271513.13 Communications Optical Fiber Cable Splicing and Terminations.pdf
PDF 26 KB Posted
- Attached to
- EHRM Infrastructure Upgrades Construction Sioux Falls VAMC Federal contract opportunity
- Solicitation number
- 36C77622R0049
About this file
This solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin is for the construction and commissioning of infrastructure upgrades needed for the Electronic Health Record Modernization project at the Sioux Falls VA Medical Center. The project scope includes building a new server room on the roof between buildings and upgrading various departments and service areas throughout the hospital. As a total Service-Disabled Veteran-Owned Small Business set-aside with an estimated value between $20-50 million, the construction is to be completed within 450 calendar days of the notice to proceed. Questions must be submitted in writing by email to the point of contact by the deadline.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sioux Falls VAHCS, Sioux Falls, SD VA Project 438-20-910
EHRM Infrastructure Upgrades 04-04-2022
2501 West 22nd St. Bid Documents
Sioux Falls, SD 57105
27 15 13.13 - 1
SECTION 27 15 13.13
COMMUNICATIONS OPTICAL FIBER SPLICING AND TERMINATIONS
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section specifies requirements for terminations of fiber optic cabling.
1.2 SUMMARY
A. Section Includes:
1. Termination Requirements.
1.3 REFERENCES
A. VA Infrastructure Standard for Telecommunications Spaces.
1.4 RELATED WORK:
A. Termination equipment: Section 27 11 19, COMMUNICATIONS TERMINATION
BLOCKS AND PATCH PANELS.
B. Fiber optic cabling requirements: Section 27 13 23, COMMUNICATIONS
OPTICAL FIBER BACKBONE CABLING.
1.5 SUBMITTALS:
A. Submit in accordance with Section 27 05 00, COMMON WORK RESULTS FOR
COMMUNICATIONS SYSTEMS.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 TERMINATION REQUIREMENTS.
A. Terminate fiber optic cabling with duplex Lucent connector (LC) adapters on the patch cable side of each fiber enclosure, 12-fiber multi-fiber push on (MPO) connectors, or 24-fiber multi-fiber push on
(MPO) connectors on the backbone cabling side of each fiber enclosure or as required for the application.
B. Pre-terminated connections are preferred for computer room structured cabling applications. Field termination (fusion splicing) for non-computer room applications where cable lengths cannot be determined in advance is acceptable.
- - - E N D - - -