Technical Exhibit 2-18_System HEAT PUMP AC_Quarterly.pdf

PDF 153 KB Posted

Attached to
Inspection, Testing and Maintenance (ITM) of Mechanical Equipment at USAG Humphreys
Solicitation number
W91QVN24R0007
Issued by

About this file

The provided document is a Technical Exhibit detailing the preventive maintenance tasks and schedule for a system heat pump air conditioning unit. The tasks include checking DDC controls, electric lines, coils, condensers, fans, motors, refrigerant, solenoid valves, and cleaning various components. The document also includes information about the quarterly preventive maintenance service, including the date, time, unit number, and total hours required.

The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Army Contracting Command for Inspection, Testing and Maintenance (ITM) of Mechanical Equipment at USAG Humphreys. The solicitation number is W91QVN24R0007, and the response date for proposal submission is 24 May 2024, 13:00 hrs, Korean Time.

View the file

Other files

File Type Posted
Revised Technical Exhibit 1-2_Air Conditioning Equipment.pdf PDF
AMENDMENT 3 W91QVN24R00070003.docx DOCX document
AMENDMENT 2 W91QVN24R00070002.docx DOCX document
ATTACHMENT 1 PWS (AMENDMENT 2).docx DOCX document
AMENDMENT W91QVN24R00070001.docx DOCX document
Technical Exhibit 3-11_Historical_Data_WorkOrder_Analysis.pdf PDF
Technical Exhibit 2-8_Fan Coil Unit_Semi Annually.pdf PDF
Technical Exhibit 2-3_Boiler_Annually.pdf PDF
Technical Exhibit 3-5_Historical_Data_AC-Minor.pdf PDF
Technical Exhibit 1-1 Boiler.pdf PDF
Technical Exhibit 3-2_Historical_Data_Boiler-Major.pdf PDF
Technical Exhibit 3-4_Historical_Data_Gas_Major.pdf PDF
Technical Exhibit 1-8_Gas line.pdf PDF
Technical Exhibit 3-7_Historical-Data_AC-Minor-YongIn.pdf PDF
Technical Exhibit 1-9_Gas Equipment list in mechanical room.pdf PDF
Technical Exhibit 3-1_Historical-Data_Boiler-Minor.pdf PDF
Technical Exhibit 2-2_Boiler_Quarterly.pdf PDF
Technical Exhibit 4_IMCOM_Facility_Maintenance_Instruction.pdf PDF
Technical Exhibit 3-8_Historical-Data_AC-Minor-ICheon.pdf PDF
Technical Exhibit 2-6_Electric Hot Water Heater_Annually.pdf PDF
Technical Exhibit 1-6_Governor.pdf PDF
Technical Exhibit 1-7_Inside facility.pdf PDF
ATTACHMENT 1 PWS.docx DOCX document
SOLICITATION W91QVN24R0007.docx DOCX document
Technical Exhibit 2-12_Unit Heater_Semi Annually.pdf PDF
Technical Exhibit 2-13_Gas Infrared Tube Heater_Semi Annually.pdf PDF
Technical Exhibit 1-4_Heating Systems.pdf PDF
Technical Exhibit 2-4_Electric Heater_Semi Annually.pdf PDF
Technical Exhibit 2-11_Hot Water Storage Tank_Semi Annually.pdf PDF
Technical Exhibit 6_Garrison Accident Report.pdf PDF
Technical Exhibit 5_Excavation_Permit_Form.pdf PDF
Technical Exhibit 2-16_DX type_Quarterly.pdf PDF
TEs.PNG PNG image
Technical Exhibit 1-5_Unit Heater (Water Type).pdf PDF
Technical Exhibit 2-5_Electric Hot Water Heater_Monthly.pdf PDF
Technical Exhibit 2-10_Fuel Tank and Dike_Monthly.pdf PDF
Technical Exhibit 2-7_Energey Recovery Unit_Quarterly.pdf PDF
Technical Exhibit 3-3_Historical-Data_Gas-Minor.pdf PDF
Technical Exhibit 2-15_Chiller_Quarterly.pdf PDF
Technical Exhibit 3-6_Historical_Data_AC-Major.pdf PDF
Technical Exhibit 1-2_Air Conditioning Equipment.pdf PDF
Technical Exhibit 2-1_Boiler_Monthly.pdf PDF
Technical Exhibit 7_Safety Plan Review Checklist.pdf PDF
Technical Exhibit 3-9_Historical_Data_Kitchen-Minor.pdf PDF
Technical Exhibit 1-3_Kitchen Equipment and Mechanical Equipment.pdf PDF
Technical Exhibit 2-14_Warm Air Furnace_Semi Annually.pdf PDF
Technical Exhibit 2-17_Stand and Wall TYPE AC_Quarterly.pdf PDF
Technical Exhibit 3-10_Historical-Data_Kitchen-Major.pdf PDF
Technical Exhibit 2-9_Infrared Heater_Semi Annually.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building number : DATE:

Unit number : Time:

No. TASK DESCRIPTION CHECK N/A 1 Check DDC control before PM (PM전에 DDC 확인)

2 Check electric line 전기 배선 점검

3 Visually inspect coil 육안으로 코일 점검

4 Check condenser and fan 컨텐서와 팬 상태 점검

5 Inspect motor for excessive heat & noise 모터 과열과 소음 점검

6 Lubricate shaft bearings 샤프트, 베어링 상태 점검

Detect refrigerant leak and repair as required for proper operation and environmental protection 냉매가 새는지 점검하고, 운전점검하여 환경적 손상이 없게함

8 Check the refrigerant status through sight glass 사이트 글라스를 통해 냉매 상태 (수분,공기 유무) 점검

9 Check compressor oil & refrigerant 컴프레서 오일 및 냉매량 점검

10 Check solenoid valve 솔레노이드 밸브 작동점검

11 Clean coil, condensate drip pan, drain & fan, air plenum 코일, 결로,드립팬/드레인/팬, 에어 플래넘 청소

12 Clean indoor unit and filter 실내기 및 필터 청소

13 Clean condensing unit 컨덴싱 유닛 청소

14 Clean area around unit 작업공간 주변청소

15 Check DDC control after PM (PM후에 DDC 확인)

16 Season Change 계절 전환 작업

17 Escort time

PM, SYSTEM HEAT PUMP AC

TOTAL HOUR:

PERFORMER:

COMMENT:

1014(AC-13)_NEW

File details come from the government source that posted it. Updated .