This is a Data Item Description (DID) document titled "Production Surge Plan" with identification number DI-MGMT-80969, approved on February 14, 2019, and maintained by the Office of Primary Responsibility (OPR) in the Army Ammunition Command/Force Development (A/AMOCM/FD).

The Production Surge Plan delineates a contractor's capability to rapidly accelerate and sustain production utilizing existing facilities and equipment in a peacetime acquisition environment without declaring war or mobilization. The plan applies to contracts requiring production surge capability for select critical items. The document establishes specific preparation instructions and content requirements for contractors to submit. The plan must include: the maximum sustainable production rate with a production buildup schedule by month until achieving the maximum rate, incorporating subcontractor and vendor capacity assessments with vertical planning verification; two lists identifying subcontracted and non-subcontracted items/components by nomenclature, part number, and leadtime, including long-leadtime, critical, or pacing items that could adversely impact production, with subcontractor identification by name and address; and a list of Government contracts at the contractor's facility with production surge provisions, including contract numbers, items, and Defense Materials System and Defense Priorities Systems priorities. Additional required elements include impact analysis on other Government contracts, identification of additional skilled labor requirements, a list of strategic or critical materials and precious metals with quantities, costs, and rolling inventory requirements, and a list of production equipment and tooling with estimated cost increases or leadtime reductions to achieve at least 10 percent surge production rate increase within current facility limitations. This DID supersedes DI-P-1634A and is applicable for use independently or with, but not in lieu of, DI-P-7046 (Industrial Preparedness Planning Data).

View the file

Other versions and copies of DI-MGMT-80969

File Revision Posted Attached to
A004_DI-MGMT-80969.pdf Same revision and size as this file Revision not stated SOLICITATION FA811826R0055- Repair of the F-16 Oxygen Monitor NSN 1660-01-473-3548
DI-MGMT-80969 Production Surge Plan.pdf Same revision and size as this file Revision not stated Remanufacture of B-2 Actuator, Electromechanical, Rotary
Production Surge Plan (DI-MGMT-80969).pdf Revision not stated F108 Compressor Inlet Temperature (CIT) Sensor
DI-MGMT-80969 Production Surge Plan.pdf Same revision and size as this file Revision not stated Tear Down, Test & Evaluation/Repair of B-2 Fuel Level Control Valve Bodies
DID_DI-MGMT-80969.pdf Revision not stated REMANUFACTURE OF B-1 YAW TRIM ACTUATOR
A006_DI-MGMT-80969.pdf Same revision and size as this file Revision not stated Solicitaton-FA8118-26-R-0047 REMAN F-15 Fuel Tank Safety Relief Valve
A006_DI-MGMT-80969.pdf Same revision and size as this file Revision not stated FA8118-26-R-0043_ Remanufacture of C-130 Fuel Boost Pump
DI-MGMT-80969 Production Surge Plan.pdf Revision not stated Overhaul of E-3 Electro-Mechanical Actuator
DI-MGMT-80969.pdf Same revision and size as this file Revision not stated Repair of B-2 Submerged Pump, Fuel Pumping Element & Fuel Pump Unit
DI-MGMT-80969.pdf Same revision and size as this file Revision not stated Amendment-01 FD20302600598_FA811826R0033- Overhaul of B1 Torque tube assembly
DI-MGMT-80969 Production Surge Plan.pdf Same revision and size as this file Revision not stated Remanufacture of B-1 Interlock Assembly, Wing Sweep
DID_DI-MGMT-80969.pdf Revision not stated Overhaul of F-16 Check Valve
DID_DI-MGMT-80969.pdf Revision not stated Overhaul of F-16 Check Valve
DI-MGMT-80969 Production Surge Plan.pdf Same revision and size as this file Revision not stated Remanufacturing of the F-16 Air Heat Exchanger
DI-MGMT-80969 Production Surge Plan.pdf Same revision and size as this file Revision not stated Remanufacture of F-15 Rudder and Nose Gear Steering Cartridge Assembly
Production Surge Plan DI-MGMT-80969.pdf Revision not stated Overhaul of KC-135 and E-3 Horizontal Stabilizer Trim Actuator, NSN 1680-01-497-3293RK, 1680-01-005-8163RK
DiD-DI-MGMT-80969-SURGE.pdf Revision not stated Repair of B-2 Transponder Set (KU Band)
DI_MGMT_80969_Surge.pdf Same revision and size as this file Revision not stated T-38 Electro-Mechanical Actuator, Multiple NSNs, Multiple Award Contract (MAC)
DI-MGMT-80969.pdf Same revision and size as this file Revision not stated Remanufacture of C-5 Dual Boost Fuel Pump; NSN: 2915-00-489-9215RK
DI-MGMT-80969.pdf Same revision and size as this file Revision not stated Solicitation for FD20302501098: Overhaul of Control Column, Airc_NSN: 1680-01-527-8154FG & 1680-01-527-8153FG
Show all 20

Who attaches DI-MGMT-80969

Other files

File Type Posted
FA8118-26-R-0038 Reman B-52 Wing Flap PDU.pdf PDF
CDRL1_REPORT.pdf PDF
A002_DI-PSSS-81995A.pdf PDF
PKGRQMT_REPORT.pdf PDF
A003_DI-MGMT-80441D.pdf PDF
A006_DI-SESS-80776B.pdf PDF
A005_DI-MGMT-80503.pdf PDF
STATEMENT_OF_WORK.pdf PDF
TRNSPDATA_REPORT.pdf PDF
A001_DI-MGMT-81838.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .