TECHNICAL EXHIBIT 1
Performance Requirement Summary (PRS)
As described in the Performance Requirement Summary (PRS), the performance objectives and standards provide the general basis for measuring the performance of each requirement associated with the standard. Task orders may include additional performance objectives and standards that are not included in this PRS.
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
| Task |
| Performance Objective (PO) |
| PWS |
| Performance Standards |
| Allowable Performance Deviation |
| Disincentive |
| Provide sufficient qualified personnel |
| ALL |
| 5.0 |
| 100% of PWS qualified personnel available |
| 0 defects |
| Daily rate |
| Training Instruction |
| Provide training instruction for courses. |
| 5.1.1 |
| a) 100% of Instruction is IAW TRADOC Reg 350-70. |
b) Must receive an 80% or better performance rating on all instructor evaluations (platform, small group, performance-based).
c) Meets 100% of requirements identified in para 5.1
d) 100% of Instructional hours comply with published training schedules.
| 0 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Schedules |
| Provide training schedule development for training courses. |
| 5.1.2 |
| 100% of training schedule input is provided within one week prior to course start. No missing or incorrect assignments of instructors to perform specified activities on course training schedules. |
| No Defects |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Course After Action Reports (AAR) |
| Participate in trainingcourse after action reviews AAR and compile AAR comments for trend analysis and training improvement |
| 5.1.3 |
| 100% of instructors participate in course AARs. Draft AAR are submitted 5 calendar days after the course. AARs meet minimum requirements after rework, which is completed within 2 workdays. |
Each day late will be treated as a single instance of a “defect” per evaluation period. Allowable defects and associated rating are identified in AQL column.
| No Defects |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Lesson Plan Feedback Report |
| Prepare and provide written feedback to training developers for assigned lesson plans. The contractor shall respond to and report accidents and incidents |
| 5.1.4 |
| 100% of Feedback is provided IAW Lesson Plan SOP and addresses the efficacy of lesson plans assigned. |
| 2 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Student Evaluation |
| Provide training evaluation for training courses. The contractor shall respond to and report accidents and incidents |
| 5.1.5 |
| a) 100% of training evaluation is IAW TRADOC Reg 350-70, and SOPs. |
b) 100% of students receive performance assessments
c) 100% of all poorly performing students are identified and remediated IAW approved strategy.
d) 100% of invalid test items are replaced.
e) 100% of testing materials are handled IAW Test Control Policy.
| 4 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Preparation |
| Prepare training materials, develop training aids, set up classrooms and deliver instruction |
| 5.1.6 |
| 100% of training preparation is IAW approved course SOPs and curriculum proceeds IAW course schedules. |
| 1 Defect per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Venues and Materials |
| Perform training support and exercise support functions |
| 5.1.7 |
| a) 100% of support is IAW with approved SOPs and curriculum proceeds IAW course schedules. |
b) 100% of training venues and materials are ready IAW respective course SOPs.
c) 100% compliance with designated programs and policies, i.e. INFOSEC, OPSEC, Physical Security, TARP: AR 380-40, AR 381-12, AR 530-1, and AR 190-11).
| 1 Defect per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Records |
| Develop and maintain student records for up to thirty-two students per class. |
| 5.1.8 |
| 90% of student records are created, maintained, and transferred IAW TRADOC Reg 350-70 and Student Records SOP meet suspense with the remainder no more than 48 hours beyond the suspense. |
| 2 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Student Academic Counseling |
| Counsel students IAW respective course SOP. |
| 5.1.9 |
| a) Maintain 100% of student counseling records for all assigned. |
b) 100% compliance with signing and abiding by a non-disclosure agreement for PII. c) 100% compliance with maintaining PII IAW to AR 340-21, The Army Privacy Program, and establish proper administrative, technical and physical safeguards to ensure the security and confidentiality of records.
| 1 Defect per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Hours |
| Provide training on nights, holidays, and weekends IAW the published training schedule. |
| 5.1.2, 1.6.1 |
| 100% compliance with training schedule. |
| No Defects |
| Daily Rate |
| Maintain Programs of Instruction |
| Develop, review, and update POIs with lessons learned, doctrine, and current and evolving Tactics, Techniques, and Procedures (TTPs) as they become available. |
| 5.2.1 |
| Incorporate 100% of applicable lessons learned, doctrine, and current and evolving Tactics, Techniques, and Procedures (TTPs) into the POIs. |
| 4 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| ADDIE Process |
| Conduct the analysis, design, development, implementation and evaluation (ADDIE) process in support of training development |
| 5.2.2 |
| 100% of tasks are conducted IAW TRADOC Regulation 350-70. |
| No Defects |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Instructional Design |
| Provide instructional design and training and development support for courses. |
| 5.2.3 |
| 100% of tasks are conducted IAW applicable regulations |
| No Defects |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Instruction Research |
| Conduct research to integrate and implement training concepts and strategies. |
| 5.2.4 |
| a) 100% of results determine applicability of emerging educational technology/methods for improving instruction. b) Implementation solves 100% of targeted training problems and issues. |
| 3 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Analysis |
| Conduct required types of training analysis |
| 5.2.5 |
| 100% of results determine training needs, requirements, and standards. |
| 3 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Validation |
| Support the validation of institutional and self-development training |
| 5.2.6 |
| 100% of training validation support is IAW TRADOC Regulation 350-70. |
| 3 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Assessment |
| Implement and assess the effectiveness of institutional and self-development training programs and products. |
| 5.2 |
| 100% of materials and products achieve instructional standards, goals, objectives, and/or outcomes. |
| 1 Defect per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Observation |
| Conduct visits to training courses and produce written post-visit reports providing feedback to course leadership |
| 5.2 |
| 100% of visits conclude with a detailed report that identifies commendable practices as well as areas for improvement |
| 3 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| End of Course AAR |
| Attend training course after action reviews (AARs) and follow attendance by producing End of Course reports. |
| 5.2.7 |
| 100% of reports including issues, discussions, and recommendations. |
| 1 Defect per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Observations, Insights and Lessons (OIL) |
| Analyze, assess, and support the validation and integration of OIL into curriculum for appropriate domains |
| 5.2.4 |
| a) 100% of Instructional programs remain relevant and responsive. |
b) 100% of products are available to support institutional and self-development instructions.
| 2 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Distributed Learning |
| Support the validation and implementation of distributed learning curriculum programs and products |
| 5.2.3, 5.2.4 |
| 100% of products employ current and emerging instructional technology and capabilities and delivery methods. |
| 2 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Training Development Capability (TDC) |
| Provide technical expertise in support of the TDC effort |
| 5.2 |
| 100% of products and support are IAW TR 350-70 and CCoE policies. b. Submit training materials no later than 30 calendar days after completion of course analysis. Final submission shall be completed no later than 10 working days after Government content approval has been received. |
| 1 Defect per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Operational Support |
| Provide the required expertise to support critical portions of programmed work within the CCoE doctrine development program/process. |
| 5.3.1 |
| a) All taskings completed within suspense. |
b) 100% SharePoint and LandWarNet electronic University (LWNeU) websites up to date and accurate.
| 1 Defect per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Doctrine Development Support |
| Provide doctrine development support for crucial doctrinal literature products |
| 5.3.2 |
| a) 100% of products and support IAW AR 25-30 and CCoE SOP. |
b) No more than 3 revisions per product for compliance.
c) Products completed within suspense.
d) Revisions will be completed within five working days
| 3 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Evaluate TTPs/External Doctrinal Publications |
| Evaluate combined, joint, multi-service, multinational, Army, Signal doctrine, TTPs for the validation, modification and development of new doctrinal products in support of Army cyberspace, signal, and electronic warfare missions and other communications and network support activities. |
| 5.3.3 |
| a) 100% of products and support IAW AR 25-30 and CCoE SOP. |
b) No more than 3 revisions per product for compliance.
c) Products completed within suspense.
d) Revisions will be completed within five working days
| 3 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
| Doctrine Editing |
| Provide literary editing support in English composition, sentence, graphic and paragraph structure, spelling, grammar, punctuation and ensure logical and coherent content flow of doctrine division products. |
| 5.3.4 |
| a) 100% of products and support IAW AR 25-30 and CCoE SOP. |
b) No more than 3 revisions per product for compliance.
c) Products completed within suspense.
d) Revisions will be completed within five working days
| 1 Defect per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |
Registrar
| 5.4 |
| a) 100% of training schedule input is provided within one week prior to course start. |
b) No missing or incorrect assignments of instructors, classrooms, or equipment.
c) Products completed within suspense.
| 2 Defects per month |
| Deficiency will be noted in COR monthly reports and may result in negative CPARS report |