Asbestos - Appendix-A part 1.pdf

PDF 6 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction Sioux Falls VAMC Federal contract opportunity
Solicitation number
36C77622R0049
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is for construction and commissioning services for infrastructure upgrades at the Sioux Falls VA Medical Center to support an Electronic Health Record Modernization project. Key details include:

  • The construction work is spread across multiple buildings and departments, including building a new server room on the roof between wings. Limited onsite storage requires offsite material storage planning.

  • The period of performance is approximately 450 calendar days from notice to proceed. The estimated value is between $20-50 million.

  • The solicitation will be a Request for Proposal conducted according to FAR Parts 15, 19, and 36 and evaluated per the procedures in the solicitation.

  • The opportunity is set aside solely for Service-Disabled Veteran-Owned Small Businesses. Questions must be submitted in writing to the issuing office by the specified date.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Infrastructure Upgrades Construction Sioux Falls VAMC, newest first.
File Type Posted
36C77622R0049 0006.pdf PDF
Technical Question Tracking Sheet Infra Upgrades Final.pdf PDF
36C77622R0049 0005.pdf PDF
271116 Communications Cabinets Racks Frames and Enclosures.pdf PDF
36C77622R0049 0004.pdf PDF
271619 Communications Patch Cords Station Cords and Cross Connect Wire.pdf PDF
271313.13 Communications Copper Cable Splicing and Terminations.pdf PDF
270526 Grounding and Bonding for Communications Systems.pdf PDF
271513.13 Communications Optical Fiber Cable Splicing and Terminations.pdf PDF
271000 Structured Cabling.pdf PDF
271323 Communications Optical Fiber Backbone Cabling.pdf PDF
270533 Conduits and Backboxes for Communications Systems.pdf PDF
271126 Communications Rack Mounted Power Protection and Power Strips.pdf PDF
271313 Communications Copper Backbone Cabling.pdf PDF
36C77622R0049 0003.pdf PDF
OIT InfrastrucStdTelecomSpaces 3.1.pdf PDF
SF Site Utility Dwg.pdf PDF
270553 Identification for Communications Systems.pdf PDF
271513 Communications Copper Horizontal Cabling.pdf PDF
Technical Question Tracking Sheet - Infra Upgrades - Final.pdf PDF
2020 Elec Combined One Lines.pdf PDF
270536 Cable Trays for Communications Systems.pdf PDF
271119 Communications Termination Blocks and Patch Panels.pdf PDF
Technical Question Tracking Sheet - Infra Upgrades.pdf PDF
Building 1C Sheet 6 - Pipe Tunnel.pdf PDF
EHRM Site Visit Attendance Sheet.pdf PDF
36C77622R0049 0002.pdf PDF
Specification - Vol 2 Revision 2.pdf PDF
36C77622R0049 0001.pdf PDF
Dwgs Bid Documents-part 6-1 REV.pdf PDF
Dwgs Bid Documents-part 3-1 REV.pdf PDF
Specifications Revision 2.pdf PDF
Dwgs Bid Documents-part 1-1 REV.pdf PDF
Asbestos - Appendix-A part 3.pdf PDF
Dwgs Bid Documents-part 4-1 REV.pdf PDF
Dwgs Bid Documents-part 5-1 REV.pdf PDF
Dwgs Bid Documents-part 2-1 REV.pdf PDF
Asbestos - Appendix-A part 4.pdf PDF
Asbestos - Appendix-A part 2.pdf PDF
Construction Wage Rates - Minnehaha - 2-25-22.pdf PDF
Dwgs Bid Documents-part 7-1 REV.pdf PDF
VHA Suppl. Contract Rqmnts for Combatting COVID-19 Updated 12-14-2021.pdf PDF
Supplement to General Requirements Spec 01 00 00.pdf PDF
36C77622R0049.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sioux Falls VAHCS, Sioux Falls, SD VA Project 438-20-910 EHRM Infrastructure Upgrades 07-06-2021 2501 West 22nd St. Bid Documents Sioux Falls, SD 57105

Appendix A

Appendix A:

-Asbestos Survey Report

Prepared for:

ANDERSON ENGINEERING

13605 1ST AVENUE NORTH

PLYMOUTH, MN

June 1, 2021

Asbestos Survey Report EHRM Infrastructure Upgrades Portions of Buildings 1, 5, 7, 16, 28, 38 & 52 Veterans Affairs Medical Center Sioux Falls, South Dakota

Landmark Environmental, LLC 2042 West 98th Street | Bloomington, MN 55431 | Phone: 952-666-2444 | www.landmarkenv.com

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Report.docx

ASBESTOS SURVEY

EMHR INFRASTRUCTURE UPGRADE

PORTIONS OF BUILDINGS 1, 5, 7, 16, 28, 38 & 52

VETERANS AFFAIRS MEDICAL CENTER

SIOUX FALLS, SD

1.0 Executive Summary

2.0 Introduction

3.0 Sampling Methods and Analysis

4.0 Asbestos-Containing Material Assessment

5.0 Findings

6.0 Recommendations

Appendices

Appendix A Certificates

Appendix B Diagram with Sample Locations and Laboratory Report

Appendix C Asbestos-Containing Materials Physical Assessment

Appendix D Diagram of “EHRM Infrastructure Upgrade” Work Areas

Appendix E Diagram of Asbestos-Containing Materials

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

1.0 Executive Summary

Landmark Environmental, LLC (Landmark) was retained by Anderson Engineering

(Client) to complete an asbestos survey (Survey) as part of a EHRM Infrastructure

Upgrade project at the Sioux Falls Veterans Affairs Medical Center located in Sioux

Falls, South Dakota (the Property). The Client intends to upgrade the IT Infrastructure through a project titled “EHRM Infrastructure Upgrade” in portions of Buildings 1, 5, 7, 16, 28, 38 & 52 at the Property (Project Area). The Project Areas included in the Survey were delineated in the Clients 35% Construction document dated 3/26/2021 and provided by the Client.

A summary of the Survey results are as follows:

Building 1

Landmark collected 17 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir Technologies Laboratory (SanAir) separated these 17 samples into 20 individual layer samples and all 20 individual layer samples were analyzed.

Based on the Survey laboratory report and prior asbestos sampling in the building, suspect building materials found to contain asbestos include – pipe insulation and joint compound. Non-fiberglass pipe insulation was observed during the Survey but was not sampled since it had previously been sampled and found to contain asbestos. Some of this pipe insulation was behind hard walls, ceilings, and soffits and was inaccessible. Pipe insulation has been included in the report and asbestos-containing material (ACM) database. ACM should not be cut, drilled, sanded or disturbed.

Building materials assumed to contain asbestos include – fire doors.

Building 5

Landmark collected 125 bulk asbestos samples as part of the Survey. SanAir separated these 125 samples into 147 individual layer samples and all 147 individual layer samples were analyzed.

Based on the Survey laboratory report and prior asbestos sampling in the building, suspect building materials found to contain asbestos include – tank insulation, pipe insulation, hard fittings on pipe insulation, joint compound, floor tile under carpet, F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Report.docx floor tile mastic, 12” x 12” floor tile, floor tile under floor tile, and Transite. Non-fiberglass tank insulation, pipe insulation, and Transite was observed during the Survey but was not sampled since it had previously been sampled and found to contain asbestos.

Some of this pipe insulation was behind hard walls, ceilings, and soffits and was inaccessible. Transite tank and pipe insulation has been included in the report and ACM database. ACM should not be cut, drilled, sanded or disturbed.

Building materials assumed to contain asbestos include – electric panels, fire doors and roofing materials.

Building 7

Landmark collected 9 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir separated these 9 samples into 12 individual layer samples and all 12 individual layer samples were analyzed.

Based on the laboratory report, no suspect building materials were found to contain asbestos.

No suspect building materials were assumed to contain asbestos.

Building 16

Landmark collected 4 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir separated these 4 samples into 7 individual layer samples and all 7

Building 28

Landmark collected 7 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir separated these 7 samples into 10 individual layer samples and all 10

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Building 38

Landmark collected 11 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir separated these 11 samples into 14 individual layer samples and all 14

Based on the laboratory report suspect building materials found to contain asbestos include – 12” x 12” floor tile, and floor tile mastic. ACM should not be cut, drilled, sanded or disturbed.

Building 52

Landmark collected 8 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir analyzed all 8 samples collected.

Building materials assumed to contain asbestos include – fire door

No attempt was made to locate materials inside ceilings, walls, doors, ducts, and other areas that would require destructive entry since the building was occupied at the time of the Survey. The possibility exists that as these locations are opened up during renovation, suspect material will be found.

Electrical wiring and panels were not sampled. Landmark does not perform bulk sampling of electrical equipment unless it has been shut down and tagged by a licensed electrician.

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Landmark did not sample the roof of Building 5 that will be impacted as part of the project since doing so would damage the integrity of the roof and void the warranty. This area must be sampled prior to disturbance.

Landmark could not gain access behind the radiators during the Survey. The possibility exists that asbestos-containing Transite may exist behind the radiators. When the radiator covers are removed during construction, Transite may possibly be found. For the purposes of this Survey, Transite is assumed to be located behind the radiators in the

Project Area.

Landmark did not gain access into Building 5, 3rd floor west Project Area (Room 370 and

Nurse Area) due to the area being in a COVID lockdown portion of the floor. According to the VA staff and the Client, this portion of the building was recently renovated at the same time as the 2nd floor nurse’s area directly below. Room 370 and the Nurse area must be inspected for ACM prior to construction activities taking place.

This Survey identifies asbestos as they existed on the day of the survey at the Property.

Conditions may change over time.

This Survey should not be used as a bidding document. The ACM quantities provided are estimates and must be verified by the bidding contractors. Landmark recommends using a licensed asbestos project designer to design and bid all projects.

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

2.0 Introduction

Landmark completed an asbestos survey report (Report) at the Property. The procedures used for this Survey and assessment comply with the Environmental Protection Agency

(EPA), Occupational Safety and Health Administration (OSHA), and South Dakota

Department of Environment and Natural Resources (SD DENR) asbestos standards.

2.1 Purpose

Landmark was retained by the Client to complete the Survey and Report for the purposes of understanding ACM locations and quantities in the areas to be renovated during the project.

2.2 Survey Approach

The Survey and assessment, consisting of identifying, sampling, assessing, and quantifying suspect ACM within the Property building, was conducted on May 12-14, 2021. Diagrams of the area included in the Survey are included in Appendix D.

2.3 Assumptions, Limitations and Exceptions

The findings and recommendations in this Report are subject to the following assumptions, limitations, and/or exceptions:

• No attempt was made to locate materials inside ceilings, walls, doors, ducts, roofs, and other areas that would require destructive entry. The possibility exists that materials may be present at these locations. Materials observed, or suspected in these areas, are assumed to be ACM if sampling was not feasible.

• Landmark could not gain access behind the radiators in the Project Area. The possibility exists that asbestos-containing Transite may exist behind the radiators.

When radiator covers are removed during construction, Transite may possibly be found. For the purposes of this Survey, Transite is assumed to be located behind the radiators in the Project Area.

• Landmark could not access the 3rd floor west (Room 370 and Nurse Area) due to the area being a COVID lockdown portion of the floor. According to the VA staff and the Client, this portion of the building was recently renovated at the same time as the

2nd floor nurse’s area directly below this area. Room 370 and the Nurse Area must be inspected for ACM prior to construction activities taking place.

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Report.docx

• Electrical wiring and panels were not sampled. Landmark does not perform bulk sampling of electrical equipment unless it has been shut down and tagged by a licensed electrician.

• Landmark did not sample the roof of Building 5 that will be impacted as part of the project since doing so would damage the integrity of the roof and void the warranty.

This area must be sampled prior to disturbance.

• This Survey identifies materials as they existed on the day of the survey. Conditions may change over time.

2.4 Qualifications

The survey was conducted by Mark Meier, an accredited asbestos building inspector with

Landmark. A photocopy of the inspector’s SD DENR certification is included in

Appendix A.

Asbestos sample analysis for this project was conducted by SanAir in Powhatan, Virginia. SanAir is accredited by the National Voluntary Accreditation Program

(NVLAP lab code 200870-0).

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

3.0 Sampling Methods and Analysis

3.1 Bulk Asbestos Sampling

Building diagrams were utilized to divide the Property building into functional spaces for the purposes of describing sampling locations. The building diagram with sample locations is included as Appendix B.

Similar systems and materials were grouped into “homogeneous areas of building materials” (homogeneous materials). Homogeneous materials often exist in more than one functional space within the Property building. Each homogeneous material was assigned a discrete number; the homogeneous material number is indicated in the first number of the sample name. Multiple samples of each homogeneous material were taken in accordance with the EPA-Asbestos Hazard Emergency Response Act (AHERA) guidelines using a random sampling procedure. These multiple samples were designated

“A, B, C,” etc. for each homogenous material, as indicated in the sample name. The sample locations and sample descriptions are shown on the building diagram and the asbestos laboratory report in Appendix B.

Samples were collected by carefully removing a small representative sample of the suspect material and sealing it in a plastic bag.

3.2 Bulk Asbestos Analysis

Landmark collected 181 bulk asbestos samples as part of the Survey. SanAir separated these 181 samples into 218 individual layer samples and all 218 individual layer samples were analyzed. The laboratory results are presented in the attached report in Appendix B.

The bulk samples were analyzed by polarized light microscopy (PLM) with dispersion staining, EPA method 600/R-93/116 and EPA method 600/M4-82-020. Quantity determinations are made by visual estimation. For each homogeneous material, once a positive sample was identified, the remaining samples were not analyzed.

EPA National Emission Standards for Hazardous Air Pollutants (NESHAP)-Rule 40 CFR

Part 61 states that samples found to contain less than 10% asbestos by visual estimation may be further quantified by point count analysis.

The Asbestos rule states that all multi-layer systems, except for wall systems where joint compound was used only at the joints and nail holes, must be analyzed as separate materials. If any layer contains greater than one percent asbestos, that layer must be treated as asbestos-containing. This requires all layers in a multi-layered system to be

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Report.docx treated as asbestos-containing if the layers cannot be separated without disturbing the asbestos-containing layer.

Asbestos samples will be held for 30 days after the date of this report.

3.3 Chain of Custody Procedures

To ensure that samples collected in the field are neither lost nor their identity mistaken, sample collection, from the point of collection to receipt in the laboratory, proceeds as follows. Each sample is first assigned a unique and distinct sampling number. After a sample is placed into a plastic bag, that unique number is assigned to that bag. This same number is documented on the laboratory’s chain of custody. The inspector signs each chain of custody before delivering to the lab. Upon receipt of the samples, the lab analyst verifies that each sample matches the corresponding chain of custody number and signs and dates the chain of custody. After analysis, the analyst generates a report that includes the sample results and the project chain of custody forms.

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

4.0 Asbestos-Containing Material Assessment

In each functional space, each homogeneous material was quantified and assessed for friability (i.e. material can be crumbled, pulverized, or reduced to powder by hand pressure when dry). Suspect ACM was then assessed as to their condition and potential for disturbance. This information was recorded on the asbestos physical assessment shown in Appendix C. The model for this system is described in the EPA Draft

Curriculum for Training Building Inspectors.

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

5.0 Findings

5.1 Summary of Asbestos-Containing Materials

Suspect homogeneous material found to contain asbestos and their sample numbers, arranged by building, include:

Thermal Insulation

• Pipe insulation (Previously Sampled).

Surfacing Material – None Observed

Miscellaneous Materials

• Joint compound (Samples 1-02-3, 1-314-4).

Assumed Materials

• Fire door

Thermal Insulation

• Tank insulation (Previously sampled).

• Pipe insulation (Previously sampled).

Surfacing Material - None Observed

• Joint compound (Samples 5-296-1, 5-B23-4, 5-E05-1, 5-330C-4, 5-546-4, 5-149-

4, 5-178-1).

• Floor tile under carpet & mastic (Samples 5-149-6, 5-149-7).

• 12” x 12” floor tile, light gray with brown streaks & mastic (Samples 5-178-6, 5-

178-7).

• Floor tile mastic (Sample 5-178-11).

• Floor tile and mastic under floor tile (Samples 5-178-12, 5-178-13).

• Transite behind radiator (Previously Sampled).

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Report.docx

Assumed Materials

• Electric panels

• Fire doors

• Roofing materials

Thermal Insulation – None Observed

Miscellaneous Materials – None Observed

Assumed Materials – None Observed

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

• 12” x 12” floor tile, cream & mastic (Samples 38-129-4, 38-129-5).

• Fire door

5.2 Summary of Non-Asbestos-Containing Materials

Suspect ACM is considered negative for asbestos when all samples of the material are found to contain one percent or less asbestos. Suspect homogeneous material found to be negative, arranged by building, includes:

1. Sheetrock and joint compound (Samples 1-314-4, 1-02-3).

2. Plaster (Samples 1-314-1, 1-037-1A, 1-037-1B).

3. Baseboard adhesive, brown (Sample 1-314-2).

4. Baseboard adhesive, tan (Sample 1-314-3).

5. Wood grain floor sheeting (Sample 1-314-5).

6. Red firestop putty (Samples 1-314-6, 1-02-7, 1-037-3).

7. 2’ x 4’ ceiling tile, white with fissures, dents and holes (Sample 1-314-7).

8. 12” x 12” floor tile, tan with blue & mastic (Samples 1-02-1, 1-02-2).

9. 2’ x 2’ ceiling tile, white reveal with holes (Sample 1-02-4).

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Report.docx

10. Gray baseboard and adhesive (Samples 1-02-5, 1-02-6).

11. Brown firestop putty (Sample 1-037-2).

1. Sheetrock and joint compound (Samples 5-1002-1, 5-1002-2, 5-1114-1, 5-268-5, 5-296-1, 5-A27-5, 5-B23-4, 5-E05-1, 5-330C-1, 5-546-4, 5-149-4, 5-178-1, 5-

510A-1).

2. Gray fireproofing (Samples 5-1002-2A, 5-1114-2A, 5-226C-1, 5-330C-4A, 5-

330C-5B, 5-330C-5C, 5-201-1A, 5-201-1B, 5-201-1C, 5-1002-2B, 5-1114-2B).

3. Red firestop putty (Samples 5-1002-3, 5-270-5-2, 5-226C-5, 5-296C-2, 5-B23-5, 5-150A-1).

4. Old roof epoxy (Samples 5-1002-4).

5. Black remnant roofing tar/felt (Sample 5-1002-5).

6. Light brown baseboard and adhesive (Samples 5-1114-3, 5-1114-4. 5-268-3, 5-

268-4, 5-226C-2, 5-226C-3, 5-330C-2, 5-330C-3).

7. Floor leveling compound and adhesive (Sample 5-111-1).

8. 2’ x 2’ ceiling tile, white with fissures, dents and holes (Sample 5-111-2).

9. Plaster (Samples 5-111-3, 5-270-5-3, 5-296C-1A, 5-296C-1B, 5-296C-1C, 5-149-

3, 5-178-2, 5-175-1, 5-433-1, 5-451-5).

10. 2’ x 2’ ceiling tile, white reveal with fissures, dents and holes (Sample 5-268-1).

11. Floor sheet, brown pebbled (Sample 5-268-2).

12. 4” white ceramic wall tile, mortar and grout (Samples 5-268-6, 7, 8).

13. Brown floor sheet (Sample 5-270-5-1).

14. Brown firestop putty (Sample 5-226C-4).

15. Tan wall panel adhesive (Sample 5-296C-3).

16. White wall texture (Samples 5-296-2A, 2B, 2C).

17. Tall gray baseboard and adhesive (Samples 5-296-3, 5-296-4, 5-433-5, 5-433-6, 5-451-1, 5-451-2).

18. 2’ x 4’ ceiling tile, white with holes (Sample 5-296-5).

19. 2’ x 4’ ceiling tile, white with fissures, dents and holes (Samples 5-296-6. 5-178-

3, 5-175-3).

20. 12” x 12” floor tile, light gray with white/gray/brown & mastic (Samples 5-296-7, 5-296-8).

21. 2’ x 2’ ceiling tile, white reveal with dents and holes (Sample 5-A27-1).

22. Light gray with tan and blue specks flooring (Sample 5-A27-2).

23. Tan baseboard and adhesive (Samples 5-A27-3, 5-A27-4).

24. Brown wood floor sheet (Sample 5-B23-1).

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Report.docx

25. Gray baseboard and adhesive (Samples 5-B32-2, 5-B32-3, 5-546-2, 5-546-3, 5-

510A-4, 5-510A-5).

26. 2’ x 2’ ceiling tile, white (Samples 5-E05-2, 5-510A-2).

27. Orange firestop putty (Sample 5-150A-2).

28. White firestop putty (Sample 5-150A-3).

29. Tan slate floor sheet (Sample 5-546-1).

30. Gray duct sealant (Sample 5-Nurse-1).

31. 2’ x 2’ ceiling tile, white with small fissures and holes (Sample 5-Nurse-2).

32. Floor sheeting, tan (Sample 5-Nurse-4).

33. Firestop putty (Sample 5-B66A-1).

34. Tan wall adhesive (Sample 5-B66A-2).

35. Window caulk, gray (Sample 5-B66A-3).

36. Tall brown baseboard and adhesive (Samples 5-149-1, 5-149-2).

37. 2’ x 2’ ceiling tile, white reveal with fissures and holes (Samples 5-149-5, 5-451-

4).

38. Black baseboard and adhesive (Samples 5-178-4, 5-178-5).

39. Black pedestal adhesive (Sample 5-178-8).

40. Tan pedestal adhesive (Sample 5-178-9).

41. 12” x 12” floor tile, tan with brown (Samples 5-178-10).

42. Black tar on exterior wall (Sample 5-178-14).

43. Window caulk (Sample 5-175-2).

44. Pyrobar (Sample 5-175-4).

45. Tan wood adhesive (Sample 5-175-5).

46. 2’ x 2’ ceiling tile, white reveal with fissures, dents and holes (Sample 5-433-2).

47. Window caulk, black (Samples 5-433-3, 5-451-8).

48. Floor sheet, wood plank (Sample 5-433-4).

49. Wood floor sheeting (Sample 5-451-3).

50. Tan hole filler (Sample 5-451-6).

51. White cellulose filler insulation (Sample 5-451-7).

52. Floor sheeting, stone plank (Sample 5-510A-3).

1. Sheetrock and joint compound (Samples 7-107-1A, 52-107-1B, 52-107-1C).

2. Brown ceramic floor tile, mortar and grout (Samples 7-107-2, 3, 4).

3. Tan ceramic floor tile, mortar and grout (Samples 7-107-5, 6, 7).

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

1. Sheetrock and joint compound (Samples 16-IT-1A, 1B, 1C).

2. Gray sealant on exterior wall (Sample 16-IT-2).

1. Sheetrock and joint compound (Samples 28-123-1A, 1B, 1C).

2. Brown baseboard and adhesive (Samples 28-123-2, 28-123-3).

3. Black hole filler (Sample 28-123-4).

4. Brown hole filler (Sample 28-123-5).

1. Sheetrock and joint compound (Samples 38-129-1A, 1B, 1C).

2. Blue baseboard and adhesive (Samples 38-129-2, 3).

3. 2’ x 2’ ceiling tile, white reveal with dents and holes (Sample 38-129-6).

4. Tan baseboard and adhesive (Sample 38-129-7, 8).

5. Gray duct sealant (Sample 38-129-9).

1. Brown baseboard and adhesive (Samples 52-106-1, 52-106-2).

2. 12” x 12” floor tile, brown mottled and mastic (Samples 52-106-3, 52-106-4).

3. Joint compound on wood panels (Samples 52-106-5A, 52-106-5B, 52-106-5C).

4. 2’ x 2’ ceiling tile, white reveal with dents and holes (Sample 52-106-6).

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

6.0 Recommendations

This Survey was conducted to locate ACM and its quantity in the Project Area. Based on the Survey and assessment results, as well as the proposed renovation project in the

Property buildings, the following recommendations for the ACM are summarized below.

Description Total Estimated

Thermal System Insulation

• Pipe insulation 23 linear feet

Surfacing Material None observed

Miscellaneous Materials None observed

• Fire door 1 door

Thermal System Insulation

• Tank insulation 240 sf

• Pipe insulation 196 lf

• Floor tile under carpet 392 sf

• 12”x12” floor tile, light gray with brown streaks 1,000 sf

• Floor tile under other flooring 1,000 sf

• Floor tile mastic 2,452 sf

• Transite 96 sf

• Electric panel 13 panels

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Report.docx

• Fire doors 7 doors

• Roofing materials not quantified

Thermal System Insulation None observed

Assumed Materials None observed

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

12”x12” floor tile & mastic 224 sf

Fire door 1 door

All tested positive and assumed ACM must be properly removed by a licensed asbestos abatement contractor according to applicable federal, state, and local regulations and according to the asbestos abatement design and specification. Assumed materials can be sampled during construction to determine asbestos content.

The joint compound applied to the gypsum wallboard was found to contain asbestos in

Buildings 1 & 5. This material, as determined by the EPA in response to its applicability to NESHAP, becomes an integral part of the wallboard, forming a wall system.

Reference document from the EPA Office of Air Quality Planning and Standards, September 4, 1992, Stationary Source Compliance Division. In this case, the wall system contains less than one-percent asbestos. OSHA requires that all contractors and employees who may disturb this material must be made aware that the joint compound

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

Report.docx contains asbestos. Appropriate precautions should be taken by anyone impacting the joint compound.

If suspect materials are encountered during renovation, work should stop immediately and the materials should be sampled for asbestos content or assumed to contain asbestos and properly removed by a licensed asbestos abatement contractor.

Landmark could not gain access behind the radiators in the Project Area. The possibility exists that Transite may exist behind the radiators. When the radiator covers are removed during construction, Transite may possibly be found. For the purposes of this Survey, Transite is assumed to be located behind the radiators in the Project Area.

Landmark could not access Building 5, 3rd floor west Project Area (Room 370 and Nurse

Area) due to the area being in a COVID lockdown portion of the floor. According to the

VA staff and the Client, this portion of the building was recently renovated at the same time as the 2nd floor nurse’s area directly below this area. Room 370 and the Nurse Area must be inspected for ACM prior to construction activities taking place.

Landmark did not sample the roof of Building 5 that will be impacted as part of the project since doing so would damage the integrity of the roof and void the warranty. This area must be sampled prior to disturbance.

This Survey identifies materials as they existed on the day of the survey. Conditions may change over time.

F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey

7.0 Signatures of Environmental Professional(s)

We declare that, to the best of our professional knowledge and belief, the Survey referenced by this report, and the report itself, were conducted in accordance with intent of the EPA, OSHA, SD DENR, AHERA regulations to the best of my ability and knowledge.

Mark Meier Asbestos Building Inspector

(SD Inspector #8199)

Eric Gabrielson, Vice President

Appendices

Appendix A

Appendix B

Room

032B Room

032C Room

Room

041C Room

032A Room

FITNESS

041A

HALLWAY

041B

VESTIBULE

032J Room032K

Room 032L Room

032M Room

VESTIBULE

MECH

034A

LOCKER

034B

LOCKER

WOMENS

TOILET

026A Room

024A Room

EMS

Room

STAIR E

Room

027A

STAIR D

CORRIDOR036

EMS

TELECOM

Room

Room

CORRIDOR

EMS

CORRIDOR

001A

ENG

001B

ENG

MENS

TOILET

Room

Room

001C

ENG

IT

ED

VESTIBULE

HALLWAY

STAIR C

BREAK

ROOM

ELEVATOR

LOBBY

052A

ELEV B 052B

ELEV C

BUILDING 1-AREA B

BUILDING 1-AREA A

BUILDING 1-AREA B

BUILDING 1-AREA A

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

PROVIDE:

- STATIC DISSIPATIVE FLOORING

-4' x8' PLYWOOD ALL WALLS WITH

FIREPROOF PAINT AND GLOSS

WHITE TOP COAT

AE412

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION

WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE

NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES

AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS

INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE

AREAS, ASCERTAIN WORK REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT

REQUIREMENTS AT NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE

EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY

ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND

CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY

OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS

FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO

PROCEEDING WITH REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING

SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE

RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL

BE VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS

SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR

SCHEDULED FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO

PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH

TRADES WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING

BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE

LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE

RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE

RATING INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS

SHALL BE CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT

THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE

SEALED WITH FIRE CAULK.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG

1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG

1A

AE2O1

INTERIOR SECTION

REFERENCE TAG

1A

KEY NOTE

A

GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

35% CONSTRUCTION

DOCUMENT REVIEW

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/2

/2

:1

:2

P

M

AE101-01-A

LOWER LEVEL FLOOR PLAN -

BUILDING 1 - AREA A

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

03/26/2021 Checker Author16090

1/8" = 1'-0"1 LOWER LEVEL FLOOR PLAN OVERALL - BUILDING 1 - AREA A

Revisions: Date:

1-02-1 1-02-2

1-02-3

1-02-4

1-02-5 1-02-6

1-02-7

1-37-1A 1-37-1B

1-37-3

1-37-2

- Negative Asbestos Bulk Sample LocationX-XX-X

- Positive Asbestos Bulk Sample LocationX-XX-X

LEGEND

Room

Room

Room

Room

Room

Room

Room

Room

Room

TOILET

Room

Room

TELECOMM

Room

Room

Room

STAIR D

Room

Room 320

Room

Room 322

Room

Room

Room

Room

Room

Room

Room

Room

Room

Room

Room334

Room

Room

Room

Room

322B

STAIR E

CORRIDOR

CORIDOR

316A Room

336B Room

336A Room

Room

Room

301A Room

302A Room

302B Room

CORRIDOR

Room

307D Room

307A Room

307G Room

307C Room

307F

STAIR C

307B Room

LIMITS OF CONSTRUCTION

AE412

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION

WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE

NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES

AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS

INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE

AREAS, ASCERTAIN WORK REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT

REQUIREMENTS AT NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE

EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY

ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND

CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY

OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS

FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO

PROCEEDING WITH REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING

SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE

RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL

BE VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS

SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR

SCHEDULED FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO

PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH

TRADES WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING

BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE

LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE

RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE

RATING INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS

SHALL BE CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT

THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE

SEALED WITH FIRE CAULK.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG

1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG

1A

AE2O1

INTERIOR SECTION

REFERENCE TAG

1A

KEY NOTE

A

GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

35% CONSTRUCTION

DOCUMENT REVIEW

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/2

/2

:1

:2

P

M

AE131-01

THIRD LEVEL OVERALL FLOOR

PLAN - BUILDING 1

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

03/26/2021 Checker GJB16090

1/8" = 1'-0"1 THIRD LEVEL FLOOR PLAN OVERALL - BUILDING 1

Revisions: Date:

1-314-1

1-314-2 1-314-3

1-314-4

1-314-5

1-314-6

1-314-7

- Negative Asbestos Bulk Sample LocationX-XX-X

E07

TANK ROOM

C15

CORRIDOR

C15A

CORRIDOR

E06

CLOTHING

E04

EMS

E03

STORAGE

E03A

VESTIBULE

196J

ENG

STORAGE

E05B

TOILET

E05

TELECOM

E08

DECONTAM

E18

CLEAN

PROCESSING

E09

ELEC.

E080B

EMS

C13

CORRIDOR

E10

LOCKERS

E10A

TOLET

E12A

TOILET E12

LOCKERS E15

OFFICE

E14

OFFICE

E16

BREAK

ROOM

A80

EMS

A79

SHARED

OFFICE

A78

STORAGE

E18A

STORAGE

E22A

STORAGE

E19

SPS

C14

CORRIDOR

E17

CLEAN

STEAM

C12

CORRIDORBUILDING 5-AREA B

BUILDING 5-AREA A

BUILDING 5-AREA B

BUILDING 5-AREA A

BU

IL

DI

NG

-A

RE

A

D

BU

IL

DI

NG

-A

RE

A

A

A76

STORAGE

A77

WORK

PROVIDE:

- - STATIC DISSIPATIVE FLOORING

-4' x8' PLYWOOD ALL WALLS WITH

FIREPROOF PAINT AND GLOSS

WHITE TOP COAT

LIMITS OF CONSTRUCTION

D45

OFFICE

D43

OFFICE

D44

LAB

D42

CYTOLOGY

E01

ELEC

DISTRIBUTION

E23

ENTRY

ROOM

E22

BREAK OUT

E20

STERILE

STORAGE

E21 Room

E24

CHILLER

PLANT

E25

CHILLER

W14

ENG

STORAGE

W17

PHARMACY

STORAGE

W16

STORAGE

W15

STORAGE

W03

VESTIBULE

W02

OFFICE

W05

OFFICE

W06

OFFICE

W12

TOILET

W11

OFFICE

W10

OFFICE

W07

BREAK

W09

MECH

W08

OFFICE

CR

AE413

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

35% CONSTRUCTION

DOCUMENT REVIEW

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/2

/2

:1

:3

P

M

AE101-05-A

GROUND LEVEL FLOOR PLAN -

BUILDING 5 - AREA A

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

03/26/2021 Checker Author16090

1/8" = 1'-0"1 GROUND LEVEL FLOOR - BUILDING 5 - AREA A

Revisions: Date:

5-E05-1

5-E05-2

- Negative Asbestos Bulk Sample LocationX-XX-X

A80

EMS

A84A

VIEWING

A84B

AUTOPSY

A71

TOILET

A84E

COOL ROOM

C12

CORRIDOR

A84G

EMS

B54

OFFICE

C03

CORRIDOR

B98

AGENT

CASHIER

A27

TELECOM

F65

STAFF

LOUNGE

F65A

STAFF

TOILET

F64A

ELEC

F64

EXAM

F63

EXAM

F65B

STORAGE

F62A

HSK F65C

STORAGE

F66A

PATIENT

TOILET

A15

MRI

A18

EQUIPMENT

A16

DRESSING

A82

TOILET

A17C

TOILET

A83

CT

A64A

OT WORK

STATIONS

A64

OT

TREATMENT

A63

OT KITCHEN

A62

OT EXAM C10

CORRIDOR

A66

PATIENT

TOILETA61

EXAM

A60

EXAM A67

SPEATCH

EXAM

A40

XRAY

A43

TOILET

A45

XRAY

A442

DRESS

A37

XRAY

A33

TOILET

A19

LOCKER

A20

XRAY

A21

XRAY

A10A

STORAGE

A10

BREAKROOM

A10B

TOILET

A08

RECEP /

WAIT

A35

SOILED

UTILITY

A36

TOILET

A47

IT CLOSET

A38

STORAGE

A34

FILM

A63A

TOILET

A86

CONTROL

A68

PATIENT

TOILET

A17

CONTROL

A46

CLEAN

UNTILITY

A49

DEXA ROOM

A50

OFFICE

A51

OFFICE

A52

INFECTION

CONTROL

A53

OFFICE

C07A

CORRIDOR C07

CORRIDOR

A06

CORRIDOR

A31E

ULTRA

SOUND

A31D

OFFICE

A31

OFFICE

A31C

WORK

ROOM

A32

OFFICE

A31A

OFFICEA31B

BREAK

ROOM

A29

WAIT

C05A

CORRIDOR

A22

DRESS

A23

TOILET

A07

WOMENS

TOILET

A24

XRAY

A25

TOILET

A26

HAC

C05

CORRIDOR

Room

Room

B87A

OFFICE

B87

OFFICE

B88

OFFICE

C04

CORRIDOR

BUILDING 5-AREA B

BU

IL

DI

NG

-A

RE

A

D

BUILDING 5-AREA A

BUILDING 5-AREA B

BUILDING 5-AREA B

BUILDING 5-AREA C

BUILDING 5-AREA E

BUILDING 5-AREA D

BU

IL

DI

NG

-A

RE

A

B

BUILDING 5-AREA A

A88

FIRE PUMP

A89 Room

C11

CORRIDOR

A81

ELEC A72

EXAM A73

EXAM

A69

TELE

HEALTH

A74

EXAM

A75

EXAM

A76

STORAGE

A77

WORK

A99 Room

A84F Room

A84C

DRESSING A84D

TOILET

A84 Room

A54

WAITING

A55

RECEPTION

A56

OFFICE

A57

WOMENS

LOCKER

A57A

WOMENS

TOILET A58

EXAM

A59

EXAM

B90A

ELEC

A91 Room

B90

TELE

PROVIDE:

-STATIC DISSIPATIVE FLOORING

-4' x8' PLYWOOD ALL WALLS WITH

FIREPROOF PAINT AND GLOSS WHITE

TOP COAT

LI

M

IT

S

OF

C

ON

ST

RU

CT

IO

N

D41

STORAGE

REMOVE PORTION OF ACT

CEILING, GRID AND ALL

ASSOCIATED MECHANICAL AND

ELECTRICAL. REMOVE GYP BD

SOFFIT. SALVAGE ACT FOR

REINSTALLATION

AE413

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

35% CONSTRUCTION

DOCUMENT REVIEW

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/2

/2

:1

:4

P

M

AE101-05-B

GROUND LEVEL FLOOR PLAN -

BUILDING 5 - AREA B

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

03/26/2021 Checker Author16090

1/8" = 1'-0"1 GROUND LEVEL FLOOR PLAN - BUILDING 5 - AREA B

Revisions: Date:

5-A27-1

5-A27-3 5-A27-4

5-A27-2

5-A27-5

- Negative Asbestos Bulk Sample LocationX-XX-X

B82

OFFICE

B84

OFFICE

B86

OFFICE

B89A

OFFICE

B76

WAITING

B40

OFFICE

B71

TRIAGE

B42

WORK

ROOM

B45

OFFICE

B47

OFFICE

B49

EXAM

B51

EXAM

B53

EMS

B54

OFFICE

B55

OFFICE

C03

CORRIDOR

B38B

TLT./

SHOWER

B38A

ON-CALL

B62

PROCEDURE

B38

NURSE

B70

ED RECPT.

CHECK-IN

B68

PAT

SUBWAIT

B69

PHYSICIAN

WORK

C21A

CORRIDOR

B72

GEN EXAM 1

B89C

BOOTH 1

B89D

BOOTH 2

B89E

BOOTH 3

B89B

CORRIDOR

B98

AGENT

CASHIER

A27

TELECOM

A02A

CORRIDOR

A04B

DOB LAB

A04

STRESS LAB

A05

TOILET

A02

OPERATOR

A01

PAT PREP

A07

WOMENS

TOILET

T

MENS

TOILET

B41

EXAM

B43B

OFFICE

B43

OFFICE

B44

EXAM

B46

EXAM

B50

TOILET

B52

EXAM

C25

CORRIDOR

B48

EXAM

A24

XRAY

A25

TOILET

A26

HAC

C05

CORRIDOR

Room

Room

B23

TELECOMM

B17

EXAMB20

Room

B28

LOCKER

B30

EMS

B31

STOR

B34

EXAM

B37

TRIAGE

B37A

TRIAGE

B39

TRIAGE

B18

EXAM

B19

ELEC

B21

EXAMB22

TOILETB24

SLEEP

B26

NURSE

B27

EXAM

B29

EXAM

B332

EXAM

B33

EXAM

B15

STOR

B43C

EXAM B09

OFFICE

B08

EXAM

B06

COSULT

B04

EXAM

B56

OFFICE

B57

OFFICE

B58

ELEC

B59

TELE

B01

EXAMB02

EXAMB03

OFFICEB05

SOILED

B07

PROCEDURE

B12

BREAKROOMB14

TOILET

C24

CORRIDOR

C27

CORRIDOR

C29

CORRIDOR

C28 Room

B35

OFFICE

B38

NURSE

B36

EMERGENCY

G09

MENS

LOCKER

G10

WOMANS

LOCKER

G11

CORRIDOR

G14

SOILED

G09B

SHOWER

BU

IL

DI

NG

-A

RE

A

C

BU

IL

DI

NG

-A

RE

A

E

BUILDING 5-AREA E

BUILDING 5-AREA D

BUILD

ING 5-A

REA F

BU

IL

DI

NG

-A

RE

A

B

BU

IL

DI

NG

-A

RE

A

D

F01B

VESTIBULE

F01A

VESTIBULE

F04A

INFO

B102 Room

F03

LOBBY

F04

WAITING

F05

ELEV EQUIPF07A

STAIR 8F08

ELEV EQUIP

F07

TOILET

PROVIDE:

-STATIC DISSIPATIVE FLOORING

-4' x8' PLYWOOD ALL WALLS WITH

FIREPROOF PAINT AND GLOSS WHITE

TOP COAT

LI

M

IT

S

OF

C

ON

ST

RU

CT

IO

N

LI

M

IT

S

OF

C

ON

ST

RU

CT

IO

N

F09

EXAMF11

TOILET

F12

STOR

F13

EXAM

F14

EXAMF15

ELEC

F16

EXAM

F17

NURSE

OFFICE

F18

EXAMF19

DICTATION

F20

EXAM

F21

EXAM

F22

EXAM

F23

PROCEDURE

F25

EXAM

F26

EXAMF27

EXAM

F28

STAIR 9

F29

EXAM

F30

CLEAN

STOR

F31

EXAM

F32

DICTATION

F33

LOCKER

F34

TOILET

F35

LOUNGE

F36

OFFICE

F37

OFFICE

F38

EXAM

F39

NURSE

OFFICE

F40

EXAM F41

EXAM F42

EXAM

F43

EXAM

F44

EXAM F45

SOILED

F46

EXAM F47

NURSE

OFFICE

F48

HAC

F49

TOILET

F50

STOR

F51

EXAM

F52

EXAM

F53 Room

F54

EXAM

F55

EXAM

F56

EXAM

F57

EXAM

F58

TELECOM

F59

OFFICE

F60

EXAM

F37A

OFFICE

C31

CORRIDORC33

CORRIDOR

C34

CORRIDOR

F37E Room

C26

CORRIDOR

B66A

GENERATOR

B66

ELEC

C23

ENTRY

B67

AMBULANCE

BAY

B67A

DECONTAM 366

BREAK

ROOM

C24C

CORRIDOR

B69B

SOILED

UTILITY

B37B

STORAGE

B69A

ELEC

B73A

TOILET

B69C

CLEAN UTIL

B72A

MENTAL

HEALTH

B73

WOMANS

HEALTH

C24A

CORRIDOR

C20

CORRIFOR

F10

STAFF

TOILET

F24

NURSE

OFFICE

REMOVE PORTION OF ACT

CEILING, GRID AND ALL

ASSOCIATED MECHANICAL AND

ELECTRICAL. REMOVE GYP BD

SOFFIT. SALVAGE ACT FOR

REINSTALLATION

PATCH FLOOR AT REMOVED 6" CONDUIT

AE413

AE413

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

35% CONSTRUCTION

DOCUMENT REVIEW

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/2

/2

:1

:5

P

M

AE101-05-E

GROUND LEVEL FLOOR PLAN -

BUILDING 5 - AREA E

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

03/26/2021 Checker Author16090

1/8" = 1'-0"1 GROUND LEVEL FLOOR PLA - BUILDING 5 - AREA E

Revisions: Date:

5-B23-2 5-B23-3

5-B23-1

5-B23-4

5-B23-5

5-B66A-3 5-B66A-1

5-B66A-2

- Negative Asbestos Bulk Sample LocationX-XX-X

CE

AE

DE

15E14E13E12E

Room

Room

142A Room

142B Room

142D Room

142C Room

Room

144A Room

Room

143B Room

191B Room

191A Room

101B

DENTAL

WAITING 179

OFFICE

101A

COFFEE

ELEVATOR

LOBBY

138A

STAIR 3

Room

Room

CORRIDOR

CO2

STORAGE

STORAGE 1021

ELEC

ROOM145

Room

Room

MECHANICAL

Room 149

TELECOM

150A

ELEC

TELE

STAIR 2

Room 173

Room

WOMENS

TOILET

MENS

TOILET

Room

Room

Room

Room

Room

Room

Room

Room

Room

Room

Room

Room

Room

Room

Room

Room

Room

MECHANICAL

CORRIDOR

BUILDING 5 - AREA A

BUILDING 5 - AREA B

BUILDING 5 - AREA A

BUILDING 5 - AREA C

BUILDING 5 - AREA D

BUILDING 5 - AREA BBUILDING 5 - AREA C

BUILDING 5 - AREA D

1026A

ENTRANCE

ROOM

INTERSTITIAL

LI

M

IT

S

OF

C

ON

ST

RU

CT

IO

N

LI

M

IT

S

OF

C

ON

ST

RU

CT

IO

N

AE411

E123

INTERSTITIAL

189A

STAIR 7

A92B

EQUIPMENT

PLATFORM

10'-6" 10'-6" 10'-6" 10'-6" 10'-6" 10'-6" 10'-6"

182A

OFFICE

181A

OFFICE

180A

OFFICE

179A

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

AE413

LI

M

IT

S

OF

C

ON

ST

RU

CT

IO

N

LIMITS OF CONSTRUCTION

175177178179A180A181A

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION

WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE

NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES

AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS

INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE

AREAS, ASCERTAIN WORK REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT

REQUIREMENTS AT NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE

EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY

ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND

CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY

OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS

FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO

PROCEEDING WITH REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING

SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE

RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH

MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL

BE VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS

SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR

SCHEDULED FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO

PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH

TRADES WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY

MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM

ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING

BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE

LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE

RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE

RATING INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS

SHALL BE CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT

THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE

SEALED WITH FIRE CAULK.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR AND

FRAME TO REMAIN

DOOR

INTERIOR BORROWED

LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR ELEVATION

INDICATOR TAG2B

AE2O1

EXTERIOR ELEVATION

INDICATOR TAG

1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG

1A

AE2O1

INTERIOR SECTION

REFERENCE TAG

1A

KEY NOTE

A

GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

35% CONSTRUCTION

DOCUMENT REVIEW

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/2

/2

:1

:2

P

M

AE111-05-B

FIRST LEVEL FLOOR PLAN -

BUILDING 5 - AREA B

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

03/26/2021 Checker Author16090

1/8" = 1'-0"1 FIRST LEVEL FLOOR PLAN - BUILDING 5 - AREA B

Revisions: Date:

5-149-1 5-149-2

5-149-4

5-149-35-149-6 5-149-7

5-149-5

5-178-1

5-178-2

5-178-3

5-178-4 5-178-5 5-178-6

5-178-7

5-178-8 5-178-9

5-178-10 5-178-11

5-178-12 5-178-13

5-178-14

5-175-1

5-175-2

5-175-3 5-175-5

5-175-4

5-150A-1

5-150A-2

5-150A-3

- Negative Asbestos Bulk Sample LocationX-XX-X

Room

142A Room

144A Room

Room

143A Room

143B Room

191B Room

101B

DENTAL

WAITING

RECEPT

102A

EXAM

EXAM

101A

COFFEE

ELEVATOR

LOBBY

138A

STAIR 3

Room

Room

TELECOM

111A

MECHANICAL

STAIR 4

Room

131A Room

MECHANICAL

MECHANICAL

SOILED

CLEAN

M.H.

ELEC

WORK

RECPT

WAITING

129A

HAC114

EXAM

TOILET

EXAM

EXAM

TOILET

PROCEDURE

WORK

120A Room

TOILET

CORRIDOR

121A

STAIR 5

113A

STAIR 10

ELEVATOR

LOBBY

CORRIDOR

LOCKER

112A

TOILET

LAB 106F

EXAM

SOILED

106J

TOILET

CLEAN

STOR

106E

EXAM

106D

EXAM

106C

EXAM

106H

HAC 106G

TOILET

OFFICE

EXAM

106B

STORAGE

106A

CLEAN

104A

DARK RM

EXAM

CORRIDOR

BU

IL

DI

NG

AR

EA

A

BU

IL

DI

NG

AR

EA

C

BUILDING 5 - AREA A

BUILDING 5 - AREA B

BUILDING 5 - AREA D

BUILDING 5 - AREA B

BUILDING 5 - AREA D

BUILDING 5 - AREA C BUILDING 5 - AREA C

BUILDING 5 - AREA D

126A

MECHANICAL

126C

MECH

127A

INTERSTITIAL

PROVIDE:

- - STATIC DISSIPATIVE FLOORING

-4' x8' PLYWOOD ALL WALLS WITH FIREPROOF PAINT AND GLOSS WHITE TOP COAT

CR

AE413

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

35% CONSTRUCTION

DOCUMENT REVIEW

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/2

/2

:1

:3

P

M

AE111-05-C

FIRST LEVEL FLOOR PLAN -

BUILDING 5 - AREA C

VAMC SIOUX FALLS EHRM

INFRASTRUCTURE UPGRADES

Sioux Falls, SD

438-20-910

03/26/2021 Checker Author16090

1/8" = 1'-0"1 FIRST LEVEL FLOOR PLAN - BUILDING 5 - AREA C

Revisions: Date:

5-111-1 5-111-2 5-111-3

- Negative Asbestos Bulk Sample LocationX-XX-X

STAIR 8

F100B

TELECOM

F100A

ELEC

STAIR C3100

ELEVATOR100A

ELEVATOR

MECH

COMM

INTERSTITIAL

TELECOM

ELEC

INTERSTITIAL

CO2

STORAGE

STORAGE 1021

ELEC

INTERSTITIAL

MECH

BUILDING 5 - AREA D

BUILDING 5 - AREA C

BU

IL

DI

N…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .