This document appears to be a Solicitation for Inspection, Testing and Maintenance (ITM) of Mechanical Equipment at USAG Humphreys. The Department of the Army Materiel Command Army Contracting Command is seeking a contractor to provide these ITM services. The response date for proposal submission is 24 May 2024 at 13:00 hrs, Korean Time. The Solicitation and a Performance Work Statement are attached. Key objectives include providing ITM services for mechanical equipment at the facility. No award date, pricing terms, set asides, or incumbent information is provided.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. Job Description Submission date Total Cost
BUILDING ROOF TOP. CHANGE THE FILTER
HV-1C-3
29/Mar/23
REPLACEMENT THE GENERATOR FOR H.W.H.B 24/Nov/22
CHK. HV WORKNG 16/Mar/22
REPLACEMENT THE PIPE LINE FOR D.H.W.H 16/Oct/23
REPLACEMENT THE FLAME ROD FOR NO1. H.W.HB 18/Aug/23
REPLACEMENT THE FLAME ROD & IGNITOR FOR NO2. H.W.HB 18/Aug/23
REPLACEMENT THE I.E.W.H ( RM 216) 31/Aug/23
CHK. HV WORKNG 15/Jun/22
WORK THE PM ( PUT THE ANTI SCALE) 2/May/22
WORK THE PM 4/May/22
WORK THE PM 21/Dec/21
241_B#887_Replacement of E.H.W.H 21/Jun/22
WORK THE INSTALLING TEMP H.W.H.B 23/Nov/22
WORK FOR THE LEAKNG LINE FOR H.W.H.B 13/Jul/23
CHK. HV WORKNG 15/Jun/22
WORK THE LEAKING LINE FOR H.W.H.B 23/Nov/22
[UMCS] CHK BOILER 1/Feb/21
WORK THE BY PASS AND KEEP WARMING LINE 21/Mar/23
REPLACEMENT THE FILTER FOR H.V 29/Jun/22
WORK THE KEEP WARMING PIPE FOR H/D 14/Jul/22
CHK. HV WORKNG 15/Jun/22
KEEP THE WARMING LINE FOR D.H.W.H 16/Jan/23
WORK THE PIPE FOR D.H.W.H 2/Feb/21
262_B#5522_Replacement of I.E.W.H 26/Sep/22
CHK. MALFUNCTION OF H.W.H.B WORKNG 7/Jan/22
CHK. HV WORKNG 3/Jun/22
WORK FOR TEMPORARY D.H.W.H INSTALLATION 11/Oct/22
BOILER MINOR
CHK. HV WORKING 4/Apr/22
REPLACEMENT THERMOSTAT FOR D.H.W.H ( POSCO WARRANTY) 19/Jul/22
NO HOT WATER 12/Apr/21
WORK PM FOR W.A.F 12/May/21
ADJUST THE TEMP 78 F FOR SWIMMING POOL 20/Oct/22
REPLACEMENT THE CIR.PUMP FOR H.W.H.B 2/Mar/22
WORK THE LEAKING PIPE FOR H.W.H.B 22/Apr/22
WORK THE CM 19/Jun/23
REPLACEMENT THE FLAME ROD FOR H.W.H.B 27/Jun/22
WORK THE KEEP WARMING LINE FOR H.W.H.B 24/Nov/22
WORK FOR THE SUPPLY WATER PIPE AND STRAINER FOR UNIT HEATER 14/Apr/21
REPLACEMENT THE FILTER FOR THE RTU 27/Jul/23
WORK PM FOR H.W.H.B 4/Jun/21
KEEP THE WARM PIPE FOR H.W.H.B 6/Apr/22
CHK. HV WORKNG 16/Mar/22
REPLACEMENT THE FILTER FOR RTU 6/Jul/23
CHK. D.H.W.H WORKING 30/Sep/22
WORK THE PIPE FOR H.W.H.B ( LEAKAGE PIPE) 19/Apr/21
WORK THE LEAKING PIPE FOR D.H.W.H 27/Oct/21
WORK THE CM 22/Aug/22
BOILER #2 STOP WORKING, AT UNDERGROUND FLOOR 14/Mar/22
WORK THE CM 16/Aug/22
NO HOT WATER 7/May/23
REPLACEMENT THE TEMP SENSOR FOR H.W.H.B 10/Mar/22
CHK. HV WORKNG 15/Jun/22
WORK THE PM 17/Mar/22
WORK THE PM 17/Mar/22
WORK THE PM 17/Mar/22
WORK THE PM 17/Mar/22
WORK THE PM 1/Apr/22
WORK THE PM 1/Apr/22
WORK THE PM 1/Apr/22
WORK THE PM 4/Apr/22
WORK THE PM 4/Apr/22
WORK THE PM 4/Apr/22
WORK THE PM 4/Apr/22
WORK THE PM 4/Apr/22
WORK THE PM 4/Apr/22
WORK THE CM 17/May/22
WORK THE CM 23/Jun/22
WORK FOR THE PIPE FOR H.W.H.B 23/Apr/21
WORK THE KEEP WARMMING OF LINE of CIR. PUMP FOR H.W.H.B 24/Aug/22
REPLACEMENT THE PIPE AND GATE VALVE FOR H.W.H.B 16/Nov/21
WORK THE KEEP WARMING OF PIPE FOR H.W.H.B 31/Aug/21
WORK FOR THE LEKAING LINE FOR E.H.W.H 28/Feb/23
REPLACEMENT THE FILTER FOR H.V. 8/Mar/23
NO HEAT, ENTIRE ,TURN ON HEATER 13/Dec/21
WORK THE CM 8/Jul/22
WORK THE CM 15/Jul/22
CHK. H.W.H.B WORKING 16/Dec/22
CHK. HV WORKNG 15/Jun/22
CHK. HV WORKNG 15/Jun/22
REPLACEMENT THE FILTER FOR H.V 29/Jun/22
WORK THE KEEP WARM LINE FOR H.W.H.B 3/May/22
WORK THE CM 11/Aug/22
CHK. HV WORKING 4/Apr/22
WORK THE CM 17/Aug/22
WORK THE CM 24/Aug/22
WORK THE CM 25/Aug/22
WORK THE CM 25/Aug/22
WORK THE PM 29/Aug/22
WORK THE PM 29/Aug/22
WORK THE CM 30/Aug/22
WORK THE CM 30/Aug/22
WORK THE CM 1/Sep/22
WORK THE CM 13/Sep/22
WORK THE CM 20/Jun/22
WORK THE CM 12/May/22
WORK THE CM 29/Aug/22
WORK THE LEAKE PIPE FOR BY PASS, WATER SUPPLY 13/Apr/21
WORK THE RUST PIPE FOR H.W.H.B 14/Oct/21
WORK THE PM 8/Mar/22
WORK THE CM 23/Aug/22
WORK THE CM 12/May/22
WORK THE CM 13/May/22
WORK THE CM 18/May/22
WORK THE CM 16/Jun/22
WORK THE CM 22/Jun/22
WORK THE CM 6/Jul/22
WORK THE CM 7/Jul/22
WORK THE CM 14/Jul/22
WORK THE CM FOR H.W.H.B 20/Jul/22
WORK THE CM 27/Jul/22
WORK THE CM 27/Jul/22
WORK THE CM 2/Aug/22
WORK THE CM 3/Aug/22
WORK THE CM 4/Aug/22
WORK THE CM 8/Aug/22
WORK THE CM 9/Aug/22
WORK THE CM 10/Aug/22
REPLACEMENT THE SEAL OF NO.2 CIR.PUMP FOR H.W.H.B 22/Nov/21
WORK THE CM 30/Aug/22
RM E-206, C [BHS] I'D LIKE REQUEST TO REPAIR OR REPLACE THE RUSTY PART W 28/Mar/23
WORK THE PM 18/Mar/22
WORK THE PM 18/Mar/22
WORK THE PM 18/Mar/22
WORK THE PM 18/Mar/22
WORK THE CM 16/May/22
WORK THE CM 19/May/22
WORK THE PM 12/Jul/22
WORK THE CM 2/Aug/22
WORK FOR THE LEAKING LINE FOR H.W.H.B 23/Feb/23
RM MAINTENA EQUIPMENT SUPPORT FOR REPAIR 16/Feb/23
WORK PM FOR H.W.H.B 4/Jun/21
KWWP WARMING LINE OF CIR. PUMP FOR D.H.W.H 12/Jan/23
WORK THE PM 8/Mar/22
WORK THE PM 8/Mar/22
WORK THE CM 17/Aug/22
WORK THE CM 18/Aug/22
WORK THE CM 19/Aug/22
WORK THE CM 22/Aug/22
WORK THE CM 25/Aug/22
WORK THE CM 29/Aug/22
WORK THE CM 5/Sep/22
WORK THE CM 15/Sep/22
RM MECHANIC HOT WATER IS NOT COMING. THE DOMESTIC HOT WATER HEA 21/Jun/23
REPLACEMENT THE PIPELINE FOR D.H.WH. 4/Sep/23
WORK THE KEEP WARMING LINE FOR H.W.H.B. 1/Dec/22
WORK THE CM 2/May/22
WORK THE CM 2/Jun/22
WORK THE CM FOR H.W.H.B 9/Jun/22
WORK THE CM FOR D.H.W.H 9/Jun/22
WORK THE CM FOR H.W.H.B 13/Jul/22
WORK THE CM FOR H.W.H.B 18/Jul/22
WORK THE CM 1/Aug/22
WORK FOR THE ELEC LINE FOR D.H.W.H. ( OLD REPLACEMENT) 1/Dec/23
REPLACEMENT THE BURNER FOR D.H.W.H 26/Sep/23
BROWN WATER RUNNING 25/Feb/22
WORK THE GUIDE OF CHIMNEY LEAKING FOR H.W.H.B 15/Feb/23
WORK PM FOR D.H.W.H 20/May/21
WORK PM FOR D.H.W.H 20/May/21
CHK THE LEAKING OF CIR.PUMP FOR H.W.HB 18/Jun/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 17/Nov/21
TURN ON THE HEATER 19/Nov/21
TURN ON THE HEATER 19/Nov/21
WORK THE PM 17/Feb/22
WORK THE PM 17/Feb/22
WORK THE PM 17/Feb/22
WORK THE PM 17/Feb/22
WORK THE PM 17/Feb/22
WORK THE PM 18/Feb/22
WORK THE PM 18/Feb/22
WORK THE PM 18/Feb/22
WORK THE PM 18/Feb/22
WORK THE PM 18/Feb/22
WORK THE PM 18/Feb/22
WORK THE PM 10/Mar/22
WORK THE PM 10/Mar/22
WORK THE PM 10/Mar/22
WORK THE PM 10/Mar/22
WORK THE PM 10/Mar/22
WORK THE PM 16/Mar/22
WORK THE PM 16/Mar/22
WORK THE PM 16/Mar/22
WORK THE PM 16/Mar/22
WORK THE PM 16/Mar/22
WORK THE CM 30/Aug/22
WORK KEEP THE WARM PIPE FOR E.H.WH. 7/Apr/23
CHK. H.W.H.B WORKING 26/Aug/21
WORK THE PM 17/Mar/22
WORK THE PM 17/Mar/22
WORK THE PM 17/Mar/22
WORK THE CM 4/May/22
WORK THE CM 6/May/22
WORK THE CM 11/May/22
WORK THE CM 24/May/22
WORK THE CM 7/Jun/22
WORK THE CM 7/Jun/22
WORK THE CM 10/Jun/22
WORK THE CM 24/Jun/22
WORK THE CM 4/Jul/22
WORK THE CM 4/Jul/22
WORK THE CM 5/Jul/22
WORK THE CM 6/Jul/22
WORK THE CM 12/Jul/22
WORK THE CM 19/Jul/22
WORK THE CM FOR D.H.W.H 20/Jul/22
WORK THE CM 25/Jul/22
WORK THE CM 26/Jul/22
WORK THE CM 1/Aug/22
WORK THE CM 3/Aug/22
WORK THE CM 8/Aug/22
WORK THE PM 5/Oct/22
WORK THE PM FOR RTU 22/Nov/22
WORK THE PM FOR RTU 8/Dec/22
WORK THE PM FOR RTU 12/Dec/22
WORK PM FOR H.W.H.B 15/Jun/21
WORK PM FOR D.H.W.H 15/Jun/21
WORK PM FOR H.W+D.H (겸용) 1/Jul/21
WORK PM FOR H.W.H.B 29/Jul/21
WORK PM FOR NO.2 H.W.H.B 3/Aug/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
WORK THE PM 15/Feb/22
WORK THE PM 15/Feb/22
WORK THE PM 15/Feb/22
WORK THE PM 15/Feb/22
WORK THE PM 15/Feb/22
WORK THE PM 15/Feb/22
WORKT THE LEAKAGE PIPE OF CEILING FOR D.H.W.H 8/Apr/21
WORK THE KEEP WARMING PIPE FOR H.W.H.B 12/May/21
WORK FOR THE LINE FOR H.W.H.B 28/Nov/23
WORK THE CM 29/Aug/22
WORK THE CRADLE OF CIR. PUMP FOR D.H.W.H 24/Oct/23
WORK THE CONDENSATION PIPE FOR H.W.H.B 7/Apr/22
CHK H.W.H.B WORKING 8/Jan/21
WORK THE CM 11/May/22
WORK THE CM 25/May/22
WORK THE CM 29/Jun/22
WORK THE CM 5/Jul/22
WORK THE PM 19/Oct/22
KEEP THE WARMING LINE FOR D.H.W.H 13/Dec/22
WORK FOR THE STRAINER LINE FOR D.H.W.H 30/Oct/23
WATER LEAK FROM HOT WATER PIPE 28/Jun/21
RPR HEATING SYSTEM, SYSTEM IS NOT WORKING PROPRELY 1/Nov/21
REPLACEMENT THE FLAME EYE FOR NO.2. H.W.H.B 1/Dec/21
CHK. LEAKING OF CIR.PUMP FOR H.W.H.B 28/Apr/23
NO HOT WATER 9/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
WORK THE PM 11/Jan/22
WORK THE PM 7/Feb/22
WORK THE PM 8/Feb/22
WORK THE PM 8/Feb/22
WORK THE PM 8/Feb/22
WORK THE PM 8/Feb/22
WORK THE PM 9/Feb/22
WORK THE PM 9/Feb/22
WORK THE PM 9/Feb/22
WORK THE PM 10/Feb/22
WORK THE PM 10/Feb/22
WORK THE PM 10/Feb/22
WORK THE PM 10/Feb/22
WORK THE PM 10/Feb/22
WORK THE PM 11/Feb/22
WORK THE PM 11/Feb/22
WORK THE PM 11/Feb/22
WORK THE PM 11/Feb/22
WORK THE PM 7/Mar/22
WORK THE PM 7/Mar/22
WORK THE PM 7/Mar/22
WORK THE PM 7/Mar/22
WORK THE PM 7/Mar/22
WORK THE KEEP WARM PIPE FOR H.W.H.B 12/May/22
REPLACEMENT THE CHECK VALVE FOR D.H.W.B 11/Mar/21
WORK THE LEAKING LINE FOR D.H.W.H 15/Mar/23
WORK THE CM 16/Aug/22
WORK THE CM 17/Aug/22
WORK THE CM 18/Aug/22
WORK THE CM 23/Aug/22
RM UNDEFINE AN ALARM SOUND OCCURRED IN T 24/Aug/22
WORK THE PM 24/Aug/22
WORK THE CM 24/Aug/22
WORK THE CM 29/Aug/22
WORK THE CM 5/Sep/22
WORK THE CM 14/Sep/22
NO HEAT RM 142 24/Jan/23
WORK THE CM ( E-5 EA) 4/Aug/23
LEAKING IN MEC-RM 19/Dec/22
WORK THE CM 23/May/22
WORK THE CM 24/May/22
WORK THE CM 8/Jun/22
WORK THE CM 5/Jul/22
WORK THE CM 8/Jul/22
WORK FOR KEEP WARMING PIPE FOR H.W.H.B 11/May/21
WORK THE PM 2/Mar/22
WORK THE PM 2/Mar/22
WORK THE PM 2/Mar/22
WORK THE KEEP WARMING PIPE FOR H.W.H.B 17/May/21
WORK THE KEEP WARMMING LINE FOR D.H.W.H 30/Jun/22
CHK. NO.1 & No.3 ERU WORKING 2/Dec/21
REPLACEMENT THE FUEL PUMP FOR H.W.HB. 8/Mar/23
CHK H.W.H.B WORKING 27/Dec/21
NO HEAT 16/Dec/22
WORK THE CM 6/May/22
WORK THE PM 6/May/22
WORK THE CM 9/May/22
WORK THE CM 18/May/22
WORK THE CM 27/May/22
WORK THE CM 13/Jun/22
WORK THE CM 24/Jun/22
WORK THE CM 1/Jul/22
WORK THE CM FOR D.H.W.H 14/Jul/22
WORK THE CM FOR D.H.W.H 19/Jul/22
WORK THE CM 26/Jul/22
WORK THE CM 1/Aug/22
WORK THE PM 10/Aug/22
KEEP WARM LINE FOR H.W.H.B 21/Dec/22
WORK THE KEEP WARM PIPE FOR H.W.H.B 11/May/22
NO HOT WATER, 1 MEN'S SHOWER ROOM 3/Jun/21
WORK PM FOR D.H.W.H 13/Jul/21
WORK PM FOR D.H.W.H 14/Jul/21
WORK PM FOR H.W.H.B 14/Jul/21
WORK PM FOR H.W.H.B 22/Jul/21
WORK PM FOR D.H.W.H 3/Aug/21
WORK THE PM 14/Mar/22
WORK THE KEEP WARM PIPE FOR H.W.H.B 9/May/22
KEEP WARMING LINE FOR BY-PASS 23/Dec/22
WORK THE SUPPLY WATER VALVE FOR D.H.W.H 12/Aug/21
REPLACEMENT THE FILTER FOR HV 30/Mar/23
WORK THE CM 19/Sep/22
WORK THE LEAKING PIPE FOR D.H.W.H 16/Mar/22
CHK. ERU WORKING 28/Oct/21
WORK THE CM 25/May/22
WORK THE CM 3/Jun/22
WORK THE CM 28/Jun/22
WORK THE CM 29/Jun/22
WORK THE CM 9/Aug/22
CHK. H.W.H.B WORKING 21/Sep/22
CHK. THE IGNITOR FLUG WORKING FOR D.H.W.H 17/Oct/23
CHK. HV WORKING 4/Apr/22
WATER PIPE BUSTED 12/Jan/21
WORK CM FOR H.W.H.B 4/May/21
WORK CM FOR D.H.W.H 4/May/21
WORK CM FOR H.W.H.B 7/May/21
WORK PM FOR H.W.H.B 10/May/21
WORK PM FOR D.H.W.H 3/Jun/21
WORK PM FOR H.W.H.B 18/Jun/21
WORK PM FOR E.H.W.H 13/Jul/21
WORK THE PM 3/Mar/22
WORK THE PM 3/Mar/22
WORK THE PM 3/Mar/22
WORK THE PM 3/Mar/22
WORK THE PM 3/Mar/22
WORK THE PM 3/Mar/22
WORK THE PM 3/Mar/22
WORK THE PM 10/Mar/22
WORK THE PM 11/Mar/22
WORK THE PM 11/Mar/22
WORK THE PM 11/Mar/22
WORK THE PM 11/Mar/22
REPLACEMENT THE SAFETY VALVE FOR H.W.H.B AND D.H.W.H 28/Jan/21
HOT WATER IS NOT COMING OUT WELL THROUGH 19/Dec/23
RM 126 HEATING SHOP REQUEST TO KOHOM BHS 29/Dec/23
WORK THE CM 1/Sep/22
WORK THE CM 15/Sep/22
[GFM] REPLACEMENT THE D.H.W.H 11/Jan/23
NO HEAT 24/Jan/23
NO HEAT 25/Jan/23
CHK THE MALFUNTION OF H.W.H.B AND D.H.W.H 31/Jan/23
(TRF TO KOHOM B; LEAK FROM SMOKESTACK) R 10/Feb/23
WORK THE PM FOR RTU 15/Feb/23
WORK THE PM FOR RTU 15/Feb/23
WORK THE PM FOR RTU 15/Feb/23
WORK THE CM 3/May/22
WORK THE CM 20/May/22
WORK THE CM 20/May/22
REPLACEMENT THE AIR FILTER FOR NO.1 MAU 21/Jun/21
REPLACEMENT THE AIR FILTER FOR NO.2 MAU 21/Jun/21
REPLACEMENT THE AIR FILTER FOR NO.3 MAU 21/Jun/21
REPLACEMENT THE AIR FILTER FOR NO.4 MAU 21/Jun/21
REPLACEMENT THE AIR FILTER FOR NO.5 MAU 21/Jun/21
REPLACEMENT THE AIR FILTER FOR NO.6 MAU 21/Jun/21
LEAKING HOT WATER BOILER TANK 1/Mar/21
WORK THE CONDENSATION PIPE FOR CHIMNEY 8/Mar/21
NO HOT WATER 1/May/21
WORK CM FOR D.H.W.H 6/May/21
WORK CM FOR D.H.W.H 6/May/21
WORK PM FOR W.A.F 2/Jun/21
WORK PM FOR H.W.H.B 2/Jun/21
WORK PM FOR H.W.H.B 12/Jul/21
WORK PM FOR D.H.W.H 20/Jul/21
WORK THE LEAKING PIPE FOR UNIT HEATER 26/May/21
WORK THE PM 6/Jan/22
WOTK FOR THE CONDENSATION LINE FOR H.W.H.B 7/Dec/23
CHK. HV WORKING 4/Apr/22
NO HOT WATER 10/Feb/21
WORK THE KEEP WARMINGLINE FOR H.W.H.B 8/Nov/22
WORK PM ( MATERIAL FOR REPALCEMENT D.H.W.H) 26/Mar/21
CHK. D.H.W.H WORKING 25/Nov/22
REPLACEMENT THE HOOD VALVE FOR H.W.H.B 21/Feb/22
CHK MALFUNCTION FOR NO.2 ERU 15/Sep/21
WORK THE CM 2/May/22
WORK THE CM 3/May/22
WORK THE CM 17/Jun/22
CHK. H.W.H.B WORKING 14/Jul/22
CHK. HV WORKNG 7/Oct/22
WORK THE PM 12/Oct/22
WORK THE PM 12/Oct/22
CHK. HV WORKING FOR 1K,2K 1/Nov/22
WORK THE PM FOR RTU 21/Nov/22
WORK THE PM FOR RTU 19/Dec/22
WORK THE PM FOR RTU 20/Dec/22
WORK THE PM FOR RTU 21/Dec/22
WORK THE PM 22/Dec/22
BHS, CHK HV1A1,HV1A2,HV5A TRF FROM 22/Dec/22
WORK THE PM FOR RTU 22/Dec/22
WORK THE PM FOR RTU 26/Dec/22
WORK THE PM FOR RTU 26/Dec/22
WORK THE PM FOR RTU 27/Dec/22
WORK THE PM FOR RTU 27/Dec/22
NO HOT WATER IN THE RESTROOMS AND BAR AR 27/Dec/22
NO HOT WATER 28/Dec/22
WORK THE PM FOR RTU 28/Dec/22
WORK PM FOR E.H.W.H 17/Jun/21
WORK PM FOR H.W.H.B 23/Jun/21
WORK PM FOR E.H.W.H 3/Aug/21
CHK THE SMOKE IN MEC-RM 4/Jan/22
WORK THE KEEP WARMING LINE FOR D.H.W.H 28/Jun/22
CHK. HV WORKNG 16/Mar/22
REPLACEMENT THE COUPLE RING OF CIR.PUMP FOR H.W.H.B 19/Apr/21
KEEP THE WARMING LINE OF CHEMICLA FEED 13/Jan/23
NO HOT WATER 31/Oct/23
CHK. WORK THE CONDENSATION PIPE FOR D.H.W.H 22/Dec/21
REPLACEMENT THE HOT WATER TANK FOR D.H.W.H 18/Mar/21
NO HEAT 9/Mar/21
REPLACEMENT THE HOOD OF FUEL LINE FOR FUEL TANK 9/Feb/23
WORK THE KEEP WARM PIPE FOR H.W.H.B 6/May/22
WORK THE CM 19/Sep/22
WORK THE LINE OF SUPPLY WATER FOR D.H.W.H 2/Nov/22
NO HOT WATER (IN MALE SHOWER BOOTH) 28/Apr/22
WORK THE CM 17/May/22
REPLACEMENT THE AIR FILTER FOR MAU 15/Jun/21
CHK THE H.W.H.B. WORKING 5/Feb/21
WORK CM FOR H.W.H.B 4/May/21
WORK PM FOR H.W+D.H (겸용) 30/Jun/21
WORK PM FOR H.W.H.B 21/Jul/21
WORK PM FOR D.H.W.H 21/Jul/21
NO HOT WATER 18/Jan/22
WORK THE PM 4/Feb/22
WORK THE PM 4/Feb/22
WORK THE PM 4/Feb/22
WORK THE PM 4/Feb/22
WORK THE PM 4/Feb/22
WORK THE PM 4/Feb/22
WORK THE PM 4/Feb/22
WORK THE PM 7/Feb/22
WORK THE PM 7/Feb/22
WORK THE PM 7/Feb/22
NO HOT WATER 5/Mar/22
WORK THE PM 15/Mar/22
WORK THE PM 15/Mar/22
WORK THE PM 15/Mar/22
WORK THE PM 15/Mar/22
WORK THE PM 15/Mar/22
WORK THE PM 15/Mar/22
WORK THE PM 11/May/23
NO HEAT 24/Jan/23
CHK H.W.H.B WORKNG 13/Dec/21
REPLACEMENT THE AIR FILTER FOR NO.1 ERU 18/Jun/21
REPLACEMENT THE AIR FILTER FOR NO.2 ERU 18/Jun/21
REPLACEMENT THE AIR FILTER FOR NO.3 ERU 18/Jun/21
WORK THE KEEP WARMMING OF LINE FOR H.W.H.B 22/Aug/22
WORK PM FOR H.W.H.B 17/Jun/21
MALFUNCTION THE E.H.W.H 1/Sep/21
WORK FOR THE PIPE FOR H.W.H.B 29/Jan/21
CHK. D.H.W.H WORKING 7/Jul/22
REPLACEMENT THE AIR FILTER FOR ERU 21/Jun/21
WORK THE KEEPING WARM OF LINE FOR E.H.W.H 4/May/22
NO HEAT 22/Feb/22
WORK THE CM 1/Sep/22
WORK THE CM 13/Sep/22
WORK THE CM 13/Sep/22
NO HOT WATER 13/Sep/22
WORK THE CM 14/Sep/22
WORK THE CM 15/Sep/22
WORK THE CM 21/Sep/22
WORK THE CM 21/Sep/22
WORK THE PM 11/Jan/23
WORK THE PM 25/Jan/23
LEAKING OF PIPE LINE IN THE MECHANICAL ROOM 24/Feb/23
WORK THE PM 28/Feb/23
WORK PM FOR H.W.H.B 23/Jun/21
WORK PM FOR D.H.W.H 12/Jul/21
CHK. THE EFFICIENCY TEST FOR H.W.H.B 10/Feb/22
WORK FOR THE CHIMNEY LINE FOR H/D 16/Jun/22
REPLACEMENT THE FLOW SENSOR FOR H.W.H.B 9/Dec/21
REPLACEMENT THE FILTER FOR RTU 7/Jun/23
WORK THE LEAKING PIPE FOR D.H.W.H 15/Jun/21
REPLACEMENT THE AIR VENT (2 EA) FOR D.H.W.H 19/Jul/22
WORK THE CM 14/Jun/22
WORK THE CM 15/Jun/22
WORK THE CM 22/Jun/22
TURN ON THE HEATER 28/Oct/22
WORK THE CM 20/Sep/22
WORK THE PM 30/Mar/23
REPLACEMENT THE RELEAF VALVE FOR D.H.W.H 7/Dec/21
REPLACEMENT THE SEAL OF CIR. PUMP FOR D.H.W.H 26/Jan/21
WORK PM FOR H.W.H.B 9/Jul/21
PUT THE ANTI SCALE FOR H.W.H.B 6/Apr/22
WATER LEAKING FROM CEILING, HOT WATER LEAKING ISSUE 19/Oct/21
WOTK THE KEEP WARMING LINE FOR H.W.H.B 17/Mar/23
WORK PM FOR H.W.H.B 10/May/21
CHK. LEAKING FROM CEILING, RM 317 12/Jul/21
CHK MALFUNCTION OF D.H.W.H 25/Nov/21
[YOUON] NO HEAT WAREHOUSE 21/Jan/22
NO HEAT 24/Jan/23
CHK. HV WORKING 4/Apr/22
WORK THE PM 5/Apr/22
WORK THE PM 6/Apr/22
WORK THE PM 6/Apr/22
WORK THE PM ( PUT THE ANTI SCALE) 2/May/22
WORK THE PM ( PUT THE ANTI SCALE) 2/May/22
WORK THE PM ( PUT THE ANTI SCALE) 2/May/22
REPLACEMENT THE LWCO CIRCUIT BOARD FOR D.H.W.H 26/Sep/22
CHK. HIGHT-LIMIT SWITCH WORKING FOR H.W.H.B 21/Oct/21
PUT THE ANTISCALES FOR H.W.H.B 10/Feb/22
WORK THE PM 16/Mar/22
WORK THE PM 16/Mar/22
WORK FOR THE SUPPORT OF CIR.PUMP FOR H.W.H.B 29/Nov/23
MALFUNCTION FOR NO.1 D.H.W.H 30/Apr/21
WORK PM FOR H.W.H.B 20/May/21
HEAT ON 1F HALLWAY 20/Oct/21
LEAKING THE PIPE FOR H.W.H.B 13/May/21
WORK THE PM 29/Nov/23
BHS, CHK HRU-1 GAS BURNER CONTROLLER. UM 20/Dec/23
BHS, HRU-1 GAS BURNER CONTROLLER CHECK 20/Dec/23
WORK THE PM FOR RTU 11/Jan/23
REPLACEMENT THE TRNSFORMENR AND BURNER CONTROL FOR D.H.W.H 23/Aug/21
WORK THE DRAIN PIPE FOR HOT WATER TANK 18/Jun/21
WATER LEAKING ON BOILER 14/Jan/21
WORK THE PM 13/Feb/23
WORK THE PM 20/Feb/23
WORK THE PM 22/Feb/23
WORK THE CORRODED PIPE FOR D.H.W.H 26/Sep/23
WORK THE CONDENSATION PIPE FOR D.H.W.H 12/Jul/21
WORK THE PM 7/Dec/23
WORK THE PM 7/Dec/23
CHK. LEAKGAE OF CIR. PUMP FOR D.H.W.H 15/Mar/21
WORK CM FOR D.H.W.H 3/May/21
WORK PM FOR NO.1 H.W.H.B 6/Jul/21
WORK THE PM 24/Sep/21
BOILER SOOT PROBLEM 11/Apr/22
NO HOT WATER 11/Apr/22
WORK THE CM FOR D.H.W.H 27/Jun/22
WORK THE PM 21/Jul/22
HOT WATER DOES NOT COME OUT PROPERLY, AND THE BOILER FOR HOT WAT 21/Nov/22
REPLACEMENT THE FUEL PUMP FOR H.W.H.B 21/Nov/23
WORK THE CM 23/Aug/22
CHK. E.H.W.H WORKING 23/Sep/22
NO HOT WATER 25/Apr/22
CHK. THE TRANSFORMER WORKING FOR D.H.W.H 30/Dec/21
MAINTAIN HOT WATER TRMPURATUER(KIS POOL IN OUTDOOR POOL) 3/Sep/21
REPLACEMENT THE SEAL OF CIR; PUMP FOR H.W.H.B 30/Jan/23
REPLACEMENT THE LWCO CIRCUIT BOARD FOR D.H.W.H 26/Sep/22
REPLACEMENT THE AIR FILTER FOR M.A.U 12/Mar/21
WORK CM FOR W.A.F 4/May/21
WORK QC PM 4/Aug/21
WATER LEAKING FROM CEILING, AT BAY #13 11/Aug/21
REPLACEMENT THE IGNITOR FOR NO.1 D.H.W.H 1/Nov/21
NO HOT WATER 25/Nov/21
TURN ON THE BOILER (ARTER VALVE REPLACEMENT) 17/Dec/21
WORK THE WELDING FOR H.W.H.B 26/Jan/22
[YOUONE] NO HEAT FROM CEILING, RM 127,128A 4/Mar/22
TURN ON BOILER 7/Jan/21
WORK PM FOR H.W.H.B 12/Apr/22
WORK THE PM 10/Oct/23
WORK THE CM 8/May/23
WORK THE PIPE FOR E.H.W.H 26/Jan/21
REPLACEMENT THE TRANSFORMER FOR H.W.H.B 27/Dec/21
TURN ON THE HEATR 13/Oct/22
WORK THE PM 16/Feb/23
WORK THE PM 16/Feb/23
PUT THE ANTI SCALE FOR H.W.H.B 20/Apr/22
WORK THE PM ( PUT THE ANTI SCALE) 2/May/22
WORK PM FOR NO.2 H.W.H.B 6/Jul/21
WORK THE PM 25/Feb/22
BHS, BOILER ALARM. UMCS_MUN YEONGJEUNG 0 8/Nov/23
HEATER INOP (BLOW AIR FROM AC) :: HVAC : 9/Mar/23
REPLACEMENT THE TEMP. SENSOR FOR D.H.W.H 19/Jul/22
REPLACEMENT THE COUPLE RING OF CIR. PUMP FOR NO.2 H.W.H.B 31/Aug/23
WORK FOR KEEP WARMING PIPE FOR H.W.H.B 7/May/21
REPLACEMENT THE FILTER FOR RTU 20/Jun/23
WORK THE RUST PIPE FOR D.H.W.H 13/Oct/21
WORK PM 23/Mar/21
TURN ON THE HEATER 16/Nov/21
REPLACEMENT THE BLOWR FAN FOR NO.3 MAU 13/Jan/23
WORK THE KEEP WARMING LINE FOR H.W.HB 2/Dec/22
WORK THE PM 28/Sep/21
(FOR KOHOM BOILER)WATER DRIPPING FROM TH 9/Aug/22
WORK THE PM 20/Oct/22
REPLACEMENT THE TEMP. SENSOR FOR NO.1 E.H.W.H 2/Jul/21
CHK . H.W.H.B WORKING/ YOUONE - HWANG INCHON 23/Feb/23
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
NO HOT WATER 3/May/21
CHK THE BURNER WORKING FOR H.W.H.B 29/Dec/21
REPLACEMENT THE RELAY OF CIR. PUMP FOR H.W.H.B 28/Oct/22
NO HEAT 22/Feb/22
REPLACEMENT THE FILTER FOR H.W.H.B 18/Oct/21
WORK THE KEEP WARM OF SUPPLY PIPE 10/Jan/22
BOILER ALARM "LOW FUEL" 28/Jun/21
CHK THE CIRCULATION WATER HEATER 22/Dec/21
REPLACEMENT THE FUEL PUMP FOR D.H.W.H 13/Jan/23
WORK THE PIPE FOR D.H.W.H 13/Jan/21
WATER TEMPERATURE IS LOW, AT SWIMMING POOL 19/May/22
WORK PM FOR H.W.H.B 13/Jul/21
CHK. THOUCH PANEL WORKING FOR D.H.W.H 27/Oct/21
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
CHK. WAF WORKING 23/Nov/21
HUGE WATER LEAKS FROM BOOSTER PUMP AT 1F MECHANICAL ROOM 17/Mar/23
CHK WAF WORKING 28/Jan/21
WORK THE PIPE FOR D.H.W.H ( KEEP WARM) 1/Apr/21
WORK THE KEEP WARMING FOR EX TANK 26/Sep/22
WORK PM 5/Jan/21
CHK. H.W.H.B WORKING 12/Jan/22
WORK THE PM 20/Feb/23
REPLACEMENT THE COUPLE RING OF CIR.PUMP FOR H.W.H.B 12/Mar/21
REPLACEMENT THE AIR FILTER FOR H.W.H.B 8/Jan/21
WORK PM 25/Feb/21
WORK THE INSTALL OF CHMICAL FEEDER FOR H.W.H.B 11/Jun/21
WORK THE PM 28/Sep/21
NO HOT WATER 30/Sep/21
[YOUONE] ALARM BURNER OF D.H.W.H IS NOT WORKING 19/Apr/22
WORK THE PM 15/Nov/23
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
WORK THE PM 17/Oct/22
NO HEAT 5/Nov/23
WORK THE PM 21/Nov/23
WORK THE PM 21/Nov/23
TURN ON THE MAU( RTU) 21/Nov/23
WORK THE PM 27/Sep/21
REPLACEMENT OF THE FILTER FOR RTU 17/Aug/23
HEATING SYSTEM ISN'T WORKING PROPERLY. 1/Feb/23
NO HOT WATER 25/Apr/23
KEEP THE WARMING LINE OF PUMP & H.W.HB 13/Jan/23
WORK THE KEEP WARM PIPE FOR H.W.HB AND D.H.W.H 9/Nov/21
NEED REPLACE INSULATION PIPE THAT WHY MOLD IN RM: 107 2/Nov/23
NO HOT WATER 7/Nov/22
WORK THE PM 16/Feb/23
CHK. HV WORKING 4/Apr/22
CHK THE LEAKING OF OIL LINE 1/Dec/21
CHK.THE LEAKING OF HEATING EXCHANGER FOR D.H.W.H 12/Oct/22
WOTK FOR THE PIPE FOR D.H.W.H ( KEEP WARMING) 30/Mar/21
HEATING PIPE LINE LEAKING 20/Aug/21
HOT WATER IS NOT AVAILABLE 8/Jun/22
REPLACEMENT THE DEMAND VLAVE OF SUPPLY WATER 31/Mar/23
REPLACEMENT THE EXHAUST SENDOR FOR NO2. H.W.H.B 5/Dec/23
WATER CIRCULATION PUMP 23/Feb/21
REPLACEMENT THE TEMP SENSOR FOR D.H.W.H 10/Jun/22
WORK THE PM 28/Dec/23
[YOUON] NO HEAT 21/Jan/22
REPLACEMENT THE SEAL OF CIR. PUMP FOR D.H.W.H 3/Mar/23
KEEP THE WARMING PIPE FOR D.H.WH. 30/Jan/23
[UMCS] CHK BOILER WORKING 11/Jan/21
NO HOT WATER 11/May/21
MALFUNCTION THE NO.1 ERU 22/Jun/21
WORK PM FOR D.H.W.H 27/Jul/21
NO HEAT 14/Nov/21
NO HOT WATER 10/Jan/22
NO HEAT 1/Feb/22
REPLACEMENT THE COUPLE RING OF CIR. PUMP FOR D.H.W.H 21/May/21
CHK. LEAKING OF PIPE FOR D.H.W.H 7/Sep/21
REPLACEMENT THE AIR VENT FOR H.W.H.B 30/Jan/23
WORK PM FOR D.H.W.H 30/Aug/21
CHK. D.H.W.H WORKING 2/Jun/22
WORK THE PM 21/Nov/23
REPLACEMENT THE AIR VENT FOR H.W.H.B 18/Oct/22
WORK THE PM 10/May/22
WORK THE PM 23/Nov/23
NO HEAT 3/Dec/23
REPLACEMENT THE FILTER FOR RTU 7/Jun/23
WORK THE LEAKING LINE AND AIR VENT REPALCEMENT FOR H.W.H.B 30/Nov/22
WORK PM FOR NO.1 D.H.W.H 3/Sep/21
WORK PM FOR NO.2 D.H.W.H 3/Sep/21
WORK PM ( MATERIAL FOR REPALCEMENT D.H.W.H) 26/Mar/21
REQUEST FOR THE KEEPING WARM OF D.H.W.H BY COR 7/Nov/23
CHK BOILER ALARM 12/Mar/21
NO HEAT 25/Dec/21
REPLACEMENT THE SEAL OF CIR. PUMP FOR H.W.H.B 27/Nov/23
REPLACEMENT THE LIMIT SEONSOR FOR NO.1 H.W.H.B 1/Sep/23
WORK THE PM FOR BOILER 7/Dec/23
WORK THE PM 18/Aug/21
WORK THE CM 3/May/22
NO HEAT 27/Dec/21
REPLACEMENT THE FILTER FOR H.V. 8/Mar/23
CHK. D.H.W.H WORKING 17/Mar/23
FROZEN FOR THE CONDENSATION PIPE 4/Jan/21
REPLACEMENT THE IGNITOR FOR D.H.W.H 19/Apr/21
WORK THE KKEP WARM LINE FOR H.W.H.B 4/Nov/22
WORK THE CM 16/Aug/23
NO HOT WATER 20/Nov/23
WORK THE CM 14/Sep/22
WORK THE CM 20/Sep/22
WORK THE PM 26/Jan/23
NO HOT WATER 13/Mar/23
WORK THE PM FOR RTU 1/Aug/23
WORK THE CM (D, E-2EA) 8/Aug/23
WORK THE CM (E-5 EA) 9/Aug/23
REPLACEMENT THE TEMP SENSOR FOR D.H.W.H 22/Dec/21
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
[YOUONE] BOILER FAULT ERROR 21/Jan/22
REPLACEMENT OF THE DEMAND VALVE FOR SUPPLY WATER 17/Aug/23
WORK THE PIPE FOR H.W.H.B 26/Jan/21
REPLACEMENT THE LIMIT SEONSOR FOR NO.2 H.W.H.B 1/Sep/23
REPLACEMENT THE LIMIT SEONSOR FOR NO.2 H.W.H.B 1/Sep/23
WORK FOR KEEP WARMING PIPE FOR H.W.H.B 7/May/21
WORK THE KEEP WARMING PIPE FOR D.H.W.H 26/May/21
WORK THE PM 16/Mar/22
WORK PM FOR NO.1 H.W.H.B 25/Aug/21
WORK PM FOR NO.2 D.H.W.H 25/Aug/21
WORK THE CM FOR D.H.W.H & E.H.W.H 17/May/22
WORK THE PM 18/May/22
WORK THE PM 18/May/22
TOO HOT 24/Oct/22
CHK THE LEAKING OF PIPE FOR H.W.H.B 28/Nov/22
WORK THE PM 28/Nov/23
WORK THE PM FOR THE RTU 21/Aug/23
WORK THE PM FOR THE BOILER 21/Aug/23
WORK THE PM FOR THE BOILER 22/Aug/23
WORK THE PM FOR THE BOILER 23/Aug/23
WORK THE PM FOR THE BOILER 24/Aug/23
WORK THE PM FOR THE RTU 28/Dec/23
WORK THE PM FOR THE BOILER 28/Dec/23
WORK THE CM 20/Sep/22
WORK THE CM 21/Sep/22
WORK THE CM 21/Sep/22
WORK THE LEAKING PIPE FOR D.H.W.H 12/Jan/23
WORK THE CM 25/May/23
WORK THE PM 18/Jul/23
WORK THE PM FOR THE RTU 20/Jul/23
WORK THE PM FOR BOILER 1/Aug/23
WORK THE CM (E-5 EA) 10/Aug/23
WORK THE CM (D, E-3 EA) 14/Aug/23
REPLACEMENT THE EXHAUST TEMP. SENSOR FOR H.W.H.B 31/Mar/21
CHK THE NOISE IN MEC-RM 27/Jul/21
WORK PM FOR D.H.W.H 27/Jul/21
WORK PM FOR D.H.W.H 27/Jul/21
TURN ON THE HEATER 16/Nov/21
ALARM IS BEEPING, MECHANICAL ROOM 18/Nov/21
WORK THE PM 6/Dec/21
REPLACEMENT THE UV SENSOR FOR H.W.H.B 18/Feb/21
REPLACEMENT THE COUPLE RING OF CIR.PUMP FOR D.H.W.H 11/Mar/21
REPLACEMENT THE GATE VALVE OF PIPE FOR D.H.W.H 15/Mar/22
WORK THE SUPPORT PIPE FOR GAS LINE 7/Mar/23
CHK. RELAY WORKING FOR D.H.W.H 21/Oct/21
REPLACEMENT THE THOUCH BOARD FOR D.H.W.H 27/Oct/21
REPLACEMENT THE RELAY FOR W.A.F 24/Nov/21
WORK PM FOR D.H.W.H 17/Aug/21
LEAKING THE PIPE LINE IN MEC-RM 1/Sep/23
WORK PM FOR H.W.H.B 30/Aug/21
WORK PM FOR D.H.W.H 30/Aug/21
WORK PM FOR NO.1 H.W + D.H 9/Sep/21
WORK PM FOR H.W.H.B 9/Sep/21
WORK PM FOR D.H.W.H 9/Sep/21
WORK THE CM 4/May/22
WORK THE CM 10/May/22
WORK THE CM 28/Jul/22
WORK THE CM 9/Aug/22
WORK THE PM 26/Dec/22
TURN ON THE HEATING 21/Oct/21
WORK THE INSULATION OF ANTISCALE PIPE FOR H.W.H.B 23/Mar/21
WORK THE CM 10/May/22
CHK. HV WORKING 4/Apr/22
NO HEAT 9/Feb/21
REPLACEMENT THE INJECTOR PLUG FOR D.H.W.H 26/Apr/21
REPLACEMENT THE FUSE FOR E.H.W.H 28/Sep/22
WOTK THE KEEP WARMING OF PIPE FOR D.H.W.H 27/Aug/21
WORK THE CM (D-2 EA) 3/Aug/23
CHK. D.H.W.H WORKING 19/Jan/22
WORK THE PM 5/Jan/22
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
REPLACEMENT THE AIR FILTER FOR MAU 14/Jun/21
REPLACEMENT THE AIR FILTER FOR MAU 14/Jun/21
WORK PM 25/Jan/21
WORK THE LAGGING OF PIPE FOIR WATER TANK 15/Feb/21
WORK QC PM 4/Aug/21
WORK PM FOR NO.2 D.H.W.H 5/Aug/21
WORK THE CONDENSATION PIPE FOR D.H.W.H 18/Mar/21
WORK THE PM 8/Nov/23
WORK THE PM 28/Nov/23
WORK THE PM 7/Dec/23
WORK THE PM FOR THE BOILER 26/Sep/23
WORK THE PM FOR THE RTU 27/Sep/23
WORK THE PM FOR THE BOILER 27/Sep/23
REPLACEMENT THE FILTER FOR H.V. 8/Mar/23
NO HEAT 13/Feb/23
WOTK THE PM 18/Aug/21
NO HOT WATER IN NTNG SHOP 29/Mar/22
WORK THE CM 31/May/22
WORK THE PM 29/Dec/22
WORK THE PM 30/Sep/21
WORK PM FOR D.H.W.H 29/Jun/21
WORK THE CONDENSATION PIPE FOR D.H.W.H 6/Apr/21
REPLACEMENT THE D.H.W.H (Old Boiler) 14/Jun/23
WORK THE PM FOR RTU 11/Oct/23
WORK THE PM FOR RTU 8/Nov/23
CHK. THE WORKING OF CON. CIR. PUMP OF D.H.W.H 14/Aug/23
WORK FOR THE CONDENSATION PIPE FOR D.H.W.H 1/Aug/23
REPLACEMENT THE FILTER FOR RTU 12/Jun/23
WORK THE PM FOR THE BOILER 28/Aug/23
WORK THE PM FOR THE BOILER 29/Aug/23
WORK THE PM FOR THE BOILER 30/Aug/23
WORK THE PM FOR THE RTU 31/Aug/23
WORK THE PM FOR THE BOILER 31/Aug/23
WORK THE PM FOR RTU 4/Sep/23
WORK THE PM FOR BOILER 4/Sep/23
WORK THE PM FOR BOILER 5/Sep/23
WORK THE PM FOR BOILER 6/Sep/23
WORK THE PM FOR BOILER 7/Sep/23
WORK THE PM FOR BOILER 11/Sep/23
WORK THE PM FOR BOILER 12/Sep/23
WORK THE PM FOR BOILER 13/Sep/23
WORK THE PM FOR BOILER 14/Sep/23
WORK THE PM FOR BOILER 18/Sep/23
WORK THE PM FOR RTU 18/Sep/23
WORK THE PM FOR BOILER 19/Sep/23
WORK THE PM FOR RTU 19/Sep/23
WORK THE PM FOR BOILER 20/Sep/23
WORK THE PM FOR RTU 20/Sep/23
WORK THE PM FOR RTU 21/Sep/23
WORK THE PM FOR BOILER 21/Sep/23
WORK THE PM FOR THE RTU 25/Sep/23
WORK THE PM FOR THE BOILER 25/Sep/23
WORK THE PM FOR RTU 4/Oct/23
WORK THE PM FOR BOILER 4/Oct/23
WORK THE PM FOR BOILER 10/Oct/23
WORK THE PM FOR RTU 12/Oct/23
WORK THE PM FOR RTU 16/Oct/23
WORK THE PM FOR RTU 17/Oct/23
WORK THE PM FOR RTU 18/Oct/23
WORK THE PM FOR RTU 19/Oct/23
WORK THE PM FOR RTU 19/Oct/23
WORK THE PM FOR BOILER 23/Oct/23
WORK THE PM FOR RTU 23/Oct/23
WORK THE PM FOR BOILER 24/Oct/23
WORK THE PM FOR RTU 24/Oct/23
WORK THE PM FOR BOILER 26/Oct/23
WORK THE PM FOR RTU 26/Oct/23
WORK THE PM FOR THE BOILER 30/Oct/23
WORK THE PM FOR THE RTU 31/Oct/23
WORK THE PM FOR THE BOILER 31/Oct/23
WORK THE PM FOR RTU 6/Nov/23
WORK THE PM FOR BOILER 6/Nov/23
WORK THE PM FOR RTU 7/Nov/23
WORK THE PM FOR BOILER 7/Nov/23
WORK THE PM FOR RTU 9/Nov/23
TOO COLD 11/Nov/23
WORK THE PM FOR RTU 13/Nov/23
WORK THE PM FOR RTU 14/Nov/23
WORK THE PM FOR RTU 15/Nov/23
WORK THE PM FOR RTU 16/Nov/23
WORK THE PM FOR RTU 16/Nov/23
WORK THE PM FOR BOILER 20/Nov/23
WORK THE PM FOR RTU 20/Nov/23
WORK THE PM FOR BOILER 21/Nov/23
WORK THE PM FOR RTU 21/Nov/23
WORK THE PM FOR RTU 22/Nov/23
WORK THE PM FOR RTU 23/Nov/23
WORK THE PM FOR RTU 27/Nov/23
WORK THE PM FOR RTU 28/Nov/23
WORK THE PM FOR THE RTU 29/Nov/23
WORK THE PM FOR THE RTU 30/Nov/23
WORK THE PM FOR THE BOILER 30/Nov/23
WORK THE PM FOR RTU 4/Dec/23
WORK THE PM FOR BOILER 4/Dec/23
WORK THE PM FOR RTU 5/Dec/23
WORK THE PM FOR BOILER 6/Dec/23
WORK THE PM FOR BOILER 7/Dec/23
WORK THE PM FOR RTU 7/Dec/23
WORK THE PM FOR RTU 11/Dec/23
WORK THE PM FOR RTU 12/Dec/23
WORK THE PM FOR RTU 13/Dec/23
WORK THE PM FOR RTU 14/Dec/23
WORK THE PM FOR BOILER 18/Dec/23
WORK THE PM FOR RTU 18/Dec/23
BOILER WAS OFF 26/Dec/23
HEATING PIPE IS LEAKING 23/Dec/23
WORK THE CM 8/Sep/22
NO HOT WATER 9/Sep/22
WORK THE PM 14/Sep/22
RM 231, 230 WT, MEN'S AND WOMEN'S BATHRO 18/Jan/23
WORK THE PM FOR RTU 18/Jan/23
NO HOT WATER 24/Jan/23
WORK THE PM FOR BOILER 25/Jan/23
WORK THE PM FOR BOILER 26/Jan/23
WORK THE PM FOR RTU 14/Feb/23
WORK THE PM FOR BOILER 23/Feb/23
NO HEAT 27/Feb/23
WORK THE PM FOR BOILER 27/Feb/23
WORK THE PM FOR BOILER 28/Feb/23
ALL BLDG IS NOT WORKING HEATER :: HVAC : 14/Mar/23
WORK THE PM FOR BOILER 29/Mar/23
WORK THE PM FOR BOILER 30/Mar/23
WORK THE PM FOR BOILRT 20/Apr/23
WORK THE PM FOR RTU 2/May/23
WORK THE PM FOR RTU 3/May/23
WORK THE CM 4/May/23
WORK THE CM 4/May/23
WORK THE CM 8/May/23
NO HOT WATER 15/May/23
BOILER LEAKING WATER 6/Jul/23
WORK PM 22/Feb/21
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
PUT THE ANTI SCALE FOR H.W.H.B 16/Mar/22
WORK PM FOR NO.1 E.H.W.H 3/Sep/21
WORK PM FOR NO.2 E.H.W.H 3/Sep/21
NO HOT WATER 14/Jan/21
CHK. ALARM FOR H.W.H.B [UMC] 18/May/21
WORK PM FOR H.W.H.B 10/Jun/21
WORK PM FOR D.H.W.H 21/Jun/21
WORK PM FOR D.H.W.H 28/Jun/21
WORK QC PM 1/Jul/21
WORK PM FOR H.W.H.B 6/Aug/21
[UMCS]CIRCULATION PUMP FOR HEAT, 21/Dec/21
WORK PM FOR D.H.W.H 1/Sep/21
CHK. E.H.W.H WORKING ( CHK. TEMP. OF E.H.W.H) 13/Apr/23
WORK THE PM 25/Sep/23
REPLACEMENT THE SEAL & COUPLE RING OF CIR.PUMP FOR H.W.HB. 21/Feb/23
WORK THE KEEP WARMING PIPE FOR H.W.H.B 21/Jun/21
WORK THE CM 10/May/23
REPLACEMENT THE UV SENSOR FOR H.W.H.B 19/Nov/21
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
WORK THE PM 14/Aug/23
WORK THE PM FOR RTU 5/Dec/22
CHK. D.H.W.H WORKING 23/Sep/22
WORK PM FOR W.A.F 17/Aug/21
WORK PM FOR E.H.W.H 17/Aug/21
WORK PM FOR H.W.H.B 24/Aug/21
WORK PM FOR E.H.W.H 24/Aug/21
WORK PM FOR H.W.H.B 26/Aug/21
WORK PM FOR H.W.H.B 31/Aug/21
WORK PM FOR E.H.W.H 31/Aug/21
CHK. HV WORKING 4/Apr/22
CHK. HV WORKNG 12/Apr/22
CHK. HV WORKNG 12/Apr/22
WORK THE CM 2/May/22
WORK THE CM 16/May/22
WORK THE PM 19/May/22
WORK THE CM 23/May/22
WORK THE CM 24/May/22
WORK THE CM 14/Jun/22
WORK THE CM 15/Jun/22
WORK THE PM 15/Jun/22
WORK THE CM 11/Jul/22
WORK THE PM FOR RTU 3/Nov/22
WORK THE PM FOR RTU 7/Nov/22
WORK THE PM FOR RTU 8/Nov/22
WORK THE PM FOR RTU 9/Nov/22
WORK THE PM FOR RTU 10/Nov/22
WORK THE PM (BOILERS) 28/Nov/22
WORK THE PM (BOILERS) 28/Nov/22
WORK THE PM (BOILERS) 29/Nov/22
WORK THE PM FOR RTU 1/Dec/22
WORK THE PM 5/Dec/22
WORK THE PM FOR BOILERS 7/Dec/22
WORK THE PM FOR RTU ( BOILER) 29/Dec/22
BOILER WATER HEATER DOES NOT WORK. 13/Feb/23
LEAKING THE PIEP ( FIRE ALARM GOES OFF) 4/Mar/22
REPLACEMENT THE FILTER FOR RTU 19/Jun/23
WORK THE PM 17/Jan/22
REPLACEMENT THE FUSE OF EXHAUST GAS FOR D.H.W.H 4/Jan/22
CHK. H.W..H.B WORKING 9/Feb/22
WORKING THE CONDENSATION LINE FOR THE D.H.W.H 11/Jul/23
CHK. H.W.H.B WORKING 26/Jul/22
NO HOT WATER 23/May/23
WORKT THE LEAKAGE PIPE OF CEILING FOR D.H.W.H 8/Apr/21
NO HEAT 17/Feb/21
REPLACEMENT THE COUPLE RING OF CIR.PUMP FOR D.H.W.H 24/Dec/21
WORK THE PM 12/Dec/23
WOTK THE CHIMNEY FOR H.W.H.B 28/Oct/21
WORK THE CM 23/Aug/22
WORK THE CM 8/Sep/22
WORK THE CM 8/Sep/22
WORK THE CM 19/Sep/22
CHK. LEAKING OF CEILING LINE 1/May/23
WORK THE PM 18/Jul/23
NO HEAT ON 2/Jan/21
NO HOT WATER 3/Jan/21
NO HOT WATER 2/Feb/21
WORK CM FOR E.H.W.H 4/May/21
WORK PM FOR D.H.W.H 13/May/21
WORK PM FOR D.H.W.H 31/May/21
WORK PM FOR E.H.W.H 9/Jun/21
WORK PM FOR D.H.W.H 22/Jun/21
WORK PM FOR NO.2 H.W.H.B 19/Jul/21
WORK PM FOR NO.3 H.W.H.B 19/Jul/21
WORK PM FOR NO.4 H.W.H.B 19/Jul/21
WORK PM FOR NO.3 D.H.W.H 19/Jul/21
WORK PM FOR D.H.W.H 30/Jul/21
WORK PM FOR H.W.H.B 2/Aug/21
WORK PM FOR D.H.W.H 4/Aug/21
WORK PM FOR H.W.H.B 6/Aug/21
WORK PM FOR H.W.H.B 9/Aug/21
WORK PM FOR E.H.W.H 9/Aug/21
WORK PM FOR W.A.F 11/Aug/21
WORK PM FOR W.A.F 12/Aug/21
WORK PM FOR E.H.W.H 12/Aug/21
WORK PM FOR D.H.W.H 12/Aug/21
CHK. HV WORKNG 16/Feb/22
WORK THE PM 4/Mar/22
WORK THE PM 4/Mar/22
WORK THE PM 4/Mar/22
WORK THE PM 4/Mar/22
WOTK FOR THE PIPE FOR D.H.W.H ( KEEP WARMING) 30/Mar/21
WORK THE CM (H-2A/ D) 15/Sep/23
NO HEAT 12/Jan/22
REPLACEMENT THE TRANSFORMER FOR H.W.H.B 14/Jan/22
REPLACEMENT THE COUPLE RING OF CIR. PUMP FOR H.W.HB 11/Dec/23
WORK THE PM 14/Nov/23
WORK THE PM 12/Dec/23
WORK THE PM 27/Sep/21
NO HOT WATER 24/Nov/21
WORK THE PM 30/Nov/21
WORK THE PM 8/Mar/23
WORK THE KEEP WARMING PIPE FOR H.W.H.B 26/Sep/22
WORK THE REPLACEMENT OF PIEP FOR EX-TANK. H.W.H.B 16/Dec/21
WORK THE PM 7/Nov/23
NO HOT WATER, PAN CAKE HOUSE 19/Oct/21
WORK THE CM 2/May/22
WORK THE CM FOR D.H.W.H 8/Jun/22
WORK THE CM 27/Jun/22
WORK THE CM 28/Jun/22
WORK THE CM 29/Jun/22
WORK THE CM 7/Jul/22
WORK THE CM 11/Jul/22
WORK THE CM 13/Jul/22
CHK THE BALANCE RELAY OF MOTOR STARTER FOR H.W.H.B 19/Oct/22
WORK THE PM 1/Nov/22
WORK THE PM 1/Nov/22
WORK THE PM 6/Feb/23
NO HEAT 17/Feb/22
WORK THE PM FOR THE BOILER 27/Sep/23
WORK THE PIPE FOR D.H.W.H 13/Jan/21
CHK THE CIR PUMP WORKING FOR NO.1 H.W.H.B 7/Apr/23
REPLACEMENT THE DEMAND VALVE FOR SUPPLY WATER 6/Apr/21
WORK FOR CHIMNEY FOR H.W.H.B 22/Apr/21
REPLACEMENT THE TEMP. CONTROLLER FOR NO. 1 D.H.W.H 6/Aug/21
WORK FOR THE LEAKING LINE FOR D.H.W.H 5/Dec/23
WORK THE PM FOR BOILER 25/Oct/23
WORK THE PM FOR RTU 25/Oct/23
WORK THE PM FOR BOILER 25/Oct/23
WORK THE PM FOR RTU 25/Oct/23
WORK THE PM FOR BOILER 19/Dec/23
WORK THE PM FOR RTU 19/Dec/23
WORK THE PM FOR BOILER 20/Dec/23
WORK THE PM FOR RTU 20/Dec/23
WORK THE PM FOR RTU 21/Dec/23
WORK THE PM FOR RTU 26/Dec/23
WORK PM 2/Mar/21
WORK PM FOR H.W.H.B 8/Jun/21
WORK THE PM 21/Jun/21
WORK PM FOR E.H.W.H 22/Jul/21
WORK PM FOR E.H.W.H 22/Jul/21
WORK PM FOR D.H.W.H 28/Jul/21
WORK PM FOR D.H.W.H 30/Jul/21
WORK PM FOR NO.1 H.W.H.B 3/Aug/21
WORK PM FOR H.W.H.B 4/Aug/21
WORK PM FOR NO.1 D.H.W.H 5/Aug/21
WORK PM FOR H.W.H.B 11/Aug/21
WORK PM FOR D.H.W.H 11/Aug/21
WORK PM FOR W.A.F 13/Aug/21
WORK PM FOR D.H.W.H 13/Aug/21
WORK THE PM 20/Jan/22
WORK THE LEAKING PIPE IN RM 381 26/Jan/22
NO HOT WATER 13/Feb/22
NO HOT WATER 13/Feb/22
WORK THE CM 19/Sep/22
CHK. THE LEAKING PIPE FOR D.H.W.H 28/Oct/22
WORK PM FOR D.H.W.H 18/Aug/21
HEAT IS NOT WORKING 18/Nov/21
REPLACEMENT THE TRANSFORMER FOR W.A.F 15/Dec/21
NO HEAT 3/Jan/22
WORK FOR THE CRADLE OF CIR.PUMP FOR H.W.H.B 21/Nov/23
NO HEAT 12/Jan/21
WORK THE CONDENSATIAON PIPE FOR H.W.H.B 1/Apr/21
WORK THE PM 27/Sep/21
WORK THE PM 22/Nov/23
WORK THE CONDENSATION DRAIN LINE FOR D.H.W.H. 14/Mar/23
CHK. HOT WATER AIR VENT VALVE 26/Jan/22
WORK THE FCU LINE LEAKING FOR H.W.H.B 14/Mar/23
REPLACEMENT THE UV SENSOR FOR H.W.H.B 1/Feb/21
CHK THE KEEP WARMING OF SUPPLY & RETURN PIPE FOR H.W.H.B 17/May/21
REPLACEMENT THE COUPLE RING OF CIR.PUMP FOR D.H.W.H 17/Jun/21
HOT WATER HEATER INOPERABLE :: PLUMBING 27/Apr/23
REPLACEMENT THE BEARING OF CIR. PUMP FOR D.H.W.H 29/Nov/23
CHK THE DEFICIENCIES OF SUMP 26/May/21
WORK PM FOR D.W.H.B 7/Jun/21
WORK PM FOR H.W.H.B 3/Aug/21
REPLACEMENT THE SEAL & BEARING OF CIR.PUMP FOR H.W.H.B 28/Dec/22
WORK PM FOR H.W.H.B 17/Aug/21
WORK PM FOR H.W.H.B 31/Aug/21
WORK THE CM 3/May/22
WORK THE CM 7/Jun/22
WORK THE CM FOR D.H.W.H 8/Jun/22
WORK THE CM 14/Jun/22
TURN ON THE HEATER 16/Nov/22
WORK THE PM 28/Nov/22
CHK. H.W.H.B WORKNG 6/Dec/22
WORK THE PM FOR THE RTU 26/Sep/23
WORK THE PM 27/Sep/23
WORK THE PM FOR THE RTU 27/Sep/23
NO HOT WATER 29/Sep/23
WORK TO KEEP WARM OF SUPPLY PIPE FOR H.W.H.B 19/Nov/21
REPLACEMENT THE CHK VALVE FOR D.H.W.H 20/Jul/22
WORK THE CONDENSATION PIPE FOR H.W.H.B 4/Feb/21
CHK. THE LEAKING LINE FOR D.H.W.H 7/Nov/23
WORK THE CONDENSATION PIPE FOR H.W.H.B 22/Mar/21
CHK. THE SENSOR WORKING FOR NO1. H.W.H.B 1/Dec/23
REPLACEMENT THE DEMAND VALVE FOR SUPPLY WATER 6/Apr/21
WORK THE PM ( PUT THE ANTI SCALE) 2/May/22
REPLACEMENT THE CIR. PUMP FOR H.W.H.B(TEMPORARY WORK) 17/Dec/21
LEAKING WATER FROM CEILING, HALLWAY, 1F 6/May/21
REPLACEMENT THE COUPLE RING OF CIR.PUMP FOR H.W.H.B 3/Jan/22
REPLACEMENT THE SEAL OF CIR. PUMP FOR H.W.H.B 26/Mar/21
WORK THE PM 15/Feb/23
CHK, BOILER'S DAMPER (H.W.H.B) 22/Jan/21
REPLACEMENT THE DAMPER FOR D.H.W.H 26/Jan/21
REPLACEMENT THE AIR FILTER FOR MAU 18/Jun/21
REPLACEMENT THE TEMP. CONTROLLER FOR NO. 2 D.H.W.H 6/Aug/21
REPLACEMENT THE FILTER FOR RTU 11/Sep/23
REPLACEMENT THE COUPLE RING FOR D.H.W.H 27/Jan/23
CHK. HV WORKNG 16/Mar/22
WORK THE DRAIN PIPE OF DEMAND VLAVE 22/Mar/21
NO HOT WATER 9/Apr/21
WORK PM FOR NO.1 H.W.H.B 18/May/21
WORK PM FOR NO.2 H.W.H.B 18/May/21
WORK PM FOR NO.2 D.H.W.H 18/May/21
WORK PM FOR D.H.W.H 28/Jun/21
WORK PM FOR H.W.H.B 28/Jul/21
WORK PM FOR D.H.W.H 29/Jul/21
WORK PM FOR H.W.H.B 2/Aug/21
WORK PM FOR D.H.W.H 2/Aug/21
WORK PM FOR H.W.H.B 13/Aug/21
RUST WATER COMES OUT 26/Oct/21
NO HEAT 19/Feb/22
REPLACEMENT THE COUPLE RING OF CIR.PUMP FOR H.W.H.B 7/Oct/21
WORK THE PM FOR BOILER 16/Aug/23
WORK THE PM FOR RTU 16/Aug/23
RM TOILET, HOT WATER IS NOT COMING. :: 18/Aug/23
WORK THE PM FOR THE RTU 21/Aug/23
WORK THE PM FOR THE BOILER 21/Aug/23
WORK THE PM FOR THE RTU 22/Aug/23
WORK THE PM FOR THE RTU 23/Aug/23
WORK THE PM FOR THE RTU 24/Aug/23
WORK THE PM FOR THE RTU 28/Aug/23
WORK THE PM FOR THE RTU 29/Aug/23
WORK THE PM FOR THE RTU 30/Aug/23
WORK THE PM FOR THE RTU 31/Aug/23
WORK THE PM FOR THE BOILER 31/Aug/23
WORK THE PM FOR RTU 4/Sep/23
WORK THE PM FOR BOILER 4/Sep/23
WORK THE PM FOR RTU 5/Sep/23
WORK THE PM FOR RTU 6/Sep/23
WORK THE PM FOR RTU 7/Sep/23
WORK THE PM FOR RTU 11/Sep/23
WORK THE PM FOR RTU 12/Sep/23
WORK THE PM FOR RTU 13/Sep/23
WORK THE PM FOR RTU 14/Sep/23
WORK THE PM FOR BOILER 18/Sep/23
WORK THE PM FOR RTU 18/Sep/23
WORK THE PM FOR BOILER 19/Sep/23
WORK THE PM FOR RTU 19/Sep/23
WORK THE PM 20/Sep/23
WORK THE PM FOR BOILER 20/Sep/23
WORK THE PM FOR RTU 20/Sep/23
WORK THE PM 21/Sep/23
WORK THE PM FOR RTU 21/Sep/23
WORK THE PM FOR BOILER 21/Sep/23
WORK THE PM FOR THE RTU 25/Sep/23
WORK THE PM FOR THE BOILER 25/Sep/23
WORK THE PM FOR RTU 4/Oct/23
WORK THE PM FOR BOILER 4/Oct/23
WORK THE PM FOR RTU 5/Oct/23
WORK THE PM FOR BOILER 5/Oct/23
WORK THE PM FOR RTU 10/Oct/23
WORK THE PM FOR BOILER 11/Oct/23
WORK THE PM FOR BOILER 12/Oct/23
WORK THE PM FOR BOILER 16/Oct/23
WORK THE PM FOR BOILER 17/Oct/23
WORK THE PM FOR BOILER 18/Oct/23
WORK THE PM FOR BOILER 19/Oct/23
WORK THE PM FOR BOILER 19/Oct/23
WORK THE PM FOR BOILER 23/Oct/23
WORK THE PM FOR RTU 23/Oct/23
WORK THE PM 24/Oct/23
WORK THE PM FOR BOILER 24/Oct/23
WORK THE PM FOR RTU 24/Oct/23
WORK THE PM 26/Oct/23
WORK THE PM FOR BOILER 26/Oct/23
WORK THE PM FOR RTU 26/Oct/23
WORK THE PM FOR THE RTU 30/Oct/23
WORK THE PM 31/Oct/23
WORK THE PM FOR THE RTU 31/Oct/23
WORK THE PM FOR THE BOILER 31/Oct/23
WORK THE PM FOR RTU 6/Nov/23
WORK THE PM FOR BOILER 6/Nov/23
WORK THE PM FOR BOILER 8/Nov/23
BHS, MAU-2 HEATING FAILURE :: HVAC :: KS 8/Nov/23
WORK THE PM FOR BOILER 9/Nov/23
WORK THE PM FOR BOILER 13/Nov/23
WORK THE PM FOR BOILER 14/Nov/23
WORK THE PM FOR BOILER 15/Nov/23
WORK THE PM FOR BOILER 16/Nov/23
WORK THE PM FOR BOILER 16/Nov/23
WORK THE PM 20/Nov/23
WORK THE PM FOR BOILER 20/Nov/23
WORK THE PM FOR RTU 20/Nov/23
WORK THE PM FOR BOILER 21/Nov/23
WORK THE PM FOR RTU 21/Nov/23
RM BARBER HOT WATER IS NOT RUNNING AT ST 21/Nov/23
WORK THE PM FOR BOILER 22/Nov/23
WORK THE PM FOR BOILER 23/Nov/23
WORK THE PM 27/Nov/23
WORK THE PM FOR BOILER 27/Nov/23
WORK THE PM 28/Nov/23
WORK THE PM FOR BOILER 28/Nov/23
WORK THE PM 29/Nov/23
WORK THE PM FOR THE BOILER 29/Nov/23
WORK THE PM FOR THE RTU 30/Nov/23
WORK THE PM FOR THE BOILER 30/Nov/23
WORK THE PM FOR RTU 4/Dec/23
WORK THE PM FOR BOILER 4/Dec/23
WORK THE PM FOR BOILER 5/Dec/23
WORK THE PM FOR RTU 6/Dec/23
WORK THE PM FOR RTU 7/Dec/23
WORK THE PM FOR BOILER 11/Dec/23
WORK THE PM FOR BOILER 12/Dec/23
WORK THE PM FOR BOILER 13/Dec/23
WORK THE PM FOR BOILER 14/Dec/23
WORK THE PM FOR BOILER 18/Dec/23
WORK THE PM FOR RTU 18/Dec/23
WORK THE PM 19/Dec/23
WORK THE PM 21/Dec/23
WORK THE PM FOR BOILER 27/Dec/23
WORK THE PM FOR RTU 27/Dec/23
WORK THE PM FOR BOILER 27/Dec/23
WORK THE PM FOR RTU 27/Dec/23
WORK THE PM 28/Dec/23
REPLACEMENT THE FUEL PUMP FOR H.W.H.B 8/Jan/21
WORK THE PM 1/Sep/22
WORK THE PM 2/Sep/22
WORK THE CM 7/Sep/22
WORK THE CM 8/Sep/22
WORK THE CM 14/Sep/22
WORK THE CM 20/Sep/22
WORK THE CM 21/Sep/22
WORK THE CM 21/Sep/22
WORK THE PM FOR RTU 9/Jan/23
REPLACEMENT THE CIR. PUMP OF H.W.H.B [GFM] 10/Jan/23
WORK THE LEAKING PIPE FOR D.H.W.H 12/Jan/23
WORK THE PM 25/Jan/23
WORK THE PM 25/Jan/23
WORK THE PM FOR BOILER 26/Jan/23
WORK THE PM FOR BOILER 31/Jan/23
NO HOT WATER 12/Feb/23
WORK THE PM 21/Feb/23
WORK THE PM 27/Feb/23
WORK THE PM FOR BOILER 27/Feb/23
WORK THE PM 28/Feb/23
WORK THE PM 6/Mar/23
WORK THE PM 23/Mar/23
WORK THE PM FOR BOILRT 27/Mar/23
WORK THE PM FOR BOILER 28/Mar/23
WORK THE PM 18/Apr/23
TOO HOT(N) :: HVAC :: KS792.859 :: B859 21/Apr/23
REQUEST TO TURN OFF HEATER IN PMO AREA (EMERGENCY) 21/Apr/23
WORK THE PM FOR BOILER 24/Apr/23
WORK THE PM FOR BOILER 25/Apr/23
WORK THE PM FOR BOILER 26/Apr/23
RM 117 HOT WATER IS NOT TURNING OUT. :: 26/Apr/23
WORK THE PM FOR BOILER 27/Apr/23
WORK THE PM FOR RTU 3/May/23
RM TOILET & HOT WATER IS NOT COMING. (IT'S AN URGENT ITEM BECAUSE O 4/May/23
WORK THE PM FOR RTU 8/May/23
WORK THE PM FOR RTU 9/May/23
WORK THE CM 10/May/23
WORK THE CM 11/May/23
WORK THE PM FOR RTU 15/May/23
WORK THE PM FOR RTU 16/May/23
WORK THE PM FOR RTU 17/May/23
WORK THE CM 23/May/23
CHK. THE LEAKING OF CEILING, FLOWER SHOP 28/May/23
WORK THE PM 31/May/23
WORK THE CM 1/Jun/23
WORK THE CM 9/Jun/23
WORK THE CM 16/Jun/23
WORK THE PM 20/Jun/23
WORK THE PM 28/Jun/23
WORK THE PM 29/Jun/23
WORK THE PM 25/Jul/23
WORK THE PM FOR RTU 1/Aug/23
WORK THE PM FOR BOILER 1/Aug/23
WORK THE PM FOR BOILER 3/Aug/23
WORK THE PM FOR RTU 3/Aug/23
WORK THE PM FOR THE BOILER 8/Aug/23
WORK THE PM FOR THE RTU 8/Aug/23
WORK THE PM FOR BOILER 9/Aug/23
WORK THE PM FOR RTU 9/Aug/23
WORK THE PM FOR BOILER 10/Aug/23
WORK THE PM FOR RTU 10/Aug/23
WORK THE CM ( E-7 EA) 11/Aug/23
WORK THE PM FOR BOILER 14/Aug/23
WORK THE PM FOR RTU 14/Aug/23
WORK FOR THE PIPE FOR H.W.H.B & D.H.W.H ( KEEP WARM) 8/Apr/21
CHK H.W.H.B WORKING 8/Jan/21
NO HEAT 24/Dec/23
WORK THE CONDENSATION PIPE FOR D.H.W.H 6/Apr/21
CHK. #NO.1 H.W.H.B WORKING 22/Nov/23
CHK. NO.1 H.W.H.B WORKING 29/Dec/23
WORK PM FOR E.H.W.H 8/Sep/21
WORK PM FOR E.H.W.H 8/Sep/21
WATER LEAK FROM D.H.W.R PIPE, 2/May/22
WORK THE PM 20/Dec/23
PUT THE ANTI SCALE OF PIPE FOR H.W.H.B 7/Jan/22
WORK THE LEAKING PIPE FOR D.H.W.H 6/Sep/22
WORK THE KEEP WARMING LINE FOR D.H.WH. 5/Dec/22
WORK PM FOR W.A.F 17/Aug/21
WORK PM FOR E.H.W.H 17/Aug/21
WORK PM FOR H.W.H.B 18/Aug/21
WORK PM FOR D.H.W.H 18/Aug/21
WORK PM FOR H.W.H.B 19/Aug/21
WORK PM FOR D.H.W.H 19/Aug/21
WORK PM FOR H.W.H.B 23/Aug/21
WORK PM FOR H.W.H.B 23/Aug/21
WORK PM FOR H.W.H.B 24/Aug/21
WORK PM FOR D.H.W.H 24/Aug/21
WORK PM FOR NO.2 H.W.H.B 25/Aug/21
WORK PM FOR NO.1 D.H.W.H 25/Aug/21
WORK PM FOR NO.1 H.W.H.B 27/Aug/21
WORK PM FOR NO.2 H.W.H.B 27/Aug/21
WORK PM FOR E.H.W.H 27/Aug/21
WORK PM FOR H.W.H.B 30/Aug/21
WORK PM FOR D.H.W.H 30/Aug/21
WORK PM FOR W.A.F 31/Aug/21
WORK PM FOR E.H.W.H 31/Aug/21
WORK PM FOR D.H.W.H 31/Aug/21
WORK PM FOR H.W.H.B 7/Sep/21
WORK PM FOR D.H.W.H 7/Sep/21
WORK PM FOR D.H.W.H 8/Sep/21
WORK PM FOR H.W.H.B 8/Sep/21
WORK PM FOR H.W + D.H 9/Sep/21
WORK PM FOR W.A.F 9/Sep/21
WORK PM FOR D.H.W.H 9/Sep/21
WORK PM FOR H.W.H.B 9/Sep/21
WORK PM FOR D.H.W.H 9/Sep/21
CHK. MALFUNCTION OF D.H.W.H 27/Sep/21
CHK. THE LIMT SWITCH FOR D.H.W.H 27/Sep/21
CHK. MALFINCTION OF NO.3 HV 28/Sep/21
CHK. MALFINCTION OF NO.6 HV 28/Sep/21
CHK. MALFINCTION OF NO.2 HV 28/Sep/21
WORK THE PM 8/Apr/22
WORK THE CM 4/May/22
WORK THE CM 6/May/22
WORK THE PM 6/May/22
WORK THE PM 9/May/22
WORK THE CM 16/May/22
WORK THE CM 17/May/22
WORK THE CM 19/May/22
WORK THE CM 23/May/22
WORK THE CM 25/May/22
WORK THE CM 30/May/22
WORK THE CM 30/May/22
WORK THE CM 31/May/22
WORK THE CM 31/May/22
WORK THE CM 31/May/22
WORK THE CM 3/Jun/22
WORK THE CM 9/Jun/22
WORK THE CM 13/Jun/22
WORK THE CM 20/Jun/22
WORK THE CM 23/Jun/22
WORK THE CM FOR H.W.H.B 23/Jun/22
WORK THE CM 27/Jun/22
WORK THE CM 28/Jun/22
WORK THE CM 29/Jun/22
WORK THE CM 7/Jul/22
WORK THE CM 28/Jul/22
WORK THE CM 9/Aug/22
WORK THE PM 5/Oct/22
WORK THE PM 7/Oct/22
TURN ON HEATER FOR HV 20/Oct/22
CHK. WORK THE LEAKING OF CIR. PUMP FOR D.H.W.H 27/Oct/22
WORK THE PM 1/Nov/22
WORK THE PM 1/Nov/22
WORK THE PM 1/Nov/22
WORK THE PM FOR RTU 2/Nov/22
WORK THE PM FOR RTU 3/Nov/22
EXEMTPED, TURN ON HEATER 8/Nov/22
WORK THE PM FOR RTU 10/Nov/22
WORK THE PM FOR RTU 16/Nov/22
WORK THE PM FOR RTU 17/Nov/22
WORK THE PM 23/Nov/22
WORK THE PM 24/Nov/22
WORK THE PM FOR BOILERS 7/Dec/22
WORK THE PM 26/Dec/22
WORK THE PM 27/Dec/22
WORK THE PM 28/Dec/22
WORK THE PM 29/Dec/22
HEATING PIPE LINE LEAKING 28/Nov/22
CHK. H.W.H.B WORKING 8/Feb/22
MALFUNCTION OF CHK. VALVE OF SUPPLY WATER FOR D.H.W.H 12/Oct/21
REPLACEMENT THE TRANSFORMER FOR H.W.H.B 2/Jan/23
NO HEAT 23/Dec/23
WORK THE PM 16/Nov/23
WORK THE PM 30/Nov/23
WORK THE PM 6/Apr/22
PUT THE ANTISCALES FOR H.W.H.B 22/Feb/22
PUT THE ANTISCALES FOR H.W.H.B 22/Feb/22
REPLACEMENT THE COUPLE RING OF CIR PUMP FOR D.H.W.H 9/Aug/21
KEEP THE WARM PIPE FOR H.W.H.B 10/Feb/22
REPALCEMENT THE AGED LINE FOR D.H.W.H 22/Jun/23
WORK PM FOR E.H.W.H 8/Sep/21
WORK THE SUPPLY PIPE FOR H.W.H.B 11/Nov/21
SMELL OF BURING, RESTROOM CEILING HEATER 6/Jan/21
NO HEAT WHOLE BLDG 7/Jan/21
NO HEAT 8/Jan/21
NO HEAT ON WHOLE 1/Feb/21
NO HEAT 8/Feb/21
REPLACEMENT THE SEAL OF CIR PUMO FOR D.H.W.H 15/Mar/21
WORK CM FOR H.W.H.B 6/May/21
NO HOT WATER 9/May/21
WORK PM FOR E.H.W.H 11/May/21
WORK PM FOR D.H.W.H 14/Jun/21
WORK PM FOR D.H.W.H 14/Jun/21
WORK PM FOR NO.1 D.H.W.H 24/Jun/21
WORK PM FOR H.W.H.B 28/Jun/21
WORK PM FOR H.W.H.B 30/Jun/21
WORK PM FOR H.W.H.B 6/Jul/21
WORK PM FOR D.H.W.H 7/Jul/21
WORK PM FOR NO.1 H.W.H.B 19/Jul/21
WORK PM FOR NO.1 D.H.W.H 19/Jul/21
WORK PM FOR NO.2 D.H.W.H 19/Jul/21
WORK PM FOR H.W.H.B 20/Jul/21
WORK PM FOR D.H.W.H 20/Jul/21
WORK PM FOR H.W.H.B 21/Jul/21
WORK PM FOR D.H.W.H 21/Jul/21
WORK PM FOR H.W.H.B 22/Jul/21
WORK PM FOR D.H.W.H 22/Jul/21
WORK PM FOR H.W.H.B 26/Jul/21
WORK PM FOR D.H.W.H 26/Jul/21
WORK PM FOR NO.1 H.W.H.B 27/Jul/21
WORK PM FOR NO.2 H.W.H.B 27/Jul/21
WORK PM FOR H.W.H.B 28/Jul/21
WORK PM FOR D.H.W.H 28/Jul/21
WORK PM FOR W.A.F 29/Jul/21
WORK PM FOR D.H.W.H 29/Jul/21
WORK PM FOR W.A.F 29/Jul/21
WORK PM FOR E.H.W.H 29/Jul/21
WORK PM FOR H.W.H.B 2/Aug/21
WORK PM FOR H.W.H.B 2/Aug/21
WORK PM FOR NO.1 H.W.H.B 3/Aug/21
WORK PM FOR NO.2 H.W.H.B 3/Aug/21
WORK PM FOR D.H.W.H 3/Aug/21
WORK QC PM 4/Aug/21
WORK PM FOR D.H.W.H 4/Aug/21
WORK PM FOR D.H.W.H 4/Aug/21
WORK PM FOR NO.1 H.W.H.B 5/Aug/21
WORK PM FOR NO.2 H.W.H.B 5/Aug/21
WORK PM FOR H.W.H.B 9/Aug/21
WORK PM FOR D.H.W.H 9/Aug/21
WORK PM FOR H.W.H.B 11/Aug/21
WORK PM FOR H.W.H.B 11/Aug/21
WORK PM FOR D.H.W.H 11/Aug/21
WORK PM FOR NO.1 WAF 12/Aug/21
WORK PM FOR NO.2 WAF 12/Aug/21
WORK PM FOR D.H.W.H 12/Aug/21
NO HEAT 14/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
TURN ON THE HEATER 16/Nov/21
NO HEAT 20/Nov/21
WORK THE PM 30/Nov/21
MALFUNCTION THE BLOWER FAN FOR NO.2 H.W.H.B 21/Dec/21
NO HEAT 27/Dec/21
CHK. H.W.H.B WORKING 10/Jan/22
NO HEAT 15/Jan/22
WORK THE PM 7/Feb/22
WORK THE PM 10/Feb/22
WORK THE PM 11/Feb/22
WORK THE PM 24/Feb/22
CHK H.W.H.B water PH 29/Nov/21
CHK H.W.H.B water PH 29/Nov/21
REPLACEMENT THE COUPLE RING OF CIR. PUMO FOR D.H.W.H 9/Feb/23
TWO CEILING PIPE LEAKING, HOT WATER LINE, 1F BAY 2/Nov/21
WORK THE CM 16/May/22
REPLACEMENT THE TRANSFORMER FOR H.W.H.B 14/Jan/22
NO HEAT WHOLE BLDG 6/Jan/21
REPLACEMENT THE COUPLE RING OF CIR PUMP FOR D.H.W.H. 18/Jan/21
REPLACEMENT THE COUPLE RING FOR H.W.H.B 18/Jan/21
WORK THE PM FOR BOILER 19/Dec/23
WORK THE PM FOR RTU 19/Dec/23
WORK THE PM FOR BOILER 20/Dec/23
WORK THE PM FOR RTU 20/Dec/23
WORK THE PM FOR BOILER 21/Dec/23
WORK THE PM FOR BOILER 26/Dec/23
WORK THE PM FOR THE RTU 28/Dec/23
WORK THE PM FOR THE BOILER 28/Dec/23
WORK THE CM 6/Sep/22
WORK THE PM 31/Jan/23
#Repair /Replace Dom, Hot water storage tank covers with ArmaFlex..(B-111) /P 7/Apr/23
NO HOT WATER 6/May/23
WORK THE CM 18/May/23
WORK THE CM 7/Jul/23
WORK THE PM 20/Jul/23
WORK THE CM 20/Jul/23
WORK THE PM FOR THE BOILER 20/Jul/23
WORK THE CM ( H-2EA, D) 26/Jul/23
REPLACEMENT THE COUPLE RING OF CIR.PUMP FOR NO.2 H.W.H.B 1/Aug/23
NO HOT WATER , THE WOMEN'S RESTROOM 19/Jul/21
WORK THE PIPE REPLACEMENT FOR D.H.W.H 18/May/21
WATER LEAK FROM PIPE 14/Jan/21
WORK PM FOR NO.1 E.H.W.H 1/Sep/21
WORK PM FOR NO.1 E.H.W.H 1/Sep/21
REPLACEMENT THE PRESSURE GAUGE FOR NO.1 H.W.H.B 6/Aug/21
WORK PM FOR NO.2 H.W.H.B 15/Jul/21
CHK. HOT WATER (NOT ENOUGH) 9/Jun/22
REPLACEMENT THE CIR. PUMP FOR D.H.W.H 7/Feb/23
CHK. LEAKING LINE FOR H.W.H.B 28/Dec/22
REPLACEMENT THE SEAL OF CIR. PUMP FOR H.W.H.B 16/Jun/23
WORK PM FOR NO.1 H.W.H.B 18/Aug/21
WORK PM FOR NO.2 H.W.H.B 18/Aug/21
WORK PM FOR D.H.W.H 19/Aug/21
WORK PM FOR NO.1 D.H.W.H 19/Aug/21
WORK PM FOR NO.2 D.H.W.H 19/Aug/21
WORK PM FOR H.W.H.B 25/Aug/21
WORK PM FOR D.H.W.H 25/Aug/21
WORK PM FOR H.W.H.B 26/Aug/21
WORK PM FOR D.H.W.H 26/Aug/21
WORK PM FOR H.W.H.B 27/Aug/21
WORK PM FOR D.H.W.H 27/Aug/21
WORK PM FOR H.W.H.B 30/Aug/21
WORK PM FOR H.W.H.B 1/Sep/21
WORK PM FOR H.W.H.B 1/Sep/21
WORK PM FOR NO.1 H.W.H.B 6/Sep/21
WORK PM FOR NO.2 H.W.H.B 6/Sep/21
WORK PM FOR NO.1 D.H.W.H 6/Sep/21
WORK PM FOR NO.2 D.H.W.H 6/Sep/21
WORK THE CM 4/May/22
WORK THE CM 24/May/22
WORK THE CM 2/Jun/22
WORK THE CM 4/Jul/22
WORK THE CM 7/Jul/22
WORK THE CM 14/Jul/22
WORK…
This is the start of the file's text. The full file is on GovTribe.