This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19) Naval vessel, specifically focused on the Auxiliary Steam System Tightness and Operational Test. The document is dated 27-SEP-2024 and relates to a maintenance task with the reference number TP 53411-3-300KTR for the auxiliary steam system. The instruction involves three primary work tasks: contractor work (22/KE shop code), Quality Assurance (QA) work (33/G1 shop code), and Ship/Force (S/F) work (EM01 shop code), all of which are required to accomplish and document the tightness and operational test in accordance with the referenced technical procedure. The document is marked FOUO (For Official Use Only) and includes preparation details by Kamimura, Yousuke and approval by Higa, Riley, with the zone manager listed as Yaginuma, Takehide.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
27-SEP-2024 0907
20.14.15.2.9020 (September 2024) ICN: 3819P22101 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53411-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 53411
CU PHASE TITLE: AUX STEAM SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM01ZAG1 * EM01ZAG3 * EM01ZAG6 * EM01ZAK5 * EM01ZAG9 * EM01ZAH0 * EM01ZAH3 * EM01ZAH6 * EM01ZAH8 *
EM01ZAI0 * EM01ZAI1 * EM01ZAI3 * EM01ZAI7
PREPARING ACTIVITY: STATUS: APP WORKING STATUS: PKG
PREPARED BY: CODE: PHONE: DATE:
KAMIMURA, YOUSUKE 246.2 3152434987 10-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
HIGA, RILEY 246.2 3152432291 26-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-ZAG1 * EM01-ZAG3 * EM01-ZAG6 * EM01-ZAG9 * EM01-ZAH0 * EM01-ZAH3 * EM01-ZAH6 * EM01-ZAH8 * EM01-ZAI0 *
EM01-ZAI1 * EM01-ZAI3 * EM01-ZAI7 * EM01-ZAK5
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE VARIOUS U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1101
Tightness & Operational Test for Aux Steam System - KTR
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
27-SEP-2024 0907
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22101 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53411-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 53411
CU PHASE TITLE: AUX STEAM SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 53411-3-300KTR AUX STEAM SYS (T & OP) -
KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 53411-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 53411-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 53411-3-300KTR.
/ EM01 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22101 KEY OP: T02