This document appears to be a Technical Exhibit providing historical data and analysis on work orders for mechanical equipment at USAG Humphreys over a 3-year period from January 1, 2021 to December 31, 2023. The analysis covers minor works (less than $500) and major works (not less than $500) for various equipment categories including boilers, HVAC, kitchen equipment, and others. Key details include the total number of works, average costs per work order, and the highest cost work order reaching $130,000 for replacing a domestic hot water heater. The analysis also provides breakdowns of the types of boiler-related work such as replacements, preventive maintenance, efficiency testing, etc. This information appears to support a federal contract opportunity for Inspection, Testing and Maintenance (ITM) of Mechanical Equipment at USAG Humphreys, with a solicitation number of W91QVN24R0007. The proposal submission deadline is May 24, 13:00 hrs Korean Time.

View the file

Other files

File Type Posted
Revised Technical Exhibit 1-2_Air Conditioning Equipment.pdf PDF
AMENDMENT 3 W91QVN24R00070003.docx DOCX document
AMENDMENT 2 W91QVN24R00070002.docx DOCX document
ATTACHMENT 1 PWS (AMENDMENT 2).docx DOCX document
AMENDMENT W91QVN24R00070001.docx DOCX document
Technical Exhibit 2-8_Fan Coil Unit_Semi Annually.pdf PDF
Technical Exhibit 2-3_Boiler_Annually.pdf PDF
Technical Exhibit 3-5_Historical_Data_AC-Minor.pdf PDF
Technical Exhibit 1-1 Boiler.pdf PDF
Technical Exhibit 3-2_Historical_Data_Boiler-Major.pdf PDF
Technical Exhibit 3-4_Historical_Data_Gas_Major.pdf PDF
Technical Exhibit 1-8_Gas line.pdf PDF
Technical Exhibit 3-7_Historical-Data_AC-Minor-YongIn.pdf PDF
Technical Exhibit 1-9_Gas Equipment list in mechanical room.pdf PDF
Technical Exhibit 3-1_Historical-Data_Boiler-Minor.pdf PDF
Technical Exhibit 2-2_Boiler_Quarterly.pdf PDF
Technical Exhibit 4_IMCOM_Facility_Maintenance_Instruction.pdf PDF
Technical Exhibit 3-8_Historical-Data_AC-Minor-ICheon.pdf PDF
Technical Exhibit 2-6_Electric Hot Water Heater_Annually.pdf PDF
Technical Exhibit 1-6_Governor.pdf PDF
Technical Exhibit 1-7_Inside facility.pdf PDF
ATTACHMENT 1 PWS.docx DOCX document
SOLICITATION W91QVN24R0007.docx DOCX document
Technical Exhibit 2-12_Unit Heater_Semi Annually.pdf PDF
Technical Exhibit 2-13_Gas Infrared Tube Heater_Semi Annually.pdf PDF
Technical Exhibit 1-4_Heating Systems.pdf PDF
Technical Exhibit 2-4_Electric Heater_Semi Annually.pdf PDF
Technical Exhibit 2-11_Hot Water Storage Tank_Semi Annually.pdf PDF
Technical Exhibit 6_Garrison Accident Report.pdf PDF
Technical Exhibit 5_Excavation_Permit_Form.pdf PDF
Technical Exhibit 2-16_DX type_Quarterly.pdf PDF
TEs.PNG PNG image
Technical Exhibit 1-5_Unit Heater (Water Type).pdf PDF
Technical Exhibit 2-5_Electric Hot Water Heater_Monthly.pdf PDF
Technical Exhibit 2-10_Fuel Tank and Dike_Monthly.pdf PDF
Technical Exhibit 2-7_Energey Recovery Unit_Quarterly.pdf PDF
Technical Exhibit 3-3_Historical-Data_Gas-Minor.pdf PDF
Technical Exhibit 2-15_Chiller_Quarterly.pdf PDF
Technical Exhibit 3-6_Historical_Data_AC-Major.pdf PDF
Technical Exhibit 1-2_Air Conditioning Equipment.pdf PDF
Technical Exhibit 2-1_Boiler_Monthly.pdf PDF
Technical Exhibit 2-18_System HEAT PUMP AC_Quarterly.pdf PDF
Technical Exhibit 7_Safety Plan Review Checklist.pdf PDF
Technical Exhibit 3-9_Historical_Data_Kitchen-Minor.pdf PDF
Technical Exhibit 1-3_Kitchen Equipment and Mechanical Equipment.pdf PDF
Technical Exhibit 2-14_Warm Air Furnace_Semi Annually.pdf PDF
Technical Exhibit 2-17_Stand and Wall TYPE AC_Quarterly.pdf PDF
Technical Exhibit 3-10_Historical-Data_Kitchen-Major.pdf PDF
Technical Exhibit 2-9_Infrared Heater_Semi Annually.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Boiler Gas A/C Kitchen Eqip Remarks

Number of Minor Works for 3 Years

(Less than $500) 13,329ea 94ea 721ea 188ea

Number of Works/Month 370ea 3ea 20ea 5ea

Average Cost/EA $50 0 $211 $252

Subtotal Cost $663,325 0 $149,993 $46,614 Number of Major Works for

3 Years (Not less than $500)

212ea 4ea 147ea 50ea

Monthly Average Cost $55,980 $177,119 $15,974 $5,535

Number of Works/Month 6 0 4 1

Subtotal Cost $2,015,286 $177,119 $575,053 $199,274

Number of Total Works 13,541ea 98ea 868ea 238ea

Total Cost $2,678,611 $177,119 $725,046 $245,888

* Minor work's ceiling amount is expected to increase from $250 to $499 for New Contract

* Major work's cost range is expected to be from $500 to $150,000 for new contract.

* The highest cost (Unscheduled repair, Replace Domestic Hot Water Heater) has reached $130,000/EA during 01 Jan 2021 ~ 31 Dec 2023

* The number of works(Unscheduled repair) over $50,000 is 8ea (Replacing Boilers)

*Boiler Major Works

(1) Replacement of D.H.W.H : 81 ea

(2) Replacement of H.W.H.B : 79 ea

(3) ETC : 52 ea

*Boiler Minor Works

(1) Work the PM(Preventive Maintenance) including CM(Cleaning Maint) : Approx.10,300 ea

(2) Turn On/Off Heater : Approx. 600 ea

(3) Efficiency Test: Approx. 240 ea

(4) ETC: 2,189 ea

ANALYSIS OF WORK ORDERS FOR THE EQUIPMENT

01 Jan 2021 ~ 31 Dec 2023

Summary