Technical Exhibit 2-15_Chiller_Quarterly.pdf
PDF 129 KB Posted
- Solicitation number
- W91QVN24R0007
About this file
The provided document is a Technical Exhibit that outlines the quarterly preventive maintenance (PM) tasks for a chiller unit. The tasks include checking the DDC control, electrical lines, coil, condenser, fan, motor, shaft bearings, refrigerant and water leaks, refrigerant status, compressor oil and refrigerant, water temperature, water line pressure, strainer, condensing unit, and the area around the unit. The total estimated labor hours for the PM is 10.
The document is related to a federal contract opportunity from the Department of the Army Materiel Command Army Contracting Command for Inspection, Testing and Maintenance (ITM) of Mechanical Equipment at USAG Humphreys. The solicitation number is W91QVN24R0007, and the response date for proposal submission is 24 May 24, 13:00 hrs, Korean Time.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building number : DATE:
Unit number :
No. TASK DESCRIPTION CHECK N/A 1 Check DDC control before PM (PM전에 DDC 확인)
2 Check electric line 전기 배선 점검
3 Visually inspect coil 육안으로 코일 점검
4 Check condenser and fan 컨텐서와 팬 상태 점검
5 Inspect motor for excessive heat & noise 모터 과열과 소음 점검
6 Lubricate shaft bearings 샤프트, 베어링 상태 점검
7 Inspect fan for bent blades 팬 블레이드 점검
Detect refrigerant and water leaks at the piping and valves as required for proper operation and environmental protection 냉매 또는 물배관 파이프와 밸브가 새는지 점검하고, 운전점검하여 환경적 손상이 없게함
9 Check the refrigerant status through sight glass 사이트 글라스를 통해 냉매 상태 (수분,공기 유무) 점검
10 Check compressor oil & refrigerant 컴프레서 오일 및 냉매량 점검
11 Check water temperature of inlet & outlet on chiller 칠러 입출구 물 온도 편차 점검
12 Check water line pressure 물라인 압력 확인 13 Check/clean strainer 스트레이너 확인 및 청소 14 Clean condensing unit 컨덴싱 유닛 청소 15 Clean area around unit 작업공간 주변청소 16 Check DDC control after PM (PM후에 DDC 확인) 17 Escort time
PERFORMER:
COMMENT:
PM, CHILLER
TOTAL HOUR:
1014(AC-13)_NEW
File details come from the government source that posted it. Updated .