A11 Section E-EXHIBIT 14 - PostAwardCerts.doc

DOC document 49 KB Posted

Attached to
Consolidated Facilities Management Services at the Mid-Atlantic Social Security Center, Philadelphia, PA
Solicitation number
SSA-RFP-09-1018
Issued by

About this file

Exhibit 14 - Post Award Certifications

View the file

Other files

File Type Posted
A11 Amendment 003 SSA-RFP-09-1018.pdf PDF
MATSSC CFM BAS Upgrade Asbuilts.pdf PDF
Amendment 002 SSA-RFP-09-1018.pdf PDF
A11-Amend 001 Section E-EXH 8A-SM Price Sched.xls XLS spreadsheet
A11 Amendment 001 info.pdf PDF
A11 Cover Letter SSA RFP 09 1018.pdf PDF
A11 - Section E-Exhibit 1B - Equipment List.pdf PDF
A11 Section E-EXHIBIT 13 MATSSC Site Plan.pdf PDF
A11 Section E-Exhibit 2 Elevator Maint.doc DOC document
A06 Security CBA-2008-2427.pdf PDF
A11 - Section E-EXHIBIT 01A-Equip_Systems.doc DOC document
A06 Operating Engineers CBA.pdf PDF
A11 - Section E-EXHIBIT 8A - Sust Maint Sched.xls XLS spreadsheet
A11 - Attach 1 - Section A Schedule of Items.xls XLS spreadsheet
A06 WD 2005-2449 Rev 6 - 05292008.doc DOC document
A11 Section E-EXHIBIT 8 Sustaining Maint.doc DOC document
A11 Section E-Exh 11 Continuity of Srvcs Plan.pdf PDF
A11 - Sect E-EXH 6-ECC OM and Staff Qualif.doc DOC document
A11 - Section E-EXHIBIT 04 Custodial.doc DOC document
SF1449 SSA-RFP-09-1018.pdf PDF
A06 Elevator WD 1980-0339 Rev 36 01122009.doc DOC document
A11 - Section E-EXHIBIT 7 UPS.doc DOC document
A11 - Section E-EXHIBIT 01 OM.doc DOC document
A11 Section E-Exhibit 10 QASP for MATSSC.doc DOC document
A11 - Section E-EXHIBIT 03 Utilities.doc DOC document
A11 - Section E-EXH 04A-4H Cust_Rel Srvcs.doc DOC document
A06 Custodial CBA-2004-216.pdf PDF
A11 Section E-EXHIBIT 9 BMC Fire Alarm System.doc DOC document
A11 Section E-EXHIBIT 12 Building Floor Plans.pdf PDF
A11 SSA-RFP-09-1018 Text.doc DOC document
A11 - Section E-EXHIBIT 5-5F Security.doc DOC document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 14 -- POSTAWARD CERTIFICATIONS

THE CONTRACTOR SHALL COMPLETE THIS CHECKLIST AND FORWARD IT

TO THE CONTRACTING OFFICER WITHIN 30 CALENDAR DAYS FOLLOWING

AWARD OF THE CONTRACT.

PRIVATE

REQUIREMENT

HAS

COMPLIED

(provide date)

HAS NOT

COMPLIED

Contractor has in place a Personal Protective Equipment (PPE) program and all employees have been trained and certified as required by Title 29 CFR 1910.132-.138 *

Contractor has in place a Hazard Communication Program and all employees have been trained and certified as required by Title 29 CFR 1910.1200

Contractor has in place a Hazardous Energy Source Control (Lockout/Tagout) program and all employees have been trained and certified as required by Title 29 CFR 1910.147

Contractor employees and/or subcontractors have been completed, as required by Title 29 CFR 1926.1101: 1) Asbestos Awareness Training, and 2) if asbestos abatement is required, Operations and Maintenance Training.

In accordance with 29 CFR 1910.269(b)(1), personnel shall be trained in CPR/First Aid if they are performing work on, or associated with, 50 volts or more

Contractor has in place a hearing conservation program and has trained all employees in hearing conservation as required by Title 29 CFR 1910.95

For any requirement for which the Contractor does not immediately comply, the Contractor may provide information which would indicate a plan to put the program in place and/or provide the required training. If any such plan is accepted by the Government, the Contractor shall be expected to comply with the requirement within 30 calendar days following submission of the checklist.

CERTIFIED TO BE TRUE AND ACCURATE

Printed Name and Title__________________________________

Signature/Date_________________________________________

* CFR - Code of Federal Regulations

File details come from the government source that posted it. Updated .