About this file

This document contains a draft Contract Data Requirements List (CDRL) and related federal contract opportunity notice. The CDRL outlines requirements for a contractor to deliver logistics product data in the form of bill of materials reports for a Type I Family of All Terrain Crane. Reports must be provided in HTML and PDF formats using an LSAR database and are due initially at a provisioning review with subsequent drafts due 30 days prior to follow-on reviews. Comments will be incorporated with an updated final report due 30 days after the final provisioning review. The related opportunity notice provides draft Section C, attachments and CDRLs for a Type I FOATC contract for industry review, with comments due by December 11, 2020. The Army Materiel Command TACOM Life Cycle Management Command will consider comments and finalize the solicitation.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A052 _ NMWR Technical Manual.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
Attachment 0012 _ Risk Management Scoring Criteria and Reporting Template.xlsx XLSX spreadsheet
A067 _ Field Level Maintenance New Equipment Training.pdf PDF
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
A057 _ Maintainability Evaluation Planning.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER X

D. SYSTEM/ITEM

Type I FOATC

E. CONTRACT/PR NO.

W56HZV-19-R-0118

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A062

2. TITLE OF DATA ITEM

Logistics Product Data (LPD)

3. SUBTITLE

Bill of Materials Report

4. AUTHORITY (Data Acquisition Document No.)

TA-HB-0007-1 CHAPTER 20; DI-SESS-81759A

5. CONTRACT REFERENCE

C.8.7

6. REQUIRING OFFICE

SFAE-CSS-FP-C

7. DD 250 REQ

NO

9. DIST

STATEMENT

A

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS:

Contractor format is not acceptable. Contractor shall deliver LSA report in HTML and PDF formats generated using the LSAR database.

Block 12/13: The first draft of the BOM Report shall be delivered in place at the initial provisioning review.

Subsequent draft submissions shall be delivered electronically 30 days prior to each provisioning review.

Government comments will be provided at each review for incorporation.

The updated BOM Report shall be delivered electronically within 30 calendar days of each review.

The contractor shall maintain the BOM Report for the life of the contract and shall make additional deliveries as requested by the Government.

The final BOM Report shall incorporate all Government comments and changes. The final BOM Report shall be delivered 30 days after the final provisioning review.

*See Attachment 0008 – Type I FOATC POC List for distribution names and contact information.

APM*

1 1

Maintenance System Manager*

1 1

Logistics Manager* 1 1

15. TOTAL 3 - 3

G. PREPARED BY

Ronald Stoutenburg

H. DATE

11 Jun 20

I. APPROVED BY

Assistant Product Manager (APM)

J. DATE

File details come from the government source that posted it. Updated .