This WebAIM Short Form Task Group Instruction (TGI) details preservation work for the structural surfaces in the clean and dirty sides of the No. One Ship Service Gas Turbine Generator (SSGTG) Intake Trunk on the USS John Finn (DDG-113). The work involves preserving 2,300 square feet of structural surface on the dirty side (from 03 Level to 02 Level, excluding the louver) and 200 square feet on the clean side (from 02 Level to above the silencer). The contractor work is scheduled to start on 4/20/26 and complete by 6/15/26.

The task includes power tool cleaning to bare metal, following specific maintenance procedures and surface preparation specifications. SRF-JRMC will provide supporting services such as crane and rigging, utility services (electrical, water, steam), safety inspections, gas-free inspections, and quality assurance inspections. The critical coated area is identified as CCNY-DDG113-003-26, and no government-furnished materials are required. The work is associated with Job Change Notice (JCN) EM01-L027 and follows gas turbine maintenance procedures with specific requirements for surface preparation and preservation.

View the file

Other files

File Type Posted
N6264926RA0090008 SF 30.pdf PDF
RFI Q7A7.rtf RTF text file
Solicitation Amendment N6264926RA0090007 SF 30.pdf PDF
300-23-224.After Hours Hotwork Memo (002).pdf PDF
Solicitation Amendment N6264926RA0090007 SF 30.pdf PDF
Solicitation Amendment N6264926RA0090006 SF 30.pdf PDF
Solicitation Amendment N6264926RA0090004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0090005 SF 30.pdf PDF
RFI Q5A5.rtf RTF text file
RFI Q6A6.rtf RTF text file
Solicitation Amendment N6264926RA0090003 SF 30.pdf PDF
Solicitation Amendment N6264926RA0090002 SF 30.pdf PDF
RFI Q4A4.rtf RTF text file
Solicitation Amendment N6264926RA0090001 SF 30.pdf PDF
RFI Q3A3.rtf RTF text file
RFI Q1A1.rtf RTF text file
RFI Q2A2.rtf RTF text file
Solicitation - N6264926RA009.pdf PDF
TGI_38BC186301_A01_c0v0_Redacted 22JUN.pdf PDF
TGI_38BC163404_A03_c0v0_Redacted.pdf PDF
Attachment (V) Source of Repair Instruction.pdf PDF
TGI_38BC116801A01_c1v1_Redacted.pdf PDF
TGI_38BC125106_A01_c0v0_Redacted.pdf PDF
TGI_38BC163406_A01_c0v0_Redacted.pdf PDF
Attachment (VI) Warranty Tracking Information.pdf PDF
Attachment (III) Request for Information Form.rtf RTF text file
TGI_38BC154101_A01_c0v0_Redacted.pdf PDF
TGI_38BC125105_A01_c0v0_Redacted.pdf PDF
Attachment (IV) GFP_List_V3.xlsx XLSX spreadsheet
Attachment (VII) QASP 26RA009 Bun1.pdf PDF
TGI_38BC112201_A01_c0v0_Redacted.pdf PDF
TGI_38BC112313_A01_c0v0_Redacted.pdf PDF
TGI_38BC186502_A01_c0v0_Redacted.pdf PDF
TGI_38BC112312_A01_c0v0_Redacted.pdf PDF
Attachment (VIII) Contract Data Sheet 26RA009.pdf PDF
Attachment (II) Price Proposal Form N6264926RA009.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

08-AUG-2025 0806

20.15.6.0.9333 (July 2025) ICN: 38BC112311 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #1GTG INTK C/D SIDES AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1

CU PHASE TITLE: F/O - PRESERVE STRUCT SURFACE IN CLEAN AND DIRTY SIDE OF NO. ONE SSGTG INTK TRK

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EM01L027

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

NANBA, RYOUSUKE 231A 3152436141 25-JUL-2025

APPROVED BY: CODE: PHONE: DATE:

NAKAMURA, YUUJI 231A 3152436041 26-JUL-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM01-L027

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A2111

1 SCOPE/PURPOSE:

1.1 Title: Structural Surface in Clean and Dirty Side of No. One SSGTG Intake Trunk; preserve

1.2 Location of Work:

1.2.1 Ship Service Gas Turbine Generator (SSGTG) Intake (03-174-0-Q)

1.2.2 SSGTG Intake/Exhaust Trunk (02-161-2-Q)

1.2.3 SSGTG Intake Trunk (2-161-2-Q)

1.2.4 Auxiliary Machinery Room No. One (4-126-0-E)

1.2.4.1 No. One SSGTG Module

1.3 Identification:

TGI Short Form

08-AUG-2025 0806

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC112311 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #1GTG INTK C/D SIDES AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1

CU PHASE TITLE: F/O - PRESERVE STRUCT SURFACE IN CLEAN AND DIRTY SIDE OF NO. ONE SSGTG INTK TRK

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.1 Quantity (2,300 SF in Total), Entire Structural Surface in No. One SSGTG Intake Trunk (Dirty Side) Remarks: The area is from 03 Level to 02 Level except the louver.

1.3.2 Quantity (200 SF in Total), Entire Structural Surface in No. One SSGTG Intake Trunk (Clean Side) Remarks: The area is from 02 Level to above silencer.

1.4 Security Classification:

1.5 Initial Condition:

1.5.1 Critical Coated Area: CCNY-DDG113-003-26 for each area listed in 1.3.1 and 1.3.2

1.6 Contractor work start date:

1.7 Contractor work completion date:

2 PROCEDURE:

2.1 Accomplish the requirements of Ref. No. 3.

(V)(G) “GAS TURBINE MAINTENANCE PROCEDURE”

2.2 Accomplish the requirements of 009-032 of Ref. No. One, including Table 3, Line(s) 18A for each area listed in 1.3.1, and Table 3, Line(s) 20 for each area listed in 1.3.2.

2.2.1 Power tool clean to bare metal for each area listed in 1.3.2. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of Ref. No. 4.

2.3 Notes:

2.3.1 Planner: Code 231A R. Nanba, 243-6141

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.3.3 Removal of the silencer, the louver, the moisture separator, and the perforated sheet are not required.

2.3.4 JCN EM01-L027 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38BC112311S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including water supply and steam supply.

4/20/26

6/15/26

08-AUG-2025 0806

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC112311 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #1GTG INTK C/D SIDES AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1

CU PHASE TITLE: F/O - PRESERVE STRUCT SURFACE IN CLEAN AND DIRTY SIDE OF NO. ONE SSGTG INTK TRK

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s), and review coating appreciation data.

2.5.7 [C285] Inspection for (G) symbol(s).

08-AUG-2025 0806

20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC112311 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #1GTG INTK C/D SIDES AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BC1

CU PHASE TITLE: F/O - PRESERVE STRUCT SURFACE IN CLEAN AND DIRTY SIDE OF NO. ONE SSGTG INTK TRK

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 MP AL14-BC112311-

EM01L027

NR.1 SSGTGINTAKE SYSTEM

FOD PROTECTION FOR

PRESERVATION OF

CLEAN/DIRTY SIDES

- Y ALL

4 TM SYSTEMS &

SPECIFICATIONS

SSPC Painting Manual Volume

- N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 OMCH 22/KE PC

2.2 PNTR , RGRS , QA 22/KE PC

CFM for Preservation Work: all paint and thinner, confined space watch cost, marine chemist cost, compressor with dryer and duel cost, heater, and MISC such as consumable parts and covering material.

22/MQ CS

Process Funding Document 10/CT OM

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38BC112311 KEY OP: A01