TGI_38BC186502_A01_c0v0_Redacted.pdf

PDF 167 KB Posted

Attached to
USS JOHN FINN (DDG-113) FY26 6J1 CNO BUNDLE #1, Chief of Naval Operation Availability Yokosuka Japan
Solicitation number
N6264926RA009
Issued by

About this file

This WebAIM Short Form Task Group Instruction (TGI) details scaffolding installation and removal procedures for the USS John Finn (DDG-113), scheduled from 4/20/26 to 6/15/26. The work involves erecting and removing scaffolding and temporary containment enclosures at multiple locations on the ship, including various deck levels and specific frames between 128-240, with preservation work to be accomplished by Ship's Force. The task includes scaffolding assemblies for multiple antenna locations and interior trunk surfaces, with specific focus on preservation work for antenna numbers 5-3A, 5-3B, 5-3C, 5-3D, 3-10B, 3-31, and 2-4.

SRF-JRMC will provide supporting services including crane and crane rigging service, safety inspections for employees, and QA inspection. The work will be performed in accordance with referenced standard items and regulations, including 29 CFR Part 1915.71 for scaffolding and staging, and specific guidelines for AEGIS Radar SPY Antenna Array Scaffolding. The task involves rigger (RGRS) and carpenter (CARP) shop tasks, with additional considerations for mobile crane costs, consumable materials, and miscellaneous covering materials.

View the file

Other files

File Type Posted
N6264926RA0090008 SF 30.pdf PDF
Solicitation Amendment N6264926RA0090007 SF 30.pdf PDF
RFI Q7A7.rtf RTF text file
300-23-224.After Hours Hotwork Memo (002).pdf PDF
Solicitation Amendment N6264926RA0090007 SF 30.pdf PDF
Solicitation Amendment N6264926RA0090006 SF 30.pdf PDF
RFI Q6A6.rtf RTF text file
Solicitation Amendment N6264926RA0090004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0090005 SF 30.pdf PDF
RFI Q5A5.rtf RTF text file
Solicitation Amendment N6264926RA0090003 SF 30.pdf PDF
Solicitation Amendment N6264926RA0090002 SF 30.pdf PDF
RFI Q4A4.rtf RTF text file
Solicitation Amendment N6264926RA0090001 SF 30.pdf PDF
RFI Q3A3.rtf RTF text file
RFI Q2A2.rtf RTF text file
RFI Q1A1.rtf RTF text file
Solicitation - N6264926RA009.pdf PDF
TGI_38BC112201_A01_c0v0_Redacted.pdf PDF
TGI_38BC112313_A01_c0v0_Redacted.pdf PDF
TGI_38BC112311_A01_c0v0_Redacted.pdf PDF
TGI_38BC112312_A01_c0v0_Redacted.pdf PDF
Attachment (VIII) Contract Data Sheet 26RA009.pdf PDF
Attachment (II) Price Proposal Form N6264926RA009.xlsx XLSX spreadsheet
TGI_38BC186301_A01_c0v0_Redacted 22JUN.pdf PDF
TGI_38BC163404_A03_c0v0_Redacted.pdf PDF
Attachment (V) Source of Repair Instruction.pdf PDF
TGI_38BC154101_A01_c0v0_Redacted.pdf PDF
TGI_38BC125105_A01_c0v0_Redacted.pdf PDF
Attachment (IV) GFP_List_V3.xlsx XLSX spreadsheet
Attachment (VII) QASP 26RA009 Bun1.pdf PDF
TGI_38BC116801A01_c1v1_Redacted.pdf PDF
TGI_38BC125106_A01_c0v0_Redacted.pdf PDF
TGI_38BC163406_A01_c0v0_Redacted.pdf PDF
Attachment (VI) Warranty Tracking Information.pdf PDF
Attachment (III) Request for Information Form.rtf RTF text file
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

08-AUG-2025 0806

20.15.6.0.9333 (July 2025) ICN: 38BC186502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1 86512

CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

ES01L025

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TAMURA, DAISUKE 231A 3152439526 18-JUL-2025

APPROVED BY: CODE: PHONE: DATE:

KOMATSU, SHUUHEI 231A 3152436786 19-JUL-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-L025

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE VARIOUS U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

865A1202

1. SCOPE/PURPOSE:

1.1 Title: Scaffolding for Ship’s Force Work; install and remove

1.2 Location of Work:

1.2.1 Between 03 Level and 04 Level Weather, Frames between 128 and 140, Port and Starboard (Stbd)

1.2.2 Between 03 Level and 05 Level Weather, Frames between 159 and 171, Port and Stbd

1.2.3 Between 02 Level and 04 Level Weather, Frame 185, Port and Stbd

1.2.4 Between 02 Level and 05 Level Weather, Frame 240, Port and Stbd

1.2.5 Access Trunk (3-322-1-T)

1.2.6 Escape Trunk (4-220-2-T)

TGI Short Form

08-AUG-2025 0806

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC186502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1 86512

CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.3 Identification:

1.3.1 Quantity (2 Lot), Scaffolding Assembly

Location: 1.2.1 Remarks: Preservation work of antenna numbers 5-3A and 5-3B will be accomplished by Ship’s Force.

1.3.2 Quantity (2 Lot), Scaffolding Assembly

Location: 1.2.2 Remarks: Preservation work of antenna numbers 5-3C and 5-3D will be accomplished by Ship’s Force.

1.3.3 Quantity (One Lot), Scaffolding Assembly

Location: 1.2.3 Remarks: Preservation work of forward side of forward stack, including platforms for antenna numbers 3-10B and 3-31 will be accomplished by Ship’s Force.

1.3.4 Quantity (One Lot), Scaffolding Assembly

Location: 1.2.4 Remarks: Preservation work of forward side of aft stack, including platform for antenna number 2-4 will be accomplished by Ship’s Force.

1.3.5 Quantity (One Lot), Scaffolding Assembly

Location: 1.2.5 Remarks: Preservation work of entire interior surface of access trunk will be accomplished by Ship’s Force.

1.3.6 Quantity (One Lot), Scaffolding Assembly

Location: 1.2.6 Remarks: Preservation work of entire interior surface of escape trunk will be accomplished by Ship’s Force.

1.3.7 Quantity (2 Lot), Temporary Containment Enclosure

Location: 1.2.1 Remarks: Preservation work of antenna numbers 5-3A and 5-3B will be accomplished by Ship’s Force.

1.3.8 Quantity (2 Lot), Temporary Containment Enclosure

Location: 1.2.2 Remarks: Preservation work of antenna numbers 5-3C and 5-3D will be accomplished by Ship’s Force.

1.3.9 Quantity (One Lot), Temporary Containment Enclosure

Location: 1.2.3 Remarks: Preservation work of forward side of forward stack, including platforms for antenna numbers 3-10B and 3-31 will

08-AUG-2025 0806

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC186502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1 86512

CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

be accomplished by Ship’s Force.

1.3.10 Quantity (One Lot), Temporary Containment Enclosure

Location: 1.2.4 Remarks: Preservation work of forward side of aft stack, including platform for antenna number 2-4 will be accomplished by Ship’s Force.

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. PROCEDURE:

2.1 Erect/hang scaffolding listed in 1.3.1 through 1.3.6 in accordance with Ref. No. 3 and Ref. No. 4.

2.2 Install each temporary containment enclosure listed in 1.3.7 through1.3.10 to each scaffolding listed in 1.3.1 through 1.3.4.

2.3 Remove each temporary containment enclosure listed in 1.3.7 through 1.3.10 upon completion of the work from each scaffolding listed in 1.3.1 through 1.3.4 when requested by Ship’s Force via Code 333.

2.4 Remove scaffolding listed in 1.3.1 through 1.3.6 upon completion of the work in accordance with Ref. No. 3 and Ref. No. 4 when requested by Ship’s Force via Code 333.

2.5 Notes:

2.5.1 Planner: Code 231A D. Tamura, 243-9526

2.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5149-0598

2.5.3 JCN ES01-L025 is related to this TGI.

2.6 Government Furnished Material (GFM): None.

2.7 SRF-JRMC will provide the following service work: (TGI No. 38BC186502S02)

2.7.1 [C740] Crane and crane rigging service.

2.7.2 [C106.1] Safety inspection for SRF-JRMC employees.

2.7.3 [C133] QA inspection for (G) symbol(s).

4/20/26

6/15/26

08-AUG-2025 0806

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC186502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1 86512

CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK

FOUO Pg 4 of 5

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

08-AUG-2025 0806

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC186502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1 86512

CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM VARIOUS LOCATION FOR S/F WORK

FOUO Pg 5 of 5

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 TM 29 CFR PART

1915.71 Scaffolding or Staging - N

4 MP PM240-0049,

SURF

AEGIS RADAR SPY ANTENNA

ARRAY SCAFFOLDING

A Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 RGRS 22/KE PC

2.2 CARP 22/KE PC

2.3 CARP 22/KE PC

2.2 RGRS 22/KE PC

CFM: for mobile crane cost, shrink wrap tape, spray adhesive, propane gas, firewatch cost, consumable parts, and MISC such as covering material.

22/MQ CS

Process Funding Document. 10/CT OM

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38BC186502 KEY OP: A01