A067 _ Field Level Maintenance New Equipment Training.pdf
PDF 690 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity. The CDRL outlines requirements for field level maintenance new equipment training on the Type 1 Family of All-Terrain Cranes (FOATC) to be provided under contract number W56HZV-19-R-0118. The training course must be at least 80 hours in duration, with a minimum 70% hands-on component and student to instructor ratio of 6 to 1. It must cover operation, maintenance, troubleshooting and repair procedures specific to the FOATC, including quarterly, semi-annual and annual crane inspections. The course is to be designed for new mechanics and technologies not currently in the Army system. Documentation of the training program must be submitted to the U.S. Army TACOM AMTA-LCF-MCC for review and acceptance. The related federal contract opportunity notice provides a draft scope of work, attachments and CDRLs for the FOATC contract and requests industry comments by December 11, 2020. The point of contact is listed for questions.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. Contract Line Item No.
TBD
B. Exhibit
C. Category
D. System/Item.
Type 1 Family of All-Terrain Cranes (Type 1 FOATC)
E. Contract/PR NO.
W56HZV-19-R-0118
F. Contractor
TBD
1. Data Item No.
A067
2. Title of Data Item
Field Level Maintenance New Equipment Training
3. Subtitle:
4. Authority (Data Acquisition Document No.)
DI-SESS-81521B
5. Contract Reference
C.11.1.2
6. Requiring Office
AMTA-LCF-MCC
7. DD 250 Req
SEE BLOCK
9. Dist Statement Required
A
10. Frequency
AS REQ
12. Date of First Submission
SEE BLOCK 16
14. Distribution
8. APP Code
A
11. As of Date
13. Date of Subsequent Submission
SEE BLOCK 16
a. Addressee b. Copies
Draft Final
AMTA- Reg Repro
16. REMARKS
The Field Level Maintenance New Equipment Training (FLMNET) course shall be designed for field level mechanics supporting the T1 FOATC and cover minimal operation characteristics, field level PMCS, troubleshooting, diagnosis and repair of system unique control systems, engine, fuel, transmission, axle, braking, electrical, hydraulic, pneumatic, boom and other ancillary systems of the vehicle. This course should also cover the quarterly, semi-annual, and annual crane inspection procedures.
Also, cover that when repairing/replacing any load bearing equipment, for example:
outriggers, lifting cylinders, or wire rope, the crane needs to be retested/recertified. The course shall be directed toward new technologies and items not currently in the Army system or different from the current system in the field. Training shall be consistent with procedures established in the appropriate vehicle technical manual. The training shall include a block of instruction using the IETM and MSD diagnostic tool. The course shall be at least 70% hands-on and 80 hours in duration based on a structure of 12 students per class with a student to instructor ratio of 6:1 and student to machine ratio of 6:1. The instructor shall score each student based on their performance as GO/NO GO. To receive a GO for this course, the student must successfully complete a written examination and a hands-on performance evaluation with a minimum score of 80%.
Government receipt of documentation does not constitute acceptance. AMTA-LCF-MCC will provide notice of acceptance for the documentation through the PCO to contractor within the established time frame and guidelines called out in the Scope of Work and applicable CDRLS.
Hard copy and electronic submittals under this CDRL shall be forwarded to the following address:
U.S. ARMY TACOM
AMTA-LCF-MCC
ATTN: Brian Roberts
6501 E. 11 MILE RD. MS# 902
DETROIT ARSENAL, MI 48397-5000
15. TOTAL 9 3
G. PREPARED BY
Brian Roberts, NET Manager
H. DATE
11/6/2020
DD FORM 1423-1, FEB 2001 Previous editions may be used. Page of Pages
File details come from the government source that posted it. Updated .