This document contains a draft risk management plan and risk register for a Type I Family of All Terrain Crane opportunity. The risk register includes templates for tracking active risks, top risks, issues, retired risks, and mitigated risks. It provides guidance on qualitatively assessing the probability and severity of risks, and calculating risk rankings. The probability scale ranges from near certainty to not likely, while the severity scale ranges from catastrophic to negligible impact on technical performance, schedule, or cost. Completed risk registers would populate these templates to manage program risks.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A062 _ Bill of Materials Report.pdf PDF
A052 _ NMWR Technical Manual.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
A067 _ Field Level Maintenance New Equipment Training.pdf PDF
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
A057 _ Maintainability Evaluation Planning.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Active Risks

Type I FOATC= Revised since last issue
Risk Register and Mitigation

Risk No. Date Category Primary PD or SOW Reference Risk Title Risk Description Root Cause Consequence If-Then Status Risk Expiry Milestone PDR Exit CDR Exit

PRR

OtherAssessment Before MitigationResponsible OrganizationMitigation PlanMitigation ProgressCurrent Assessment of In-Progress MitigationAssessment After Mitigation
Program

Technical (Performance) Cost Schedule Identified In Progress Mitigated Realized Retired Expired Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible

5 - CatastrophicRisk
RankingProbability

(Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Current Risk Ranking Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Risk Ranking

&G Response to Solicitation No. W56HZV-15-R-0187 Risk Register and Mitigation

Proposal Date: 30 JAN 2016 Unclassified//For Official Use Only (U//FOUO) Volume 2: Attachment V2-029, Page &P

Top Risks

Type I FOATC= Revised since last issue
Risk Register and Mitigation

Risk No. Date Category Primary PD or SOW Reference Risk Title Risk Description Root Cause Consequence If-Then Status Risk Expiry Milestone PDR Exit CDR Exit

PRR

OtherAssessment Before MitigationResponsible OrganizationMitigation PlanMitigation ProgressCurrent Assessment of In-Progress MitigationAssessment After Mitigation
Program

Technical (Performance) Cost Schedule Identified In Progress Mitigated Realized Retired Expired Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible

5 - CatastrophicRisk
RankingProbability

(Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Current Risk Ranking Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Risk

&G Response to Solicitation No. W56HZV-15-R-0187

Proposal Date: 30 JAN 2016 Unclassified//For Official Use Only (U//FOUO) Volume 2: Attachment V2-029, Page &P

Issues

Type I FOATC= Revised since last issue
Risk Register and Mitigation

Risk No. Date Category Primary PD or SOW Reference Risk Title Risk Description Root Cause Consequence If-Then Status Risk Expiry Milestone PDR Exit CDR Exit

PRR

OtherAssessment Before MitigationResponsible OrganizationMitigation PlanMitigation ProgressCurrent Assessment of In-Progress MitigationAssessment After Mitigation
Program

Technical (Performance) Cost Schedule Identified In Progress Mitigated Realized Retired Expired Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible

5 - CatastrophicRisk
RankingProbability

(Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Current Risk Ranking Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Risk

&G Response to Solicitation No. W56HZV-15-R-0187

Proposal Date: 30 JAN 2016 Unclassified//For Official Use Only (U//FOUO) Volume 2: Attachment V2-029, Page &P

Retired Risks

Type I FOATC
Risk Register and Mitigation

Risk No. Date Category Primary PD or SOW Reference Risk Title Risk Description Root Cause Consequence If-Then Status Risk Expiry Milestone

PDR

CDR

PRR

OtherAssessment Before MitigationResponsible OrganizationMitigation PlanMitigation ProgressAssessment of In-Progress MitigationAssessment After Mitigation
Program

Technical (Performance) Cost Schedule Identified In Progress Mitigated Realized Retired Expired Probability (Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible

5 - CatastrophicRisk
RankingProbability

(Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible

5 - CatastrophicRisk
RankingProbability

(Likelihood) A - Not Likely E - Near Certainty Severity (Impact) 1 - Negligible 5 - Catastrophic Risk

Mitigated, Retired, or Expired Risks

&G Response to Solicitation No. W56HZV-15-R-0187

Proposal Date: 30 JAN 2016 Unclassified//For Official Use Only (U//FOUO) Volume 2: Attachment V2-029, Page &P

Rank Rubrics

Maneuver Support Vessel (Light)
Risk Register and Mitigation
Risk Analysis per Government Risk Management Plan, Contract Attachment 0005
Notes:Risk Analysis per Government Draft Risk Issue Opportunity Management Plan
1. Risk expiry is program milestone after which risk mitigation has been completed or risk is no longer valid.
2. Use table below to rank level of likelihood:Qualitative Risk Analysis
Probability of
OccurrenceDescriptionProbability
PercentageLikelihood/Probability
Near
CertaintyEA risk item is nearly certain to occur.> 90%High – Risks weighted 20-25 are greater than 70% likelihood/probability of occurrence
Highly
LikelyDA risk item is probable but may be avoided.> 65% to 90%Medium – Risk weighted 12-19 are between 30% and 70% likelihood/probability of occurrence
ModerateCA risk item is equally likely to occur or not occur.> 40% to 65%Low – Risks weighted 1-11 are below 30% likelihood/probability of occurrence
LowBA risk item is possible by will likely be avoided.10% to 40%
Not
LikelyAA risk item is unlikely to occur.< 10%Consequence/Impact
3. Use guidance below to rank level of technical (performance), schedule and severity.High – (4/5) Risk that has the potential to greatly impact program cost, program schedule or performance
Severity LevelRisk TypeMedium – (3/4) Risk that has the potential to slightly impact program cost, program schedule or performance
Performance
Referring to all requirements designated in the PD and SOW.ScheduleCost
Referring to APB Cost ParametersLow – (1/2) Risk that has relatively little impact on cost, schedule or performance
CatastrophicProgram Success Jeopardized5Potentially fails KPP.Cannot meet next major Milestone (A, B, C, FRP, IOC, FOC).Impacted ≥ 10%
CriticalProgram Success in Doubt4Potentially fails KSA or shorts a critical mission need but expect no breech of KPP.Cannot meet next major Program Event (including, but not limited to, CDR, TRR, vehicle delivery).Impacted

5% ≤ X ≤ 10% Moderate Limited Impact on Program Success 3 Performance below goal; moderate changes required. Schedule slip impacting another IPT and/or subsystem, with no impact to a major Program Event or Milestone. Impacted 2% ≤ X ≤ 5% Marginal Minor Impact on Program Success 2 Remedy will require minor performance trades. Schedule slip with no impact to another IPT and/or subsystem, with no impact to a major Program Event or Milestone. Impacted 1% ≤ X ≤ 2% Negligible No Impact on Program Success 1 Minimal consequence in technical performance. Minor schedule slip with minimal or no impact. Impacted < 1%

Risk Rank Table from Government Original Risk Plan
Severity of Consequence
NegligibleMarginalModerateCriticalCatastrophic
12345
Probability of OccurrenceNear CertaintyE916202325
Highly LikelyD613182224
ModerateC410151921
LowB27111417
Not LikelyA135812

&G Response to Solicitation No. W56HZV-15-R-0187

Proposal Date: 30 JAN 2016 Unclassified//For Official Use Only (U//FOUO) Volume 2: Attachment V2-029, Page &P image1.jpeg image2.png

File details come from the government source that posted it. Updated .