Attachment_1_Pricing_Matrix_F108 MEC.xlsx
XLSX spreadsheet 41 KB Posted
- Attached to
- Overhaul F108-201 Main Engine Control (MEC)
- Solicitation number
- FA8122-25-R-0006
About this file
This document is a Pricing Matrix for the F108-201 Main Engine Control (MEC) Overhaul solicitation issued by the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation (FA8122-25-R-0006) is for overhauling a critical safety item (NSN: 2915-01-454-3407PN) and is being issued as a sole source requirement to Woodward Inc. The pricing matrix covers a five-year period with a base year and four option years, each containing line items for data lot, test and inspection reports, and main engine control overhaul.
The pricing structure requires offerors to input unit prices in U.S. dollars for each contract line item number (CLIN), with estimated quantities of 1 data lot, 2 test and inspection reports, and 10 overhaul units per year. Vendors must have an approved Source Approval Request (SAR) prior to award, and while the solicitation is technically sole source, all responsible sources may submit a capability statement, proposal, or quotation. The estimated total evaluated price (TEP) for the five-year period is currently set at $0.00, indicating placeholder pricing that will be completed by the offeror.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS_F108-201 MEC.pdf | ||
| DI-MGMT-81838.pdf | ||
| DI-MGMT-80441D.pdf | ||
| Surge Plan_DI-MGMT-80969.pdf | ||
| CSS_FA812225R0006_F108 MEC.pdf | ||
| DI-MGMT-80995A.pdf | ||
| DI-NDTI-80809B.pdf | ||
| Transportation.pdf | ||
| Packaging Requirements.pdf | ||
| Counterfeit Prevention Plan_DI-MISC-81832.pdf | ||
| DI-MGMT-81324C.pdf | ||
| CDRL Form 1423.pdf | ||
| DI-PSSS-81535B.pdf | ||
| DI-MGMT-80503.pdf | ||
| Special Packaging Instruction.pdf | ||
| GFP Attachment.pdf | ||
| CAVAF Reporting Requirements.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Source Selection Information - See FAR 2.101 and 3.104 | |
| Remanufacture of F108 Turbine Clearance Control Valve | |
| Attachment 1 | |
| Instructions to complete this Pricing Matrix: |
| 1 | Offerors are to input the proposed unit prices on this TEP Worksheet, Column G, in ALL yellow highlighted cells |
| 2 | All amounts shall be proposed in U.S. Dollars |
| 3 | Rounding: All dollar amounts shall be rounded to two decimal places |
| 4 | The extended price will be automatically calculated by multiplying the proposed unit price by the estimated quantity |
| 5 | A subtotal price will be automatically calculated at the bottom of each year |
| 6 | The Total Evaluated Price (TEP) will automatically calculate at the top of the TEP worksheet |
| 7 | If deemed necessary, the Offeror may provide additional rationale in the "Additional Rationale (Optional)" worksheet |
SOURCE SELECTION INFORMATION - See FAR 2.101 and FAR 3.104
SOURCE SELECTION INFORMATION - See FAR 2.101 and FAR 3.104
TEP
| ATTACHMENT 1 - PRICING MATRIX |
| FA812225R0006 - Overhaul F108-201 Main Engine Control |
| USE DATA BELOW TO PROVIDE QUOTE |
| PERIOD OF PERFORMANCE | PRICE |
| ESTIMATED TOTAL PRICE FOR BASE YEAR, YEAR 1 | $0.00 |
| ESTIMATED TOTAL PRICE FOR OPTION I, YEAR 2 | $0.00 |
| ESTIMATED TOTAL PRICE FOR OPTION II, YEAR 3 | $0.00 |
| ESTIMATED TOTAL PRICE FOR OPTION III, YEAR 4 | $0.00 |
| ESTIMATED TOTAL PRICE FOR OPTION IV, YEAR 5 | $0.00 |
| TOTAL EVALUATED PRICE (TEP) = (5 YEARS) | $0.00 |
| BASE YEAR, YEAR 1 | |||||||
| CLIN | NSN | PART NUMBER | CLIN DESCRIPTION | UNIT OF ISSUE | BEST ESTIMATED QUANTITY | UNIT PRICE | TOTAL PRICE |
| 0001 | N/A | N/A | Data | Lot | 1 | NSP | NSP |
| 0002 | 2915-01-454-3407PN | N/A | Test and Inspection Report | Each | 2 | $0.00 | |
| 0003 | 2915-01-454-3407PN | 8063-216 | Overhaul F108-201 Main Engine Control | Each | 10 | $0.00 | |
| 0004 | N/A | N/A | Over and Above | Lot | 1 | TBN | TBN |
| BASE YEAR TEP | $0.00 | ||||||
| OPTION I, YEAR 2 | |||||||
| CLIN | NSN | PART NUMBER | CLIN DESCRIPTION | UNIT OF ISSUE | BEST ESTIMATED QUANTITY | UNIT PRICE | TOTAL PRICE |
| 1001 | N/A | N/A | Data | Lot | 1 | NSP | NSP |
| 1002 | 2915-01-454-3407PN | N/A | Test and Inspection Report | Each | 2 | $0.00 | |
| 1003 | 2915-01-454-3407PN | 8063-216 | Overhaul F108-201 Main Engine Control | Each | 10 | $0.00 | |
| 1004 | N/A | N/A | Over and Above | Lot | 1 | TBN | TBN |
| OPTION I TEP | $0.00 | ||||||
| OPTION II, YEAR 3 | |||||||
| Item No. | NSN | PART NUMBER | CLIN DESCRIPTION | UNIT OF ISSUE | BEST ESTIMATED QUANTITY | UNIT PRICE | TOTAL PRICE |
| 2001 | N/A | N/A | Data | Lot | 1 | NSP | NSP |
| 2002 | 2915-01-454-3407PN | N/A | Test and Inspection Report | Each | 2 | $0.00 | |
| 2003 | 2915-01-454-3407PN | 8063-216 | Overhaul F108-201 Main Engine Control | Each | 10 | $0.00 | |
| 2004 | N/A | N/A | Over and Above | Lot | 1 | TBN | TBN |
| OPTION II TEP | $0.00 | ||||||
| OPTION III, YEAR 4 | |||||||
| CLIN | NSN | PART NUMBER | CLIN DESCRIPTION | UNIT OF ISSUE | BEST ESTIMATED QUANTITY | UNIT PRICE | TOTAL PRICE |
| 3001 | N/A | N/A | Data | Lot | 1 | NSP | NSP |
| 3002 | 2915-01-454-3407PN | N/A | Test and Inspection Report | Each | 2 | $0.00 | |
| 3003 | 2915-01-454-3407PN | 8063-216 | Overhaul F108-201 Main Engine Control | Each | 10 | $0.00 | |
| 3004 | N/A | N/A | Over and Above | Lot | 1 | TBN | TBN |
| OPTION III TEP | $0.00 | ||||||
| OPTION IV, YEAR 5 | |||||||
| CLIN | NSN | PART NUMBER | CLIN DESCRIPTION | UNIT OF ISSUE | BEST ESTIMATED QUANTITY | UNIT PRICE | TOTAL PRICE |
| 4001 | N/A | N/A | Data | Lot | 1 | NSP | NSP |
| 4002 | 2915-01-454-3407PN | N/A | Test and Inspection Report | Each | 2 | $0.00 | |
| 4003 | 2915-01-454-3407PN | 8063-216 | Overhaul F108-201 Main Engine Control | Each | 10 | $0.00 | |
| 4004 | N/A | N/A | Over and Above | Lot | 1 | TBN | TBN |
| OPTION IV TEP | $0.00 |
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and FAR 3.104
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and FAR 3.104
Additional Rationale (Optional) Offerors: If additional rationale is deemed pertinent to support the pricing in your pricing matrix, please provide it here.
File details come from the government source that posted it. Updated .