A062 _ Bill of Materials Report.pdf
PDF 182 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document contains a draft Contract Data Requirements List (CDRL) and related federal contract opportunity notice. The CDRL outlines requirements for a contractor to deliver logistics product data in the form of bill of materials reports for a Type I Family of All Terrain Crane. Reports must be provided in HTML and PDF formats using an LSAR database and are due initially at a provisioning review with subsequent drafts due 30 days prior to follow-on reviews. Comments will be incorporated with an updated final report due 30 days after the final provisioning review. The related opportunity notice provides draft Section C, attachments and CDRLs for a Type I FOATC contract for industry review, with comments due by December 11, 2020. The Army Materiel Command TACOM Life Cycle Management Command will consider comments and finalize the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER X
D. SYSTEM/ITEM
Type I FOATC
E. CONTRACT/PR NO.
W56HZV-19-R-0118
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A062
2. TITLE OF DATA ITEM
Logistics Product Data (LPD)
3. SUBTITLE
Bill of Materials Report
4. AUTHORITY (Data Acquisition Document No.)
TA-HB-0007-1 CHAPTER 20; DI-SESS-81759A
5. CONTRACT REFERENCE
C.8.7
6. REQUIRING OFFICE
SFAE-CSS-FP-C
7. DD 250 REQ
NO
9. DIST
STATEMENT
A
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS:
Contractor format is not acceptable. Contractor shall deliver LSA report in HTML and PDF formats generated using the LSAR database.
Block 12/13: The first draft of the BOM Report shall be delivered in place at the initial provisioning review.
Subsequent draft submissions shall be delivered electronically 30 days prior to each provisioning review.
Government comments will be provided at each review for incorporation.
The updated BOM Report shall be delivered electronically within 30 calendar days of each review.
The contractor shall maintain the BOM Report for the life of the contract and shall make additional deliveries as requested by the Government.
The final BOM Report shall incorporate all Government comments and changes. The final BOM Report shall be delivered 30 days after the final provisioning review.
*See Attachment 0008 – Type I FOATC POC List for distribution names and contact information.
APM*
1 1
Maintenance System Manager*
1 1
Logistics Manager* 1 1
15. TOTAL 3 - 3
G. PREPARED BY
Ronald Stoutenburg
H. DATE
11 Jun 20
I. APPROVED BY
Assistant Product Manager (APM)
J. DATE
File details come from the government source that posted it. Updated .