This document is a Request for Information (RFI) related to the USS JOHN FINN (DDG-113) Chief of Naval Operation (CNO) Availability contract, solicitation number N6264926RA009. The opportunity involves ship repair and maintenance work at the Yokosuka Naval Base in Japan, with a performance period from 20 April 2026 through 22 June 2026. The work comprises twelve Task Group Instructions (TGIs) for ship repair overhaul, preservation, and replacement activities.
The RFI contains two specific contractor questions: (1) requesting Government Furnished Material (GFM) for BERP fabrication by end of January 2026 and seeking early fabrication permission, and (2) inquiring about potentially reducing BERP fabrication to one unit. The government responses indicate: (A1) GFM will be provided pending contract status, and (A2) they will not reduce the number of BERP units. The solicitation has undergone multiple amendments, with the most recent (Amendment 0005) addressing potential extensions to hot work hours and discussing project strategy modifications. Proposals are to be submitted to specified Navy contacts, with considerations for hazardous materials and sea transportation requirements.
Text of this file
file_0.jpg file_1.wmf
ATTACHMENT IV: REQUEST FOR INFORMATION (RFI)
DATE OF REQUEST: 2025/DEC/17
CONTRACTOR:
RFP Number: N6264926RA009
PAGE Number(s): 1/1 CONTRACTOR QUESTION(s):
38BC116801A01
Q1. Can we receive the GFM related to fabrication of BERP by the end of January, 2026 ?
Additionally, we would like to let us early start to fabricate BERP at the same juncture.
In para 1.3.2.1
Q2. If the above mentioned request turns to be impossible, could you lower and specify the number of BREP to be fabricated only into One (BERP No. 02-225-1) ?
DO NOT WRITE BELOW THIS LINE (FOR GOVERNMENT USE ONLY)
TECHNICAL REVIEWER:
DATE:
TGI NO:
DATE:
SPEC CHG: Y/N
DWG/REF CHG: Y/N
RQMTS CHG: Y/N
MAT'L CHG: Y/N
RESPONSE TO CODE 200:
A1. YES but depends on contract status.
A2. No
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .