This WebAIM Short Form Task Group Instruction (TGI) details scaffolding installation and removal procedures for the USS John Finn (DDG-113), scheduled from 4/20/26 to 6/15/26. The work involves erecting and removing scaffolding and temporary containment enclosures at multiple locations on the ship, including various deck levels and specific frames between 128-240, with preservation work to be accomplished by Ship's Force. The task includes scaffolding assemblies for multiple antenna locations and interior trunk surfaces, with specific focus on preservation work for antenna numbers 5-3A, 5-3B, 5-3C, 5-3D, 3-10B, 3-31, and 2-4.
SRF-JRMC will provide supporting services including crane and crane rigging service, safety inspections for employees, and QA inspection. The work will be performed in accordance with referenced standard items and regulations, including 29 CFR Part 1915.71 for scaffolding and staging, and specific guidelines for AEGIS Radar SPY Antenna Array Scaffolding. The task involves rigger (RGRS) and carpenter (CARP) shop tasks, with additional considerations for mobile crane costs, consumable materials, and miscellaneous covering materials.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) ICN: 38BC186502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
ES01L025
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TAMURA, DAISUKE 231A 3152439526 18-JUL-2025
APPROVED BY: CODE: PHONE: DATE:
KOMATSU, SHUUHEI 231A 3152436786 19-JUL-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-L025
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE VARIOUS U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
865A1202
1. SCOPE/PURPOSE:
1.1 Title: Scaffolding for Ship’s Force Work; install and remove
1.2 Location of Work:
1.2.1 Between 03 Level and 04 Level Weather, Frames between 128 and 140, Port and Starboard (Stbd)
1.2.2 Between 03 Level and 05 Level Weather, Frames between 159 and 171, Port and Stbd
1.2.3 Between 02 Level and 04 Level Weather, Frame 185, Port and Stbd
1.2.4 Between 02 Level and 05 Level Weather, Frame 240, Port and Stbd
1.2.5 Access Trunk (3-322-1-T)
1.2.6 Escape Trunk (4-220-2-T)
TGI Short Form
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC186502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
1.3 Identification:
1.3.1 Quantity (2 Lot), Scaffolding Assembly
Location: 1.2.1 Remarks: Preservation work of antenna numbers 5-3A and 5-3B will be accomplished by Ship’s Force.
1.3.2 Quantity (2 Lot), Scaffolding Assembly
Location: 1.2.2 Remarks: Preservation work of antenna numbers 5-3C and 5-3D will be accomplished by Ship’s Force.
1.3.3 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.3 Remarks: Preservation work of forward side of forward stack, including platforms for antenna numbers 3-10B and 3-31 will be accomplished by Ship’s Force.
1.3.4 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.4 Remarks: Preservation work of forward side of aft stack, including platform for antenna number 2-4 will be accomplished by Ship’s Force.
1.3.5 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.5 Remarks: Preservation work of entire interior surface of access trunk will be accomplished by Ship’s Force.
1.3.6 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.6 Remarks: Preservation work of entire interior surface of escape trunk will be accomplished by Ship’s Force.
1.3.7 Quantity (2 Lot), Temporary Containment Enclosure
Location: 1.2.1 Remarks: Preservation work of antenna numbers 5-3A and 5-3B will be accomplished by Ship’s Force.
1.3.8 Quantity (2 Lot), Temporary Containment Enclosure
Location: 1.2.2 Remarks: Preservation work of antenna numbers 5-3C and 5-3D will be accomplished by Ship’s Force.
1.3.9 Quantity (One Lot), Temporary Containment Enclosure
Location: 1.2.3 Remarks: Preservation work of forward side of forward stack, including platforms for antenna numbers 3-10B and 3-31 will
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC186502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
be accomplished by Ship’s Force.
1.3.10 Quantity (One Lot), Temporary Containment Enclosure
Location: 1.2.4 Remarks: Preservation work of forward side of aft stack, including platform for antenna number 2-4 will be accomplished by Ship’s Force.
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. PROCEDURE:
2.1 Erect/hang scaffolding listed in 1.3.1 through 1.3.6 in accordance with Ref. No. 3 and Ref. No. 4.
2.2 Install each temporary containment enclosure listed in 1.3.7 through1.3.10 to each scaffolding listed in 1.3.1 through 1.3.4.
2.3 Remove each temporary containment enclosure listed in 1.3.7 through 1.3.10 upon completion of the work from each scaffolding listed in 1.3.1 through 1.3.4 when requested by Ship’s Force via Code 333.
2.4 Remove scaffolding listed in 1.3.1 through 1.3.6 upon completion of the work in accordance with Ref. No. 3 and Ref. No. 4 when requested by Ship’s Force via Code 333.
2.5 Notes:
2.5.1 Planner: Code 231A D. Tamura, 243-9526
2.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5149-0598
2.5.3 JCN ES01-L025 is related to this TGI.
2.6 Government Furnished Material (GFM): None.
2.7 SRF-JRMC will provide the following service work: (TGI No. 38BC186502S02)
2.7.1 [C740] Crane and crane rigging service.
2.7.2 [C106.1] Safety inspection for SRF-JRMC employees.
2.7.3 [C133] QA inspection for (G) symbol(s).
4/20/26
6/15/26
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC186502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK
FOUO Pg 4 of 5
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC186502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK
FOUO Pg 5 of 5
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 TM 29 CFR PART
1915.71 Scaffolding or Staging - N
4 MP PM240-0049,
SURF
AEGIS RADAR SPY ANTENNA
ARRAY SCAFFOLDING
A Y ALL
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 RGRS 22/KE PC
2.2 CARP 22/KE PC
2.3 CARP 22/KE PC
2.2 RGRS 22/KE PC
CFM: for mobile crane cost, shrink wrap tape, spray adhesive, propane gas, firewatch cost, consumable parts, and MISC such as covering material.
22/MQ CS
Process Funding Document. 10/CT OM
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38BC186502 KEY OP: A01