Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf

PDF 219 KB Posted

Attached to
Type I Family of All Terrain Crane Draft Section C (Scope of Work); Draft Attachments, and Draft Contract Data Requirement Lists (CDRLs)
Solicitation number
W56HZV_19_R_0118
Issued by

About this file

This document contains a draft Level of Repair Analysis worksheet and summary for conducting a National Maintenance Work Requirement analysis on various components of military equipment. The worksheet requires identification and sourcing data for components under review, including part numbers, failure rates, costs for government and contractor repair, repair methods, warranty terms, and a recommendation for level of maintenance. Information covers areas like functional group codes, repair levels, unit pricing, special tools required, and distinction between new and rebuilt items. Contractors are asked to complete the analysis and provide a formatted summary to assist the government in determining optimal repair sources for components.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A062 _ Bill of Materials Report.pdf PDF
A052 _ NMWR Technical Manual.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
Attachment 0012 _ Risk Management Scoring Criteria and Reporting Template.xlsx XLSX spreadsheet
A067 _ Field Level Maintenance New Equipment Training.pdf PDF
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
A057 _ Maintainability Evaluation Planning.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 0027

LMI Summary Worksheet – NMWR DATA

MIL PRF 49506 LMI Summary Worksheet 1

SUMMARY TITLE: National Maintenance Work Requirement (NMWR) Level of Repair Analysis

SPECIFIC INSTRUCTIONS: The contractor shall document a NMWR Data Summary for each component on the government approved NMWR candidate list. The summary will be in the contractor’s format, in end item hardware breakdown sequence (Top-down Breakdown). The final Summary will provide source data for the government to analyze and identify which components (parts) will have a NMWR prepared. The analysis will include a conclusion for each component that clearly recommends the best source of repair (government or contractor) for the component. The following data elements are required. The contractor may add additional data elements as desired.

DATA IN LMI SPECIFICATION (Please provide the data product title):

LMI 1520 COMMERCIAL GOVERNMENT ENTITY(CAGE) CODE

LMI 2790 ITEM NAME

LMI 3270 MEAN TIME BETWEEN FAILURES (MTBF) *

LMI 4400 REFERENCE NUMBER (Part Number)

LMI 4830 SOURCE, MAINTENANCE AND RECOVERABILITY (SMR) CODE

DATA NOT IN LMI SPECIFICATION (Please provide the data product title, its definition and its format):

1. Functional Group Code (FGC).

2. Level of Maintenance, they are: Field (which includes: C-Crew, O-Service and F-Field) and Sustainment

(which includes H-Below depot, L-Special Repair activity and D-Depot).

3. Component Cost (US Dollars, Based on a Lot of 100 Pieces).

4. Government cost to buy rebuilt/remanufactured (US Dollars, Based on a Lot of 100 Pieces).

5. Contractor cost to rebuild/remanufacture broken down as follows (US Dollars, Based on a Lot of 100 Units):

a. Labor hours to; tear down, remove/replace parts, any machining, rebuild, inspection, and testing.

b. Packing, shipping and any storage requirements.

c. Cost of any mandatory replacement parts and parts that will most likely be replaced.

d. Listing of any special tools or test equipment required to perform this work and cost of this equipment.

6. Identify whether it is directly available from the contractor through the same supply and distribution channels as all other parts/components.

7. Identify the standard to which the component will be remanufactured, rebuilt or otherwise refurbished:

a. like-new condition, using only new components,

b. Using nonstandard (oversize/undersize) bearings or other components which may vary from the original component configuration.

8. Describe the length and type of warranty, if different from a new component

9. Identify the method used to distinguish between new vs. rebuilt/remanufactured component, such as part number difference, etc.

10. Identify whether a commercial reusable container is available for the NMWR component candidate(s), and whether the container has a long life (20+ trips) or a short life (10 trips).

11. Make a recommendation as to whether the component should be organically repaired at sustainment level or contractor repaired and returned to government stocks through a long term contract.

* The required Mean Time Between Essential Function Failure (MTBEFF) of 120 hours can be used if MTBF is unknown.

SUMMARY LAYOUT: Contractor provided in Microsoft Excel compatible format

File details come from the government source that posted it. Updated .