This is a Data Item Description (DID) form that establishes the format and content requirements for a Production Surge Plan deliverable in federal contracts. The DID, identified as DI-MGMT-80969, was approved on February 14, 2019, and applies to contracts requiring production surge capability for select critical items. The office of primary responsibility is A/AMOCM/FD, and the applicable AMSC number is A4923.

The Production Surge Plan delineates a contractor's capability to rapidly accelerate and sustain production of existing facilities and equipment in a peacetime acquisition environment without declaring war or mobilization and subsequent use of emergency war powers. The plan must address the maximum sustainable production rate, including a production buildup schedule by month until achieving the maximum rate, and must account for subcontractor and vendor capacity to expedite production and delivery of components and materials. Required content includes: (1) a rate section describing maximum sustainable production with vertical planning verification; (2) two lists identifying subcontracted and non-subcontracted items/components by nomenclature, part number, leadtime, and production volume of long-leadtime, critical, or pacing items that could adversely impact production; (3) a list of Government contracts at the contractor's facility with production surge provisions, including contract numbers, items, and Defense Materials System/Defense Priorities Systems priorities; (4) impact analysis describing effects on current Government contracts and contractor's commercial business; (5) identification of additional skilled labor requirements; (6) a list of strategic or critical materials and precious metals by type, quantity, and cost with substitute materials identified; and (7) a list of production equipment and tooling, down to the lowest tier subcontractor, with costs and estimated surge capacity increases. The DID supersedes DI-P-1634A and may be used independently or in conjunction with DI-P-7046 (Industrial Preparedness Planning Data).

View the file

Other versions and copies of DI-MGMT-80969

File Revision Posted Attached to
DI-MGMT-80969 Production Surge Plan.pdf Same revision and size as this file Revision not stated Remanufacture of B-2 Actuator, Electromechanical, Rotary
Production Surge Plan (DI-MGMT-80969).pdf Revision not stated F108 Compressor Inlet Temperature (CIT) Sensor
DI-MGMT-80969 Production Surge Plan.pdf Same revision and size as this file Revision not stated Tear Down, Test & Evaluation/Repair of B-2 Fuel Level Control Valve Bodies
DID_DI-MGMT-80969.pdf Revision not stated REMANUFACTURE OF B-1 YAW TRIM ACTUATOR
A006_DI-MGMT-80969.pdf Same revision and size as this file Revision not stated Solicitaton-FA8118-26-R-0047 REMAN F-15 Fuel Tank Safety Relief Valve
A006_DI-MGMT-80969.pdf Same revision and size as this file Revision not stated FA8118-26-R-0043_ Remanufacture of C-130 Fuel Boost Pump
A004_DI-MGMT-80969.pdf Same revision and size as this file Revision not stated FA8118-26-R-0038- Remanufacture and Upgrade of B-52 Wing Flap PDU
DI-MGMT-80969 Production Surge Plan.pdf Revision not stated Overhaul of E-3 Electro-Mechanical Actuator
DI-MGMT-80969.pdf Same revision and size as this file Revision not stated Repair of B-2 Submerged Pump, Fuel Pumping Element & Fuel Pump Unit
DI-MGMT-80969.pdf Same revision and size as this file Revision not stated Amendment-01 FD20302600598_FA811826R0033- Overhaul of B1 Torque tube assembly
DI-MGMT-80969 Production Surge Plan.pdf Same revision and size as this file Revision not stated Remanufacture of B-1 Interlock Assembly, Wing Sweep
DID_DI-MGMT-80969.pdf Revision not stated Overhaul of F-16 Check Valve
DID_DI-MGMT-80969.pdf Revision not stated Overhaul of F-16 Check Valve
DI-MGMT-80969 Production Surge Plan.pdf Same revision and size as this file Revision not stated Remanufacturing of the F-16 Air Heat Exchanger
DI-MGMT-80969 Production Surge Plan.pdf Same revision and size as this file Revision not stated Remanufacture of F-15 Rudder and Nose Gear Steering Cartridge Assembly
Production Surge Plan DI-MGMT-80969.pdf Revision not stated Overhaul of KC-135 and E-3 Horizontal Stabilizer Trim Actuator, NSN 1680-01-497-3293RK, 1680-01-005-8163RK
DiD-DI-MGMT-80969-SURGE.pdf Revision not stated Repair of B-2 Transponder Set (KU Band)
DI_MGMT_80969_Surge.pdf Same revision and size as this file Revision not stated T-38 Electro-Mechanical Actuator, Multiple NSNs, Multiple Award Contract (MAC)
DI-MGMT-80969.pdf Same revision and size as this file Revision not stated Remanufacture of C-5 Dual Boost Fuel Pump; NSN: 2915-00-489-9215RK
DI-MGMT-80969.pdf Same revision and size as this file Revision not stated Solicitation for FD20302501098: Overhaul of Control Column, Airc_NSN: 1680-01-527-8154FG & 1680-01-527-8153FG
Show all 20

Who attaches DI-MGMT-80969

Other files

File Type Posted
PKGRQMT_REPORT.pdf PDF
FA811826R0055.pdf PDF
Performance_Work_Statement.pdf PDF
A001_DI-MGMT-81838.pdf PDF
A002_DI-PSSS-81995A.pdf PDF
A006_DI-SESS-80776B.pdf PDF
A005_DI-MGMT-80503.pdf PDF
TRNSPDATA_REPORT.pdf PDF
A003_DI-MGMT-80441D.pdf PDF
CDRL1_REPORT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .