A067 _ Field Level Maintenance New Equipment Training.pdf

PDF 690 KB Posted

Attached to
Type I Family of All Terrain Crane Draft Section C (Scope of Work); Draft Attachments, and Draft Contract Data Requirement Lists (CDRLs)
Solicitation number
W56HZV_19_R_0118
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity. The CDRL outlines requirements for field level maintenance new equipment training on the Type 1 Family of All-Terrain Cranes (FOATC) to be provided under contract number W56HZV-19-R-0118. The training course must be at least 80 hours in duration, with a minimum 70% hands-on component and student to instructor ratio of 6 to 1. It must cover operation, maintenance, troubleshooting and repair procedures specific to the FOATC, including quarterly, semi-annual and annual crane inspections. The course is to be designed for new mechanics and technologies not currently in the Army system. Documentation of the training program must be submitted to the U.S. Army TACOM AMTA-LCF-MCC for review and acceptance. The related federal contract opportunity notice provides a draft scope of work, attachments and CDRLs for the FOATC contract and requests industry comments by December 11, 2020. The point of contact is listed for questions.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A062 _ Bill of Materials Report.pdf PDF
A052 _ NMWR Technical Manual.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
Attachment 0012 _ Risk Management Scoring Criteria and Reporting Template.xlsx XLSX spreadsheet
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
A057 _ Maintainability Evaluation Planning.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

Form Approved CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. Contract Line Item No.

TBD

B. Exhibit

C. Category

D. System/Item.

Type 1 Family of All-Terrain Cranes (Type 1 FOATC)

E. Contract/PR NO.

W56HZV-19-R-0118

F. Contractor

TBD

1. Data Item No.

A067

2. Title of Data Item

Field Level Maintenance New Equipment Training

3. Subtitle:

4. Authority (Data Acquisition Document No.)

DI-SESS-81521B

5. Contract Reference

C.11.1.2

6. Requiring Office

AMTA-LCF-MCC

7. DD 250 Req

SEE BLOCK

9. Dist Statement Required

A

10. Frequency

AS REQ

12. Date of First Submission

SEE BLOCK 16

14. Distribution

8. APP Code

A

11. As of Date

13. Date of Subsequent Submission

SEE BLOCK 16

a. Addressee b. Copies

Draft Final

AMTA- Reg Repro

16. REMARKS

The Field Level Maintenance New Equipment Training (FLMNET) course shall be designed for field level mechanics supporting the T1 FOATC and cover minimal operation characteristics, field level PMCS, troubleshooting, diagnosis and repair of system unique control systems, engine, fuel, transmission, axle, braking, electrical, hydraulic, pneumatic, boom and other ancillary systems of the vehicle. This course should also cover the quarterly, semi-annual, and annual crane inspection procedures.

Also, cover that when repairing/replacing any load bearing equipment, for example:

outriggers, lifting cylinders, or wire rope, the crane needs to be retested/recertified. The course shall be directed toward new technologies and items not currently in the Army system or different from the current system in the field. Training shall be consistent with procedures established in the appropriate vehicle technical manual. The training shall include a block of instruction using the IETM and MSD diagnostic tool. The course shall be at least 70% hands-on and 80 hours in duration based on a structure of 12 students per class with a student to instructor ratio of 6:1 and student to machine ratio of 6:1. The instructor shall score each student based on their performance as GO/NO GO. To receive a GO for this course, the student must successfully complete a written examination and a hands-on performance evaluation with a minimum score of 80%.

Government receipt of documentation does not constitute acceptance. AMTA-LCF-MCC will provide notice of acceptance for the documentation through the PCO to contractor within the established time frame and guidelines called out in the Scope of Work and applicable CDRLS.

Hard copy and electronic submittals under this CDRL shall be forwarded to the following address:

U.S. ARMY TACOM

AMTA-LCF-MCC

ATTN: Brian Roberts

6501 E. 11 MILE RD. MS# 902

DETROIT ARSENAL, MI 48397-5000

15. TOTAL 9 3

G. PREPARED BY

Brian Roberts, NET Manager

H. DATE

11/6/2020

DD FORM 1423-1, FEB 2001 Previous editions may be used. Page of Pages

File details come from the government source that posted it. Updated .