A029 _ Safety Assessment Report _ SAR.pdf
PDF 230 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document contains a Contract Data Requirements List (CDRL) and information about a draft federal contract opportunity for a Family of All Terrain Cranes. The CDRL requires a Safety Assessment Report (SAR) to be delivered in draft form 60 days after contract award, with the final report due 30 days after government comments. The report must include Material Safety Data Sheets for all hazardous materials. Three copies of the SAR must be delivered to safety, program management, and systems engineering contacts.
The related draft federal contract opportunity notice provides draft Section C (Scope of Work), attachments, and CDRLs for industry review and comments on the Type I Family of All Terrain Crane contract. Comments on the draft documents are due by December 11, 2020. The final RFP will be posted to SAM.gov. The Army Materiel Command TACOM Life Cycle Management Command is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
Type I FOATC
E. CONTRACT/PR NO.
W56HZV-19-R-0118
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A029
2. TITLE OF DATA ITEM
Safety Assessment Report (SAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
MIL-STD-882E
5. CONTRACT REFERENCE
C.2.3.4 and C.2.3.6
6. REQUIRING OFFICE
SFAE-CSS-FP-C
7. DD 250 REQ
LT
9. DIST
STATEMENT
A
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION SEE BLK 16 Draft Final
Reg Repro
16. REMARKS
Draft to be delivered 60 Days after Contract Award (DAC).
The SAR shall include copies of Material Safety Data Sheets (MSDS) for all hazardous materials incorporated into the system.
Government comments will be provided No Later Than (NLT) 30 days after receipt of draft.
Final report to be delivered NLT 30 days after receipt of Government comments.
Block 14. *E-mail delivery per e-mail addresses on Attachment 0008 - Type I FOATC POC List.
Safety Engineer* 1 1
APM* 1 1
System Engineer 1 1
15. TOTAL --------- 3 3
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
17. PRICE
GROUP
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages
File details come from the government source that posted it. Updated .