Technical Exhibit 2-12_Unit Heater_Semi Annually.pdf
PDF 95 KB Posted
- Solicitation number
- W91QVN24R0007
About this file
This document appears to be a Technical Exhibit for the semi-annual inspection and maintenance of a unit heater. The key tasks include checking the heater's operation, electrical wiring and connections, automatic controls, coils, voltage/amps, and mechanical components like fans, dampers, and bearings. The total estimated labor hours are also provided.
The related federal contract opportunity is a solicitation for Inspection, Testing and Maintenance (ITM) of Mechanical Equipment at USAG Humphreys. The Department of the Army Materiel Command Army Contracting Command is seeking a contractor to provide these services. The response date for proposal submission is May 24, 2024, 13:00 hrs, Korean Time.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building Number : Date:
Unit Number :
No. TASK DESCRIPTION CHECK N/A
1 Check air heater for proper opration.
운전점검
2 Turn on/off 끄고 켜기
3 Check electrical wiring and connections. Tighten loose connections.
배선/연결 상태점검. 느슨한 연결 조이기
4 Check and adjust automatic off/on systems 자동 온 오프 시스템점검/조정
5 Check remoto control on/off, control if need 리모트 콘트롤 점검 (필요시)
6 Check all coils for damage externally and internally.
코일에 외부 및 내부 손상 점검
7 Check unit elect Voltage,Amps 볼트와 압력점검
8 Check the tightness of fixings, bracket.
고정장치 확인
9 Check fan, damper blades and motor bearings 팬/댐퍼, 블레이드, 모터베어링 점검
10 Check Ensure that the pipe, valve, air bin and insulation.
배관, 밸브, 에어빈 보온확인
11 Check water circulation, condition 물 순환, 상태 점검
12 Use Ladder, lift equipments 사다리/ 고공 장비 사용
PM, Unit Heater
TOTAL HOUR:
PERFORMER:
COMMENT:
UH-W