Technical Exhibit H - Snow and Ice Removal Map.pdf
PDF 4 MB Posted
- Solicitation number
- W91ZLK-25-R-0002
About this file
This is a technical exhibit (Exhibit H) showing snow removal requirements and mapping for multiple buildings at Aberdeen Proving Ground. The document details snow removal responsibilities for 21 buildings across three directorates (R&O, ENG, and OoD), with specific requirements for entryways/front entrances, emergency exits, sidewalks, stairs, and docks/ramps/lifts.
The work is divided between two contractors - CBC Contractor (Priority 1) and DPW Contractor (Priority 2). Each building has a detailed aerial map showing the areas of responsibility marked in red (Priority 1) and blue (Priority 2), with specific measurements in linear feet (LF) and square feet (SF). The total scope covers 3,280 LF/30,269 SF for Priority 1 areas and 18,507 LF/78,874 SF for Priority 2 areas. Key buildings include E3150, E3330, E3400, E3549, and E5233 which require both entryway/exit clearing as well as dock/ramp access points in specific directions (Southeast, Northwest, etc.). The document was last updated February 28, 2024.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit “H” – Snow Removal Activities
Contracted Snow Removal Activities Last updated: 28 Feb 2024
Technical Exhibit “G” – Snow Removal Activities
Buildings Directorate Entryways / Front Entrances Emergency Exits Sidewalks Stairs Docks / Ramps / Lifts
E3150 R&O X X X X X (Southeast)
E3320 ENG X X X
E3330 OoD X X X X X (Northwest, Northeast) E3400 R&O X X X X X (Southeast) E3401 OoD X X X E3462 R&O X X X
E3510 ENG X X X
E3511 ENG X X
E3548 ENG X X X
E3549 ENG X X X X X (Southeast)
E3551 ENG X X X
E4301 ENG X X
E4810 OoD X X X X E4811 OoD X X X X
E5100 R&O / ENG X X X X
E5102 R&O/ ENG X X
E5179 OoD X X X X (East) E5233 OoD X X X X (Southeast) E5234 OoD X X E5242 OoD X X E5951 R&O X X X X X (East)
Total Buildings: 21
Buildings
• E3150, E3320, E3330, E3400, E3401, E3462, E3510, E3511, E3548, E3549, E3551, E4301, E4810, E4811, E5100, E5102, E5179, E5233, E5234, E5242, E5951
Priority 1- Performed by CBC Contractor
Priority 2- Performed by DPW Contractor
• E3150 Priority 1- Performed by CBC Contractor
Priority 2- Performed by DPW Contractor
Building Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks /
Ramps / Lifts
E3150 R&O X X X X X(Southeast)
• E3320
• E3330 Priority 1- Performed by CBC Contractor
Priority 2- Performed by DPW Contractor
Buildings Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks / Ramps
/ Lifts
E3320 ENG X X X
E3330 OoD X X X X X(Northwest) (Northeast)
• E3400
• E3401
Priority 1- Performed by CBC Contractor
Priority 2- Performed by DPW Contractor
Buildings Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks / Ramps
/ Lifts
E3400 R&O X X X X X(Southeast) E3401 OoD X X X
• E3462
Priority 1- Performed by CBC Contractor
Building Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks /
E3462 R&O X X X
• E3510
• E3511 Priority 1- Performed by CBC Contractor
Priority 2- Performed by DPW Contractor
Buildings Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks / Ramps
/ Lifts
E3510 ENG X X X
E3511 ENG X X
• E3548
• E3549
• E3551
Priority 1- Performed by CBC Contractor
Priority 2- Performed by DPW Contractor
Buildings Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks / Ramps
/ Lifts
E3548 ENG X X X
E3549 ENG X X X X X(Southeast)
E3551 ENG X X X
• E4301
Priority 1- Performed by CBC Contractor
Priority 2- Performed by DPW Contractor
Building Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks /
E4301 ENG X X
• E4810
• E4811 Priority 1- Performed by CBC Contractor
Priority 2- Performed by DPW Contractor
Buildings Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks / Ramps
/ Lifts
E4810 OoD X X X X E4811 OoD X X X X
• E5100
• E5102
Priority 1- Performed by CBC Contractor Priority 2- Performed by DPW Contractor
Buildings Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks / Ramps
/ Lifts
E5100 R&O/ENG X X X X
E5102 R&O/ENG X X
• E5179 Priority 1- Performed by CBC Contractor
Building Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks /
E5179 OoD X X X X(East)
• E5233
• E5234 Priority 1- Performed by CBC Contractor
Priority 2- Performed by DPW Contractor
Buildings Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks / Ramps
/ Lifts
E5233 OoD X X X X(Southeast) E5234 OoD X X
• E5242
Priority 1- Performed by CBC Contractor
Building Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks / Ramps
/ Lifts
E5242 OoD X X
• E5951 Priority 1- Performed by CBC Contractor
Building Directorate Entryways /
Front Entrances
Emergency Exits Sidewalks Stairs Docks /
E5951 R&O X X X X X(East)
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
File details come from the government source that posted it. Updated .