Surge Plan_DI-MGMT-80969.pdf

PDF 173 KB Posted

Attached to
Overhaul F108-201 Main Engine Control (MEC)
Solicitation number
FA8122-25-R-0006
Issued by

About this file

This document is a Data Item Description (DID) for a Production Surge Plan with identification number DI-MGMT-80969. The purpose of the document is to delineate a contractor's capability to rapidly accelerate and sustain production utilizing existing facilities and equipment in a peace-time acquisition environment, without a declaration of war or mobilization.

The document outlines specific requirements for the Production Surge Plan, including detailing the maximum sustainable production rate, identifying critical components with potential surge impact, listing subcontracted and non-subcontracted items/components, and describing the potential impact on other government contracts. Key elements to be included are production buildup schedules, lists of critical items/components with lead times and pacing items, identification of strategic or critical materials, and an assessment of additional labor and tooling requirements needed to support maximum sustainable production rates. The document is approved for public release with unlimited distribution.

View the file

Other files

File Type Posted
PWS_F108-201 MEC.pdf PDF
DI-MGMT-81838.pdf PDF
DI-MGMT-80441D.pdf PDF
CSS_FA812225R0006_F108 MEC.pdf PDF
DI-MGMT-80995A.pdf PDF
DI-NDTI-80809B.pdf PDF
Transportation.pdf PDF
Packaging Requirements.pdf PDF
Counterfeit Prevention Plan_DI-MISC-81832.pdf PDF
Attachment_1_Pricing_Matrix_F108 MEC.xlsx XLSX spreadsheet
DI-MGMT-81324C.pdf PDF
CDRL Form 1423.pdf PDF
DI-PSSS-81535B.pdf PDF
DI-MGMT-80503.pdf PDF
Special Packaging Instruction.pdf PDF
GFP Attachment.pdf PDF
CAVAF Reporting Requirements.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .