticality Analysis (FMECA) for the Type I Family of All Terrain Crane. The contractor must submit the FMECA electronically in Microsoft format to the Government 30 days in advance of Provisioning Conferences for review and acceptance. The Government will review the FMECA within 14 calendar days of receipt and has the right to request further data if the initial submission is insufficient. Distribution of the accepted FMECA will be to the Logistics Manager, Weapon System Manager, and Alternate Project Manager.
The related federal contract opportunity posting provides draft Section C (Scope of Work), attachments, and Contract Data Requirement Lists (CDRLs) for the Type I Family of All Terrain Cranes contract for industry review and comment. Offerors may submit feedback by December 11, 2020 to the listed Point of Contact to inform the final RFP. The Department of the Army Materiel Command TACOM Life Cycle Management Command will award the contract and does not intend to award based solely on this notice.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER Engineering
D. SYSTEM/ITEM
Type I FOATC
E. CONTRACT/PR NO.
W56HZV-19-R-0118
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A020
2. TITLE OF DATA ITEM
Failure Mode, Effects and Criticality Analysis (FMECA)
3. SUBTITLE
Failure Mode, Effects and Criticality Analysis
(FMECA)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81495B
5. CONTRACT REFERENCE
C.1.5.7.1, C.3.4
6. REQUIRING OFFICE
SFAE-CSS-FP-C
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
Draft
Final
Reg Repro
16. REMARKS
The contractor shall develop and provide a Failure Mode, Effects and Criticality
Analysis (FMECA) 30 days in advance of Provisioning Conferences, as stated and outlined in section C.1.5.7.1 and C.3.4 in the SOW. The contractor shall deliver the
FMECA in an electronic format to the Government for review and acceptance.
Delivery of the FMECA may be in a Microsoft format. The Government will review and accept FMECA data within 14 calendar days of receipt.
The Government has the right to review, reject, and request further FMECA data if the data within the FMECA is insufficient for the Governments requirement.
*See Attachment 0008 – Type I FOATC POC List for distribution names and contact information.
APM* 1 1
Logistics Manager* 1 1
WSM* 1 1
15. TOTAL 3 0 3
G. PREPARED BY
Michael Markowski (IPSM)
H. DATE
06/10/2020
I. APPROVED BY
Assistant Product Manager (APM)
J. DATE
File details come from the government source that posted it. Updated .