Technical Exhibit 2-8_Fan Coil Unit_Semi Annually.pdf
PDF 106 KB Posted
- Solicitation number
- W91QVN24R0007
About this file
This document appears to be a technical exhibit detailing semi-annual maintenance tasks for a fan coil unit at a specific building location. The tasks include checking the air handler, cleaning the heat exchange core, replacing air filters, inspecting electrical wiring and components, lubricating bearings, and inspecting the fan and coil. The document also includes references to checking DDC control systems and performing corrosion control.
The related federal contract opportunity is for Inspection, Testing and Maintenance (ITM) of Mechanical Equipment at USAG Humphreys. The solicitation number is W91QVN24R0007, and the response date for proposal submission is May 24, 2024 at 13:00 hrs, Korean Time. The Department of the Army Materiel Command Army Contracting Command is the issuing agency.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building Number : Date:
Unit Number :
No. TASK DESCRIPTION CHECK N/A
1 Check air handler for proper operation prior to and after maintenance 정비전/후 에어 핸들러 작동 점검
2 Turn power off and on.
끄고 켜보기
Check Clean the heat-exchange core Vacuuming the core and washing it with soap and water, 난방코일 물 청소, 청결 확인
4 Remove and reinstall latch or finger-screw/bolted type access panel.
걸쇠 혹은 스크루/볼트 타입의 패널 열고 닫기
Clean or replace air filters washed with water( OA, Prefilter, Middum, bird screen). 필터 교환 및 물 청소
6 Check electrical wiring and connections. Tighten loose connections.
배선/연결 상태점검. 느슨한 연결 조이기
7 Inspect motor for excessive heat and noise 모터의 과열 심한 소음 점검
8 Lubricate and grease shaft bearings and motor as needed 필요에 따라 샤프트 베어링과 모터 윤활하기
9 Inspect fan for bent blades or unbalance, Belt tension and alignment, Corrosion.
팬의 날개와 불균형 점검, 벨트 손상, 강도, 균형, 부식 점검
10 Check and inspect coil, vacuum, drip pan, fan and clean 코일, 진공, 드립팬, 팬을 보고 닦기
11 Check piping, valves and 2/3way for leaks and malfunction.
파이프, 밸브, 2way/3way 누수 또는 동작상태 점검
12 Check for corrosion & perform corrosion control 부식점검/예방정비
13 Check and adjust automatic off/on systems, DDC control systems(set point/Flow). DDC 자동 온 오프 장치 점검/조정(셋포인트, 유량,풍량)
14 Clean up area around unit 유닛주위 청소
PM, Fan Coil Unit (FCU)
TOTAL HOUR:
PERFORMER:
COMMENT:
FCU
File details come from the government source that posted it. Updated .