Specifications Revision 2.pdf

PDF 7 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction Sioux Falls VAMC Federal contract opportunity
Solicitation number
36C77622R0049
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides specifications for a federal construction project. The project scope involves infrastructure upgrades at the Sioux Falls VA Medical Center to support implementation of an electronic health records system. Work includes construction and commissioning of server rooms, electrical and mechanical systems throughout multiple hospital buildings and departments. The solicitation will be issued as a total SDVOSB set-aside construction contract with a magnitude between $20-50 million. The period of performance is approximately 450 calendar days. Questions must be submitted in writing by a specified date and the solicitation will follow FAR Parts 15, 19, and 36.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Infrastructure Upgrades Construction Sioux Falls VAMC, newest first.
File Type Posted
36C77622R0049 0006.pdf PDF
Technical Question Tracking Sheet Infra Upgrades Final.pdf PDF
36C77622R0049 0005.pdf PDF
271116 Communications Cabinets Racks Frames and Enclosures.pdf PDF
36C77622R0049 0004.pdf PDF
271619 Communications Patch Cords Station Cords and Cross Connect Wire.pdf PDF
2020 Elec Combined One Lines.pdf PDF
270536 Cable Trays for Communications Systems.pdf PDF
271119 Communications Termination Blocks and Patch Panels.pdf PDF
OIT InfrastrucStdTelecomSpaces 3.1.pdf PDF
SF Site Utility Dwg.pdf PDF
270553 Identification for Communications Systems.pdf PDF
271513 Communications Copper Horizontal Cabling.pdf PDF
Technical Question Tracking Sheet - Infra Upgrades - Final.pdf PDF
271313.13 Communications Copper Cable Splicing and Terminations.pdf PDF
270526 Grounding and Bonding for Communications Systems.pdf PDF
271513.13 Communications Optical Fiber Cable Splicing and Terminations.pdf PDF
271000 Structured Cabling.pdf PDF
271323 Communications Optical Fiber Backbone Cabling.pdf PDF
270533 Conduits and Backboxes for Communications Systems.pdf PDF
271126 Communications Rack Mounted Power Protection and Power Strips.pdf PDF
271313 Communications Copper Backbone Cabling.pdf PDF
36C77622R0049 0003.pdf PDF
EHRM Site Visit Attendance Sheet.pdf PDF
36C77622R0049 0002.pdf PDF
Building 1C Sheet 6 - Pipe Tunnel.pdf PDF
Technical Question Tracking Sheet - Infra Upgrades.pdf PDF
Specification - Vol 2 Revision 2.pdf PDF
36C77622R0049 0001.pdf PDF
Dwgs Bid Documents-part 7-1 REV.pdf PDF
VHA Suppl. Contract Rqmnts for Combatting COVID-19 Updated 12-14-2021.pdf PDF
Supplement to General Requirements Spec 01 00 00.pdf PDF
36C77622R0049.pdf PDF
Dwgs Bid Documents-part 4-1 REV.pdf PDF
Dwgs Bid Documents-part 5-1 REV.pdf PDF
Dwgs Bid Documents-part 2-1 REV.pdf PDF
Asbestos - Appendix-A part 4.pdf PDF
Asbestos - Appendix-A part 2.pdf PDF
Construction Wage Rates - Minnehaha - 2-25-22.pdf PDF
Dwgs Bid Documents-part 6-1 REV.pdf PDF
Dwgs Bid Documents-part 3-1 REV.pdf PDF
Asbestos - Appendix-A part 1.pdf PDF
Dwgs Bid Documents-part 1-1 REV.pdf PDF
Asbestos - Appendix-A part 3.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Anderson Engineering of Minnesota, LLC 13605 1st Avenue North

Plymouth, MN 55441 Phone: 763-412-4000 Fax: 763-412-4090

Prepared in association with the following:

AST ENGINEERING AND SPECIALIZED ENGINEERING SOLUTIONS

VAMC SIOUX FALLS

EHRM INFRASTRUCTURE UPGRADES

VA PROJECT NUMBER: 438-20-910

2501 WEST 22ND STREET

SIOUX FALLS, SD. 57105

TECHNICAL SPECIFICATIONS VOL I

ANDERSON ENGINEERING OF MN, LLC

Project Number: 16090

Issue for

BID DOCUMENTS

06, JULY 2021

Sioux Falls VAHCS, Sioux Falls, SD VA Project 438-20-910 EHRM Infrastructure Upgrades 07-06-2021 2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 10-1

TABLE OF CONTENTS

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01-21 01 32 16.01 Architectural and Engineering CPM Schedules 03-20 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 03-19 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 01-21 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 02 82 13.13 Glovebag Asbestos Abatement 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21 02 82 13.21 Asbestos Roofing Abatement 01-21 02 82 13.31 Asbestos Transite Abatement 01-21

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17 04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 36 00 Composite Metal Decking 01-21

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 10-2

TABLE OF CONTENTS

SECTION NO. DIVISION AND SECTION TITLES DATE

05 40 00 Cold-Formed Metal Framing 01-21 05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 01-21 07 08 00 Facility Exterior Closure Commissioning 01-21 07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 14 23 Impact Resistant Doors 08 34 00 Special Function Doors 08 71 00 Door Hardware 01-21 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21 08 87 00 Architectural Window Film

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 00 Specialty Moldings and Trims for Floorings 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 09 65 36.13 Static Dissipative Resilient Tile

09 67 26 EPOXY BROADCAST, OPT FINISH WITH URETHANE TOPCOAT

09 72 16 Vinyl-Coated Fabric Wall Covering 01-21 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21 10 26 00 Wall and Door Protection 01-21

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 10-3

TABLE OF CONTENTS

SECTION NO. DIVISION AND SECTION TITLES DATE

10 51 16 Lockers

DIVISION 12 – FURNISHINGS

12 11 13 Edge Illuminated Photo Murals 12 32 00 Manufactured Wood Casework 09-15 12 36 00 Solid Surface Countertops 12-18

Appendix A

- Asbestos Survey Report

EHRM Infrastructure Upgrades 11-29-2021 2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 1

LIST OF DRAWING SHEETS

SECTION 00 01 15

LIST OF DRAWINGS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GI000 COVER SHEET

GI001 SHEET INDEX

GI002 ABBREVIATIONS

GI010 PARTIAL FIRST LEVEL LIFE SAFETY PLAN

GI020 PARTIAL SECOND LEVEL LIFE SAFETY PLAN

GC101-01 LOWER LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 1

GC131-01 THIRD LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 1

GC101-05 GROUND LEVEL ICRA-CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 5

GC111-05 FIRST LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 5

GC121-05 SECOND LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 5

GC131-05 THIRD LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 5

GC141-05 FOURTH LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 5

GC151-05 FIFTH LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 5

GC111-07 FIRST LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 7

GC101-16 LOWER LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 16

GC111-28 FISRT LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 28

GC111-38 FIRST LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN - BUILDING 38

ASB101-01 LOWER LEVEL ABATEMENT AND REMEDIATION PLAN - BUILDING 1

ASB131-01 THIRD LEVEL ABATEMENT AND REMEDIATION PLAN - BUILDING 1

ASB101-05 GROUND LEVEL ABATEMENT AND REMEDIATION PLAN - BUILDING 5

ASB111-05 FIRST LEVEL ABATEMENT AND REMEDIATION PLAN - BUILDING 5

ASB121-05 SECOND LEVEL ABATEMENT AND REMEDIATION PLAN - BUILDING 5

ASB131-05 THIRD LEVEL ABATEMENT AND REMEDIATION PLAN - BUILDING 5

ASB141-05 FOURTH LEVEL ABATEMENT AND REMEDIATION PLAN - BUILDING 5

ASB151-05 FIFTH LEVEL ABATEMENT AND REMEDIATION PLAN - BUILDING 5

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 2

LIST OF DRAWING SHEETS

ASB111-38 FIRST LEVEL ABATEMENT AND REMEDIATION PLAN - BUILDING 38

S100 TITLE SHEET

S110 STRUCTURAL NOTES

S111 SCHEDULES

S200 KEY PLAN

S210 FIRST FLOOR PLAN

S220 SECOND FLOOR FRAMING PLAN

S230 ROOF FRAMING PLAN

S240 SECTIONS AND DETAILS

S241 SECTIONS AND DETAILS

S250 WALL SECTIONS

AS100 ARCHITECTURAL SITE & STAGING PLAN

ES101 ELECTRICAL SITE PLAN

AD101-01 LOWER LEVEL OVERALL DEMOLITION PLAN - BUILDING 1

AE101-01 LOWER LEVEL OVERALL FLOOR PLAN & ENLARGED PLAN - BUILDING 1

MD101-01-A LOWER LEVEL & FIRST LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 1 - AREA A

MH101-01-A LOWER LEVEL & FIRST LEVEL DUCTWORK PLAN - BUILDING 1 - AREA A

MP101-01-A LOWER LEVEL PIPING PLAN - BUILDING 1 - AREA A

EE101-01 OVERALL LOWER LEVEL FLOOR PLAN - BUILDING 1

ED301-01-A LOWER LEVEL ELECTRICAL DEMOLITION - BUILDING 1 - ENLARGED ROOMS - AREA A

EE401-01-A PANEL SCHEDULES - BUILDING 1 - LOWER LEVEL - AREA A

TN101-01-A LOWER LEVEL & FIRST LEVEL LOW VOLTAGE PLAN - BUILDING 1 - AREA A

T301-01-A ENLARGED ROOM 037

T302-01-A ENLARGED ROOM 002

EE401-01-A PANEL SCHEDULES - BUILDING 1 - LOWER LEVEL - AREA A

ED101-01-B LOWER LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 1 - AREA B

TN101-01-B LOWER LEVEL & FIRST LEVEL LOW VOLTAGE PLAN - BUILDING 1 - AREA B

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 3

LIST OF DRAWING SHEETS

AE111-01 FIRST LEVEL DEMOLITION, FLOOR & ENLARGED PLANS - BUILDING 1

MH111-01-A FIRST LEVEL DUCTWORK PLAN - BUILDING 1 - AREA A

MP111-01-A FIRST LEVEL PIPING PLAN - BUILDING 1 - AREA A

EE111-01 FIRST LEVEL FLOOR PLAN - BUILDING 1

ED111-01-A FIRST LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 1 - AREA A

TN111-01-A FIRST LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 1 - AREA A

MH111-01-B FIRST LEVEL DUCTWORK PLAN - BUILDING 1 - AREA B

MP111-01-B FIRST LEVEL PIPING PLAN - BUILDING 1 - AREA B

ED111-01-B FIRST LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 1 - AREA B

ED311-01-B FIRST LEVEL ELECTRICAL DEMOLITION - BUILDING 1 - ENLARGED ROOMS - AREA B

TN111-01-B FIRST LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 1 - AREA B

T311-01-B ENLARGED ROOM 122A

EE411-01-B PANEL SCHEDULES - BUILDING 1 - FIRST LEVEL - AREA B

AE121-01 SECOND LEVEL DEMOLITION, FLOOR & ENLARGED PLANS - BUILDING 1

MP121-01-A SECOND LEVEL PIPING FLOOR PLAN - BUILDING 1 - AREA A

EE121-01 SECOND LEVEL FLOOR PLAN - BUILDING 1

ED121-01-A SECOND LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 1 - AREA A

TN121-01-A SECOND LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 1 - AREA A

AD131-01 THIRD LEVEL OVERALL DEMOLITION PLAN - BUILDING 1

AE131-01 THIRD LEVEL OVERALL FLOOR PLAN & ENLARGED PLAN - BUILDING 1

MD131-01-A THIRD LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 1 - AREA A

MH131-01-A THIRD LEVEL DUCTWORK FLOOR PLAN - BUILDING 1 - AREA A

MP131-01-A THIRD LEVEL PIPING FLOOR PLAN - BUILDING 1 - AREA A

EE131-01 THIRD LEVEL OVERALL FLOOR PLAN - BUILDING 1

ED131-01-A THIRD LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 1 - AREA A

ED331-01-A THIRD LEVEL ELECTRICAL DEMOLITION - BUILDING 1 - ENLARGED ROOMS - AREA A

TN131-01-A THIRD LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 1 - AREA A

T331-01-A ENLARGED ROOM 313 AND 313A

EE431-01-A PANEL SCHEDULES - BUILDING 1 - THIRD LEVEL - AREA A

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 4

LIST OF DRAWING SHEETS

C-001 OVERALL SITE PLAN

CD-101 EXISTING CONDITIONS & REMOVALS

CU-201 PLANNED CONSTRUCTION

CU-301 UTILITY PROFILE

C-501 DETAILS & NOTES

AD101-05 GROUND LEVEL OVERALL DEMOLITION PLAN - BUILDING 5

AE101-05 GROUND LEVEL OVERALL FLOOR PLAN - BUILDING 5

AE101.1-05 GROUND LEVEL ENLARGED DEMOLITION & FLOOR PLANS - BUILDING 5

AE101.2-05 GROUND LEVEL ENLARGED DEMOLITION & FLOOR PLANS - BUILDING 5

AE101.3-05 GROUND LEVEL ENLARGED DEMOLITION & FLOOR PLANS - BUILDING 5

AC101-05 PARTIAL GROUND LEVEL REFLECTED CEILING PLAN - BUILDING 5

MD101-05-A GROUND LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA A

MH101-05-A GROUND LEVEL DUCTWORK PLAN - BUILDING 5 - AREA A

MP101-05-A GROUND LEVEL PIPING PLAN - BUILDING 5 - AREA A

EE101-05 GROUND LEVEL OVERALL ELECTRICAL FLOOR PLAN - BUILDING 5

ED101-05-A GROUND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA A

ED301-05-A GROUND LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA A

TN101-05-A GROUND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA A

T301-05-A ENLARGED ROOM E05

EE401-05-A PANEL SCHEDULES - BUILDING 5 - GROUND LEVEL - AREA A

MD101-05-B GROUND LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA B

MP101-05-B GROUND LEVEL PIPING PLAN - BUILDING - 5 - AREA B

ED101-05-B GROUND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA B

ED301-05-B GROUND LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA B

TN101-05-B GROUND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA B

MD101-05-C GROUND LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA C

MH101-05-C GROUND LEVEL DUCTWORK PLAN - BUILDING 5 - AREA C

MP101-05-C GROUND LEVEL PIPING PLAN - BUILDING 5 - AREA C

ED101-05-C GROUND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA C

TN101-05-C GROUND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA C

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 5

LIST OF DRAWING SHEETS

T301-05-C ENLARGED ROOM A27

T302-05-C ENLARGED ROOM A27

EE401-05-C PANEL SCHEDULES - BUILDING 5 - GROUND LEVEL - AREA C

ED101-05-D GROUND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA D

ED301-05-D GROUND LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA D

TN101-05-D GROUND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA D

MD101-05-E GROUND LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA E

MH101-05-E GROUND LEVEL DUCTWORK PLAN - BUILDING 5 - AREA E

MP101-05-E GROUND LEVEL PIPING PLAN - BUILDING - 5 - AREA E

ED101-05-E GROUND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA E

ED301-05-E GROUND LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA E

TN101-05-E GROUND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA E

T301-05-E ENLARGED ROOM B23

EE401-05-E PANEL SCHEDULES - BUILDING 5 - GROUND LEVEL - AREA E

MP101-05-F GROUND LEVEL PIPING PLAN - BUILDING - 5 - AREA F

ED101-05-F GROUND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA F

ED301-05-F GROUND LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA F

TN101-05-F GROUND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA F

MD101-05-G GROUND LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA G

MH101-05-G GROUND LEVEL DUCTWORK PLAN - BUILDING 5 - AREA G

MP101-05-G GROUND LEVEL PIPING PLAN - BUILDING - 5 - AREA G

ED101-05-G GROUND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA G

ED301-05-G GROUND LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA G

TN101-05-G GROUND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA G

T301-05-G ENLARGED ROOM H1

EE401-05-G PANEL SCHEDULES - BUILDING 5 - GROUND LEVEL - AREA G

AD111-05 FIRST LEVEL OVERALL DEMOLITION PLAN - BUILDING 5

AE111-05 FIRST LEVEL OVERALL FLOOR PLAN - BUILDING 5

AE111.1-05 FIRST LEVEL ENLARGED DEMOLITION & FLOOR PLAN - BUILDING 5 & 52

AE111.2-05 FIRST LEVEL ENLARGED DEMOLITION & FLOOR PLAN - BUILDING 5

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 6

LIST OF DRAWING SHEETS

AE111.3-05 FIRST LEVEL ENLARGED DEMOLITION & FLOOR PLAN - BUILDING 5

AC111-05 PARTIAL FIRST LEVEL REFLECTED CEILING PLAN - BUILDING 5

EE111-05 FIRST LEVEL OVERALL ELECTRICAL FLOOR PLAN - BUILDING 5

MP111-05-A FIRST LEVEL PIPING PLAN - BUILDING 5 - AREA A

ED111-05-A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA A

ED311-05-A FIRST LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA A

TN111-05-A FIRST LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA A

EE411-05-A PANEL SCHEDULES - BUILDING 5 - FIRST LEVEL - AREA A

MD111-05-B FIRST LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA B

MH111-05-B FIRST LEVEL DUCTWORK PLAN - BUILDING 5 - AREA B

MP111-05-B FIRST LEVEL PIPING PLAN - BUILDING 5 - AREA B

ED111-05-B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA B

ED311-05-B FIRST LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA B

EL111-05-B FIRST LEVEL LIGHTING PLAN - BUILDING 5 - AREA B

TN111-05-B FIRST LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA B

T311-05-B ENLARGED ROOM 1026A

T312-05-B ENLARGED ROOM 149

EE411-05-B PANEL SCHEDULES - BUILDING 5 - FIRST LEVEL - AREA B

MD111-05-C FIRST LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA C

MP111-05-C FIRST LEVEL PIPING PLAN - BUILDING 5 - AREA C

ED111-05-C FIRST LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA C

ED311-05-C FIRST LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA C

TN111-05-C FIRST LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA C

MP111-05-D FIRST LEVEL PIPING PLAN - BUILDING 5 - AREA D

ED111-05-D FIRST LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA D

ED311-05-D FIRST LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA D

TN111-05-D FIRST LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA D

MH111-05-E FIRST LEVEL DUCTWORK PLAN - BUILDING 5 - AREA E

MP111-05-E FIRST LEVEL PIPING PLAN - BUILDING 5 - AREA E

ED111-05-E FIRST LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA E

ED311-05-E FIRST LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA E

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 7

LIST OF DRAWING SHEETS

TN111-05-E FIRST LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA E

T311-05-E ENLARGED ROOM 1014

T312-05-E ENLARGED ROOM 1002

EE411-05-E PANEL SCHEDULES - BUILDING 5 - FIRST LEVEL-AREA E

MH111-05-G FIRST LEVEL DUCTWORK PLAN - BUILDING 5 - AREA G

MP111-05-G FIRST LEVEL PIPING PLAN - BUILDING 5 - AREA G

ED111-05-G FIRST LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA G

ED311-05-G FIRST LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA G

TN111-05-G FIRST LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA G

T311-05-G ENLARGED ROOM 111

EE411-05-G PANEL SCHEDULES - BUILDING 5 - FIRST LEVEL - AREA G

AD121.1-05 SECOND LEVEL ENLARGED DEMOLITION PLANS - BUILDING 5

AD121-05 SECOND LEVEL OVERALL DEMOLITION PLAN- BUILDING 5

AE121-05 SECOND LEVEL OVERALL FLOOR PLAN - BUILDING 5

AE121.1-05 SECOND LEVEL ENLARGED DEMOLITION & FLOOR PLANS - BUILDING 5

AC121-05 PARTIAL SECOND LEVEL REFLECTED CEILING PLANS - BUILDING 5

EE121-05 SECOND LEVEL OVERALL FLOOR PLAN - BUILDING 5

MD121-05-A SECOND LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA A

MH121-05-A SECOND LEVEL DUCTWORK PLAN - BUILDING 5 - AREA A

MP121-05-A SECOND LEVEL PIPING FLOOR PLAN - BUILDING 5 - AREA A

ED121-05-A SECOND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA A

ED321-05-A SECOND LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA A

TN121-05-A SECOND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA A

T321-05-A ENLARGED ROOM 296C

EE421-05-A PANEL SCHEDULES - BUILDING 5 - SECOND LEVEL - AREA A

MD121-05-B SECOND LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA B

MH121-05-B SECOND LEVEL DUCTWORK PLAN - BUILDING 5 - AREA B

MP121-05-B SECOND LEVEL PIPING FLOOR PLAN - BUILDING 5 - AREA B

FX121-05-B SECOND LEVEL FIRE PROTECTION PLAN - BUILDING 5 - AREA B

ED121-05-B SECOND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA B

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 8

LIST OF DRAWING SHEETS

ED321-05-B SECOND LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA B

EL121-05-B SECOND LEVEL LIGHTING PLAN - BUILDING 5 - AREA B

TN121-05-B SECOND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA B

T321-05-B ENLARGED ROOM 268

EE421-05-B PANEL SCHEDULES - BUILDING 5 - SECOND LEVEL - AREA B

MD121-05-C SECOND LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA C

MH121-05-C SECOND LEVEL DUCTWORK PLAN - BUILDING 5 - AREA C

MP121-05-C SECOND LEVEL PIPING FLOOR PLAN - BUILDING 5 - AREA C

ED121-05-C SECOND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA C

ED321-05-C SECOND LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA C

TN121-05-C SECOND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA C

T321-05-C ENLARGED ROOM 226C

EE421-05-C PANEL SCHEDULES - BUILDING 5 - SECOND LEVEL - AREA C

ED121-05-D SECOND LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA D

EL121-05-D SECOND LEVEL LIGHTING PLAN - BUILDING 5 - AREA D

TN121-05-D SECOND LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA D

AD131-05 THIRD LEVEL OVERALL DEMOLITION PLAN - BUILDING 5

AD131.01-05 THIRD LEVEL ENLARGED DEMOLITION & FLOOR PLANS - BUILDING 5

AE131-05 THIRD LEVEL OVERALL FLOOR PLAN - BUILDING 5

AE131.1-05 THIRD LEVEL ENLARGED DEMOLITION & FLOOR PLANS - BUILDING 5

AC131-05 PARTIAL THIRD LEVEL REFLECTED CEILING PLAN - BUILDING 5

EE131-05 THIRD LEVEL OVERALL FLOOR PLAN - BUILDING 5

ED131-05-A THIRD LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA A

TN131-05-A THIRD LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA A

MD131-05-B THIRD LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA B

MH131-05-B THIRD LEVEL DUCTWORK PLAN - BUILDING 5 - AREA B

MP131-05-B THIRD LEVEL PIPING FLOOR PLAN - BUILDING 5 - AREA B

ED131-05-B THIRD LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA B

ED331-05-B THIRD LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA B

EL131-05-B THIRD LEVEL LIGHTING PLAN - BUILDING 5 - AREA B

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 9

LIST OF DRAWING SHEETS

TN131-05-B THIRD LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA B

T331-05-B ENLARGED ROOM 370

EE431-05-B PANEL SCHEDULES - BUILDING 5 - THIRD LEVEL - AREA B

MD131-05-C THIRD LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA C

MH131-05-C THIRD LEVEL DUCTWORK PLAN - BUILDING 5 - AREA C

MP131-05-C THIRD LEVEL PIPING FLOOR PLAN - BUILDING 5 - AREA C

ED131-05-C THIRD LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA C

ED331-05-C THIRD LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA C

TN131-05-C THIRD LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA C

T331-05-C ENLARGED ROOM 330C

EE431-05-C PANEL SCHEDULES - BUILDING 5 - THIRD LEVEL - AREA C

AD141-05 FOURTH LEVEL OVERALL DEMOLITION PLAN - BUILDING 5

AE141-05 FOURTH LEVEL OVERALL FLOOR PLAN - BUILDING 5

AE141.1-05 FOURTH LEVEL ENLARGED DEMOLITION & FLOOR PLANS - BUILDING 5

EE141-05 FOURTH LEVEL OVERALL FLOOR PLAN - BUILDING 5

ED141-05-A FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA A

TN141-05-A FOURTH LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA A

MD141-05-B FOURTH LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA B

MH141-05-B FOURTH LEVEL DUCTWORK PLAN - BUILDING 5 - AREA B

MP141-05-B FOURTH LEVEL PIPING FLOOR PLAN - BUILDING 5 - AREA B

ED141-05-B FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA B

ED341-05-B FOURTH FLOOR ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA B

TN141-05-B FOURTH LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA B

T341-05-B ENLARGED ROOM 451

EE441-05-B PANEL SCHEDULES - BUILDING 5 - FOURTH LEVEL - AREA B

MD141-05-C FOURTH LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA C

MH141-05-C FOURTH LEVEL DUCTWORK PLAN - BUILDING 5 - AREA C

MP141-05-C FOURTH LEVEL PIPING FLOOR PLAN - BUILDING 5 - AREA C

ED141-05-C FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - BUILDING 5 - AREA C

ED341-05-C FOURTH FLOOR ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS - AREA C

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 10

LIST OF DRAWING SHEETS

TN141-05-C FOURTH LEVEL LOW VOLTAGE PLAN - BUILDING 5 - AREA C

T341-05-C ENLARGED ROOM 433

EE441-05-C PANEL SCHEDULES - BUILDING 5 - FOURTH LEVEL - AREA C

AD151-05 FIFTH LEVEL OVERALL DEMOLITION PLAN - BUILDING 5

AE151-05 FIFTH LEVEL OVERALL & ENLARGED FLOOR & REFLECTED CEILING PLAN - BUILDING 5

EE151-05 FIFTH LEVEL OVERALL FLOOR PLAN - BUILDING 5

MD151-05 FIFTH LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 5 - AREA A

MP151-05 FIFTH LEVEL PIPING FLOOR PLAN - BUILDING 5

ED151-05 FIFTH LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 5

ED351-05 FIFTH LEVEL ELECTRICAL DEMOLITION - BUILDING 5 - ENLARGED ROOMS

TN151-05 FIFTH LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 5

T351-05 ENLARGED ROOM 546

EE451-05 PANEL SCHEDULES - BUILDING 5 - FIFTH LEVEL

MP161-05 ROOF PIPING PLAN - BUILDING 5

ED161-05 ROOF ELECTRICAL DEMOLITION PLAN - BUILDING 5

TN161-05 ROOF LOW VOLTAGE PLAN - BUILDING 5

AE111-07 FIRST LEVEL DEMOLITION PLAN, FLOOR PLAN & ENLARGED PLAN - BUILDING 7

MD111-07-09 FIRST LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 7, 8 & 9

MH111-07-09 FIRST LEVEL DUCTWORK PLAN - BUILDING 7, 8 & 9

MP111-07-09 FIRST LEVEL PIPING FLOOR PLAN - BUILDING 7, 8 & 9

ED111-07-09 FIRST LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 7, 8 & 9

TN111-07-09 FIRST LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 7, 8 & 9

T311-07 ENLARGED ROOM 1151

EE411-07-09 PANEL SCHEDULES - BUILDING 07-09 - FIRST LEVEL

MH111-11 FIRST LEVEL DUCTWORK PLAN - BUILDING 11

ED111-11 FIRST LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 11

TN111-11 FIRST LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 11

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 11

LIST OF DRAWING SHEETS

AE101-16 LOWER LEVEL DEMOLITION, FLOOR PLAN & ENLARGED PLAN - BUILDING 16

MD111-16

LOWER LEVEL, FIRST LEVEL & SECOND LEVEL MECHANICAL DEMOLITION PLAN -

BUILDING 16

MH111-16 LOWER LEVEL & FIRST LEVEL DUCTWORK PLAN - BUILDING 16

MP111-16 LOWER LEVEL & FIRST LEVEL PIPING FLOOR PLAN - BUILDING 16

ED111-16 LOWER, FIRST & SECOND LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 16

TN111-16 LOWER, FIRST, & SECOND LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 16

T311-16 ENLARGED ROOM 1031A

EE411-16 PANEL SCHEDULES - BUILDING 16 - FIRST LEVEL

ED111-17 FIRST LEVEL & SECOND LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 17

TN111-17 FIRST LEVEL & SECOND LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 17

AE111-28 FIRST LEVEL DEMOLITION, FLOOR & ENLARGED PLANS - BUILDING 28

MH111-28 FIRST LEVEL DUCTWORK PLAN - BUILDING 28

MP111-28 FIRST LEVEL PIPING FLOOR PLAN - BUILDING 28

ED111-28 FIRST LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 28

TN111-28 FIRST LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 28

AE111-38 FIRST LEVEL DEMOLITION, FLOOR & ENLARGED PLANS - BUILDING 38

MD111-38 FIRST LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 38

MH111-38 BUILDING 38 - DUCTWORK FLOOR PLAN

MP111-38 FIRST LEVEL PIPING FLOOR PLAN - BUILDING 38

ED111-38 FIRST LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 38

TN111-38 FIRST LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 38

EE411-38 PANEL SCHEDULES - BUILDING 38 - FIRST LEVEL

TN111-50 FIRST LEVEL LOW VOLTAGE FLOOR PLAN -BUILDING 50

MD111-52 FIRST LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 52

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 12

LIST OF DRAWING SHEETS

MH111-52 FIRST LEVEL DUCTWORK PLAN - BUILDING 52

MP111-52 FIRST LEVEL PIPING PLAN - BUILDING 52

ED111-52 FIRST LEVEL ELECTRICAL DEMOLITION FLOOR PLAN - BUILDING 52

ED311-52 FIRST LEVEL ELECTRICAL DEMOLITION - BUILDING 52 - ENLARGED ROOMS

TN111-52 FIRST LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 52

T311-52 ENLARGED ROOM 106

EE411-52 PANEL SCHEDULES - BUILDING 52 - FIRST LEVEL

AE201 EXTERIOR ELEVATIONS

AE211 INTERIOR ELEVATIONS & ENLARGED PLANS

AE301 BUILDING & WALL SECTIONS

AE302 WALL SECTIONS

AE411 ENLARGED PLANS ADDITION - FIRST & SECOND LEVEL AND ROOF - BUILDING 5

AE501 EXTERIOR PLAN DETAILS

AE520 EXTERIOR SECTION DETAILS

AE530 ROOF DETAILS

AE540 INTERIOR DETAILS

AE560 CEILING DETAILS

AE601 WALL TYPES & INTERIOR PARTITION TYPES AND DETAILS

AE602 OPENING SCHEDULE, FRAME AND PANEL TYPES

AE640 MOUNTING HEIGHTS

AF600 MATERIAL AND ROOM FINISH SCHEDULE

AW601 WAYFINDING MESSAGE SCHEDULES & SIGNAGE DETAILS

MI000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MI001 MECHANICAL SYMBOLS AND ABBREVIATIONS

MI300 MECHANICAL CONTROLS

ME500 MECHANICAL DETAILS

ME600 MECHANICAL SCHEDULES

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

00 01 15 - 13

LIST OF DRAWING SHEETS

EI000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

EI001 ELECTRICAL SYMBOLS AND ABBREVIATIONS

EE500 ONE-LINE DIAGRAM

EE600 TELECOMMUNICATIONS ROUTING SCHEMATIC

EE601 TELECOMMUNICATIONS ROUTING SCHEMATIC

EE602 ELECTRICAL DETAILS

EE603 ELECTRICAL DETAILS

EE700 ELECTRICAL SCHEDULES

EE701 WORK RESTRICTIONS

- - - E N D - - -

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -1

GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM

Infrastructure Upgrades 438-20-910 as required by drawings and specifications.

B. Visits to the site by Bidders/Offerors must be made in accordance with the solicitation and the Contracting Officer.

C. Offices of Anderson Engineering, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Work subject to tests by testing laboratory retained by General

Contractor, the Contractor shall notify the COR when personal will be on site for testing and provide copies of all testing results to the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -2

GENERAL REQUIREMENTS

F. The Key Personnel assigned by the contractor for the performance of work on this contract shall be acceptable to VA in terms of personal and professional conduct and technical knowledge. Should the assignment to this contract of any person by the contractor be deemed to conflict with the interests of VA, or in the event performance is deemed to be unsatisfactory at any time during the life of the contract, the Contracting Officer may notify the contractor and request the person be removed from the assignment. The reason for removal will be documented and a request to receive key personnel replacement within three (3) business days of the notification will be made. Replacement of key personnel qualifications shall be equal to or greater than those of the key personnel being replaced. Employment and staffing difficulties will not be justification for failure to meet established schedules. The contractor is required to submit a resume with qualifications for the proposed replacement which shall be approved by the COR and CO prior to the replacement starting work.

G. Normal working hours for this contract will be from 7:00AM to

4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays.

1. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR.

Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the

Government. Approvals are subject to the availability of on-site staff.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I,GENERAL CONSTRUCTION: BASE BID : Work includes general construction, alterations, roads, walks, grading, drainage, all

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -3

GENERAL REQUIREMENTS

necessary removal of existing structures and construction and certain other items as shown on drawings.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at

Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer and COR so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -4

GENERAL REQUIREMENTS

may return to the site only with the written approval of the

Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See

Section 08 71 00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting

Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of

Contracting Officer.

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -5

GENERAL REQUIREMENTS

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the

VA.

6. Notify Contracting Officer and COR immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

a) Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

b) “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officers Representative. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the

Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the

Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -6

GENERAL REQUIREMENTS

C. The Contractor shall, under regulations prescribed by the

Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the

Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be in the southwest corner of the Sioux Falls campus

(contractorville) or as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -7

GENERAL REQUIREMENTS

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by

Department of Veterans Affairs in quantities sufficient for not more than five work days. Provide unobstructed access to

Medical Center areas required to remain in operation.

3. Where access by Medical personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at the nearest main line; or, in absence of such indication, where directed by COR .

All such actions shall be coordinated with the COR or Utility

Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -8

GENERAL REQUIREMENTS

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate, phasing, and dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. Since unpredictable variables may affect the construction sequence scheduling, a protocol for making changes due to unforeseen problems should be plainly stated. The Contractor shall update the

Construction Sequencing Plan as changes occur during Work. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing and dates to ensure accomplishment of this work in successive phases mutually agreeable to the COR. Access to occupied spaces will be limited. This may require the sequencing of the

Work in many rooms on multiple occasions, potentially requiring completion during hours outside of normal business hours when spaces are occupied. The sequencing of access to spaces will be coordinated with the COR.

J. All buildings will be occupied during performance of work .

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical

Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -9

GENERAL REQUIREMENTS

Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

K. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m

(seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum

375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.

L. When a building and/or construction site is turned over to

Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C

(40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

M. Utilities Services: Maintain existing utility services for

Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -10

GENERAL REQUIREMENTS

and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.

Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical

Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours (after hours or on weekends).

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -11

GENERAL REQUIREMENTS

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their main line. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

O. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval. Where trenches could remain partially exposed during working hours, steel plates (capable of normal vehicle traffic) will be placed over and anchored in place so that normal traffic can remain during the day.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

P. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -12

GENERAL REQUIREMENTS

traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of buildings or areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the

Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled

"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4).

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -13

GENERAL REQUIREMENTS

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by

Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -14

GENERAL REQUIREMENTS

stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by

COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

4. PCB Transformers and Capacitors : The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl (PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the Environmental Protection Agency (EPA) and the Department of Transportation (DOT) as outlined in Code of Federal Regulation (CFR), Titled 40 and 49 respectively.

The EPA's Toxic Substance Control Act (TSCA) Compliance

Program Policy Nos. 6-PCB-6 and 6-PCB-7 also apply. Upon removal of PCB transformers and capacitors for disposal, the

"originator" copy of the Uniform Hazardous Waste Manifest (EPA

Form 8700-22), along with the Uniform Hazardous Waste Manifest

Continuation Sheet (EPA Form 8700-22A) shall be returned to the Contracting Officer who will annotate the contract file and transmit the Manifest to the COR.

2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

01 00 00 -15

GENERAL REQUIREMENTS

a) Copies of the following listed CFR titles may be obtained from the Government Printing Office:

40 CFR 261 ......Identification and Listing of Hazardous

Waste

40 CFR 262 ......Standards Applicable to Generators of

Hazardous Waste

40 CFR 263 ......Standards…