RFI Q3A3.rtf
RTF text file 336 KB Posted
- Attached to
- USS JOHN FINN (DDG-113) FY26 6J1 CNO BUNDLE #1, Chief of Naval Operation Availability Yokosuka Japan
- Solicitation number
- N6264926RA009
About this file
This is a Request for Information (RFI) for the USS JOHN FINN (DDG-113) Chief of Naval Operation (CNO) Availability at Yokosuka Naval Base, Japan. The solicitation, issued by NAVSUP Fleet Logistics Center Yokosuka, seeks proposals for ship repair and maintenance work comprising twelve Task Group Instructions (TGIs) involving overhaul, preservation, and replacement activities.
Key details include a proposal submission deadline of 17 December 2025 at 10:00 AM, with proposals to be sent to kazuo.takamura.ln@us.navy.mil. The period of performance is 20 April 2026 through 22 June 2026, located at Yokosuka Naval Base in Japan. Offerors must specify any hazardous materials and potential sea transportation requirements. Reference materials will be provided through DoD Safe, and interested parties should contact Kazuo Takamura or Ai Gillard to request additional documentation. The solicitation is part of a naval ship repair contract with specific requirements for documentation and compliance with federal acquisition regulations.
Text of this file
file_0.jpg file_1.wmf
ATTACHMENT IV: REQUEST FOR INFORMATION (RFI)
DATE OF REQUEST:
CONTRACTOR: -
RFP Number: N6264926RA009
PAGE Number(s):
CONTRACTOR QUESTION(s):
38BC112201A01
Para1.3.3 Quantity (One Lot), Composite Panel for Platform 76’ – 5” ABL and Platform 65 Feet – 8 Inches ABL.
We are unsure of quantity “one lot”. Is it possible to inform us sqft?
Para1.3.4 Para1.3.5 Is it possible to provide us DWG or reference of the location?
38BC186301A01
Is it possible to inform us where in Enclosure-01 is Para1.3.1, Para 1.3.2, Para1.3.3 indicating?
DO NOT WRITE BELOW THIS LINE (FOR GOVERNMENT USE ONLY)
TECHNICAL REVIEWER:
DATE:
TGI NO:
DATE:
SPEC CHG: Y/N
DWG/REF CHG: Y/N
RQMTS CHG: Y/N
MAT'L CHG: Y/N
RESPONSE TO CODE 200:
38BC112201A01
Answer: Sqft of composite panels are approx. 175 in total.
Para1.3.4 Para1.3.5 Answer: Please see attached DWG and Photos.
38BC186301A01
Answer: Red markings provided in Enclosure-01 indicate the locations that are applicable to Paragraph 1.3.1, 1.3.2, and 1.3.3.
Contractor should plan to provide the requirements of Paragraphs 1.3.1, 1.3.2, and 1.3.3 at all these locations.
Exact installation locations, details, and work dates for enclosure, life rail, and bridge will be provided by SRF-JRMC WIM Code 333 as stated in Paragraph 2.2.3 during execution of availability.
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .