About this file

This Contract Data Requirements List (CDRL) outlines technical manual requirements for a Type I Family of All Terrain Crane contract. The Army Materiel Command TACOM Life Cycle Management Command will require at least four National Maintenance Work Requirements technical manuals delivered on specific schedules. Draft manuals are due 270 days after contract award, with final reproducible copies due 15 days after government comments on the final draft. Electronic and hard copy versions of manuals must be provided at each stage. Acceptance and invoicing will follow final government approval.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A062 _ Bill of Materials Report.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
Attachment 0012 _ Risk Management Scoring Criteria and Reporting Template.xlsx XLSX spreadsheet
A067 _ Field Level Maintenance New Equipment Training.pdf PDF
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
A057 _ Maintainability Evaluation Planning.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

Form Approved CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. Contract Line Item No.

TBD

B. Exhibit

A C. Category

TM

D. System/Item.

Type 1 Family of All-Terrain Cranes (FOATC)

E. Contract/PR NO.

W56HZV-19-R-0118

F. Contractor

TBD

1. Data Item No.

A052

2. Title of Data Item

NMWR 10-XXXX-XXX-XX-1*

NMWR 10-XXXX-XXX-XX-2*

NMWR 10-XXXX-XXX-XX-3*

NMWR 10-XXXX-XXX-XX-4*

3. Subtitle:

National Maintenance Work Requirements (NMWRs)

4. Authority (Data Acquisition Document No.)

MIL-STD-40051-2C

5. Contract Reference

C.4.10.5

6. Requiring Office

AMTA-LCC-JC

7. DD 250 Req

DD

9. Dist Statement Required

A

10. Frequency

AS REQ

12. Date of First Submission

SEE BLOCK 16

14. Distribution

8. APP Code

A

11. As of Date

SEE BLOCK 16

13. Date of Subsequent Submission

SEE BLOCK 16

a. Addressee b. Copies

Draft Final

AMTA- Reg Repro

16. REMARKS

NMWR 10-XXXX-XXX-XX-1*

NMWR 10-XXXX-XXX-XX-2*

NMWR 10-XXXX-XXX-XX-3*

NMWR 10-XXXX-XXX-XX-4*

*NOTE: NMWR Technical Manual Requirements will be determined after the contract Start of Work Meeting (SOWM), so these items are placeholders and do not represent the Government committing to four (4) NMWR TMs; more or less NMWR TMs may be required.

TAILORING: As clarified and tailored by Attachment 013, NMWR Requirements with TM requirements matrices Tables A- VII and A-VIII, and Attachment XXX (Deployment Equipment Publications Style Guide).

*DRAFT EQUIPMENT PUBLICATION/PRELIMINARY TECHNICAL MANUAL (DEP/PTM). Contractor shall deliver three (3) paper copies and one (1) electronic copy of each NMWR no later than (NLT) 270 days after contract (DAC) award. The Government will review and provide comments within 45 days of receipt of each NMWR.

**FINAL DRAFT EQUIPMENT PUBLICATION (FDEP). Contractor shall make all changes and corrections from the verification and deliver three (3) paper copies and one (1) electronic copy of each NMWR within 60 days after completion of Government Verification. The Government will review and provide comments within 45 days of receipt of each the FDEP. The review process of the FDEP will continue until the Government accepts an FDEP submission.

***FINAL REPRODUCIBLE COPY (FRC). Contractor shall deliver three (3) paper copies and one (1) electronic copy of each NMWR no later than (NLT) 15 days after receipt of Government comments on the FDEP. The final delivery shall include a complete Electronic Technical Manual (ETM) in searchable and editable Portable Document Format (PDF) with fonts embedded, one (1) set of desktop-publishing files (MS Word or equivalent), one (1) set of electronic running sheets, and digital illustration files. CD-ROMs will be delivered as follows: one (1) CD-ROM containing PDF file and one (1) CD-ROM containing source data (desktop-publishing files), illustration files for the TM, and running sheets.

A DD250 must accompany FRC submission per this CDRL.

Contractor can only invoice upon final Government approval.

Government receipt of documentation does not constitute acceptance. AMSTA-LCC-JC will provide notice of acceptance for the documentation through the PCO to contractor within the established time frame and guidelines called out in the Scope of Work and applicable CDRLs.

Hard copy and electronic submittals under this CDRL shall be forwarded to the following address:

U.S. ARMY TACOM LCMC

MS# 326

AMTA-LCC-JC

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

ATTN: Meredith Mydlo

*LCC-JC 3 1

**LCC-JC 3 1

***LCC-JC 3 1

15. TOTAL 9 3

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Meredith Mydlo, Publications Manager 16 Jun 2020 Assistant Product Manager (APM) 16 Jun 2020

DD FORM 1423-1, FEB 2001 Previous editions may be used. Page of Pages

File details come from the government source that posted it. Updated .