TGI_3819P14115A01_c0v0_FY26.pdf

PDF 251 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 3 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA024
Issued by

About this file

This Task Group Instruction (TGI) details repair and preservation work for a bulkhead plate on the USS Blue Ridge, specifically for Frame 98 in section 6-86-2-A. The work involves removing and replacing a bulkhead plate, with activities spanning multiple ship locations including the Ship Fitter Storeroom, Crew Living Space, Fresh Water Ballast, Medical Storeroom, Lube Oil Storage Tank, and Engine Room. The project includes one bulkhead plate (15.3 lbs) made of OS, MIL-S-22698 Grade A material, along with 7 square feet of transverse bulkhead plating and 3 square feet of first platform deck plating.

The contract work is scheduled to start on 7/21/2026 and complete by 11/21/2027, with specific procedural requirements including removing existing plates, fabricating and installing new plates, conducting air hose tests on welds, and performing preservation work. The instruction notes potential asbestos and lead hazards, and requires a non-flammable closure due to work affecting a fire zone boundary. SRF-JRMC will provide government-furnished material and services including crane rigging, utility services, safety inspections, and quality assurance inspections. The total project involves multiple materials such as plates, insulation, adhesives, and various tapes, ordered specifically for the contractor (KTR).

View the file

Other files

File Type Posted
TGI_3819P51403A01_c0v0_FY26.pdf PDF
TGI_3819P26202_A01_c0v0_FY26.pdf PDF
TGI_3819P25604A01_c1v1_FY26.pdf PDF
TGI_3819P22103A01_c0v0_FY26.pdf PDF
TGI_3819P14121A01_c0v0_FY26.pdf PDF
TGI_3819P13507A01_c0v0_FY26.pdf PDF
TGI_3819P12351A01_c0v0_FY26.pdf PDF
TGI_3819P12333A01_c0v0_FY26.pdf PDF
TGI_3819P12331A01_c1v1_FY26.pdf PDF
TGI_3819P12315A01_c0v0_FY26.pdf PDF
TGI_3819P12314A01_0c0v0_FY26.pdf PDF
TGI_3819P12309A01_c1v0_FY26.pdf PDF
TGI_3819P12303A01_c1v0_FY26.pdf PDF
TGI_3819P12302A01_c2v2_FY26.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
Attachment II Price Proposal Form N6264925RA024.xlsx XLSX spreadsheet
TGI_3819P25502_A01_c0v0.pdf PDF
TGI_3819P22101_T09_c0v0.pdf PDF
TGI_3819P14208T02_c0v0.pdf PDF
TGI_3819P14204A01_c0v0.pdf PDF
TGI_3819P13507A01_c0v0.pdf PDF
TGI_3819P13505A01_c0v0.pdf PDF
TGI_3819P12389A01_c0v0.pdf PDF
TGI_3819P12360A01_c0v0.pdf PDF
TGI_3819P12359_A01_c0v0.pdf PDF
TGI_3819P12358_A01_c0v0.pdf PDF
TGI_3819P12353_A01_c1v0.pdf PDF
TGI_3819P12343A01_c1v1.pdf PDF
TGI_3819P12334T01_c0v0.pdf PDF
TGI_3819P12333A01_c0v0.pdf PDF
TGI_3819P12329A01_c1v1.pdf PDF
TGI_3819P12322_A01_c2v1.pdf PDF
TGI_3819P12319A01_c0v0.pdf PDF
TGI_3819P12308A01_c0v0.pdf PDF
TGI_3819P12303A01_c1v0.pdf PDF
2.01 N6264925RA024.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL).pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
TGI_3819P26201A01_c0v0.pdf PDF
TGI_3819P25604A01_c1v1.pdf PDF
TGI_3819P22102_T08_c0v0.pdf PDF
TGI_3819P22102_T06_c0v0.pdf PDF
TGI_3819P22102_T02_c0v0.pdf PDF
TGI_3819P22101_T08_c0v0.pdf PDF
TGI_3819P22101A01_c2v2.pdf PDF
TGI_3819P14207_T01_c0v0.pdf PDF
TGI_3819P14117A01_c0v0.pdf PDF
TGI_3819P14115A01_c0v0.pdf PDF
TGI_3819P13339A01_c0v0.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

19-AUG-2024 1644

20.14.12.0.8874 (April 2024) ICN: 3819P14115 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BHD FR98 IN 6-86-2-A AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - REPAIR AND PRESERVE BULKHEAD PLATE FR98 IN 6-86-2-A

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

ES01NPL2

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

ANDO, TOMOHIKO 231B 3152434372 23-MAY-2024

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 23-MAY-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-NPL2

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

141A0015

1. SCOPE/PURPOSE:

1.1 Title: Bulkhead Plate Frame 98 in 6-86-2-A; repair and preserve

1.2 Location of Work:

1.2.1 Ship Fitter Storeroom (6-86-2-A)

1.2.2 Crew Living Space (6-98-2-L)

1.2.3 Fresh Water Ballast (9-86-6-W)

1.2.4 Medical Storeroom (7-98-2-A)

1.2.5 Lube Oil Storage Tank 1C (7-97-10-F)

1.2.6 Engine Room (8-86-0-E)

TGI Short Form

19-AUG-2024 1644

20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14115 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BHD FR98 IN 6-86-2-A AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - REPAIR AND PRESERVE BULKHEAD PLATE FR98 IN 6-86-2-A

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.3 Identification:

1.3.1 Quantity (One EA), Bulkhead Plate, Watertight Transverse Bulkhead Frame 98 in 6-86-2-A, Port

Material: OS, MIL-S-22698 Grade A, 15.3 LBs Plate Remarks: See 2.3 for detail

1.3.2 Quantity (7 SF), Transverse Bulkhead Plating Frame 98 in 6-86-2-A, including Longitudinal Bulkhead surface up to Forward of 6 inches from Bulkhead Plating

Remarks: See Sketch Enclosure-01 for location detail

1.3.3 Quantity (3 SF), First Platform Deck Plating in 6-86-2-A

Remarks: See Sketch Enclosure-01 for location detail

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.5.2 Potential Lead Hazard

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 11/21/2027

2. PROCEDURE:

2.1 Remove existing, fabricate and install new each bulkhead plate listed in 1.3.1 in accordance with Ref. No. 3.

2.1.1 Accomplish the requirements of 009-12 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.

2.1.2 Accomplish the requirements of 009-25 of Ref. No. One for a local air hose test of each new weld of each bulkhead plate.

Allowable leakage: None

2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 27, for each area listed in 1.3.2 and 1.3.3.

2.3 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.4 Notes:

2.4.1 Planner: Code 231B T. Ando, 243-4372

Engineer: Code 250 Y, Seimiya, 243-0091

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

19-AUG-2024 1644

20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14115 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BHD FR98 IN 6-86-2-A AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - REPAIR AND PRESERVE BULKHEAD PLATE FR98 IN 6-86-2-A

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.4.3 This TGI clears DFS LCC-19-1019-2024 in its entirety.

2.4.4 Opening, initial cleaning, and closing of each space listed in 1.2.3 will be covered by TGI No. 3819P12319A01 (KTR TGI).

2.4.5 Opening, initial cleaning, and closing of each space listed in 1.2.5 will be covered by TGI No. 3819P12332A01 (KTR TGI).

2.4.6 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.

2.4.7 JCN ES01-NPL2 is related to this TGI.

2.5 Government Furnished Material (GFM):

2.5.1 SRF-JRMC will provide GFM listed in the Material List.

2.6 SRF-JRMC will provide the following service work: (TGI No. 3819P14115S02).

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [X99E] Utility service, electrical.

2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.6 [C133] QA inspection for (G) symbol(s).

19-AUG-2024 1644

20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14115 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BHD FR98 IN 6-86-2-A AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - REPAIR AND PRESERVE BULKHEAD PLATE FR98 IN 6-86-2-A

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III.

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 PDD 114-ELM-

240199

RPR OF CORRODED WTRTT

TRANSV BHD FR 98 IN

SHIPFITTER STRM (6-86-2-A)

- Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 SFTR HRs, WELD HRs, SMTL HRs, CARP HRs, INSL HRs, RGRS HRs, PNTR HRs, QA HRs

22/KE PC N

2.2 PNTR HRs, QA HRs 22/KE PC N

2.3 PNTR HRs, QA HRs 22/KE PC N

Structure Work CFM for firewatch cost, tankwatch cost, lead sampling/analysis cost, deck covering material cost, air compressor rental cost and fuel oil cost for air hose test, marine chemist ---continue to below---

22/MQ CS N

---continued to from above---asbestos sampler cost and analysis cost for compartment insulation and deck covering, and misc such as electrode, gases, temporary covering and closure material, and other consumable.

22/MQ CS N

Preservation Work CFM for all paints, thinner, grits including disposal cost, tankwatch cost, and MISC such as covering material, and other consumable.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M PLATE,ME, ORIG: C231B, T.

ANDO 243-4372

ORDERED FOR KTR

QTY: 8 SF

4 FT X 2 FT X 1 PM

9B 9515 001533223 NA 4 N 41325090 8/SF

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P14115 KEY OP: A01

19-AUG-2024 1644

20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14115 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BHD FR98 IN 6-86-2-A AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - REPAIR AND PRESERVE BULKHEAD PLATE FR98 IN 6-86-2-A

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

002 M INSULATI, ORIG: C231B, T.

ANDO 243-4372

ORDERED FOR KTR

9Q 5640 008096312 NA 4 N 41325091 5/EA

003 M INSULATI, ORIG: C231B, T.

ANDO 243-4372

ORDERED FOR KTR

9Q 5640 008096315 NA 4 N 41325092 5/EA

004 M ADHESIVE, ORIG: C231B, T.

ANDO 243-4372

ORDERED FOR KTR

9B 8040 002738708 NA 4 Y 41325089 1/GL

005 M TAPE,TEX, ORIG: C231B, T.

ANDO 243-4372

ORDERED FOR KTR

9B 8315 002671632 NA 4 N 41325093 1/RO

006 M TAPE,TEX, ORIG: C231B, T.

ANDO 243-4372

ORDERED FOR KTR

9B 8315 002671633 NA 4 N 41325095 1/RO

007 M CAP,SNAP, ORIG: C231B, T.

ANDO 243-4372

ORDERED FOR KTR

9B 5325 007377648 NA 4 N 41325096 30/EA

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P14115A01-Sketch.pdf 23-MAY-2024 0000

KEY PLAN

FR 86 - 109

LOCATION OF WORK

SKETCH

ENCLOSURE-01

See Sheet 2

3819P14115A01 Sheet 1 of 2

SKETCH

ENCLOSURE-01

LONG BHD

12”

1ST PLATF

6”

Ship Fitter Storeroom 6-86-2-A

FR 98

Shell35”

Preservation Area

52”

3819P14115A01 Sheet 2 of 2

Preservation Area 12”

6”

File details come from the government source that posted it. Updated .