This WebAIM Short Form Task Group Instruction (TGI) details preservation and replacement work for the USS John Finn (DDG-113), specifically targeting the superstructure, platform, and nonskid deck covering. The work involves multiple preservation tasks across 03, 04, and 05 Level Weather areas, including 650 square feet of exterior platform surface, 175 square feet of deck plating, and one lot of composite panel work. Additional tasks include coating preservation for bulkheads and antenna foundation, with work to be performed between April 20, 2026, and June 15, 2026. SRF-JRMC will provide supporting services including crane rigging, utility services, safety inspections, and quality assurance inspections. The nonskid deck covering must conform to MIL-PRF-24667, Type XI, Composition PS specifications.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) ICN: 38BC112201 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 03 - 05 LVL WEATHER AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1
CU PHASE TITLE: F/O – ACCOMPLISH PSVTN OF SUPERSTR AND PLTF AND REPLT OF NONSKID DECK COVERING
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
ES01L024
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TAKANASHI, TATSUNORI 231A 3152436238 28-JUL-2025
APPROVED BY: CODE: PHONE: DATE:
NAKAMURA, YUUJI 231A 3152436041 28-JUL-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-L024
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
122A2101
1 SCOPE/PURPOSE:
1.1 Title: Preservation of Superstructure and Platform and Replacement of Nonskid Deck Covering; accomplish
1.2 Location of Work:
1.2.1 03 Level Weather, Frames between 175 and 215, Port
1.2.2 04 Level Weather, Frames between 175 and 190, Port and Starboard (Stbd)
1.2.3 05 Level Weather, Frames between 180 and 192, Port and Stbd
1.3 Identification:
1.3.1 Quantity (650 SF), Exterior Surface of Platform 76 Feet – 5 Inches Above Base Line (ABL) and Platform 65 Feet – 8 Inches ABL, including stanchion and support
Remarks: The area except where nonskid deck covering system is installed
TGI Short Form
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC112201 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 03 - 05 LVL WEATHER AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1
CU PHASE TITLE: F/O – ACCOMPLISH PSVTN OF SUPERSTR AND PLTF AND REPLT OF NONSKID DECK COVERING
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
1.3.2 Quantity (175 SF), Deck Plating of Platform 76 Feet – 5 Inches ABL and Platform 65 Feet – 8 Inches ABL, including vertical surface up to height of 4 inches from deck in and around peel and stick nonskid deck area
1.3.3 Quantity (One Lot), Composite Panel for Platform 76’ – 5” ABL and Platform 65 Feet – 8 Inches ABL
1.3.4 Quantity (5 SF in Total), Deteriorated Coating of Longitudinal Bulkhead, 03 Level, Frames between 193 and 213, Port Remarks: The area is surface where underside of louver
1.3.5 Quantity (9 SF in Total), Deteriorated Coating of Transvers Bulkhead, 03 Level to 05 Level, Frames between 186 and 189, Port and Starboard
1.3.6 Quantity (4 SF in Total), Deteriorated Coating of Foundation for Antenna 3-10B
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2 PROCEDURE:
2.1 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) One, for each area listed in 1.3.1.
2.2 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) 23, for each area listed in 1.3.2.
2.2.1 Accomplish the requirements of 009-026 of Ref No. One, including Attachment G, for installation of new peel and stick nonskid deck covering. Application of peel and stick nonskid deck covering must conform to MIL-PRF-24667, Type XI, Composition PS.
2.3 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) 83, for each area listed in 1.3.3.
2.4 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) One, for each area listed in 1.3.4 through 1.3.6.
2.4.1 The preservation area must not exceed 10 square feet per one area.
2.5 Notes:
2.5.1 Planner: Code 231A T. Takanashi, 243-6238
2.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
2.5.3 JCN ES01-L024 is related to this TGI.
2.6 Government Furnished Material (GFM): None.
4/20/26
6/15/26
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC112201 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 03 - 05 LVL WEATHER AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1
CU PHASE TITLE: F/O – ACCOMPLISH PSVTN OF SUPERSTR AND PLTF AND REPLT OF NONSKID DECK COVERING
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
2.7 SRF-JRMC will provide the following service work: (TGI No. 38BC112201S02)
2.7.1 [C740] Crane and crane rigging service.
2.7.2 [X99E] Utility service, electrical.
2.7.3 [X99M] Utility service, including water supply, steam supply and low pressure air supply except on-board blasting work.
2.7.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.7.6 [C133] QA inspection for (G) symbol(s).
08-AUG-2025 0806
20.15.6.0.9333 (July 2025) (Continued) ICN: 38BC112201 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 03 - 05 LVL WEATHER AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-113 USS JOHN FINN BC1
CU PHASE TITLE: F/O – ACCOMPLISH PSVTN OF SUPERSTR AND PLTF AND REPLT OF NONSKID DECK COVERING
FOUO Pg 4 of 4
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - N OR
G
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 PNTR , RGRS , CARP , QA 22/KE PC N
2.2 PNTR , CARP , QA 22/KE PC N
2.3 PNTR QA 22/KE PC N
2.4 PNTR , QA 22/KE PC N
Preservation Work CFM: all paints, grits, thinner, compressor and fuel oil, dryer for compressor, air conditioner, and misc such as consumable parts and covering material.
22/MQ CS N
Process Funding Document 10/CT OM N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38BC112201 KEY OP: A01