Exhibit 10 - QASP

View the file

Other files

File Type Posted
A11 Amendment 003 SSA-RFP-09-1018.pdf PDF
MATSSC CFM BAS Upgrade Asbuilts.pdf PDF
Amendment 002 SSA-RFP-09-1018.pdf PDF
A11-Amend 001 Section E-EXH 8A-SM Price Sched.xls XLS spreadsheet
A11 Amendment 001 info.pdf PDF
A11 Cover Letter SSA RFP 09 1018.pdf PDF
A11 - Section E-Exhibit 1B - Equipment List.pdf PDF
A11 Section E-EXHIBIT 13 MATSSC Site Plan.pdf PDF
A11 Section E-Exhibit 2 Elevator Maint.doc DOC document
A06 Security CBA-2008-2427.pdf PDF
A11 - Section E-EXHIBIT 01A-Equip_Systems.doc DOC document
A06 Operating Engineers CBA.pdf PDF
A11 - Section E-EXHIBIT 8A - Sust Maint Sched.xls XLS spreadsheet
A11 - Attach 1 - Section A Schedule of Items.xls XLS spreadsheet
A06 WD 2005-2449 Rev 6 - 05292008.doc DOC document
A11 Section E-EXHIBIT 8 Sustaining Maint.doc DOC document
A11 Section E-Exh 11 Continuity of Srvcs Plan.pdf PDF
A11 Section E-EXHIBIT 14 - PostAwardCerts.doc DOC document
A11 - Sect E-EXH 6-ECC OM and Staff Qualif.doc DOC document
A11 - Section E-EXHIBIT 04 Custodial.doc DOC document
SF1449 SSA-RFP-09-1018.pdf PDF
A06 Elevator WD 1980-0339 Rev 36 01122009.doc DOC document
A11 - Section E-EXHIBIT 7 UPS.doc DOC document
A11 - Section E-EXHIBIT 01 OM.doc DOC document
A11 - Section E-EXHIBIT 03 Utilities.doc DOC document
A11 - Section E-EXH 04A-4H Cust_Rel Srvcs.doc DOC document
A06 Custodial CBA-2004-216.pdf PDF
A11 Section E-EXHIBIT 9 BMC Fire Alarm System.doc DOC document
A11 Section E-EXHIBIT 12 Building Floor Plans.pdf PDF
A11 SSA-RFP-09-1018 Text.doc DOC document
A11 - Section E-EXHIBIT 5-5F Security.doc DOC document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 10

SOCIAL SECURITY

Mid-Atlantic Social

Security Center (MATSSC)

300 Spring Garden Street

Philadelphia, PA 19123 Mid-Atlantic Social Security Center (MATSSC)

Quality Assurance Surveillance Plan

For the

Combined Facilities Management Contract

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing the Performance Based Work Statement (PBWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective on the PBWS in the facilities management contract.

The QASP provides a systematic method to evaluate the services the contractor is required to furnish.

This QASP is based on the premise the government desires to maintain a quality standard in operating, maintaining and repairing facilities and that a service contract is the best means of achieving that objective.

The contractor, and not the government, is responsible for management and quality control actions to meet the terms of the contract. The role of the government is quality assurance to ensure contract standards are achieved.

In this contract the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspection and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the contractor to success.

Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.

PROCEDURES:

The government will conduct quarterly and annual evaluations of the contractor’s performance based on the following performance objectives:

Performance Objective Ratings Quality of Product/Service

0, 1, 2, 3, 4, 5

Timeliness of Performance 0, 1, 2, 3, 4, 5

Business Relations 0, 1, 2, 3, 4, 5

Customer Satisfaction

0, 1, 2, 3, 4 , 5

Legend:

Quality of Product/Service:

Compliance with Contract Requirements

Meets Contract Objectives

Accuracy of Reports

Appropriateness of Personnel

Manager(s)/Key Personnel Performance

Technical Excellence/Service Calls

Meets all requirements for Inspections

Meets all requirements for Safety

Business Relations:

Effective management

Businesslike correspondence

Responsive to contract requirements

Prompt notification of problems

Reasonable/cooperative

Flexible

Pro-active

Effective contractor- recommended solutions

Timeliness of Performance:

Responsive to technical direction

Completes PM on schedule

Competes Repairs on schedule

Responds timely to Emergency Service Requirements

Responds timely to Service Calls

Reports and Deliverables provided on schedule

Customer Satisfaction:

Demonstrates commitment to Customer Satisfaction

Strives to meet or exceed Customer Expectations

Responsive to Customer Complaints

Performance minimizes legitimate Complaints

Provides friendly helpful service to Customers

The evaluation will take into consideration the contractor’s performance in the following specific areas:

· Operation and Maintenance of Building and Mechanical Equipment;

· Elevator Maintenance;

· Utility Operation

· Custodial and Related Services;

· Security Services;

· Operation of Environmental Control Center Services;

· Uninterruptible Power Supply System Maintenance (after expiration of the initial installation warranty);

· Sustaining Maintenance and Repairs; and

· Operation and Maintenance of Building Automation System (Energy Management and Life Safety).

The COTR and/or his representative performs evaluations in any number of ways:

· The COTR may perform evaluations using the contractor’s quality control program, which was previously approved by the government

· The COTR may accompany the PM on scheduled inspections and observe the PM inspecting the service to ensure defects are corrected.

· The COTR may immediately inspect the same area as the PM as soon as the PM has completed the quality control inspection to determine if any surveillance areas were overlooked.

· The COTR may inspect an area prior to the PM and compare results. The COTR will record defects if PM fails to record performance defects and defects are not corrected.

· The COTR may periodically review data from the CMMS to determine how timely PM and equipment repairs are accomplished.

· Information on building occupant complaints may be collected and analyzed to determine to what extent they indicate contractor performance problems.

· Building occupants may be surveyed as part of the evaluation of customer satisfaction.

· The COTR may review contractor inspection reports. See Section C-4.8 and 4.9 for more information on inspectors and inspection procedures.

The COTR will notify the contracting officer if there is a significant decline in Contractor performance.

Ratings: The instructions below will be used as guidance in making these evaluations and as an explanation of the rating scale.

RATING GUIDELINES

0 = Unsatisfactory 1 = Poor 2 = Fair 3 = Good 4 = Excellent 5 = Outstanding Quality of product or Service 0 = Unsatisfactory 1 = Poor 2 = Fair 3 = Good 4 = Excellent 5 = Outstanding

Unsatisfactory
Non-conformances are jeopardizing the achievement of contract objectives, despite use of Agency resources. Recovery is not likely. If performance cannot be substantially corrected, it constitutes a significant impediment in consideration for future awards containing similar objectives.
Poor
Overall compliance requires significant Agency resources to ensure achievement of contract objectives.
Fair
Overall compliance requires minor Agency resources to ensure achievement of contract objectives.
Good
There are no, or very minimal, quality problems, and the Contractor has met the contract objectives.
Excellent
There are no quality issues, and the Contractor has substantially exceeded the contract performance objectives without commensurate additional costs to the Government.
Outstanding
The contractor has demonstrated an outstanding performance level that was significantly in excess of anticipated achievements and is commendable as an example for others, so that it justifies adding a point to the score. It is expected that this rating will be used in those rare circumstances where contractor performance clearly exceeds the performance levels described as "Excellent".

Timeliness of Performance 0 = Unsatisfactory 1 = Poor 2 = Fair 3 = Good 4 = Excellent 5 = Outstanding

Unsatisfactory
Delays are jeopardizing the achievement of contract requirements, despite use of Agency resources. Recovery is not likely. If performance cannot be substantially corrected, it constitutes a significant impediment in consideration for future awards.
Poor
Delays require significant Agency resources to ensure achievement of contract requirements.
Fair
Delays require minor Agency resources to ensure achievement of contract requirements.
Good
There are no, or minimal, delays that impact achievement of contract requirements.
Excellent
There are no delays and the contractor has exceeded the agreed upon time schedule.
Outstanding
The contractor has demonstrated an outstanding performance level that justifies adding a point to the score. It is expected that this rating will be used in those rare circumstances where contractor performance clearly exceeds the performance levels described as "Excellent".

Business Relations

Unsatisfactory
Response to inquiries and/or technical, service, administrative issues is not effective. If not substantially mitigated or corrected it should constitute a significant impediment in considerations for future awards.
Poor
Response to inquiries and/or technical, service, administrative issues is marginally effective.
Fair
Response to inquiries and/or technical, service, administrative issues is somewhat effective.
Good
Response to inquiries and/or technical, service, administrative issues is consistently effective.
Excellent
Response to inquiries and/or technical, service, administrative issues exceeds Government expectation.
Outstanding
The contractor has demonstrated an outstanding performance level that justifies adding a point to the score. It is expected that this rating will be used in those rare circumstances where contractor performance clearly exceeds the performance levels described as "Excellent".

Customer Satisfaction

Unsatisfactory
Showed no commitment to customer satisfaction. Would definitely not recommend the selection of this firm again.
Poor
Showed little commitment to customer satisfaction. Would probably not recommend the selection of this firm again.
Fair
Showed some commitment to customer satisfaction. Might recommend the selection of this firm again.
Good
Showed commitment to customer satisfaction. Would recommend the selection of this firm again.
Excellent
Showed strong commitment to customer satisfaction. Would definitely recommend the selection of this firm again.
Outstanding
Showed unwavering commitment to customer satisfaction. Would strongly recommend the selection of this firm again.

File details come from the government source that posted it. Updated .