This solicitation is for construction and commissioning services for infrastructure upgrades at the Sioux Falls VA Medical Center to support an Electronic Health Record Modernization project. Key details include:
-
The construction work is spread across multiple buildings and departments, including building a new server room on the roof between wings. Limited onsite storage requires offsite material storage planning.
-
The period of performance is approximately 450 calendar days from notice to proceed. The estimated value is between $20-50 million.
-
The solicitation will be a Request for Proposal conducted according to FAR Parts 15, 19, and 36 and evaluated per the procedures in the solicitation.
-
The opportunity is set aside solely for Service-Disabled Veteran-Owned Small Businesses. Questions must be submitted in writing to the issuing office by the specified date.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sioux Falls VAHCS, Sioux Falls, SD VA Project 438-20-910 EHRM Infrastructure Upgrades 07-06-2021 2501 West 22nd St. Bid Documents Sioux Falls, SD 57105
Appendix A
Appendix A:
-Asbestos Survey Report
Prepared for:
ANDERSON ENGINEERING
13605 1ST AVENUE NORTH
PLYMOUTH, MN
June 1, 2021
Asbestos Survey Report EHRM Infrastructure Upgrades Portions of Buildings 1, 5, 7, 16, 28, 38 & 52 Veterans Affairs Medical Center Sioux Falls, South Dakota
Landmark Environmental, LLC 2042 West 98th Street | Bloomington, MN 55431 | Phone: 952-666-2444 | www.landmarkenv.com
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Report.docx
ASBESTOS SURVEY
EMHR INFRASTRUCTURE UPGRADE
PORTIONS OF BUILDINGS 1, 5, 7, 16, 28, 38 & 52
VETERANS AFFAIRS MEDICAL CENTER
SIOUX FALLS, SD
1.0 Executive Summary
2.0 Introduction
3.0 Sampling Methods and Analysis
4.0 Asbestos-Containing Material Assessment
5.0 Findings
6.0 Recommendations
Appendices
Appendix A Certificates
Appendix B Diagram with Sample Locations and Laboratory Report
Appendix C Asbestos-Containing Materials Physical Assessment
Appendix D Diagram of “EHRM Infrastructure Upgrade” Work Areas
Appendix E Diagram of Asbestos-Containing Materials
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
1.0 Executive Summary
Landmark Environmental, LLC (Landmark) was retained by Anderson Engineering
(Client) to complete an asbestos survey (Survey) as part of a EHRM Infrastructure
Upgrade project at the Sioux Falls Veterans Affairs Medical Center located in Sioux
Falls, South Dakota (the Property). The Client intends to upgrade the IT Infrastructure through a project titled “EHRM Infrastructure Upgrade” in portions of Buildings 1, 5, 7, 16, 28, 38 & 52 at the Property (Project Area). The Project Areas included in the Survey were delineated in the Clients 35% Construction document dated 3/26/2021 and provided by the Client.
A summary of the Survey results are as follows:
Building 1
Landmark collected 17 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir Technologies Laboratory (SanAir) separated these 17 samples into 20 individual layer samples and all 20 individual layer samples were analyzed.
Based on the Survey laboratory report and prior asbestos sampling in the building, suspect building materials found to contain asbestos include – pipe insulation and joint compound. Non-fiberglass pipe insulation was observed during the Survey but was not sampled since it had previously been sampled and found to contain asbestos. Some of this pipe insulation was behind hard walls, ceilings, and soffits and was inaccessible. Pipe insulation has been included in the report and asbestos-containing material (ACM) database. ACM should not be cut, drilled, sanded or disturbed.
Building materials assumed to contain asbestos include – fire doors.
Building 5
Landmark collected 125 bulk asbestos samples as part of the Survey. SanAir separated these 125 samples into 147 individual layer samples and all 147 individual layer samples were analyzed.
Based on the Survey laboratory report and prior asbestos sampling in the building, suspect building materials found to contain asbestos include – tank insulation, pipe insulation, hard fittings on pipe insulation, joint compound, floor tile under carpet, F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Report.docx floor tile mastic, 12” x 12” floor tile, floor tile under floor tile, and Transite. Non-fiberglass tank insulation, pipe insulation, and Transite was observed during the Survey but was not sampled since it had previously been sampled and found to contain asbestos.
Some of this pipe insulation was behind hard walls, ceilings, and soffits and was inaccessible. Transite tank and pipe insulation has been included in the report and ACM database. ACM should not be cut, drilled, sanded or disturbed.
Building materials assumed to contain asbestos include – electric panels, fire doors and roofing materials.
Building 7
Landmark collected 9 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir separated these 9 samples into 12 individual layer samples and all 12 individual layer samples were analyzed.
Based on the laboratory report, no suspect building materials were found to contain asbestos.
No suspect building materials were assumed to contain asbestos.
Building 16
Landmark collected 4 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir separated these 4 samples into 7 individual layer samples and all 7
Building 28
Landmark collected 7 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir separated these 7 samples into 10 individual layer samples and all 10
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Building 38
Landmark collected 11 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir separated these 11 samples into 14 individual layer samples and all 14
Based on the laboratory report suspect building materials found to contain asbestos include – 12” x 12” floor tile, and floor tile mastic. ACM should not be cut, drilled, sanded or disturbed.
Building 52
Landmark collected 8 bulk asbestos samples as part of the Survey. The contracted laboratory, SanAir analyzed all 8 samples collected.
Building materials assumed to contain asbestos include – fire door
No attempt was made to locate materials inside ceilings, walls, doors, ducts, and other areas that would require destructive entry since the building was occupied at the time of the Survey. The possibility exists that as these locations are opened up during renovation, suspect material will be found.
Electrical wiring and panels were not sampled. Landmark does not perform bulk sampling of electrical equipment unless it has been shut down and tagged by a licensed electrician.
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Landmark did not sample the roof of Building 5 that will be impacted as part of the project since doing so would damage the integrity of the roof and void the warranty. This area must be sampled prior to disturbance.
Landmark could not gain access behind the radiators during the Survey. The possibility exists that asbestos-containing Transite may exist behind the radiators. When the radiator covers are removed during construction, Transite may possibly be found. For the purposes of this Survey, Transite is assumed to be located behind the radiators in the
Project Area.
Landmark did not gain access into Building 5, 3rd floor west Project Area (Room 370 and
Nurse Area) due to the area being in a COVID lockdown portion of the floor. According to the VA staff and the Client, this portion of the building was recently renovated at the same time as the 2nd floor nurse’s area directly below. Room 370 and the Nurse area must be inspected for ACM prior to construction activities taking place.
This Survey identifies asbestos as they existed on the day of the survey at the Property.
Conditions may change over time.
This Survey should not be used as a bidding document. The ACM quantities provided are estimates and must be verified by the bidding contractors. Landmark recommends using a licensed asbestos project designer to design and bid all projects.
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
2.0 Introduction
Landmark completed an asbestos survey report (Report) at the Property. The procedures used for this Survey and assessment comply with the Environmental Protection Agency
(EPA), Occupational Safety and Health Administration (OSHA), and South Dakota
Department of Environment and Natural Resources (SD DENR) asbestos standards.
2.1 Purpose
Landmark was retained by the Client to complete the Survey and Report for the purposes of understanding ACM locations and quantities in the areas to be renovated during the project.
2.2 Survey Approach
The Survey and assessment, consisting of identifying, sampling, assessing, and quantifying suspect ACM within the Property building, was conducted on May 12-14, 2021. Diagrams of the area included in the Survey are included in Appendix D.
2.3 Assumptions, Limitations and Exceptions
The findings and recommendations in this Report are subject to the following assumptions, limitations, and/or exceptions:
• No attempt was made to locate materials inside ceilings, walls, doors, ducts, roofs, and other areas that would require destructive entry. The possibility exists that materials may be present at these locations. Materials observed, or suspected in these areas, are assumed to be ACM if sampling was not feasible.
• Landmark could not gain access behind the radiators in the Project Area. The possibility exists that asbestos-containing Transite may exist behind the radiators.
When radiator covers are removed during construction, Transite may possibly be found. For the purposes of this Survey, Transite is assumed to be located behind the radiators in the Project Area.
• Landmark could not access the 3rd floor west (Room 370 and Nurse Area) due to the area being a COVID lockdown portion of the floor. According to the VA staff and the Client, this portion of the building was recently renovated at the same time as the
2nd floor nurse’s area directly below this area. Room 370 and the Nurse Area must be inspected for ACM prior to construction activities taking place.
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Report.docx
• Electrical wiring and panels were not sampled. Landmark does not perform bulk sampling of electrical equipment unless it has been shut down and tagged by a licensed electrician.
• Landmark did not sample the roof of Building 5 that will be impacted as part of the project since doing so would damage the integrity of the roof and void the warranty.
This area must be sampled prior to disturbance.
• This Survey identifies materials as they existed on the day of the survey. Conditions may change over time.
2.4 Qualifications
The survey was conducted by Mark Meier, an accredited asbestos building inspector with
Landmark. A photocopy of the inspector’s SD DENR certification is included in
Appendix A.
Asbestos sample analysis for this project was conducted by SanAir in Powhatan, Virginia. SanAir is accredited by the National Voluntary Accreditation Program
(NVLAP lab code 200870-0).
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
3.0 Sampling Methods and Analysis
3.1 Bulk Asbestos Sampling
Building diagrams were utilized to divide the Property building into functional spaces for the purposes of describing sampling locations. The building diagram with sample locations is included as Appendix B.
Similar systems and materials were grouped into “homogeneous areas of building materials” (homogeneous materials). Homogeneous materials often exist in more than one functional space within the Property building. Each homogeneous material was assigned a discrete number; the homogeneous material number is indicated in the first number of the sample name. Multiple samples of each homogeneous material were taken in accordance with the EPA-Asbestos Hazard Emergency Response Act (AHERA) guidelines using a random sampling procedure. These multiple samples were designated
“A, B, C,” etc. for each homogenous material, as indicated in the sample name. The sample locations and sample descriptions are shown on the building diagram and the asbestos laboratory report in Appendix B.
Samples were collected by carefully removing a small representative sample of the suspect material and sealing it in a plastic bag.
3.2 Bulk Asbestos Analysis
Landmark collected 181 bulk asbestos samples as part of the Survey. SanAir separated these 181 samples into 218 individual layer samples and all 218 individual layer samples were analyzed. The laboratory results are presented in the attached report in Appendix B.
The bulk samples were analyzed by polarized light microscopy (PLM) with dispersion staining, EPA method 600/R-93/116 and EPA method 600/M4-82-020. Quantity determinations are made by visual estimation. For each homogeneous material, once a positive sample was identified, the remaining samples were not analyzed.
EPA National Emission Standards for Hazardous Air Pollutants (NESHAP)-Rule 40 CFR
Part 61 states that samples found to contain less than 10% asbestos by visual estimation may be further quantified by point count analysis.
The Asbestos rule states that all multi-layer systems, except for wall systems where joint compound was used only at the joints and nail holes, must be analyzed as separate materials. If any layer contains greater than one percent asbestos, that layer must be treated as asbestos-containing. This requires all layers in a multi-layered system to be
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Report.docx treated as asbestos-containing if the layers cannot be separated without disturbing the asbestos-containing layer.
Asbestos samples will be held for 30 days after the date of this report.
3.3 Chain of Custody Procedures
To ensure that samples collected in the field are neither lost nor their identity mistaken, sample collection, from the point of collection to receipt in the laboratory, proceeds as follows. Each sample is first assigned a unique and distinct sampling number. After a sample is placed into a plastic bag, that unique number is assigned to that bag. This same number is documented on the laboratory’s chain of custody. The inspector signs each chain of custody before delivering to the lab. Upon receipt of the samples, the lab analyst verifies that each sample matches the corresponding chain of custody number and signs and dates the chain of custody. After analysis, the analyst generates a report that includes the sample results and the project chain of custody forms.
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
4.0 Asbestos-Containing Material Assessment
In each functional space, each homogeneous material was quantified and assessed for friability (i.e. material can be crumbled, pulverized, or reduced to powder by hand pressure when dry). Suspect ACM was then assessed as to their condition and potential for disturbance. This information was recorded on the asbestos physical assessment shown in Appendix C. The model for this system is described in the EPA Draft
Curriculum for Training Building Inspectors.
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
5.0 Findings
5.1 Summary of Asbestos-Containing Materials
Suspect homogeneous material found to contain asbestos and their sample numbers, arranged by building, include:
Thermal Insulation
• Pipe insulation (Previously Sampled).
Surfacing Material – None Observed
Miscellaneous Materials
• Joint compound (Samples 1-02-3, 1-314-4).
Assumed Materials
• Fire door
Thermal Insulation
• Tank insulation (Previously sampled).
• Pipe insulation (Previously sampled).
Surfacing Material - None Observed
• Joint compound (Samples 5-296-1, 5-B23-4, 5-E05-1, 5-330C-4, 5-546-4, 5-149-
4, 5-178-1).
• Floor tile under carpet & mastic (Samples 5-149-6, 5-149-7).
• 12” x 12” floor tile, light gray with brown streaks & mastic (Samples 5-178-6, 5-
178-7).
• Floor tile mastic (Sample 5-178-11).
• Floor tile and mastic under floor tile (Samples 5-178-12, 5-178-13).
• Transite behind radiator (Previously Sampled).
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Report.docx
Assumed Materials
• Electric panels
• Fire doors
• Roofing materials
Thermal Insulation – None Observed
Miscellaneous Materials – None Observed
Assumed Materials – None Observed
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
• 12” x 12” floor tile, cream & mastic (Samples 38-129-4, 38-129-5).
• Fire door
5.2 Summary of Non-Asbestos-Containing Materials
Suspect ACM is considered negative for asbestos when all samples of the material are found to contain one percent or less asbestos. Suspect homogeneous material found to be negative, arranged by building, includes:
1. Sheetrock and joint compound (Samples 1-314-4, 1-02-3).
2. Plaster (Samples 1-314-1, 1-037-1A, 1-037-1B).
3. Baseboard adhesive, brown (Sample 1-314-2).
4. Baseboard adhesive, tan (Sample 1-314-3).
5. Wood grain floor sheeting (Sample 1-314-5).
6. Red firestop putty (Samples 1-314-6, 1-02-7, 1-037-3).
7. 2’ x 4’ ceiling tile, white with fissures, dents and holes (Sample 1-314-7).
8. 12” x 12” floor tile, tan with blue & mastic (Samples 1-02-1, 1-02-2).
9. 2’ x 2’ ceiling tile, white reveal with holes (Sample 1-02-4).
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Report.docx
10. Gray baseboard and adhesive (Samples 1-02-5, 1-02-6).
11. Brown firestop putty (Sample 1-037-2).
1. Sheetrock and joint compound (Samples 5-1002-1, 5-1002-2, 5-1114-1, 5-268-5, 5-296-1, 5-A27-5, 5-B23-4, 5-E05-1, 5-330C-1, 5-546-4, 5-149-4, 5-178-1, 5-
510A-1).
2. Gray fireproofing (Samples 5-1002-2A, 5-1114-2A, 5-226C-1, 5-330C-4A, 5-
330C-5B, 5-330C-5C, 5-201-1A, 5-201-1B, 5-201-1C, 5-1002-2B, 5-1114-2B).
3. Red firestop putty (Samples 5-1002-3, 5-270-5-2, 5-226C-5, 5-296C-2, 5-B23-5, 5-150A-1).
4. Old roof epoxy (Samples 5-1002-4).
5. Black remnant roofing tar/felt (Sample 5-1002-5).
6. Light brown baseboard and adhesive (Samples 5-1114-3, 5-1114-4. 5-268-3, 5-
268-4, 5-226C-2, 5-226C-3, 5-330C-2, 5-330C-3).
7. Floor leveling compound and adhesive (Sample 5-111-1).
8. 2’ x 2’ ceiling tile, white with fissures, dents and holes (Sample 5-111-2).
9. Plaster (Samples 5-111-3, 5-270-5-3, 5-296C-1A, 5-296C-1B, 5-296C-1C, 5-149-
3, 5-178-2, 5-175-1, 5-433-1, 5-451-5).
10. 2’ x 2’ ceiling tile, white reveal with fissures, dents and holes (Sample 5-268-1).
11. Floor sheet, brown pebbled (Sample 5-268-2).
12. 4” white ceramic wall tile, mortar and grout (Samples 5-268-6, 7, 8).
13. Brown floor sheet (Sample 5-270-5-1).
14. Brown firestop putty (Sample 5-226C-4).
15. Tan wall panel adhesive (Sample 5-296C-3).
16. White wall texture (Samples 5-296-2A, 2B, 2C).
17. Tall gray baseboard and adhesive (Samples 5-296-3, 5-296-4, 5-433-5, 5-433-6, 5-451-1, 5-451-2).
18. 2’ x 4’ ceiling tile, white with holes (Sample 5-296-5).
19. 2’ x 4’ ceiling tile, white with fissures, dents and holes (Samples 5-296-6. 5-178-
3, 5-175-3).
20. 12” x 12” floor tile, light gray with white/gray/brown & mastic (Samples 5-296-7, 5-296-8).
21. 2’ x 2’ ceiling tile, white reveal with dents and holes (Sample 5-A27-1).
22. Light gray with tan and blue specks flooring (Sample 5-A27-2).
23. Tan baseboard and adhesive (Samples 5-A27-3, 5-A27-4).
24. Brown wood floor sheet (Sample 5-B23-1).
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Report.docx
25. Gray baseboard and adhesive (Samples 5-B32-2, 5-B32-3, 5-546-2, 5-546-3, 5-
510A-4, 5-510A-5).
26. 2’ x 2’ ceiling tile, white (Samples 5-E05-2, 5-510A-2).
27. Orange firestop putty (Sample 5-150A-2).
28. White firestop putty (Sample 5-150A-3).
29. Tan slate floor sheet (Sample 5-546-1).
30. Gray duct sealant (Sample 5-Nurse-1).
31. 2’ x 2’ ceiling tile, white with small fissures and holes (Sample 5-Nurse-2).
32. Floor sheeting, tan (Sample 5-Nurse-4).
33. Firestop putty (Sample 5-B66A-1).
34. Tan wall adhesive (Sample 5-B66A-2).
35. Window caulk, gray (Sample 5-B66A-3).
36. Tall brown baseboard and adhesive (Samples 5-149-1, 5-149-2).
37. 2’ x 2’ ceiling tile, white reveal with fissures and holes (Samples 5-149-5, 5-451-
4).
38. Black baseboard and adhesive (Samples 5-178-4, 5-178-5).
39. Black pedestal adhesive (Sample 5-178-8).
40. Tan pedestal adhesive (Sample 5-178-9).
41. 12” x 12” floor tile, tan with brown (Samples 5-178-10).
42. Black tar on exterior wall (Sample 5-178-14).
43. Window caulk (Sample 5-175-2).
44. Pyrobar (Sample 5-175-4).
45. Tan wood adhesive (Sample 5-175-5).
46. 2’ x 2’ ceiling tile, white reveal with fissures, dents and holes (Sample 5-433-2).
47. Window caulk, black (Samples 5-433-3, 5-451-8).
48. Floor sheet, wood plank (Sample 5-433-4).
49. Wood floor sheeting (Sample 5-451-3).
50. Tan hole filler (Sample 5-451-6).
51. White cellulose filler insulation (Sample 5-451-7).
52. Floor sheeting, stone plank (Sample 5-510A-3).
1. Sheetrock and joint compound (Samples 7-107-1A, 52-107-1B, 52-107-1C).
2. Brown ceramic floor tile, mortar and grout (Samples 7-107-2, 3, 4).
3. Tan ceramic floor tile, mortar and grout (Samples 7-107-5, 6, 7).
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
1. Sheetrock and joint compound (Samples 16-IT-1A, 1B, 1C).
2. Gray sealant on exterior wall (Sample 16-IT-2).
1. Sheetrock and joint compound (Samples 28-123-1A, 1B, 1C).
2. Brown baseboard and adhesive (Samples 28-123-2, 28-123-3).
3. Black hole filler (Sample 28-123-4).
4. Brown hole filler (Sample 28-123-5).
1. Sheetrock and joint compound (Samples 38-129-1A, 1B, 1C).
2. Blue baseboard and adhesive (Samples 38-129-2, 3).
3. 2’ x 2’ ceiling tile, white reveal with dents and holes (Sample 38-129-6).
4. Tan baseboard and adhesive (Sample 38-129-7, 8).
5. Gray duct sealant (Sample 38-129-9).
1. Brown baseboard and adhesive (Samples 52-106-1, 52-106-2).
2. 12” x 12” floor tile, brown mottled and mastic (Samples 52-106-3, 52-106-4).
3. Joint compound on wood panels (Samples 52-106-5A, 52-106-5B, 52-106-5C).
4. 2’ x 2’ ceiling tile, white reveal with dents and holes (Sample 52-106-6).
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
6.0 Recommendations
This Survey was conducted to locate ACM and its quantity in the Project Area. Based on the Survey and assessment results, as well as the proposed renovation project in the
Property buildings, the following recommendations for the ACM are summarized below.
Description Total Estimated
Thermal System Insulation
• Pipe insulation 23 linear feet
Surfacing Material None observed
Miscellaneous Materials None observed
• Fire door 1 door
Thermal System Insulation
• Tank insulation 240 sf
• Pipe insulation 196 lf
• Floor tile under carpet 392 sf
• 12”x12” floor tile, light gray with brown streaks 1,000 sf
• Floor tile under other flooring 1,000 sf
• Floor tile mastic 2,452 sf
• Transite 96 sf
• Electric panel 13 panels
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Report.docx
• Fire doors 7 doors
• Roofing materials not quantified
Thermal System Insulation None observed
Assumed Materials None observed
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
12”x12” floor tile & mastic 224 sf
Fire door 1 door
All tested positive and assumed ACM must be properly removed by a licensed asbestos abatement contractor according to applicable federal, state, and local regulations and according to the asbestos abatement design and specification. Assumed materials can be sampled during construction to determine asbestos content.
The joint compound applied to the gypsum wallboard was found to contain asbestos in
Buildings 1 & 5. This material, as determined by the EPA in response to its applicability to NESHAP, becomes an integral part of the wallboard, forming a wall system.
Reference document from the EPA Office of Air Quality Planning and Standards, September 4, 1992, Stationary Source Compliance Division. In this case, the wall system contains less than one-percent asbestos. OSHA requires that all contractors and employees who may disturb this material must be made aware that the joint compound
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
Report.docx contains asbestos. Appropriate precautions should be taken by anyone impacting the joint compound.
If suspect materials are encountered during renovation, work should stop immediately and the materials should be sampled for asbestos content or assumed to contain asbestos and properly removed by a licensed asbestos abatement contractor.
Landmark could not gain access behind the radiators in the Project Area. The possibility exists that Transite may exist behind the radiators. When the radiator covers are removed during construction, Transite may possibly be found. For the purposes of this Survey, Transite is assumed to be located behind the radiators in the Project Area.
Landmark could not access Building 5, 3rd floor west Project Area (Room 370 and Nurse
Area) due to the area being in a COVID lockdown portion of the floor. According to the
VA staff and the Client, this portion of the building was recently renovated at the same time as the 2nd floor nurse’s area directly below this area. Room 370 and the Nurse Area must be inspected for ACM prior to construction activities taking place.
Landmark did not sample the roof of Building 5 that will be impacted as part of the project since doing so would damage the integrity of the roof and void the warranty. This area must be sampled prior to disturbance.
This Survey identifies materials as they existed on the day of the survey. Conditions may change over time.
F:\PROJECTS\AND-Anderson Engineering\Sioux Falls VA IT Infrastructure\Sioux VA EHRM Update - Asbestos Survey
7.0 Signatures of Environmental Professional(s)
We declare that, to the best of our professional knowledge and belief, the Survey referenced by this report, and the report itself, were conducted in accordance with intent of the EPA, OSHA, SD DENR, AHERA regulations to the best of my ability and knowledge.
Mark Meier Asbestos Building Inspector
(SD Inspector #8199)
Eric Gabrielson, Vice President
Appendices
Appendix A
Appendix B
Room
032B Room
032C Room
Room
041C Room
032A Room
FITNESS
041A
HALLWAY
041B
VESTIBULE
032J Room032K
Room 032L Room
032M Room
VESTIBULE
MECH
034A
LOCKER
034B
LOCKER
WOMENS
TOILET
026A Room
024A Room
EMS
Room
STAIR E
Room
027A
STAIR D
CORRIDOR036
EMS
TELECOM
Room
Room
CORRIDOR
EMS
CORRIDOR
001A
ENG
001B
ENG
MENS
TOILET
Room
Room
001C
ENG
IT
ED
VESTIBULE
HALLWAY
STAIR C
BREAK
ROOM
ELEVATOR
LOBBY
052A
ELEV B 052B
ELEV C
BUILDING 1-AREA B
BUILDING 1-AREA A
BUILDING 1-AREA B
BUILDING 1-AREA A
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
PROVIDE:
- STATIC DISSIPATIVE FLOORING
-4' x8' PLYWOOD ALL WALLS WITH
FIREPROOF PAINT AND GLOSS
WHITE TOP COAT
AE412
GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION
WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE
NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES
AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS
INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE
AREAS, ASCERTAIN WORK REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT
REQUIREMENTS AT NO ADDITIONAL COST.
2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE
EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY
ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND
CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY
OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.
5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS
FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO
PROCEEDING WITH REMODELING.
6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING
SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE
RATING, AT THE SUBCONTRACTORS EXPENSE.
7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH
MANUFACTURER.
8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL
BE VERIFIED WITH THE RESPECTIVE TRADE.
9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS
SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR
SCHEDULED FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO
PROCEEDING.
10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH
TRADES WHICH REQUIRE THEM.
11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY
MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.
12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM
ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.
13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING
BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.
14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE
LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE
RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE
RATING INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS
SHALL BE CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT
THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE
SEALED WITH FIRE CAULK.
FLOOR PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL
EXISTING DOOR AND
FRAME TO REMAIN
DOOR
INTERIOR BORROWED
LIGHT
101B
101A
8'-0" DIMENSION LINE,
NOMINAL
8'-0" EXTENDED
DIMENSION LINE,
NOMINAL
AE2111A
INTERIOR ELEVATION
INDICATOR TAG2B
AE2O1
EXTERIOR ELEVATION
INDICATOR TAG
1A
203 EQUIPMENT TAG
100 FLOOR SPOT
ELEVATIONWALL TAG
OFFICE
ROOM NAME AND
NUMBER AE501
1A
DETAIL REFERENCE
TAG
AE2O1
EXTERIOR SECTION
REFERENCE TAG
1A
AE2O1
INTERIOR SECTION
REFERENCE TAG
1A
KEY NOTE
A
GRIDLINE
REVISION TAG
PR01
REVISION CLOUD
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
FP10
B3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
35% CONSTRUCTION
DOCUMENT REVIEW
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/2
/2
:1
:2
P
M
AE101-01-A
LOWER LEVEL FLOOR PLAN -
BUILDING 1 - AREA A
VAMC SIOUX FALLS EHRM
INFRASTRUCTURE UPGRADES
Sioux Falls, SD
438-20-910
03/26/2021 Checker Author16090
1/8" = 1'-0"1 LOWER LEVEL FLOOR PLAN OVERALL - BUILDING 1 - AREA A
Revisions: Date:
1-02-1 1-02-2
1-02-3
1-02-4
1-02-5 1-02-6
1-02-7
1-37-1A 1-37-1B
1-37-3
1-37-2
- Negative Asbestos Bulk Sample LocationX-XX-X
- Positive Asbestos Bulk Sample LocationX-XX-X
LEGEND
Room
Room
Room
Room
Room
Room
Room
Room
Room
TOILET
Room
Room
TELECOMM
Room
Room
Room
STAIR D
Room
Room 320
Room
Room 322
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room334
Room
Room
Room
Room
322B
STAIR E
CORRIDOR
CORIDOR
316A Room
336B Room
336A Room
Room
Room
301A Room
302A Room
302B Room
CORRIDOR
Room
307D Room
307A Room
307G Room
307C Room
307F
STAIR C
307B Room
LIMITS OF CONSTRUCTION
AE412
GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION
WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE
NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES
AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS
INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE
AREAS, ASCERTAIN WORK REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT
REQUIREMENTS AT NO ADDITIONAL COST.
2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE
EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY
ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND
CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY
OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.
5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS
FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO
PROCEEDING WITH REMODELING.
6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING
SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE
RATING, AT THE SUBCONTRACTORS EXPENSE.
7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH
MANUFACTURER.
8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL
BE VERIFIED WITH THE RESPECTIVE TRADE.
9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS
SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR
SCHEDULED FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO
PROCEEDING.
10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH
TRADES WHICH REQUIRE THEM.
11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY
MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.
12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM
ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.
13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING
BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.
14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE
LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE
RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE
RATING INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS
SHALL BE CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT
THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE
SEALED WITH FIRE CAULK.
FLOOR PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL
EXISTING DOOR AND
FRAME TO REMAIN
DOOR
INTERIOR BORROWED
LIGHT
101B
101A
8'-0" DIMENSION LINE,
NOMINAL
8'-0" EXTENDED
DIMENSION LINE,
NOMINAL
AE2111A
INTERIOR ELEVATION
INDICATOR TAG2B
AE2O1
EXTERIOR ELEVATION
INDICATOR TAG
1A
203 EQUIPMENT TAG
100 FLOOR SPOT
ELEVATIONWALL TAG
OFFICE
ROOM NAME AND
NUMBER AE501
1A
DETAIL REFERENCE
TAG
AE2O1
EXTERIOR SECTION
REFERENCE TAG
1A
AE2O1
INTERIOR SECTION
REFERENCE TAG
1A
KEY NOTE
A
GRIDLINE
REVISION TAG
PR01
REVISION CLOUD
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
FP10
B3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
35% CONSTRUCTION
DOCUMENT REVIEW
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/2
/2
:1
:2
P
M
AE131-01
THIRD LEVEL OVERALL FLOOR
PLAN - BUILDING 1
VAMC SIOUX FALLS EHRM
INFRASTRUCTURE UPGRADES
Sioux Falls, SD
438-20-910
03/26/2021 Checker GJB16090
1/8" = 1'-0"1 THIRD LEVEL FLOOR PLAN OVERALL - BUILDING 1
Revisions: Date:
1-314-1
1-314-2 1-314-3
1-314-4
1-314-5
1-314-6
1-314-7
- Negative Asbestos Bulk Sample LocationX-XX-X
E07
TANK ROOM
C15
CORRIDOR
C15A
CORRIDOR
E06
CLOTHING
E04
EMS
E03
STORAGE
E03A
VESTIBULE
196J
ENG
STORAGE
E05B
TOILET
E05
TELECOM
E08
DECONTAM
E18
CLEAN
PROCESSING
E09
ELEC.
E080B
EMS
C13
CORRIDOR
E10
LOCKERS
E10A
TOLET
E12A
TOILET E12
LOCKERS E15
OFFICE
E14
OFFICE
E16
BREAK
ROOM
A80
EMS
A79
SHARED
OFFICE
A78
STORAGE
E18A
STORAGE
E22A
STORAGE
E19
SPS
C14
CORRIDOR
E17
CLEAN
STEAM
C12
CORRIDORBUILDING 5-AREA B
BUILDING 5-AREA A
BUILDING 5-AREA B
BUILDING 5-AREA A
BU
IL
DI
NG
-A
RE
A
D
BU
IL
DI
NG
-A
RE
A
A
A76
STORAGE
A77
WORK
PROVIDE:
- - STATIC DISSIPATIVE FLOORING
-4' x8' PLYWOOD ALL WALLS WITH
FIREPROOF PAINT AND GLOSS
WHITE TOP COAT
LIMITS OF CONSTRUCTION
D45
OFFICE
D43
OFFICE
D44
LAB
D42
CYTOLOGY
E01
ELEC
DISTRIBUTION
E23
ENTRY
ROOM
E22
BREAK OUT
E20
STERILE
STORAGE
E21 Room
E24
CHILLER
PLANT
E25
CHILLER
W14
ENG
STORAGE
W17
PHARMACY
STORAGE
W16
STORAGE
W15
STORAGE
W03
VESTIBULE
W02
OFFICE
W05
OFFICE
W06
OFFICE
W12
TOILET
W11
OFFICE
W10
OFFICE
W07
BREAK
W09
MECH
W08
OFFICE
CR
AE413
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
35% CONSTRUCTION
DOCUMENT REVIEW
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/2
/2
:1
:3
P
M
AE101-05-A
GROUND LEVEL FLOOR PLAN -
BUILDING 5 - AREA A
VAMC SIOUX FALLS EHRM
INFRASTRUCTURE UPGRADES
Sioux Falls, SD
438-20-910
03/26/2021 Checker Author16090
1/8" = 1'-0"1 GROUND LEVEL FLOOR - BUILDING 5 - AREA A
Revisions: Date:
5-E05-1
5-E05-2
- Negative Asbestos Bulk Sample LocationX-XX-X
A80
EMS
A84A
VIEWING
A84B
AUTOPSY
A71
TOILET
A84E
COOL ROOM
C12
CORRIDOR
A84G
EMS
B54
OFFICE
C03
CORRIDOR
B98
AGENT
CASHIER
A27
TELECOM
F65
STAFF
LOUNGE
F65A
STAFF
TOILET
F64A
ELEC
F64
EXAM
F63
EXAM
F65B
STORAGE
F62A
HSK F65C
STORAGE
F66A
PATIENT
TOILET
A15
MRI
A18
EQUIPMENT
A16
DRESSING
A82
TOILET
A17C
TOILET
A83
CT
A64A
OT WORK
STATIONS
A64
OT
TREATMENT
A63
OT KITCHEN
A62
OT EXAM C10
CORRIDOR
A66
PATIENT
TOILETA61
EXAM
A60
EXAM A67
SPEATCH
EXAM
A40
XRAY
A43
TOILET
A45
XRAY
A442
DRESS
A37
XRAY
A33
TOILET
A19
LOCKER
A20
XRAY
A21
XRAY
A10A
STORAGE
A10
BREAKROOM
A10B
TOILET
A08
RECEP /
WAIT
A35
SOILED
UTILITY
A36
TOILET
A47
IT CLOSET
A38
STORAGE
A34
FILM
A63A
TOILET
A86
CONTROL
A68
PATIENT
TOILET
A17
CONTROL
A46
CLEAN
UNTILITY
A49
DEXA ROOM
A50
OFFICE
A51
OFFICE
A52
INFECTION
CONTROL
A53
OFFICE
C07A
CORRIDOR C07
CORRIDOR
A06
CORRIDOR
A31E
ULTRA
SOUND
A31D
OFFICE
A31
OFFICE
A31C
WORK
ROOM
A32
OFFICE
A31A
OFFICEA31B
BREAK
ROOM
A29
WAIT
C05A
CORRIDOR
A22
DRESS
A23
TOILET
A07
WOMENS
TOILET
A24
XRAY
A25
TOILET
A26
HAC
C05
CORRIDOR
Room
Room
B87A
OFFICE
B87
OFFICE
B88
OFFICE
C04
CORRIDOR
BUILDING 5-AREA B
BU
IL
DI
NG
-A
RE
A
D
BUILDING 5-AREA A
BUILDING 5-AREA B
BUILDING 5-AREA B
BUILDING 5-AREA C
BUILDING 5-AREA E
BUILDING 5-AREA D
BU
IL
DI
NG
-A
RE
A
B
BUILDING 5-AREA A
A88
FIRE PUMP
A89 Room
C11
CORRIDOR
A81
ELEC A72
EXAM A73
EXAM
A69
TELE
HEALTH
A74
EXAM
A75
EXAM
A76
STORAGE
A77
WORK
A99 Room
A84F Room
A84C
DRESSING A84D
TOILET
A84 Room
A54
WAITING
A55
RECEPTION
A56
OFFICE
A57
WOMENS
LOCKER
A57A
WOMENS
TOILET A58
EXAM
A59
EXAM
B90A
ELEC
A91 Room
B90
TELE
PROVIDE:
-STATIC DISSIPATIVE FLOORING
-4' x8' PLYWOOD ALL WALLS WITH
FIREPROOF PAINT AND GLOSS WHITE
TOP COAT
LI
M
IT
S
OF
C
ON
ST
RU
CT
IO
N
D41
STORAGE
REMOVE PORTION OF ACT
CEILING, GRID AND ALL
ASSOCIATED MECHANICAL AND
ELECTRICAL. REMOVE GYP BD
SOFFIT. SALVAGE ACT FOR
REINSTALLATION
AE413
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
35% CONSTRUCTION
DOCUMENT REVIEW
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/2
/2
:1
:4
P
M
AE101-05-B
GROUND LEVEL FLOOR PLAN -
BUILDING 5 - AREA B
VAMC SIOUX FALLS EHRM
INFRASTRUCTURE UPGRADES
Sioux Falls, SD
438-20-910
03/26/2021 Checker Author16090
1/8" = 1'-0"1 GROUND LEVEL FLOOR PLAN - BUILDING 5 - AREA B
Revisions: Date:
5-A27-1
5-A27-3 5-A27-4
5-A27-2
5-A27-5
- Negative Asbestos Bulk Sample LocationX-XX-X
B82
OFFICE
B84
OFFICE
B86
OFFICE
B89A
OFFICE
B76
WAITING
B40
OFFICE
B71
TRIAGE
B42
WORK
ROOM
B45
OFFICE
B47
OFFICE
B49
EXAM
B51
EXAM
B53
EMS
B54
OFFICE
B55
OFFICE
C03
CORRIDOR
B38B
TLT./
SHOWER
B38A
ON-CALL
B62
PROCEDURE
B38
NURSE
B70
ED RECPT.
CHECK-IN
B68
PAT
SUBWAIT
B69
PHYSICIAN
WORK
C21A
CORRIDOR
B72
GEN EXAM 1
B89C
BOOTH 1
B89D
BOOTH 2
B89E
BOOTH 3
B89B
CORRIDOR
B98
AGENT
CASHIER
A27
TELECOM
A02A
CORRIDOR
A04B
DOB LAB
A04
STRESS LAB
A05
TOILET
A02
OPERATOR
A01
PAT PREP
A07
WOMENS
TOILET
T
MENS
TOILET
B41
EXAM
B43B
OFFICE
B43
OFFICE
B44
EXAM
B46
EXAM
B50
TOILET
B52
EXAM
C25
CORRIDOR
B48
EXAM
A24
XRAY
A25
TOILET
A26
HAC
C05
CORRIDOR
Room
Room
B23
TELECOMM
B17
EXAMB20
Room
B28
LOCKER
B30
EMS
B31
STOR
B34
EXAM
B37
TRIAGE
B37A
TRIAGE
B39
TRIAGE
B18
EXAM
B19
ELEC
B21
EXAMB22
TOILETB24
SLEEP
B26
NURSE
B27
EXAM
B29
EXAM
B332
EXAM
B33
EXAM
B15
STOR
B43C
EXAM B09
OFFICE
B08
EXAM
B06
COSULT
B04
EXAM
B56
OFFICE
B57
OFFICE
B58
ELEC
B59
TELE
B01
EXAMB02
EXAMB03
OFFICEB05
SOILED
B07
PROCEDURE
B12
BREAKROOMB14
TOILET
C24
CORRIDOR
C27
CORRIDOR
C29
CORRIDOR
C28 Room
B35
OFFICE
B38
NURSE
B36
EMERGENCY
G09
MENS
LOCKER
G10
WOMANS
LOCKER
G11
CORRIDOR
G14
SOILED
G09B
SHOWER
BU
IL
DI
NG
-A
RE
A
C
BU
IL
DI
NG
-A
RE
A
E
BUILDING 5-AREA E
BUILDING 5-AREA D
BUILD
ING 5-A
REA F
BU
IL
DI
NG
-A
RE
A
B
BU
IL
DI
NG
-A
RE
A
D
F01B
VESTIBULE
F01A
VESTIBULE
F04A
INFO
B102 Room
F03
LOBBY
F04
WAITING
F05
ELEV EQUIPF07A
STAIR 8F08
ELEV EQUIP
F07
TOILET
PROVIDE:
-STATIC DISSIPATIVE FLOORING
-4' x8' PLYWOOD ALL WALLS WITH
FIREPROOF PAINT AND GLOSS WHITE
TOP COAT
LI
M
IT
S
OF
C
ON
ST
RU
CT
IO
N
LI
M
IT
S
OF
C
ON
ST
RU
CT
IO
N
F09
EXAMF11
TOILET
F12
STOR
F13
EXAM
F14
EXAMF15
ELEC
F16
EXAM
F17
NURSE
OFFICE
F18
EXAMF19
DICTATION
F20
EXAM
F21
EXAM
F22
EXAM
F23
PROCEDURE
F25
EXAM
F26
EXAMF27
EXAM
F28
STAIR 9
F29
EXAM
F30
CLEAN
STOR
F31
EXAM
F32
DICTATION
F33
LOCKER
F34
TOILET
F35
LOUNGE
F36
OFFICE
F37
OFFICE
F38
EXAM
F39
NURSE
OFFICE
F40
EXAM F41
EXAM F42
EXAM
F43
EXAM
F44
EXAM F45
SOILED
F46
EXAM F47
NURSE
OFFICE
F48
HAC
F49
TOILET
F50
STOR
F51
EXAM
F52
EXAM
F53 Room
F54
EXAM
F55
EXAM
F56
EXAM
F57
EXAM
F58
TELECOM
F59
OFFICE
F60
EXAM
F37A
OFFICE
C31
CORRIDORC33
CORRIDOR
C34
CORRIDOR
F37E Room
C26
CORRIDOR
B66A
GENERATOR
B66
ELEC
C23
ENTRY
B67
AMBULANCE
BAY
B67A
DECONTAM 366
BREAK
ROOM
C24C
CORRIDOR
B69B
SOILED
UTILITY
B37B
STORAGE
B69A
ELEC
B73A
TOILET
B69C
CLEAN UTIL
B72A
MENTAL
HEALTH
B73
WOMANS
HEALTH
C24A
CORRIDOR
C20
CORRIFOR
F10
STAFF
TOILET
F24
NURSE
OFFICE
REMOVE PORTION OF ACT
CEILING, GRID AND ALL
ASSOCIATED MECHANICAL AND
ELECTRICAL. REMOVE GYP BD
SOFFIT. SALVAGE ACT FOR
REINSTALLATION
PATCH FLOOR AT REMOVED 6" CONDUIT
AE413
AE413
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
35% CONSTRUCTION
DOCUMENT REVIEW
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/2
/2
:1
:5
P
M
AE101-05-E
GROUND LEVEL FLOOR PLAN -
BUILDING 5 - AREA E
VAMC SIOUX FALLS EHRM
INFRASTRUCTURE UPGRADES
Sioux Falls, SD
438-20-910
03/26/2021 Checker Author16090
1/8" = 1'-0"1 GROUND LEVEL FLOOR PLA - BUILDING 5 - AREA E
Revisions: Date:
5-B23-2 5-B23-3
5-B23-1
5-B23-4
5-B23-5
5-B66A-3 5-B66A-1
5-B66A-2
- Negative Asbestos Bulk Sample LocationX-XX-X
CE
AE
DE
15E14E13E12E
Room
Room
142A Room
142B Room
142D Room
142C Room
Room
144A Room
Room
143B Room
191B Room
191A Room
101B
DENTAL
WAITING 179
OFFICE
101A
COFFEE
ELEVATOR
LOBBY
138A
STAIR 3
Room
Room
CORRIDOR
CO2
STORAGE
STORAGE 1021
ELEC
ROOM145
Room
Room
MECHANICAL
Room 149
TELECOM
150A
ELEC
TELE
STAIR 2
Room 173
Room
WOMENS
TOILET
MENS
TOILET
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
MECHANICAL
CORRIDOR
BUILDING 5 - AREA A
BUILDING 5 - AREA B
BUILDING 5 - AREA A
BUILDING 5 - AREA C
BUILDING 5 - AREA D
BUILDING 5 - AREA BBUILDING 5 - AREA C
BUILDING 5 - AREA D
1026A
ENTRANCE
ROOM
INTERSTITIAL
LI
M
IT
S
OF
C
ON
ST
RU
CT
IO
N
LI
M
IT
S
OF
C
ON
ST
RU
CT
IO
N
AE411
E123
INTERSTITIAL
189A
STAIR 7
A92B
EQUIPMENT
PLATFORM
10'-6" 10'-6" 10'-6" 10'-6" 10'-6" 10'-6" 10'-6"
182A
OFFICE
181A
OFFICE
180A
OFFICE
179A
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
AE413
LI
M
IT
S
OF
C
ON
ST
RU
CT
IO
N
LIMITS OF CONSTRUCTION
175177178179A180A181A
GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF CONSTRUCTION
WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY BE
NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL DRAWINGS DUE TO CHANGES
AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING ALONG WITH OTHER SYSTEMS. THIS
INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT, AND ALL TRADES SHALL INSPECT THESE
AREAS, ASCERTAIN WORK REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT
REQUIREMENTS AT NO ADDITIONAL COST.
2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH THE
EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT AND FIELD VERIFY
ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO DEMOLITION AND
CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY
OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.
5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES AND DUCTS
FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO
PROCEEDING WITH REMODELING.
6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE FIREPROOFING
SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE
RATING, AT THE SUBCONTRACTORS EXPENSE.
7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE WITH
MANUFACTURER.
8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR EQUIPMENT SHALL
BE VERIFIED WITH THE RESPECTIVE TRADE.
9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING CONDITIONS
SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE AND PREPARE FOR
SCHEDULED FINISH APPLICATION. COORDINATE WORK WITH GENERAL CONTRACTOR PRIOR TO
PROCEEDING.
10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES WITH
TRADES WHICH REQUIRE THEM.
11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS REQUIRED BY
MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.
12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY DIFFER FROM
ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR DEFINITIONS.
13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT PLYWOOD BACKING
BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT, UNLESS NOTED OTHERWISE.
14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY SYMBOLS ON THE
LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE AS REQUIRED. ALL FIRE
RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF MATERIALS / ASSEMBLIES MEETING THE
RATING INDICATED, TERMINATE AT THE DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS
SHALL BE CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT
THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS SHALL BE
SEALED WITH FIRE CAULK.
FLOOR PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL
EXISTING DOOR AND
FRAME TO REMAIN
DOOR
INTERIOR BORROWED
LIGHT
101B
101A
8'-0" DIMENSION LINE,
NOMINAL
8'-0" EXTENDED
DIMENSION LINE,
NOMINAL
AE2111A
INTERIOR ELEVATION
INDICATOR TAG2B
AE2O1
EXTERIOR ELEVATION
INDICATOR TAG
1A
203 EQUIPMENT TAG
100 FLOOR SPOT
ELEVATIONWALL TAG
OFFICE
ROOM NAME AND
NUMBER AE501
1A
DETAIL REFERENCE
TAG
AE2O1
EXTERIOR SECTION
REFERENCE TAG
1A
AE2O1
INTERIOR SECTION
REFERENCE TAG
1A
KEY NOTE
A
GRIDLINE
REVISION TAG
PR01
REVISION CLOUD
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
FP10
B3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
35% CONSTRUCTION
DOCUMENT REVIEW
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/2
/2
:1
:2
P
M
AE111-05-B
FIRST LEVEL FLOOR PLAN -
BUILDING 5 - AREA B
VAMC SIOUX FALLS EHRM
INFRASTRUCTURE UPGRADES
Sioux Falls, SD
438-20-910
03/26/2021 Checker Author16090
1/8" = 1'-0"1 FIRST LEVEL FLOOR PLAN - BUILDING 5 - AREA B
Revisions: Date:
5-149-1 5-149-2
5-149-4
5-149-35-149-6 5-149-7
5-149-5
5-178-1
5-178-2
5-178-3
5-178-4 5-178-5 5-178-6
5-178-7
5-178-8 5-178-9
5-178-10 5-178-11
5-178-12 5-178-13
5-178-14
5-175-1
5-175-2
5-175-3 5-175-5
5-175-4
5-150A-1
5-150A-2
5-150A-3
- Negative Asbestos Bulk Sample LocationX-XX-X
Room
142A Room
144A Room
Room
143A Room
143B Room
191B Room
101B
DENTAL
WAITING
RECEPT
102A
EXAM
EXAM
101A
COFFEE
ELEVATOR
LOBBY
138A
STAIR 3
Room
Room
TELECOM
111A
MECHANICAL
STAIR 4
Room
131A Room
MECHANICAL
MECHANICAL
SOILED
CLEAN
M.H.
ELEC
WORK
RECPT
WAITING
129A
HAC114
EXAM
TOILET
EXAM
EXAM
TOILET
PROCEDURE
WORK
120A Room
TOILET
CORRIDOR
121A
STAIR 5
113A
STAIR 10
ELEVATOR
LOBBY
CORRIDOR
LOCKER
112A
TOILET
LAB 106F
EXAM
SOILED
106J
TOILET
CLEAN
STOR
106E
EXAM
106D
EXAM
106C
EXAM
106H
HAC 106G
TOILET
OFFICE
EXAM
106B
STORAGE
106A
CLEAN
104A
DARK RM
EXAM
CORRIDOR
BU
IL
DI
NG
AR
EA
A
BU
IL
DI
NG
AR
EA
C
BUILDING 5 - AREA A
BUILDING 5 - AREA B
BUILDING 5 - AREA D
BUILDING 5 - AREA B
BUILDING 5 - AREA D
BUILDING 5 - AREA C BUILDING 5 - AREA C
BUILDING 5 - AREA D
126A
MECHANICAL
126C
MECH
127A
INTERSTITIAL
PROVIDE:
- - STATIC DISSIPATIVE FLOORING
-4' x8' PLYWOOD ALL WALLS WITH FIREPROOF PAINT AND GLOSS WHITE TOP COAT
CR
AE413
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
35% CONSTRUCTION
DOCUMENT REVIEW
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/2
/2
:1
:3
P
M
AE111-05-C
FIRST LEVEL FLOOR PLAN -
BUILDING 5 - AREA C
VAMC SIOUX FALLS EHRM
INFRASTRUCTURE UPGRADES
Sioux Falls, SD
438-20-910
03/26/2021 Checker Author16090
1/8" = 1'-0"1 FIRST LEVEL FLOOR PLAN - BUILDING 5 - AREA C
Revisions: Date:
5-111-1 5-111-2 5-111-3
- Negative Asbestos Bulk Sample LocationX-XX-X
STAIR 8
F100B
TELECOM
F100A
ELEC
STAIR C3100
ELEVATOR100A
ELEVATOR
MECH
COMM
INTERSTITIAL
TELECOM
ELEC
INTERSTITIAL
CO2
STORAGE
STORAGE 1021
ELEC
INTERSTITIAL
MECH
BUILDING 5 - AREA D
BUILDING 5 - AREA C
BU
IL
DI
N…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .