Dwgs Bid Documents-part 4-1 REV.pdf

PDF 24 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction Sioux Falls VAMC Federal contract opportunity
Solicitation number
36C77622R0049
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal contract opportunity for construction and commissioning services at the Sioux Falls VA Medical Center. The solicitation will be issued as a Request for Proposal to upgrade infrastructure in preparation for an Electronic Health Records Modernization project. Work will include building a new server room on the hospital roof and upgrades throughout multiple departments. The period of performance is approximately 450 calendar days from notice to proceed. The magnitude of construction is estimated between $20-50 million. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. Questions must be submitted in writing to the identified point of contact by email only, with no phone calls accepted. The solicitation will be conducted according to FAR Parts 15, 19, and 36 and evaluated under the procedures defined within. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Infrastructure Upgrades Construction Sioux Falls VAMC, newest first.
File Type Posted
36C77622R0049 0006.pdf PDF
Technical Question Tracking Sheet Infra Upgrades Final.pdf PDF
36C77622R0049 0005.pdf PDF
271116 Communications Cabinets Racks Frames and Enclosures.pdf PDF
36C77622R0049 0004.pdf PDF
271619 Communications Patch Cords Station Cords and Cross Connect Wire.pdf PDF
271313.13 Communications Copper Cable Splicing and Terminations.pdf PDF
270526 Grounding and Bonding for Communications Systems.pdf PDF
271513.13 Communications Optical Fiber Cable Splicing and Terminations.pdf PDF
271000 Structured Cabling.pdf PDF
271323 Communications Optical Fiber Backbone Cabling.pdf PDF
OIT InfrastrucStdTelecomSpaces 3.1.pdf PDF
SF Site Utility Dwg.pdf PDF
270553 Identification for Communications Systems.pdf PDF
271513 Communications Copper Horizontal Cabling.pdf PDF
Technical Question Tracking Sheet - Infra Upgrades - Final.pdf PDF
270533 Conduits and Backboxes for Communications Systems.pdf PDF
271126 Communications Rack Mounted Power Protection and Power Strips.pdf PDF
271313 Communications Copper Backbone Cabling.pdf PDF
36C77622R0049 0003.pdf PDF
2020 Elec Combined One Lines.pdf PDF
270536 Cable Trays for Communications Systems.pdf PDF
271119 Communications Termination Blocks and Patch Panels.pdf PDF
Technical Question Tracking Sheet - Infra Upgrades.pdf PDF
Building 1C Sheet 6 - Pipe Tunnel.pdf PDF
EHRM Site Visit Attendance Sheet.pdf PDF
36C77622R0049 0002.pdf PDF
Specification - Vol 2 Revision 2.pdf PDF
36C77622R0049 0001.pdf PDF
Dwgs Bid Documents-part 6-1 REV.pdf PDF
Dwgs Bid Documents-part 3-1 REV.pdf PDF
Asbestos - Appendix-A part 1.pdf PDF
Dwgs Bid Documents-part 5-1 REV.pdf PDF
Dwgs Bid Documents-part 2-1 REV.pdf PDF
Asbestos - Appendix-A part 4.pdf PDF
Asbestos - Appendix-A part 2.pdf PDF
Construction Wage Rates - Minnehaha - 2-25-22.pdf PDF
Specifications Revision 2.pdf PDF
Dwgs Bid Documents-part 1-1 REV.pdf PDF
Asbestos - Appendix-A part 3.pdf PDF
Dwgs Bid Documents-part 7-1 REV.pdf PDF
VHA Suppl. Contract Rqmnts for Combatting COVID-19 Updated 12-14-2021.pdf PDF
Supplement to General Requirements Spec 01 00 00.pdf PDF
36C77622R0049.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CR

CR

C R

D

D

D

D

D

22.1

O.2

27.9

N.2M.2L.2

.9E

E.1

D.1

I

H.1

C.1

C.1

C.A

B.A

B.1

G.1

F.1

2D

1D

1D

4D

4D

4D

4D

4D

4D4D

4D

4D 4D 4D

4D

4D

4D

1D

4D

3D

3D

3D

WAP

WAP

WAP

T311-05-G

8"x2"

8" x2

8" x2

SSOU-111

SSIU-111

111-A

111-B

4" 4"

4" 4"

T311-05-G

WAP

C2

12"x4"

C3

121A

STAIR 5

SOILED

113A

STAIR 10

Space

C21-2

CORRIDOR-2

100-2

CORRIDOR-2

120A

Room

TOILET

TOILET

TOILET

EXAM

STAIR 4

Space

126C

MECH

LOCKER

111A

MECHANICAL

131A-1

Room-1

Room

Space

CLEAN

M.H.

ELEC

WORK

SOILED

MECHANICAL

WAITING

RECPT

ELEVATOR LOBBY

112A

TOILET

LAB

WORK

EXAM

EXAM

PROCEDURE

121A

STAIR 5

SOILED

113A

STAIR 10

Space

C21-2

CORRIDOR-2

100-2

CORRIDOR-2

120A

Room

TOILET

TOILET

TOILET

EXAM

STAIR 4

Space

126C

MECH

LOCKER

111A

MECHANICAL

131A-1

Room-1

Room

Space

CLEAN

M.H.

ELEC

WORK

SOILED

MECHANICAL

WAITING

RECPT

ELEVATOR LOBBY

112A

TOILET

LAB

WORK

EXAM

EXAM

PROCEDURE

121A

STAIR 5

SOILED

113A

STAIR 10

Space

C21-2

CORRIDOR-2

100-2

CORRIDOR-2

120A

Room

TOILET

TOILET

TOILET

EXAM

STAIR 4

Space

126C

MECH

LOCKER

111A

MECHANICAL

131A-1

Room-1

Room

Space

CLEAN

M.H.

ELEC

WORK

SOILED

MECHANICAL

WAITING

RECPT

ELEVATOR LOBBY

112A

TOILET

LAB

WORK

EXAM

EXAM

PROCEDURE

121A

STAIR 5

SOILED

113A

STAIR 10

Space

C21-2

CORRIDOR-2

100-2

CORRIDOR-2

120A

Room

TOILET

TOILET

TOILET

EXAM

STAIR 4

Space

126C

MECH

LOCKER

111A

MECHANICAL

131A-1

Room-1

Room

Space

CLEAN

M.H.

ELEC

WORK

SOILED

MECHANICAL

WAITING

RECPT

ELEVATOR LOBBY

112A

TOILET

LAB

WORK

EXAM

EXAM

PROCEDURE

121A

STAIR 5

SOILED

113A

STAIR 10

Space

C21-2

CORRIDOR-2

100-2

CORRIDOR-2

120A

Room

TOILET

TOILET

TOILET

EXAM

STAIR 4

Space

126C

MECH

LOCKER

111A

MECHANICAL

131A-1

Room-1

Room

Space

CLEAN

M.H.

ELEC

WORK

SOILED

MECHANICAL

WAITING

RECPT

ELEVATOR LOBBY

112A

TOILET

LAB

WORK

EXAM

EXAM

PROCEDURE

121A

STAIR 5

SOILED

113A

STAIR 10

Space

C21-2

CORRIDOR-2

100-2

CORRIDOR-2

120A

Room

TOILET

TOILET

TOILET

EXAM

STAIR 4

Space

126C

MECH

LOCKER

111A

MECHANICAL

131A-1

Room-1

Room

Space

CLEAN

M.H.

ELEC

WORK

SOILED

MECHANICAL

WAITING

RECPT

ELEVATOR LOBBY

112A

TOILET

LAB

WORK

EXAM

EXAM

PROCEDURE

121A

STAIR 5

SOILED

MECHANICAL

113A

STAIR 10

Space

C21-2

CORRIDOR-2

100-2

CORRIDOR-2

120A

Room

TOILET

TOILET

TOILET

EXAM

STAIR 4

Space

126C

MECH

LOCKER

111A

MECHANICAL

131A-1

Room-1

Room

Space

CLEAN

M.H.

ELEC

WORK

SOILED

MECHANICAL

WAITING

RECPT

ELEVATOR LOBBY

112A

TOILET

132-1

CORRIDOR-1

TELECOM

LAB

WORK

EXAM

EXAM

PROCEDURE

WP

4"

4"

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN

A

B

C E

D

G

F

B

IM

/2

.0

V

A S io u x F a lls

E H

R M

/2

.0

V

A S io u x F a lls

E H

R M l_ S

E S

.r v t

/6

/2

:4

:1

P M

TN111-05-G

FIRST LEVEL LOW VOLTAGE PLAN -

BUILDING 5 - AREA G

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

07/06/2021 KSB NMT16090

1/8" = 1'-0"

FIRST LEVEL LOW VOLTAGE FLOOR PLAN - BUILDING 5 - AREA G

1:96

8' 12'

SHEET NOTES:

1. POWER DEVICE TO NEAREST AVAILABLE BRANCH CIRCUIT FEEDING RECEPTACLES IN THIS AREA.

Revisions: Date:

AC

C

C

ID

SIDE CABLE

MANAGEMENT

(TYP)

RACK 2 ELECTRONIC EQUIPMENT

NOTES:

1. COORDINATE FINAL RACK LAYOUT WITH OWNER'S IS/IT REPRESENTATIVE.

2. PROVIDE COMPONENTS NOT LISTED "BY OWNER".

3. SEE SPECIFICATION FOR ADDITIONAL RACK COMPONENTS.

4. COORDINATE EXACT RACK LOCATION WITH OWNER PRIOR TO PERMANENT INSTALLATION.

5. REFER TO NEW WORK PLAN FOR RACK LOCATIONS.

6. CONTRACTOR IS RESPONSIBLE FOR FINAL DEVICE COUNT AND QUANTITY OF PATCH

PANELS, SWITCHES, FIBER ENCLOSURES, AND CABLE MANAGEMENT REQUIRED.

7. COORDINATE INSTALLATIONS WITH OWNER'S IS/IT REPRESENTATIVE.

1U 48 STRAND OM4 FIBER OPTIC DISTRIBUTION PANEL

1U RACK BONDING BUSBAR

1U 24 STRAND OS1 FIBER OPTIC DISTRIBUTION PANEL

1U BLANKING PANEL

1U BLANKING PANEL

SPACE FOR

OWNER EQUIPMENT

1U RACK BONDING BUSBAR

RACK 3 DISTRIBUTION

1U 24 PORT VOICE BACKBONE PATCH PANEL

1U CABLE MANAGEMENT

1U RACK BONDING BUSBAR

SPACE FOR NON-IT

SYSTEM

ELECTRONICS

RACK 1 NON-IT SYSTEMS

CHANNEL RACK CHANNEL RACK CHANNEL RACK

1U CABLE MANAGEMENT

2U DATA PATCH PANEL

1U CABLE MANAGEMENT

2U DATA PATCH PANEL

1U CABLE MANAGEMENT

2U DATA PATCH PANEL

12U SPACE FOR FUTURE12U SPACE FOR FUTURE12U SPACE FOR FUTURE

1U CABLE MANAGEMENT

2U DATA PATCH PANEL

1U CABLE MANAGEMENT

2U COMMERCIAL WIRELESS PATCH PANEL

1U CABLE MANAGEMENT

2U CATV PATCH PANEL

1U CABLE MANAGEMENT

2U PATIENT MONITORING PATCH PANEL

1U BLANKING PANEL

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

1U NETBOTZ 750 MONITOR SYSTEM

N.2

M.2

B.A

B.1

G.1

111-B

111-A

W

111-A-1,3,5

111-B-1,3,5 111-A-7,9,11

111-B-13,15,17

111-A-13,15,17

111-B-7,9,11

111-B-6

111-A-4

111-B-4

111-A-2

111-A-6T311-05-G a

1 - b c

1 - d

L21-20 L21-20

L21-20 L21-20 L21-20 L21-20

MOTION W

111-B-2

111-A-8

111-B-8

F2

F2

C4

FIRST FLOOR - BLDG 1 & 5

1510' - 10 3/4"

SECOND FLOOR - BLDG 5

1522' - 9 3/4"

B.1G.1

FIRST FLOOR - BLDG 1 & 5

1510' - 10 3/4"

SECOND FLOOR - BLDG 5

1522' - 9 3/4"

FIRST FLOOR - BLDG 1 & 5

1510' - 10 3/4"

SECOND FLOOR - BLDG 5

1522' - 9 3/4"

B.1 G.1

FIRST FLOOR - BLDG 1 & 5

1510' - 10 3/4"

SECOND FLOOR - BLDG 5

1522' - 9 3/4"

N.2

M.2

B.A

B.1

G.1

T311-05-G a

1 - b c

1 - d a b

111-B

111-A

12"x4"

12"x4"

12"x4"

111-A-19

I1

I1 b a

I1a

111-B-19

I1 b

4" 4" 4" 4"

SSIU-111

12" LADDER

12" LADDER

MEC

4" 4"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

B

IM

/2

.0

V

A S io u x F a lls

E H

R M

/2

.0

V

A S io u x F a lls

E H

R M l_ S

E S

.r v t

/6

/2

:3

:5

P M

T311-05-G

ENLARGED ROOM 111 VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

07/06/2021 KSB NMT16090

NO SCALE

RACK ELEVATION - ROOM 111

1/2" = 1'-0"

ENLARGED ROOM 111 - BUILDING 05 - POWER & DATA

1/4" = 1'-0"

1 - a 1/4" = 1'-0"

1 - b

1/4" = 1'-0"5 1 - c

1/4" = 1'-0"

1 - d

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.

THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED

FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE

PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.

ROOM 111

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5): 0

VIDEO: 0

PATIENT MONITORING: 0

COMMERCIAL WIRELESS: 0

CABLE RELOCATION COUNT

DATA (CAT6): +120 FROM ROOM 131A

DATA (CAT5): +24 FROM ROOM 131A

VIDEO: +2 FROM ROOM 131A

PATIENT MONITORING: +6 FROM ROOM 131A

COMMERCIAL WIRELESS: +3 FROM ROOM 131A

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

VIDEO: 0

PATIENT MONITORING: 0

COMMERCIAL WIRELESS: 0

FINAL CABLE COUNT

DATA (CAT6A): 144

VIDEO: 2

PATIENT MONITORING: 6

COMMERCIAL WIRELESS: 3

1/2" = 1'-0"

ENLARGED ROOM 111 - BUILDING 05 - LIGHTING & CABLE TRAY

1:24

2' 3'

1:24

2' 3'

HAUSER

TRACY J.

10206

R E

G

IS

T

ER

ED PROFESSIONAL

EN

G

IN

E

E R

S O

U T

H D A K O

T A

R E

G . NO.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

07/06/2021

B

IM

/2

.0

V

A S io u x F a lls

E H

R M

/2

.0

V

A S io u x F a lls

E H

R M l_ S

E S

.r v t

/6

/2

:3

:0

P M

EE411-05-G

PANEL SCHEDULES - BUILDING 5 -

FIRST LEVEL - AREA G

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

07/06/2021 KSB NMT16090

A. PANEL AIC (INTERRUPTING) RATING SHALL BE MINIMUM 120% OF THE AVAILABLE SCC (SHORT CIRCUIT CURRENT).

GENERAL REMARKS:

CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING

PROVISIONS / 'R' - PROVIDE CIRCUIT BREAKER WITH RED MARKING

OPTIONS:

50 A

SPARE CAPACITY:

49 %

FEEDER AVAILABLE:

EQUIPMENT AMPS: 100 A

CONSIDER 125% DEMAND: 22648 A

PWR-NC 17295 VA 78.91% 13648 VA DEMAND CURRENT: 50 A

MTR 2975 VA 124.00% 3689 VA DEMAND LOAD: 18118 VA

REC 720 VA 100.00% 720 VA CONNECTED CURRENT: 58 A

LTG 50 VA 125.00% 62 VA CONNECTED LOAD: 21040 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

TOTAL AMPS: 51 A 64 A 64 A

TOTAL LOAD: 6175 VA 7433 VA 7433 VA

41 0 VA 42

39 0 VA 40

SPARE -- 20 A 3

0 VA 38

35 SPARE -- 20 A 1 0 VA 36

33 SPARE -- 20 A 1 0 VA 34

31 SPARE -- 20 A 1 0 VA 32

29 SPARE -- 20 A 1 0 VA 30

27 SPARE -- 20 A 1 0 VA 28

25 SPARE -- 20 A 1 0 VA 26

23 1488 VA 24

SSIU-111/SSOU-111 30 A 2

1488 VA 22

19 LTG - 111 20 A 1 50 VA 20

17 1922 VA 18

15 1922 VA 16

PWR-C TELECOM 111 - RACK

RECEPTACLE

20 A 3

1922... 14

11 1922 VA 12

9 1922 VA 10

PWR-C TELECOM 111 - RACK

RECEPTACLE

20 A 3

1922... 180 VA 1 20 A REC TELECOM 111 8

5 1922 VA 180 VA 1 20 A REC TELECOM 111 6

3 1922 VA 180 VA 1 20 A REC TELECOM 111 4

PWR-C TELECOM 111 - RACK

RECEPTACLE

20 A 3

1922... 180 VA 1 20 A REC TELECOM 111 2

C... CIRCUIT DESCRIPTION OPT RATI... POL... A B C POL... RATI... OPT CIRCUIT DESCRIPTION C...

NEMA ENCLOSURE: 1

MOUNTING: SURFACE AVAILABLE SCC (kA): 3.0 PANEL POLES: 42

SERVICE RATED: No INTEGRAL SPD: Yes SECTIONS: 1

BRANCH: CRITICAL WIRES: 4 MCB OPTIONS: NONE

SUPPLY FROM: A1 PHASES: 3 MCB/MLO RATING: 100 A

LOCATION: CORRIDOR C21 VOLTS: 208/120 WYE MAINS TYPE: MCB

LIGHTING PANEL: 111-A

A. PANEL AIC (INTERRUPTING) RATING SHALL BE MINIMUM 120% OF THE AVAILABLE SCC (SHORT CIRCUIT CURRENT).

GENERAL REMARKS:

CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING

PROVISIONS / 'R' - PROVIDE CIRCUIT BREAKER WITH RED MARKING

OPTIONS:

60 A

SPARE CAPACITY:

59 %

FEEDER AVAILABLE:

EQUIPMENT AMPS: 100 A

CONSIDER 125% DEMAND: 18037 A

DEMAND CURRENT: 40 A

PWR-NC 17295 VA 78.91% 13648 VA DEMAND LOAD: 14429 VA

REC 720 VA 100.00% 720 VA CONNECTED CURRENT: 50 A

LTG 50 VA 125.00% 62 VA CONNECTED LOAD: 18065 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

TOTAL AMPS: 51 A 50 A 50 A

TOTAL LOAD: 6175 VA 5945 VA 5945 VA

41 42

39 40

37 38

35 0 VA 36

33 0 VA 34

SPARE -- 20 A 3

0 VA 32

29 SPARE -- 20 A 1 0 VA 30

27 SPARE -- 20 A 1 0 VA 28

25 SPARE -- 20 A 1 0 VA 26

23 SPARE -- 20 A 1 0 VA 24

21 SPARE -- 20 A 1 0 VA 22

19 LTG - 111 20 A 1 50 VA 20

17 1922 VA 18

15 1922 VA 16

PWR-C TELECOM 111 - RACK

RECEPTACLE

20 A 3

1922... 14

11 1922 VA 12

9 1922 VA 10

PWR-C TELECOM 111 - RACK

RECEPTACLE

20 A 3

1922... 180 VA 1 20 A REC TELECOM 111 8

5 1922 VA 180 VA 1 20 A REC TELECOM 111 6

3 1922 VA 180 VA 1 20 A REC TELECOM 111 4

PWR-C TELECOM 111 - RACK

RECEPTACLE

20 A 3

1922... 180 VA 1 20 A REC TELECOM 111 2

C... CIRCUIT DESCRIPTION OPT RATI... POL... A B C POL... RATI... OPT CIRCUIT DESCRIPTION C...

NEMA ENCLOSURE: 1

MOUNTING: SURFACE AVAILABLE SCC (kA): 2.4 PANEL POLES: 42

SERVICE RATED: No INTEGRAL SPD: Yes SECTIONS: 1

BRANCH: NORMAL WIRES: 4 MCB OPTIONS: NONE

SUPPLY FROM: B1 PHASES: 3 MCB/MLO RATING: 100 A

LOCATION: TELECOM 111 VOLTS: 208/120 WYE MAINS TYPE: MCB

LIGHTING PANEL: 111-B

FD

FD

FD

FD

FD

AE121.1-05

AE121.1-05

AD121.1-05

AD121.1-05

AE121.1-05

OFFICE

OFFICE

STORAGE

WOMEN'S

LOCKER

294A

TOILET

STORAGE

245B

OFFICE

245C

STORAGE

245D

REF

245E

REF

CORRIDOR

296B

STORAGE

296A

EMS

296C

TELEPHONE

299A

STAIR 6

BREAK ROOM

292A

TOILET

MEN'S LOCKER

245A

KITCHEN

KITCHEN

DINING

TOILET

TOILET

OXYGEN

230A

PATIENT

TOILET

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BLOOD BANK

DRUG

SCREEN/

BARIATRIC

TOILET

TOILET

TOILET

TOILET

CHIEF OF

SERVICES

OFFICE

RESIDENT

WORKROOM

OFFICE

HISTOLOGY

2085A

FLOURO

MICROSCOPE

2088C

STERILIZATION

/ PREP

2088B

HISTO

STORAGE

MICROBIOLOGY

STORAGE

WALK-IN

COOLER

SHARED

OFFICE

STAFF

LOUNGE

HSK

HALLWAY

LABORATORY

BLOOD DRAW

BLOOD DRAW

BLOOD DRAW

BLOOD DRAW

BLOOD DRAW

HSK

SHARED

OFFICE

WOMENS

TOILET

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

SOILED

HOLD

MEDS

CLEAN

EXAM

EXAM

EXAM

PAT TLT

PAT TLT

EXAM2033

MINOR

EXAM

EXAM

EXAM

SCREEN

SCREEN

OFFICE

SCREEN

SCREEN2021C

MEN

2021A

WOMEN

2021DD

NURSE

TEAM

FAMILY

WAITING

PATIENT

ROOM

203A

TOILET

204A

TOILET

PATIENT

ROOM

PATIENT

ROOM

205A

TOILET

PATIENT

ROOM

206A

TOILET

PATIENT

ROOM 289A

TOILET

OFFICE

OFFICE

OFFICE

OFFICE

SEC

OFFICE

2020A

STAIR

2050A

LOCKERS 2050

BREAK

ROOM

2020B

CORRIDOR

2020C

CORR

K

ELEV2000A

STAIR 8

S7

ELEV

WAITING

RECEPTION

2020D

CORR

CONFRENCE

228F

STAIR 3

VOL/ ESCORT

228C

EMS

228B

ELEC

228A

WHEEL CHAIR

ELEVATOR

LOBBY

2088A

SLIDES /

BLOCKS

HALLWAY

2070A

HALLWAY

2070B

HALLWAY

CARTS

2072B

SHAFT

2089A

SHAFT

PATIENT

ROOM

207A

TOILET

227A

NOURISH 227

CONFRENCE

ROOM

227F

EMS

227C

EQUIP

227B

TRAYS

PATIENT

ROOM

PATIENT

ROOM

208A

TOILET

MEDS226B

ENV

226C

TELECOM

226F

TOILET

226E

SOILED

227D

CLEAN

227H

WORK ROOM

227G

NURSE

PATIENT

ROOM

248A

TOILET 249

PATIENT

ROOM

245F

MECH

2010A

HALL

OFFICE2013

CONFRENCE

ROOM

MENS

TOILET

SHARED

OFFICE

2082A

WALK-IN

REFRIGERATOR

HALLWAY

CORRIDOR

CONFRENCE

WORK

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

230B

ANTE231A

PATIENT

TOILET

232A

PATIENT

TOILET

233A

PATIENT

TOILET

234A

PATIENT

TOILET

235A

PATIENT

TOILET

236A

PATIENT

TOILET

237A

PATIENT

TOILET

237B

ANTE

ELEVATOR

LOBBY

212A

STAIR 10

OFFICE

OFFICE

MECHANICAL

COPY

217A

TOILET

ON CALL

TOILET

ON CALL

219A

TOILET

286A

STAIR 5

220B

SIM

CONTROL

220A

SIM

OFFICE

OFFICE

OFFICE

OFFICE

MEDS

STORAGE

ELEC

STAIR 2

HAC

SOILED

Room

NURSE

STATION

CLEAN

STORAGE

Room

PATIENT

ROOM

283A

TOILET

PATIENT

ROOM

PATIENT

ROOM

272A

TOILET

PATIENT

ROOM

PATIENT

ROOM

LOUNGE

PATIENT

ROOM

Room

OFFICE

OFFICE

PATIENT

ROOM

PATIENT

ROOM

281A

TOILET

274A

TOILET

276A

TOILET

280A Room

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

Room

254A

TOILET

255A

CLOSET

259A

Room

Room

STAIR 7

WHEEL CHAIR

STORAGE

OFFICE

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

265A

TOILET

252A

TOILET

CORRIDOR

DAY ROOM

263A

TOILET

STAIR 1

OFFICE

209A

BREAK

225C

STAIR 4

255B

Room

EQUIPMENT

238A

Room

2000B

STAIR 9

BREAK

ROOM

TRAINING

ROOM

CONFRENCE

2012A

CLOSET

TOILET

TOILET

HAC 2004

POLICE

POLICE

ARM

OFFICE

OFFICE

225A Room

WORK

ROOM

DEMOLITION GENERAL NOTES

1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING AND

SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING

PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING PURPOSES

ONLY, UNLESS NOTED OTHERWISE.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL

TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.

3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG

WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,

SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO

STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.

4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO FLOOR

SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED FINISHES WITHIN

AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH SCHEDULE FOR

EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.

5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION

SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS, UNLESS

NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR EXTENT OF

CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE REMODELED.

6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND PREPARE

THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR FINISHES.

7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY DEMOLITION

WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.

8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH AS:

DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.

9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR

REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.

10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS

COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE

PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL

MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL

ENGINEER.

11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED

DEMOLITION AND PREP WORK.

12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,

SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE

REMOVED, UNLESS NOTED OTHERWISE.

13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL, OR

CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING FINISHES

DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS LOCATED WITHIN

THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL SUBSTRATES TO

RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION, SEE KEYNOTED

ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL, MECHANICAL AND

ELECTRICAL.

14. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF

CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.

WORK MUST BE ACCOMPLISHED IN AREAS NOT SHOWN ON ARCHITECTURAL

DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL, PLUMBING AND

TECHNOLOGY ALONG WITH OTHER SYSTEMS. THIS WORK SHALL BE PART OF THIS

CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK

REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO

ADDITIONAL COST. SEE MECHANICAL, ELECTRICAL, PLUMBING AND TECHNOLOGY

PLANS FOR ADDITIONAL WORK.

DEMOLITION PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL OR PARTITION

TO BE REMOVED

EXISTING DOOR AND

FRAME TO REMAIN

KEY NOTE

A

GRIDLINE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

EXISTING DOOR AND

FRAME TO BE

DEMOLISHED

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

NOTE:

COORDINATE GENERAL DEMOLITION WORK

WITH ABATEMENT AND REMEDIATION WORK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/7

/2

:0

:4

P M

AD121-05

SECOND LEVEL OVERALL

DEMOLITION PLAN- BUILDING 5

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

07/06/2021 -- GJB16090

1/16" = 1'-0"

SECOND LEVEL OVERALL DEMOLITION PLAN - BULIDING 5

HSK

HALLWAY

CARTS

2070A

HALLWAY

LABORATORY

CHIEF OF

SERVICES

OFFICE

OFFICE

RESIDENT

WORKROOM

OFFICE 2089

SHARED

OFFICE

LIMITS OF CONSTRUCTION

LI

M

IT

S

O F

C O

N S

TR

U

C

TI

O N

DE25DE25DE25

DE3

DE5

DE25DE27

DE5

REMOVE WALL, BELOW ROOF LINE, ONLY AFTER NEW WORK IS WEATHER

TIGHT. SEE PLANS FOR ADDITIONAL INFORMATION

BLOOD

DRAW 1

TOILET

TOILET

TOILET

DRUG

SCREEN/

BARIATRIC

TOILET

PATIENT

ROOM

NURSE

STATION

289A

TOILET

PATIENT

ROOM

CORRIDOR246

ELEVATOR

LOBBY

DE5

CUT METAL PANEL AS REQUIRED.

DEMOLITION GENERAL NOTES

1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING AND

SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING

PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING PURPOSES

ONLY, UNLESS NOTED OTHERWISE.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL

TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.

3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG

WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,

SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO

STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.

4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO FLOOR

SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED FINISHES WITHIN

AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH SCHEDULE FOR

EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.

5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION

SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS, UNLESS

NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR EXTENT OF

CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE REMODELED.

6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND PREPARE

THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR FINISHES.

7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY DEMOLITION

WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.

8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH AS:

DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.

9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR

REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.

10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS

COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE

PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL

MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL

ENGINEER.

11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED

DEMOLITION AND PREP WORK.

12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,

SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE

REMOVED, UNLESS NOTED OTHERWISE.

13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL, OR

CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING FINISHES

DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS LOCATED WITHIN

THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL SUBSTRATES TO

RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION, SEE KEYNOTED

ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL, MECHANICAL AND

ELECTRICAL.

14. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF

CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.

WORK MUST BE ACCOMPLISHED IN AREAS NOT SHOWN ON ARCHITECTURAL

DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL, PLUMBING AND

TECHNOLOGY ALONG WITH OTHER SYSTEMS. THIS WORK SHALL BE PART OF THIS

CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK

REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO

ADDITIONAL COST. SEE MECHANICAL, ELECTRICAL, PLUMBING AND TECHNOLOGY

PLANS FOR ADDITIONAL WORK.

DEMOLITION PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL OR PARTITION

TO BE REMOVED

EXISTING DOOR AND

FRAME TO REMAIN

KEY NOTE

A

GRIDLINE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

EXISTING DOOR AND

FRAME TO BE

DEMOLISHED

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

DEMOLITION PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

DE1

REMOVE FLOOR FINISH IN ITS ENTIRETY. PATCH & PREP FLOOR FOR

SCHEDULED FINISH. SEE SPECIFICATION SECTION 09 05 16 SUBSURFACE

PREPARATION FOR FLOOR FINISHES

DE2

REMOVE CEILING IN ITS ENTIRETY. INCLUDING ALL MECHANICAL &

ELECTRICAL ITEMS. SEE MECHANICAL / ELECTRICAL.

DE3

REMOVE GYP BD ON ONE SIDE OF PARTITION AS REQUIRED. SEE PLANS

AND MECHANICAL / ELECTRICAL PLANS FOR ADDITIONAL INFORMATION

DE4

CUT OPENING IN PARTITION AS REQUIRED FOR INSTALLATION OF DOOR

AND FRAME AS SCHEDULED. SEE PLAN

DE5

REMOVE PORTION OF CEILING AS REQUIRED. SEE PLANS FOR ADDITIONAL

INFORMATION

DE6

REMOVE PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. -SEE MEP

DRAWINGS FOR ADDITIONAL INFORMATION

DE7

REMOVE BASE CABINETS, UPPER CABINETS, TALL CABINETS AND/ OR

COUNTERTOP

DE8

REMOVE CEILING IN THIS AREA AS REQUIRED FOR MEP WORK. SALVAGE

CEILING WHERE APPROPRIATE FOR REINSTALLATION. SEE PLANS FOR

ADDITIONAL WORK

DE9

REMOVE CONDUITS THOUGH FLOOR. SEE PLAN FOR ADDITIONAL

INFORMATION

DE10

REMOVE PARTITION MOUNTED MIRROR AND ALL ASSOCIATED HARDWARE.

SALVAGE FOR REINSTALLATION

DE11

REMOVE SURFACE MOUNTED PLYWOOD. TEMPORARILY SUPPORT ANY

EQUIPMENT. SEE ELECTRICAL AND TECHNOLOGY DRAWINGS FOR

ADDITIONAL INFORMATION

DE12

REMOVE COVED CONCRETE BASE AT PARTITION.

DE13

REMOVE PREMANUFACTURED PLASTIC LOCKER(S). SALVAGE FOR

REINSTALLATION

DE14

REMOVE RAISED FLOOR SYSTEM IN ITS ENTIRETY AND METAL RAMP

DE15

REMOVE PORTION OF MEMBRANE ROOFING SYSTEM. SEE FLOOR/ROOF

PLAN FOR ADDITIONAL INFORMATION

DE16

REMOVE PORTION OF MEMBRANE ROOFING SYSTEM, IN PREPARATION

FOR RESLOPING AND REROOFING. SEE FLOOR/ROOF PLAN FOR

ADDITIONAL INFORMATION

DE17

REMOVE ROOF DRAIN AND ASSOCIATED PIPING. SEE MECHANICAL FOR

ADDITIONAL INFORMATION

DE18

not used

DE19

CUT OPENING IN BRICK AND METAL STUD BACK UP WALL FOR DOOR AND

FRAME AS SCHEDULED. SEE FLOOR PLAN FOR ADDITIONAL INFORMATION

DE20

REMOVE PARTIAL HEIGHT CERAMIC TILE AT SINK

DE21

REMOVE METAL RADIATOR COVER

DE23

REMOVE SURFACE APPLIED WALL COVERING, TRIM, VINYL BASE AND / OR

CRASH / HAND RAIL AS NEEDED.

DE24

REMOVE DOOR, FRAME AND ALL ASSOCIATED HARDWARE. SALVAGE FOR

REINSTALLATION. SEE PLAN

DE25

REMOVE ALUMINUM WINDOW SYSTEM AND ALL ASSOCIATED HARDWARE.

REMOVE CAST STONE SILL, EXTERIOR, AND SOLID SURFACE SILL,

INTERIOR.

DE26

CUT OPENING IN PARTITION AS REQUIRED FOR INSTALLATION OF EDGE

ILLUMINATED PHOTO MURALS

DE27

SAW CUT FACE BRICK AND REMOVE PORTION OF WALL. SEE PLAN FOR

ADDITIONAL INFORMATION

LIMITS OF CONSTRUCTION

NURSE

STATION

PATIENT

ROOM

CLEAN

STORAGE

LIMITS OF CONSTRUCTION

DE7

DE5

DE5

DE5

DE1

DE1

DE23

DE23

DE3

NOTE:

COORDINATE GENERAL DEMOLITION WORK

WITH ABATEMENT AND REMEDIATION WORK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/7

/2

:0

:0

P M

AD121.1-05

SECOND LEVEL ENLARGED

DEMOLITIOM PLANS - BUILDING 5

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

07/06/2021 Checker Author16090

1/4" = 1'-0"

ENLARGED DEMOLITION PLAN - LABORATORY OFFICES - BUILDING 5

1/4" = 1'-0"

ENLARGED DEMOLITION PLAN - NURSE STATION 288 - BUILDING 5

FD

FD

FD

FD

T

T

T

OFFICE

OFFICE

STORAGE

WOMEN'S

LOCKER

294A

TOILET

STORAGE

245B

OFFICE

245C

STORAGE

245D

REF

245E

REF

CORRIDOR

296B

STORAGE

296A

EMS

296C

TELECOMM

299A

STAIR 6

BREAK ROOM

292A

TOILET

MEN'S LOCKER

245A

KITCHEN

KITCHEN

DINING

TOILET

TOILET

OXYGEN

230A

PATIENT

TOILET

BLOOD DRAW

HALLWAY

BLOOD DRAW

3 2061

BLOOD DRAW

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BLOOD BANK

DRUG

SCREEN/

BARIATRIC

TOILET

TOILET

TOILET

TOILET

CHIEF OF

SERVICES

OFFICE

RESIDENT

WORKROOM

OFFICE

HISTOLOGY

2085A

FLOURO

MICROSCOPE

2088C

STERILIZATION

/ PREP

2088B

HISTO

STORAGE

MICROBIOLOGY

STORAGE

SHARED

OFFICE

STAFF

LOUNGE

HSK

LABORATORY

BLOOD DRAW

BLOOD DRAW

HSK

SOILED

HOLDING

SHARED

OFFICE

WOMENS

TOILET

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

SOILED HOLD

MEDS

CLEAN

EXAM

EXAM

EXAM

PAT TLT

PAT TLT

EXAM2033

MINOR

EXAM

EXAM

EXAM

SCREEN

SCREEN

OFFICE

SCREEN

SCREEN2021C

MEN

2021A

WOMEN

2021DD

NURSE TEAM

FAMILY

WAITING

PATIENT

ROOM

203A

TOILET

204A

TOILET

PATIENT

ROOM

PATIENT

ROOM

205A

TOILET

PATIENT

ROOM

206A

TOILET

PATIENT

ROOM 289A

TOILET

OFFICE

OFFICE

OFFICE

OFFICE

SEC

OFFICE

STAFF TOILET

2020A

STAIR

2050A

LOCKERS 2050

BREAK ROOM

2020C

CORRIDOR

CORR

K

ELEV

2000A

STAIR 8

S7

ELEV

WAITING

RECEPTION

2020D

CORR

CONFRENCE

228F

STAIR 3

VOL/ ESCORT

228C

EMS

228B

ELEC

228A

WHEEL CHAIR

ELEVATOR

LOBBY

2088A

SLIDES /

BLOCKS

2070A

HALLWAY

2070B

HALLWAY

CARTS

2072B

SHAFT

2089A

SHAFT

PATIENT

ROOM

207A

TOILET

227A

NOURISH 227

CONFRENCE

ROOM

227F

EMS

227C

EQUIP

227B

TRAYS

PATIENT

ROOM

PATIENT

ROOM

208A

TOILET

MEDS226B

HAC

226C

TELECOMM

226F

TOILET

226E

SOILED

227D

CLEAN

227H

WORK ROOM

227G

NURSE

PATIENT

ROOM

248A

TOILET 249

BATHING

245F

MECH

2010A

HALL

OFFICE2013

CONFRENCE

ROOM

MENS TOILET

SHARED

OFFICE

2082A

WALK-IN

REFRIGERATOR

CORRIDOR

CORRIDOR

HALLWAY

TELECOMM

ELEC

STAIR 2

HAC

SOILED

Room

288B

MEDS

NURSE

STATION

CLEAN

STORAGE

Room

PATIENT

ROOM

283A

TOILET

PATIENT

ROOM

PATIENT

ROOM

272A

TOILET

PATIENT

ROOM

OFFICE

209A

BREAK

CONFRENCE

WORK ROOM

225C

STAIR 4

255B

Room 225A

Room

WORK ROOM

EQUIPMENT

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

230B

ANTE231A

PATIENT

TOILET

232A

PATIENT

TOILET

233A

PATIENT

TOILET

234A

PATIENT

TOILET

235A

PATIENT

TOILET

236A

PATIENT

TOILET

237A

PATIENT

TOILET

237B

ANTE

238A

Room

287A

CORRIDOR

226D

NURSE

226A

NURSE

PATIENT

ROOM

LOUNGE

PATIENT

ROOM

Room

OFFICE

OFFICE

PATIENT

ROOM

PATIENT

ROOM

281A

TOILET

274A

TOILET

276A

TOILET

280A

Room

BUILDING 5 - AREA B

BUILDING 5 - AREA D

BUILDING 5 - AREA C

BUILDING 5 - AREA D

BUILDING 5 - AREA A

BUILDING 5 - AREA B

B U

IL

D

IN

G

A R

E A

C

B U

IL

D

IN

G

A R

E A

A

OFFICE

CONFRENCE

TRAINING

ROOM

BREAK ROOM

2000B

STAIR 9

ARM

POLICE

POLICE

HAC

TOILET

TOILET

MAIN SERVER

ROOM

270A

CRASH CART

ALCOVE

ELEVATOR

LOBBY

212A

STAIR 10

OFFICE

OFFICE

MECHANICAL

COPY

217A

TOILET

ON CALL

TOILET

ON CALL

219A

TOILET

286A

STAIR 5

220B

SIM

CONTROL

220A

SIM

OFFICE

OFFICE

OFFICE

OFFICE

286B

CORRIDOR

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

Room

254A

TOILET

255A

CLOSET

259A

Room

Room

STAIR 7

WHEEL CHAIR

STORAGE

OFFICE

Room

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

265A

TOILET

252A

TOILET

CORRIDOR

DAY ROOM

263A

TOILET

STAIR 1

CLOSET

OFFICE

288C

SHARED

OFFICE

AE121.1-05

AE121.1-05

AE411

AE121.1-05

AE211

ROOF BELOW

ROOF BELOW

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION

WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. WORK MUST BE

ACCOMPLISHED IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES

AFFECTING ELECTRICAL, MECHANICAL, PLUMBING AND TECHNOLOGY ALONG WITH OTHER

SYSTEMS. THIS WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT

THESE AREAS, ASCERTAIN WORK REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT

REQUIREMENTS AT NO ADDITIONAL COST. SEE MECHANICAL, ELECTRICAL, PLUMBING AND

TECHNOLOGY PLANS FOR ADDITIONAL WORK.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE

EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY

ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND

CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY

OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS

FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO

PROCEEDING WITH REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING

SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE

RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL

BE VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS

SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR

SCHEDULED FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO

PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH

TRADES WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING

BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE

LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE

RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE

RATING INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS

SHALL BE CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT

THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE

SEALED WITH FIRE CAULK.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0"

DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG

1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG

1A

AE2O1

INTERIOR SECTION

REFERENCE TAG

1A

KEY NOTE

A

GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

99.3 SIGN TAG

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/7

/2

:0

:2

P M

AE121-05

SECOND LEVEL OVERALL FLOOR

PLAN - BUILDING 5

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

07/06/2021 Checker GJB16090

1/16" = 1'-0"

SECOND LEVEL FLOOR PLAN OVERALL - BUILDING 5

T

T

226C

TELECOMM

226D

NURSE

287A

CORRIDOR

226E

SOILED

226F

TOILET

226B

HAC

LIMITS OF CONSTRUCTION

FL5

FL1

226C FL22

CO2 FEC NON RATED

CABINET

1 HOUR FIRE & SMOKE

RATED. SMOKE RATING NOT

SHOWN.

TELECOMM

HAC

CORRIDOR CARD READER

270A

CRASH

CART

ALCOVE

ELEC

STAIR 2

PATIENT

ROOM

FL4

FL4

FL4

FL5

3'-8"

XN7

XN7

FL17

LI

M

IT

S

O F

C O

N S

TR

U

C

TI

O N

LI

M

IT

S

O F

C O

N S

TR

U

C

TI

O N

B3

CG1CG1

FL4

FL1

FL1

FL1

99.3

FL14

CO2 FEC NON

RATED CABINET

FL22

B3bsB3bs

1 HOUR FIRE & SMOKE RATED. SMOKE

RATING NOT SHOWN.

296C

TELECOMM

STORAGE

OFFICE

OFFICE

CORRIDOR

296C

CARD

READER

B3bs

FL5FL4

FL4

FL4

FL18

LIMITS OF CONSTRUCTION

FL1

ABOVE

ABOVE

FL1

FL1

FL10

CO2 FEC

NON

RATED

1 HOUR FIRE & SMOKE RATED. SMOKE

RATING NOT SHOWN.

FL22

LIMITS OF CONSTRUCTION

296C

TELECOMM

296A

EMS

STORAGE

OFFICE

OFFICE

CORRIDOR

MEN'S

LOCKER

296B

STORAGE

CORRIDOR

DE1

DE5

DE1

DE7

DE4

DE3

LI

M

IT

S

O F

C O

N S

TR

U

C

TI

O N 226C

TELECOMM

226E

SOILED

226D

NURSE

287A

CORRIDOR

226B

HAC

MEDS

226F

TOILET

DE1

DE3

DE1 DE2

DE3

DE6

DE7

DE1 DE2

DE20

LI

M

IT

S

O F

C O

N S

TR

U

C

TI

O N

LI

M

IT

S

O F

C O

N S

TR

U

C

TI

O N

4'-0 7/8"

DE4

DE3

DE23

DE23

MEDS

STORAGE

STAIR 2

ELEC

CORRIDOR

PATIENT

ROOM

HAC

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION

WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. WORK MUST BE

ACCOMPLISHED IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES

AFFECTING ELECTRICAL, MECHANICAL, PLUMBING AND TECHNOLOGY ALONG WITH OTHER

SYSTEMS. THIS WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT

THESE AREAS, ASCERTAIN WORK REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT

REQUIREMENTS AT NO ADDITIONAL COST. SEE MECHANICAL, ELECTRICAL, PLUMBING AND

TECHNOLOGY PLANS FOR ADDITIONAL WORK.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE

EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY

ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND

CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY

OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS

FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO

PROCEEDING WITH REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING

SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE

RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL

BE VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS

SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR

SCHEDULED FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO

PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH

TRADES WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING

BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE

LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE

RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE

RATING INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS

SHALL BE CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT

THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE

SEALED WITH FIRE CAULK.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0"

DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG

1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG

1A

AE2O1

INTERIOR SECTION

REFERENCE TAG

1A

KEY NOTE

A

GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

99.3 SIGN TAG

FLOOR PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

FL1

PATCH PARTITION, BOTH SIDES, AS REQUIRED FROM MECHANICAL /

ELECTRICAL WORK. SEE MECHANICAL / ELECTRICAL FOR ADDITIONAL

INFORMATION.

FL2

PROVIDE PARTITION TYPE XP3 INFILL AT REMOVED RADIATOR GRILLS.

PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT

SURFACES. WHERE EXISTING FINISHES ARE DISTURBED PAINT TO MATCH

ADJACENT FINISH, PAINT ENTIRE WALL OF EXISTING INTERIOR SPACES

WHERE PATCHING OCCURS.

FL3

INFILL FLOOR TO MATCH EXISTING HEIGHT. SEE STRUCTURAL

FL4

PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT

SURFACES, AS REQUIRED FROM DEMOLITION. WHERE EXISTING FINISHES

ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE WALL

OF EXISTING INTERIOR SPACES WHERE PATCHING OCCURS.

FL5

PROVIDE PLYWOOD 3 SIDES OF ROOM. SEE TYPICAL ELEVATIONS SHEET

AE211

FL6

INFILL OPENING IN CONCRETE FLOOR. SEE STRUCTURAL FOR ADDITIONAL

INFORMATION. PREP FLOOR FOR FINISHES AS SCHEDULED.

FL7

PATCH FLOOR AT REMOVED ELECTRICAL. PREP FLOOR FOR FINISHES AS

SCHEDULED.

FL8

REINSTALL SALVAGED DOOR, FRAME AND ALL ASSOCIATED HARDWARE.

FL9

REINSTALL SALVAGED LOCKER(S). PROVIDE PREMANUFACTURED BASE,

FINISHED END PANEL(S) AND SLOPED TOP(S) TO MATCH EXISTING.

FL10

REINSTALL SALVAGED SIGN(S)

FL11

REINSTALL SALVAGED CEILING REMOVED FOR INSTALLATION OF MEP

ITEMS. SEE MEP PLANS FOR ADDITIONAL INFORMATION

FL12

MODIFY BASE AND SLOPED TOP AT EXISTING LOCKERS. PROVIDE

PREMANUFACTURED FINISHED END PANEL(S) TO MATCH EXISTING.

FL13

PATCH EXISTING FINISHES DISTURBED BY CONSTRUCTION; WALL AND

CEILING. CONTRACTOR TO PROVIDE LABOR AND MATERIALS. REFER TO

MATERIAL AND ROOM FINISH SCHEDULE AND DETAIL

FL14

PATCH FLOORING TO MATCH EXISTING FLOORING AS REQUIRED.

CONTRACTOR TO PROVIDE LABOR AND MATERIALS.

FL15

PATCH CONCRETE FLOOR AT REMOVED PARTITION AND/OR CONCRETE

COVE BASE. PREP FOR FINISHES AS SCHEDULED.

FL16

EDGE ILLUMINATED PHOTO MURALS, RECESSED IN PARTITION. FOR

ADDITIONAL INFORMATION SEE ELEVATION /8 AE211

FL17

FINISH WALLS TO MATCH EXISTING. CONTRACTOR TO PROVIDE LABOR AND

MATERIALS. REFER TO MATERIAL AND ROOM FINISH SCHEDULE AND

DETAIL /2 AF600

FL18

PAINT WALLS P-1

/3 AF600

FL19

PATCH EXISTING FINISHES DISTURBED BY CONSTRUCTION; WALL AND

CEILING. CONTRACTOR TO PROVIDE LABOR AND MATERIALS. REFER TO

MATERIAL AND ROOM FINISH SCHEDULE AND DETAIL /4 AF600

FL20

FINISH WALLS TO MATCH EXISTING. CONTRACTOR TO PROVIDE LABOR AND

MATERIALS. REFER TO MATERIAL AND ROOM FINISH SCHEDULE AND

DETAIL /5 AF600

FL21

PATCH EXISTING FINISHES DISTURBED BY CONSTRUCTION; WALL AND

CEILING. CONTRACTOR TO PROVIDE LABOR AND MATERIALS. REFER TO

MATERIAL AND ROOM FINISH SCHEDULE AND DETAIL /6 AF600

FL22

UPGRADE PARTITIONS TO 1 HOUR FIRE AND SMOKE BARRIER ALL SIDES OF

ROOM. PROVIDE TESTED HEAD OF PARTITION ASSEMBLY WITH MATERIALS

THAT RESIST THE PASSAGE OF SMOKE. SEAL JOINT AT HEAD OF

PARTITION AND ALL PENETRATIONS WITH FIRE CAULK.

DEMOLITION GENERAL NOTES

1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING AND

SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING

PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING PURPOSES

ONLY, UNLESS NOTED OTHERWISE.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL

TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.

3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG

WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,

SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO

STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.

4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO FLOOR

SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED FINISHES WITHIN

AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH SCHEDULE FOR

EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.

5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION

SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS, UNLESS

NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR EXTENT OF

CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE REMODELED.

6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND PREPARE

THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR FINISHES.

7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY DEMOLITION

WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.

8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH AS:

DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.

9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR

REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.

10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS

COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE

PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL

MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL

ENGINEER.

11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED

DEMOLITION AND PREP WORK.

12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,

SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE

REMOVED, UNLESS NOTED OTHERWISE.

13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL, OR

CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING FINISHES

DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS LOCATED WITHIN

THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL SUBSTRATES TO

RECEIVE SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION, SEE KEYNOTED

ITEMS, FINISH PLANS AND/OR SCHEDULES, STRUCTURAL, MECHANICAL AND

ELECTRICAL.

14. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF

CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.

WORK MUST BE ACCOMPLISHED IN AREAS NOT SHOWN ON ARCHITECTURAL

DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL, PLUMBING AND

TECHNOLOGY ALONG WITH OTHER SYSTEMS. THIS WORK SHALL BE PART OF THIS

CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK

REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO

ADDITIONAL COST. SEE MECHANICAL, ELECTRICAL, PLUMBING AND TECHNOLOGY

PLANS FOR ADDITIONAL WORK.

DEMOLITION PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL OR PARTITION

TO BE REMOVED

EXISTING DOOR AND

FRAME TO REMAIN

KEY NOTE

A

GRIDLINE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

EXISTING DOOR AND

FRAME TO BE

DEMOLISHED

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

DEMOLITION PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

DE1

REMOVE FLOOR FINISH IN ITS ENTIRETY. PATCH & PREP FLOOR FOR

SCHEDULED FINISH. SEE SPECIFICATION SECTION 09 05 16 SUBSURFACE

PREPARATION FOR FLOOR FINISHES

DE2

REMOVE CEILING IN ITS ENTIRETY. INCLUDING ALL MECHANICAL &

ELECTRICAL ITEMS. SEE MECHANICAL / ELECTRICAL.

DE3

REMOVE GYP BD ON ONE SIDE OF PARTITION AS REQUIRED. SEE PLANS

AND MECHANICAL / ELECTRICAL PLANS FOR ADDITIONAL INFORMATION

DE4

CUT OPENING IN PARTITION AS REQUIRED FOR INSTALLATION OF DOOR

AND FRAME AS SCHEDULED. SEE PLAN

DE5

REMOVE PORTION OF CEILING AS REQUIRED. SEE PLANS FOR ADDITIONAL

INFORMATION

DE6

REMOVE PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. -SEE MEP

DRAWINGS FOR ADDITIONAL INFORMATION

DE7

REMOVE BASE CABINETS, UPPER CABINETS, TALL CABINETS AND/ OR

COUNTERTOP

DE8

REMOVE CEILING IN THIS AREA AS REQUIRED FOR MEP WORK. SALVAGE

CEILING WHERE APPROPRIATE FOR REINSTALLATION. SEE PLANS FOR

ADDITIONAL WORK

DE9

REMOVE CONDUITS THOUGH FLOOR. SEE PLAN FOR ADDITIONAL

INFORMATION

DE10

REMOVE PARTITION MOUNTED MIRROR AND ALL ASSOCIATED HARDWARE.

SALVAGE FOR REINSTALLATION

DE11

REMOVE SURFACE MOUNTED PLYWOOD. TEMPORARILY SUPPORT ANY

EQUIPMENT. SEE ELECTRICAL AND TECHNOLOGY DRAWINGS FOR

ADDITIONAL INFORMATION

DE12

REMOVE COVED CONCRETE BASE AT PARTITION.

DE13

REMOVE PREMANUFACTURED PLASTIC LOCKER(S). SALVAGE FOR

REINSTALLATION

DE14

REMOVE RAISED FLOOR SYSTEM IN ITS ENTIRETY AND METAL RAMP

DE15

REMOVE PORTION OF MEMBRANE ROOFING SYSTEM. SEE FLOOR/ROOF

PLAN FOR ADDITIONAL INFORMATION

DE16

REMOVE PORTION OF MEMBRANE ROOFING SYSTEM, IN PREPARATION

FOR RESLOPING AND REROOFING. SEE FLOOR/ROOF PLAN FOR

ADDITIONAL INFORMATION

DE17

REMOVE ROOF DRAIN AND ASSOCIATED PIPING. SEE MECHANICAL FOR

ADDITIONAL INFORMATION

DE18

REMOVE METAL LOUVER AND ALL ASSOCIATED MOUNTING HARDWARE.

SEE MECHANICAL FOR ADDITIONAL INFORMATION

DE19

CUT OPENING IN BRICK AND METAL STUD BACK UP WALL FOR DOOR AND

FRAME AS SCHEDULED. SEE FLOOR PLAN FOR ADDITIONAL INFORMATION

DE20

REMOVE PARTIAL HEIGHT CERAMIC TILE AT SINK

DE21

REMOVE METAL RADIATOR COVER

DE23

REMOVE SURFACE APPLIED WALL COVERING, TRIM, VINYL BASE AND / OR

CRASH / HAND RAIL AS NEEDED.

DE24

REMOVE DOOR, FRAME AND ALL ASSOCIATED HARDWARE. SALVAGE FOR

REINSTALLATION. SEE PLAN

DE25

REMOVE ALUMINUM WINDOW SYSTEM AND ALL ASSOCIATED HARDWARE.

REMOVE CAST STONE SILL, EXTERIOR, AND SOLID SURFACE SILL,

INTERIOR.

DE26

CUT OPENING IN PARTITION AS REQUIRED FOR INSTALLATION OF EDGE

ILLUMINATED PHOTO MURALS

DE27

SAW CUT FACE BRICK AND REMOVE PORTION OF WALL. SEE PLAN FOR

ADDITIONAL INFORMATION

NOTE:

COORDINATE GENERAL DEMOLITION WORK

WITH ABATEMENT AND REMEDIATION WORK.

LIFE SAFETY SYMBOLS

SMOKE TIGHT

ASSEMBLY

1 HOUR FIRE

BARRIER

2 HOUR FIRE

BARRIER

3 HOUR FIRE

BARRIER

1 HOUR FIRE &

SMOKE BARRIER

2 HOUR FIRE &

SMOKE BARRIER

3 HOUR FIRE &

SMOKE BARRIER

FIRE EXTINGUISHER

CABINETFEC

NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/1

/2

:2

:4

A

M

AE121.1-05

SECOND LEVEL ENLARGED

DEMOLITION & FLOOR PLANS -

BUILDING 5

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

02/18/2022 Checker Author16090

1/4" = 1'-0"

ENLARGED PLAN - TELECOM 226C - BUILDING 5

1/4" = 1'-0"

ENLARGED PLAN - TELECOM 268 - BUILDING 5

1/4" = 1'-0"

ENLARGED PLAN - TELECOM 296C - BUILDING 5

1/4" = 1'-0"

ENLARGED DEMOLITION PLAN - STROAGE 296& TELEPHONE 296C - BUILDING 5

1/4" = 1'-0"

ENLARGED DEMOLITION PLAN - TELECOM 226C - BUILDING 5

1/4" = 1'-0"

ENLARGED DEMOLITION PLAN - MEDS 268, STORAGE 269 & ELEC 270

LI

M

IT

S

O F

C O

N S

TR

U

C

TI

O N

LI

M

IT

S

O F

C O

N S

TR

U

C

TI

O N

DRUG

SCREEN/

BARIATRIC

TOILET

TOILET

TOILET

TOILET

CHIEF OF

SERVICES

OFFICE

RESIDENT

WORKROOM

OFFICE

BLOOD

DRAW 1

HSK

SHARED

OFFICE

PATIENT

ROOM

OFFICE

HALLWAY

CARTS

PATIENT

ROOM

CORRIDOR

MAIN

SERVER

ROOM

TELECOMM

ELEC

STAIR 2

HAC

SOILED

288B

MEDS

NURSE

STATION

CLEAN

STORAGE

Room

PATIENT

ROOM

PATIENT

ROOM

270A

CRASH

CART

ALCOVE

EXPOSED

288C

SHARED

OFFICE

EXPOSED

AFF8'-6"

AFF7'-9"

RC1

RC1

AE560

AFF7'-3"

AFF8'-6"

AFF7'-5"

AE560

EXISTING CEILING

AFF7'-6"

AFF7'-6"

RC1

RC1

AE560

RCP GENERAL NOTES

1. GENERAL CONTRACTOR TO COORDINATE ALL CEILING MOUNTED EQUIPMENT

SUPPORT REQUIREMENTS, LOCATIONS, DIMENSIONS, ETC WITH EQUIPMENT SUPPLIER

AND OWNER, PRIOR TO INSTALLATION.

2. ALL CEILING MOUNTED ITEMS SUCH AS LIGHT FIXTURES, GRILLES, DIFFUSERS,

SPEAKERS, EXIT LIGHTS, ETC SHALL BE LOCATED IN THE CENTER OF ACT PANELS,

GYP BD SOFFITS AND/OR PLASTER SOFFIT BAYS, UNLESS NOTED OTHERWISE.

COORDINATE WITH MECHANICAL AND ELECTRICAL DRAWINGS.

3. FINISHED GYP BD SOFFITS SHALL EXTEND 1" BEYOND FACE AND EXPOSED ENDS OF

WALL CABINETS, FULL-HEIGHT CABINETS, ETC UNLESS NOTED OTHERWISE.

COORDINATE CABINET DIMENSIONS WITH SUPPLIER. GYP BD FASCIA/SOFFIT DETAILS

ARE REFERENCED FROM THE REFLECTED CEILING PLAN.

4. SEE MECHANICAL DRAWINGS FOR SPRINKLER HEAD TYPES AND LOCATIONS. CENTER

ALL HEADS IN ACT UNLESS NOTED OTHERWISE.

5. AT REMODELING WORK IN EXISTING ACT SUSPENSION SYSTEM, REMOVE EXISTING

PANELS, CUT AS REQUIRED FOR CONSTRUCTION AND RE-INSTALL. REPLACE ALL

DAMAGED AND / OR EXTREMELY SOILED PANELS WITH ACT TO MATCH EXISTING.

REFLECTED CEILING PLAN SYMBOLS

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

GBPD CEILING

/ SOFFIT

ACT CEILING

SYSTEM

EXISTING ACT

CEILING

SYSTEM

IV TRACK

CUBICLE

CURTAIN

TRACK

ACCESS

PANEL

2'-0" x 4'-0" LIGHT

FIXTURE

2'-0" x 2'-0" LIGHT

FIXTURE

PENDANT STRIP

LIGHT FIXTURE

PENDANT STRIP

LIGHT FIXTURE

RECESSED LIGHT

FIXTURE

MECHANICAL

SUPPLY GRILL

MECHANICAL

RETURN GRILL

OCCUPANCY

SENSOR

MECHANICAL LINEAR

SUPPLY GRILL

CEILING ELEVATION

AND FINISH

9'-0" AFF

ACT

REFLECTED CEILING KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

RC1

PATCH / MODIFY CEILING TO MATCH EXISTING AS NECESSARY,

CONTRACTOR TO PROVIDE LABOR AND MATERIALS. REPLACE ANY

BROKEN, DAMAGED OR DIRTY ACT TILES AND CEILING GRID. COORDINATE

WITH OWNER FOR ACT AND CEILING GRID TYPE. WHERE EXISTING

FINISHES ARE DISTURBED ON PAINTED SURFACES. PAINT TO MATCH

ADJACENT FINISH. PAINT ENTIRE WALL / SOFFIT OF EXISTING INTERIOR

SPACES WHERE PATCHING OCCURS.

RC2

PATCH SOFFIT WITH MATERIALS TO MATCH EXISTING ADJACENT

SURFACES AS REQUIRED FROM DEMOLITION. CONTRACTOR TO PROVIDE

LABOR AND MATERIALS FOR PAINTED AREAS. CONTRACTOR TO PROVIDE

LABOR AND MATERIALS AT AREAS WITH WALL COVERING. WHERE

EXISTING FINISHES ARE DISTURBED ON PAINTED SURFACES. PAINT TO

MATCH ADJACENT FINISH, PAINT ENTIRE SOFFIT OF EXISTING INTERIOR

SPACES WHERE PATCHING OCCURS.

RC3

REINSTALL CEILING TILE, GRID AND ANY MECHANICAL ITEMS AS REQUIRED

FROM CONSTRUCTION, REPLACE ANY BROKEN, DAMAGED OR DIRTY ACT

TILES AND CEILING GRID. COORDINATE WITH OWNER FOR ACT AND

CEILING GRID TYPE. WHERE EXISTING FINISHES ARE DISTURBED ON

PAINTED SURFACES. PAINT TO MATCH ADJACENT FINISH. PAINT ENTIRE

WALL / SOFFIT OF EXISTING INTERIOR SPACES WHERE PATCHING OCCURS.

RC4

MODIFY CEILING GRID AND TILE AS REQUIRED FROM CONSTRUCTION. SEE

PLANS FOR ADDITIONAL INFORMATION

LIMITS OF CONSTRUCTION

BREAK

ROOM

292A

TOILET

299A

STAIR 6

CORRIDOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .