TE-H - Hazardous_Material_Authorization.pdf

PDF 177 KB Posted

Attached to
Fort Hood Installation Custodial Services
Solicitation number
W91151-26-R-A004
Issued by

About this file

This is a template for a Hazardous Material Authorization Request (HMAR) form used by Fort Hood to track and authorize the use of hazardous materials by contractors and internal operations.

The form requires requestors to provide comprehensive information about hazardous materials including nomenclature, stock numbers, part numbers, quantities, monthly usage estimates, container types, and manufacturer information. Requestors must describe in detail the specific work process and application method for the hazardous material, including whether it will be applied by hand, brush, spray gun, or other means, and the type of industrial equipment involved. The form requires estimation of the percentage of product that ends up in various disposal locations: on end items/equipment, released into air, placed in waste drums, disposed in trash dumpsters, or sent to central waste treatment or sewer systems. Additional required information includes the building or area where the material will be used, cost center/DODAC authorization, technical reference documents, process type, and contact information for both the requester and technical point of contact. The DPW-Environmental section requires NFPA 704 label data (health, flammability, reactivity, special instructions), MSDS serial number, and an authorization control number. The form emphasizes that contractors are strongly encouraged to purchase hazardous materials through the HazMart; when non-government furnished hazardous materials are used, MSDS documentation must be submitted for tracking purposes without implying Fort Hood endorsement of any product.

View the file

Other files

File Type Posted
Solicitation Amendment - W9115126RA0040004.pdf PDF
Solicitation Amendment W9115126RA0040004 SF 30.pdf PDF
Solicitation Amendment - W9115126RA0040003.pdf PDF
Attachment 9 - Industry Questions 2026.09.29 UPDATED.pdf PDF
Solicitation Amendment W9115126RA0040003 SF 30.pdf PDF
Attachment 7 - DoD SAFE Instructions.pdf PDF
Attachment 8 - Solicitation Clarifications 2026.09.29.pdf PDF
Solicitation Amendment W9115126RA0040002 SF 30.pdf PDF
Solicitation Amendment - W9115126RA0040002.pdf PDF
Attachment 4 - Past Performance Evaluation Questionaire v3.docx DOCX document
Solicitation Amendment W9115126RA0040001 SF 30.pdf PDF
Attachment 1 - Performance Work Statement Installation Custodial Service UPDATED.pdf PDF
Attachment 4 - Past Performance Evaluation Questionaire v2 UPDATED.docx DOCX document
TE-A - Building_Inventory_List 24 Sep 26 UPDATED.xlsx XLSX spreadsheet
Industry Questions 2026.09.24.pdf PDF
2026.09.16 - Site Visit Sign In Roster.pdf PDF
Attachment 3 - Collective Bargaining Agreement with 01 APR 2026 Rates UPDATED.pdf PDF
Solicitation Amendment - W9115126RA0040001.pdf PDF
TE-L Pricing Spreadsheet_W91151-26-R-A004_V5 UPDATED.xlsx XLSX spreadsheet
Attachment 1 - Performance Work Statement Installation Custodial Services (viewable).pdf PDF
Attachment 4 - Past Performance Evaluation Questionaire.docx DOCX document
TE-C - PWS Custodial Tasks Performance Standards.xlsx XLSX spreadsheet
TE-L Pricing Spreadsheet_W91151-26-R-A004_V4.xlsx XLSX spreadsheet
TE-A - Building_Inventory_List 19 Aug 26.xlsx XLSX spreadsheet
TE-E - Work_Schedule Example.xlsx XLSX spreadsheet
Solicitation - W9115126RA004.pdf PDF
Attachment 2 - WD 2015-5237_Revision 32_12AUG2026.pdf PDF
Attachment 5 - Relevant Contracts.docx DOCX document
Attachment 1 - Performance Work Statement Installation Custodial Services.pdf PDF
Attachment 3 - Collective Bargaining Agreement_Redacted.pdf PDF
Attachment 6 - Limitations on Subcontracting Review_SAMPLE LETTER vAUG2022.docx DOCX document
TE-B - Fort Hood Cantonment Maps.pdf PDF
TE-D Example Building Closure Report.xlsx XLSX spreadsheet
TE-F- MWR Physical Fitness Facilities Operation Hours.pdf PDF
TE-G Example Waterless Urinal Monthly Report.xlsx XLSX spreadsheet
TE-I Building 36048 1ST FL and 2ND FL Areas.pdf PDF
TE-J Example Annual Service Confirmation Form.xlsx XLSX spreadsheet
TE-K Example Complied Monthly Restroom Logs.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT B

Hazardous Material Authorization Request

COMPANY

NAME

COMPANY

NAME

ADDRESS ADDRESS

PHONE/FAX PHONE/FAX

NEW

CURRENT

(phone) (name) (phone)

AUTHORIZATION

CONTROL

NUMBER

MSDS

SERIAL

NUMBER

NFPA 704 LABEL

DATA

HEALTH: FLAMMABILITY: REACTIVITY: SPECIAL INSTRUCTIONS:

REMARKS

(Alternate material available?)

(name)

14. LIST BUILDING OR AREA WHERE THIS

MATERIAL WILL BE USED

15. COST CENTER/DODAC

AUTHORIZED TO USE THIS

MATERIAL

17. TECHNICAL REFERENCE REQUIRING

SPECIFIC USE

19. TECHNICAL POC AND PHONE

NUMBER

18. REQUESTER NAME AND PHONE

NUMBER

20. ORGANIZATION 21. DATE REQUESTED

TECHNICAL EXHIBIT B- HAZARDOUS MATERIAL AUTHORIZATION REQUEST

REQUESTOR USE

1. NOMENCLATURE/TRADE NAME

2. STOCK NUMBER (NSN, LSN, MCN, etc.) 3. PART NUMBER

4. QUANTITY REQUESTED 5. MONTHLY REQUIREMENT

(estimate monthly usage or a one-time purchase)

7. UNIT OF MEASURE (must be weight or volume)6. UNIT OF ISSUE (EA, GL, CAN, etc.)

9. TYPE CONTAINER

(CAN, BOTTLE, TUBE, PLASTIC, METAL, GLASS, AEROSOL, etc.)

8. UNIT OF USE (must be weight or volume, e.g., pounds, gallons, etc.)

10. SUGGESTED SOURCE OF SUPPLY 11. MANUFACTURE INFORMATION

(complete if different than supplier)

D. INTO THE TRASH DUMPSTER

12. DESCRIBE THE WORK OR PROCESS IN WHICH THE MATERIAL WILL BE USED

A. ON THE END ITEM, EQUIPMENT, OR

PRODUCT

B. INTO THE AIR

C. INTO A WASTE DRUM

16. PROCESS

(Circle or check (x) one)

E. CENTRAL WASTE TREATMENT OR SEWER

F. OTHER

DPW-ENVIRONMENTAL USE ONLY

13. ESTIMATE WHAT PERCENTAGE OF THE PRODUCT ENDS UP IN THE

LISTED LOCATIONS

TE B - Hazardous Material Authorization Request 1

TECHNICAL EXHIBIT B

Hazardous Material Authorization Request

Block Description Information Required

1 Nomenclature If not a government source NSN, enter a descriptive noun for the item you are purchasing, i.e., SAE 30 oil, yellow spray paint, lead acid battery…

2 NSN Enter NSN if item is from a government source of supply. If it is, skip to block 4.

3 Part Number Enter as appropriate, using the most specific information available

4 Quantity Requested Make every effort to enter only how much you will need to sustain your process for 7-10 days. The only exceptions should be for those items where the smallest size procurable (UI) lasts longer in your process. If a weekly or monthly interval does not work in your process, contact the HMCG to establish special tracking requirements.

5 Monthly Requirement How much do you use per Month ? Enter a quantity and select the appropriate unit: FL OZ, Gallon, Gram, KG, LB, Liter, OZ, Pint, Quart, Troy Oz. An example would be using 5 qts to change oil in car.

6 Unit of Issue Unit of issue. Examples are ea, gal, qt, oz…

7 Unit of Measure Enter the quantity of the size, and select the appropriate measuring unit: Fluid Oz, Gallon, Gram, KG, LB, Liter, Oz, Pint, Quart, Troy Oz.

8 Unit of Use If decanting, what unit will you issue/use

9 Type Container Select the appropriate container description. Bottle, Box, Can, Cartridge, Drum. If not listed, fill in the container type next to “other”

10 Suggested Source of

Supply

Name of Brand Name or source of supply

11 Manufacturer

Information

Enter the manufacturer information. This is very important to determine the correct MSDS and chemical formulation. You may also find this on the container.

A full description of the work activity and process in which the HAZMAT is used. More detail in this block enhances your chances of approval, i.e., Application method, such as hand, brush, spray gun/nozzle, or vapor condensation

Type of industrial equipment, such as open tanks, closed tanks, vapor degreaser, spray booth, mechanical equipment, or other system

If the HAZMAT are transferred to industrial equipment, list the equipment number and specify whether the transfer will occur by pouring, pumping, or another method

The process codes located in Section 8.6 may help to identify the use or application of the HAZMAT. List the process code that best describes the application or use for the HAZMAT.

Method by which HAZMAT may be mixed or combined with other ingredients, such as hand, mixer, open container, closed container

Explain what will happen to the HAZMAT in the process, such as heated in an oven, soldering iron, torch, or heated to facilitate parts washing, or even used to facilitate removal of other HAZMAT by wire brush, sander, grinder.

The important thing here is to be as specific as possible, which can shave days off the approval process – use additional paper if necessary and remember your reviewers don’t do your work – explain it so they can understand it (some of them are not as smart as you).

13 Product Use Make a best estimate (%) for each item

14 Where is the product used

Provide a building number or location

15 DODAC/Cost Center Enter your DODAC for your unit/activity

16 Process Circle the appropriate answer

17 Technical Reference Where is the authorization to use this HAZMAT? I.E, TM,LO,Etc.

18 Requestor Name Your name

19 Technical POC Who can answer questions about the process using the HAZMAT

20 Organization Where do you come from

21 Date Requested Date HMAR form is completed

12 Work or process description

Instructions: Information required for your Hazardous Material Authorization Request .

NOTE: Contractors are strongly encouraged to purchase hazardous materials at the HazMart . On those rare occasions that short-term contractors use non-government furnished HAZMAT, they must use the Hazardous Material Authorization Request t o notify Fort Hood of HAZMAT usage and submit an MSDS for all materials. In these cases, MSDS are used for tracking purposes and does not imply endorsement of any product by Fort Hood.

TE B - Hazardous Material Authorization 2 of 2

File details come from the government source that posted it. Updated .