This WebAIM Short Form Task Group Instruction (TGI) details preservation work for the structural surfaces in the No. 1B Gas Turbine Main (GTM) Intake Trunk on the USS John Finn (DDG-113). The task involves preserving 1,050 square feet of structural surface on the dirty side and 1,200 square feet on the clean side of the intake trunk, with work to be performed between April 20, 2026, and June 15, 2026. The Surface Repair Facility - Japan Regional Maintenance Center (SRF-JRMC) will provide supporting services including crane and rigging, utility services, safety inspections, gas-free inspections, and quality assurance reviews. The work requires power tool cleaning to bare metal on the clean side, following Surface Preparation Specification SSPC-SP 11, and will follow specific gas turbine maintenance procedures.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) ICN: 38BC125106 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GTM INTK C/D SIDE AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1
CU PHASE TITLE: F/O - PRESERVE STRUCT SURFACE IN CLEAN AND DIRTY SIDE OF NO. 1B GTM INTK TRK
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
EM01L029
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NANBA, RYOUSUKE 231A 3152436141 26-JUL-2025
APPROVED BY: CODE: PHONE: DATE:
NAKAMURA, YUUJI 231A 3152436041 26-JUL-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-L029
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
251A3206
1 SCOPE/PURPOSE:
1.1 Title: Structural Surface in Clean and Dirty Side of No. 1B GTM Intake Trunk; preserve
1.2 Location of Work:
1.2.1 Intake Engine Room No. One (Port) (02-174-0-Q)
1.2.2 Intake Trunk (A) Engine Room No. One (1-174-1-Q)
1.2.3 Engine Room No. One (4-174-0-E)
1.2.3.1 No. 1B Gas Turbine Main (GTM) Inlet Plenum
1.3 Identification:
1.3.1 Quantity (1,050 SF in Total), Entire Structural Surface in No. 1B GTM Intake Trunk (Dirty Side)
TGI Short Form
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC125106 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GTM INTK C/D SIDE AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1
CU PHASE TITLE: F/O - PRESERVE STRUCT SURFACE IN CLEAN AND DIRTY SIDE OF NO. 1B GTM INTK TRK
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
Remarks: The area excludes louvers.
1.3.2 Quantity (1,200 SF in Total), Entire Structural Surface in No. 1B GTM Intake Trunk (Clean Side) Remarks: The area is from 02 Level to above silencer.
1.4 Security Classification:
1.5 Initial Condition:
1.5.1 Critical Coated Area: CCNY-DDG113-005-26 for each area listed in 1.3.1 and 1.3.2
1.6 Contractor work start date:
1.7 Contractor work completion date:
2 PROCEDURE:
2.1 Accomplish the requirements of Ref. No. 3.
(V)(G) “GAS TURBINE MAINTENANCE PROCEDURE”
2.2 Accomplish the requirements of 009-032 of Ref. No. One, including Table 3, Line(s) 18A for each area listed in 1.3.1, and Table 3, Line(s) 20 for each area listed in 1.3.2.
2.2.1 Power tool clean to bare metal for each area listed in 1.3.2. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of Ref. No. 4.
2.3 Notes:
2.3.1 Planner: Code 231A R. Nanba, 243-6141
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
2.3.3 Removal of the silencer, the BERP, the louver, the moisture separator, and the perforated sheet are not required.
2.3.4 JCN EM01-L029 is related to this TGI.
2.4 Government Furnished Material (GFM): None.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38BC125106S02)
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [X99E] Utility service, electrical.
2.5.3 [X99M] Utility service, including water supply and steam supply.
2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
4/20/26
6/15/26
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC125106 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GTM INTK C/D SIDE AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1
CU PHASE TITLE: F/O - PRESERVE STRUCT SURFACE IN CLEAN AND DIRTY SIDE OF NO. 1B GTM INTK TRK
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.5.6 [C133] QA inspection for (G) symbol(s), and review coating appreciation data.
2.5.7 [C285] Inspection for (G) symbol(s).
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC125106 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GTM INTK C/D SIDE AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1
CU PHASE TITLE: F/O - PRESERVE STRUCT SURFACE IN CLEAN AND DIRTY SIDE OF NO. 1B GTM INTK TRK
FOUO Pg 4 of 4
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 MP LM19-BC125106-
EM01L029
1B GTM INTAKE FOD
PROTECTION FOR
PRESERVE THE INTAKE
TRUNK 02 LEVEL (02-174-0-Q)
- Y ALL
4 TM SYSTEMS &
SPECIFICATIONS
SSPC Painting Manual Volume
- N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 OMCH 22/KE PC
2.2 PNTR , RGRS , QA 22/KE PC
CFM for Preservation Work: for all paint and thinner, grit, confined space watch cost, marine chemist cost, compressor with dryer and duel cost, heater, and MISC such as consumable parts and covering material.
22/MQ CS
Process Funding Document 10/CT OM
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38BC125106 KEY OP: A01
File details come from the government source that posted it. Updated .