Technical Exhibit V - Water Foutain and Water Cooler Inspection Checklist.xlsx

XLSX spreadsheet 62 KB Posted

Attached to
Facilities Infrastructure and Logistics Operations Support Services (FI&LOSS)
Solicitation number
W91ZLK-25-R-0002
Issued by

About this file

This file is a technical exhibit containing water fountain and water cooler inspection checklists for buildings E3320, E3330, E4301, and E4811 at Aberdeen Proving Ground. The checklists are part of contract W91ZLK-19-D-0001 TO W91ZLK24F0007 and outline bi-annual inspection requirements for water fountains and coolers, including checks of filter housing, water leaks, filter changes, spout nozzles, O-rings, cleaning, operational status, cooling water adequacy, and availability of disposable cups and trash bins.

The document specifies that contractors must perform monthly inspections of safety equipment (including touchless faucets and water filters) and maintain a comprehensive digital list of equipment details including name, model, building location, status, and lifecycle expectations. All issues must be reported to G4 Facility Manager Leads. The buildings contain various Oasis and Avalon water fountains, with E3330 having 12 units, E4301 having 16 units, E3320 having 1 unit, and E4811 having 1 unit. Each unit is identified by specific serial numbers and model numbers, with precise locations noted throughout the facilities.

View the file

Other files

File Type Posted
PWS IDIQ v2.pdf PDF
Technical Exhibit A v2 - Key Personnel Job Descriptions and Qualifications.pdf PDF
Attachment 18 - Solicitation Questions and Answers v2.xlsx XLSX spreadsheet
Attachment 14 - Price List Sample Task Order v2.xlsx XLSX spreadsheet
W91ZLK-25-R-0002 FI and LOSS Solicitation v3.pdf PDF
PWS TO v2.pdf PDF
W91ZLK-25-R-0002 FI and LOSS Solicitation v2.pdf PDF
Technical Exhibit U - Mobile Fleet and Equipment Inspection Template.pdf PDF
Attachment 16 - APG-EA Site Map.pdf PDF
W91ZLK-25-R-0002 FI and LOSS Solicitation.pdf PDF
Technical Exhibit R - MHE Inspection Template.pdf PDF
Technical Exhibit A - Key Personnel Job Descriptions and Qualifications.pdf PDF
Technical Exhibit B - Service Order Submission Form.pdf PDF
Technical Exhibit C - DA 4283 Submission Form.pdf PDF
Technical Exhibit E - General Maintenance Service Request Form.pdf PDF
Attachment 3 - GFP and GFE List.xlsx XLSX spreadsheet
Attachment 2 - IDIQ QASP.pdf PDF
Attachment 13 - Wage Determination.pdf PDF
Technical Exhibit Q - EAP Form 1105 - Statement of Render Safe.pdf PDF
Attachment 12 - DD Form 254 DoD Contract Security Classification Specification.pdf PDF
Technical Exhibit I - DA-Form-1687 Template.pdf PDF
Technical Exhibit J - Request for AESIP Number Template.pdf PDF
Technical Exhibit P - G4 Turn-In Program Tracker Template.xlsx XLSX spreadsheet
Technical Exhibit G - Nameplate Standards.pdf PDF
PWS IDIQ.pdf PDF
Attachment 4 - GFE Serially Managed Items (Pictures).pdf PDF
Technical Exhibit T - TMDE Inspection Template.pdf PDF
Technical Exhibit M - DA_FORM_2765-1 Template.pdf PDF
Technical Exhibit H - Snow and Ice Removal Map.pdf PDF
Attachment 14 - Price List Sample Task Order.xlsx XLSX spreadsheet
Attachment 1 - DEVCOM-CBC Facilities Matrix.xlsx XLSX spreadsheet
Technical Exhibit N - G4 Warehouse Receiving and Delivery and Shipping Tracker.xlsx XLSX spreadsheet
Attachment 15 - APG-AA Site Map.pdf PDF
Technical Exhibit L - Storage Room Supplies Tracker Template.xlsx XLSX spreadsheet
Technical Exhibit F - G4 Facility Inspection Checklist.pdf PDF
Technical Exhibit O - G4 Warehouse Equipment Storage Supply List Template.xlsx XLSX spreadsheet
Attachment 10 - Contract Data Requirements List (CDRL) M Start of Work Meeting Minutes.pdf PDF
Attachment 17 - Past Performance Questionaire.docx DOCX document
Attachment 9 - CDRL COR Meeting Agenda-Minutes and KTR Manpower-Training Report v2.pdf PDF
Technical Exhibit S - USATA TIMMS TMDE Correction Form.pdf PDF
Attachment 7 - Contract Data Requirements List CDRL Final Comprehensive Report (A002).pdf PDF
Attachment 2A - Task Order QASP.pdf PDF
Attachment 18 - Draft Solicitation Questions and Answers.xlsx XLSX spreadsheet
PWS TO.pdf PDF
Attachment 8 - Contract Data Requirements List (CDRL) GFP.pdf PDF
Attachment 6 - Contract Data Requirements List (CDRL) Monthly Status Reports.docx DOCX document
Attachment 11 - Standard Form 701 - Example.pdf PDF
Attachment 5 - GFE Non-Serially Managed Items (Pictures).pdf PDF
Technical Exhibit A1 - Support Personnel Job Descriptions and Qualifications.pdf PDF
Technical Exhibit D - Minor Project Request Form.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E3320

Water Fountain Inspection Checklist
Reference 3.2.3.1 in contract - W91ZLK-19-D-0001 TO W91ZLK24F0007 Frequency : Bi- Annually
LegendOK - ACCEPTABLE, NOT - NOT ACCEPTABLE, REP - UNDER REPAIR, N/A - NOT APPLICABLE
Building # E3320ManufacturerSerial # /Model #Filter Housing Visual InspectionChecked for Water LeaksFilters Changed (Date)Spout Nozzle ChangedReplaced O-Rings on Filter HousingCleaned Water CoolerOperationalAdequate Cooling WaterDisposable CupsTrash BinRemarksDate
Location of Water Cooler
1. KitchenetteOasis1204001550 / POC2LRHK

Inspector Initials:

Reference 3.2.3.1 - The Contractor shall perform monthly inspections of safety equipment including touchless faucets (battery replacement), water filters (filter replacement), and inspection of eyewash stations. Any fire, safety, security, mechanical, or quality of life issues shall be reported to the G4 Facility Manger Leads for resolution. The Contractor shall inspect safety equipment and provide a comprehensive digital list including the name, model, building location, physical location, status of the equipment, and the associated expected lifecycle. The G4 will provide the Contractor direction on the timeline and vehicle for repair and replacement for all deficient items. The Contractor shall perform semi-annual inspections for all automatic restroom faucets and water fountains and their associated components. The inspections shall indicate lifecycle replacement review.

E3330

Water Fountain Inspection Checklist
Reference 3.2.3.1 in contract - W91ZLK-19-D-0001 TO W91ZLK24F0007 Frequency : Bi- Annually
LegendOK - ACCEPTABLE, NOT - NOT ACCEPTABLE, REP - UNDER REPAIR, N/A - NOT APPLICABLE
Building # E3330ManufacturerSerial # /Model #Filter Housing Visual InspectionChecked for Water LeaksFilters Changed (Date)Spout Nozzle ChangedReplaced O-Rings on Filter HousingCleaned Water CoolerOperationalAdequate Cooling WaterDisposable CupsTrash BinRemarksDate
Location of Water Cooler
1. Hallway Near Room 6Oasis1221001003 / PF2LRHK
2. Hallway Near Room 18Oasis1221001003 / PF2LRHK
3. Hallway Near Room 110Oasis1221001009 / PF2LRHK
4. Hallway Near Room 119Oasis1221001004 / PF2LRHK
5. Hallway Near Room 145Oasis1204001557 / PF2LRHK
6. Hallway Near Room 158Oasis1204001549 / PF2LRHK
7. Hallway Near Room 208Oasis1221001002 / PF2LRHK
8. Hallway Near Room 216Oasis1221001008 / PF2LRHK
9. Hallway Near Room 236Oasis1204001552 / PF2LRHK
10. Hallway Near Room 248Oasis1204001553 / PF2LRHK
11. Hallway Near Room 263Oasis1204001551 / PF2LRHK
12. Hallway Near Room 269Oasis1221001005 / PF2LRHK

Inspector Initials:

Reference 3.2.3.1 - The Contractor shall perform monthly inspections of safety equipment including touchless faucets (battery replacement), water filters (filter replacement), and inspection of eyewash stations. Any fire, safety, security, mechanical, or quality of life issues shall be reported to the G4 Facility Manger Leads for resolution. The Contractor shall inspect safety equipment and provide a comprehensive digital list including the name, model, building location, physical location, status of the equipment, and the associated expected lifecycle. The G4 will provide the Contractor direction on the timeline and vehicle for repair and replacement for all deficient items. The Contractor shall perform semi-annual inspections for all automatic restroom faucets and water fountains and their associated components. The inspections shall indicate lifecycle replacement review.

E4301

Water Fountain Inspection Checklist
Reference 3.2.3.1 in contract - W91ZLK-19-D-0001 TO W91ZLK24F0007 Frequency : Bi- Annually
LegendOK - ACCEPTABLE, NOT - NOT ACCEPTABLE, REP - UNDER REPAIR, N/A - NOT APPLICABLE
Building # E4301ManufacturerSerial # /Model #Filter Housing Visual InspectionChecked for Water LeaksFilters Changed (Date)Spout Nozzle ChangedReplaced O-Rings on Filter HousingCleaned Water CoolerOperationalAdequate Cooling WaterDisposable CupsTrash BinRemarksDate
Location of Water Cooler
1. Hallway Near Room 14Oasis1318001452 / PF2LRHK
2. Hallway Between Rooms 26 + 27Oasis1318001451 / PF2LRHK
3. Hallway Between Rooms 28 + 30Oasis1318001444 / PF2LRHK
4. Hallway Across Room 30Oasis1318001448 / PF2LRHK
5. Hallway Between Rooms 34 + 36Oasis1233002172 / PF2LRHK
6. Hallway Near Room 42Oasis1231001021 / PF2LRHK
7. Hallway Near Room 50Oasis1318001449 / PF2LRHK
8. Hallway Near Room 52Oasis1231001026 / PF2LRHK
9. Hallway Across Room 107Oasis1231001024 / PF2LRHK
10. Hallway Between Rooms 120 + 122Oasis1231001023 / PF2LRHK
11. Hallway Near Room 126Oasis1231001017 / PF2LRHK
12. Bay 61, Outside of Room 66Oasis1316001047 / PF2LRHK
13. Bay 61, Outside of Bay 69Oasis1316001048 / PF2LRHK
14. Bay 74A, Outside of Room 55Oasis1318001445 / PF2LRHK
15. Bay 86, Outside of Room 80Oasis1308001902 / PF2LRHK
16. Bay 86, Outside of Room 90Oasis1318001447 / PF2LRHK
Inspector Initials:

Reference 3.2.3.1 - The Contractor shall perform monthly inspections of safety equipment including touchless faucets (battery replacement), water filters (filter replacement), and inspection of eyewash stations. Any fire, safety, security, mechanical, or quality of life issues shall be reported to the G4 Facility Manger Leads for resolution. The Contractor shall inspect safety equipment and provide a comprehensive digital list including the name, model, building location, physical location, status of the equipment, and the associated expected lifecycle. The G4 will provide the Contractor direction on the timeline and vehicle for repair and replacement for all deficient items. The Contractor shall perform semi-annual inspections for all automatic restroom faucets and water fountains and their associated components. The inspections shall indicate lifecycle replacement review.

E4811

Water Fountain and Water Cooler Inspection Checklist
Reference 3.2.1.3.1

Frequency : Bi- Annually

LegendOK - ACCEPTABLE, NOT - NOT ACCEPTABLE, REP - UNDER REPAIR, N/A - NOT APPLICABLE
Building # E4811ManufacturerSerial # /Model #Filter Housing Visual InspectionChecked for Water LeaksFilters Changed (Date)Spout Nozzle ChangedReplaced O-Rings on Filter HousingCleaned Water CoolerOperationalAdequate Cooling WaterDisposable CupsTrash BinRemarksDate
Location of Water Cooler
1. Outside of RestroomsAvalon7525211608 / A7BOTTLELESS

Inspector Initials:

Reference 3.2.1.3.1 - The Contractor shall inspect all automatic water fountains, water coolers, and their associated components bi-annually. The Contractor shall indicate lifecycle replacement review in the inspections. The Contractor shall maintain a digital repository and provide all bi-annually reports to the COR and the Facilities Division Chief.

image1.png image2.png

File details come from the government source that posted it. Updated .