Technical Question Tracking Sheet - Infra Upgrades.pdf

PDF 271 KB Posted

Attached to
EHRM Infrastructure Upgrades Construction Sioux Falls VAMC Federal contract opportunity
Solicitation number
36C77622R0049
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document contains a technical questions and answers tracking sheet and details of a related federal contract opportunity for infrastructure upgrades at the Sioux Falls VA Medical Center. The technical tracking sheet includes questions received from contractors between March 31 and April 5, 2022 and responses from the VA regarding details of existing structures like wall openings and floor structures, as well as the submittal and approval process for product equals. The related federal contract opportunity is a $20-50 million design-bid-build construction project issued by the VA Technology Acquisition Center to upgrade infrastructure in support of the national Electronic Health Records Modernization project. The solicitation will be conducted as a total SDVOSB set-aside with a 450-day period of performance.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Infrastructure Upgrades Construction Sioux Falls VAMC, newest first.
File Type Posted
36C77622R0049 0006.pdf PDF
Technical Question Tracking Sheet Infra Upgrades Final.pdf PDF
36C77622R0049 0005.pdf PDF
271116 Communications Cabinets Racks Frames and Enclosures.pdf PDF
36C77622R0049 0004.pdf PDF
271619 Communications Patch Cords Station Cords and Cross Connect Wire.pdf PDF
271313.13 Communications Copper Cable Splicing and Terminations.pdf PDF
270526 Grounding and Bonding for Communications Systems.pdf PDF
271513.13 Communications Optical Fiber Cable Splicing and Terminations.pdf PDF
271000 Structured Cabling.pdf PDF
271323 Communications Optical Fiber Backbone Cabling.pdf PDF
OIT InfrastrucStdTelecomSpaces 3.1.pdf PDF
SF Site Utility Dwg.pdf PDF
270553 Identification for Communications Systems.pdf PDF
271513 Communications Copper Horizontal Cabling.pdf PDF
Technical Question Tracking Sheet - Infra Upgrades - Final.pdf PDF
270533 Conduits and Backboxes for Communications Systems.pdf PDF
271126 Communications Rack Mounted Power Protection and Power Strips.pdf PDF
271313 Communications Copper Backbone Cabling.pdf PDF
36C77622R0049 0003.pdf PDF
2020 Elec Combined One Lines.pdf PDF
270536 Cable Trays for Communications Systems.pdf PDF
271119 Communications Termination Blocks and Patch Panels.pdf PDF
Building 1C Sheet 6 - Pipe Tunnel.pdf PDF
EHRM Site Visit Attendance Sheet.pdf PDF
36C77622R0049 0002.pdf PDF
Specification - Vol 2 Revision 2.pdf PDF
36C77622R0049 0001.pdf PDF
Dwgs Bid Documents-part 6-1 REV.pdf PDF
Dwgs Bid Documents-part 3-1 REV.pdf PDF
Asbestos - Appendix-A part 1.pdf PDF
Dwgs Bid Documents-part 4-1 REV.pdf PDF
Dwgs Bid Documents-part 5-1 REV.pdf PDF
Dwgs Bid Documents-part 2-1 REV.pdf PDF
Asbestos - Appendix-A part 4.pdf PDF
Asbestos - Appendix-A part 2.pdf PDF
Construction Wage Rates - Minnehaha - 2-25-22.pdf PDF
Specifications Revision 2.pdf PDF
Dwgs Bid Documents-part 1-1 REV.pdf PDF
Asbestos - Appendix-A part 3.pdf PDF
Dwgs Bid Documents-part 7-1 REV.pdf PDF
VHA Suppl. Contract Rqmnts for Combatting COVID-19 Updated 12-14-2021.pdf PDF
Supplement to General Requirements Spec 01 00 00.pdf PDF
36C77622R0049.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONS AND RESPONSE TRACKING SHEET - 36C77622R0049 - EHRM Infrastructure Upgrades Construction DBB - Sioux Falls

QUESTION #

QUESTION

RECEIVE

DATE

QUESTION

ANSWERED

DATE

CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS

1 3.31.2022 Please define the opening width and lintel size in the existing wall for the 1st and 2nd levels to the new data center? Reference details AE411- 1 and 2, S230 detail 1, S250 detail 1.

The opening on 1st floor is via a 7 foot wide opening consisting of two ajoining doors. This is door 1026 as shown on AE411, and door details on page AE602. The opening on 2nd floor, is via a 6 foot wide opening consisting of two ajoining doors.

This is door 201 as shown on page AE411 with door details on AE602. Lintel is not required for the new openings. Openings are in Gyp BD and metal stud wall with metal panel exterior.

2 3.31.2022 Building 1, Telecom Room 037, AD101-01 detail 2, AE 101 detail 2, please provide a cross section of the existing concrete floor and structural requirements?

Building 1 - C, Sheet 6 - Pipe Tunne Best we have for anything concrete/structural on the building 1 basement floor is the original detail plan from 1920. Below is a picture of a floor opening from 2017. This may not be exactly what exists under room 037, by may be close.

3 4.1.2022 Where to send samples to and who would be giving product approval for a potential approved equal on

Submittal approvals are submitted by the GC once project has been awarded. Review and approvals are done after that by the brick for the EHRM Infrastructure Upgrades project in Sioux Falls the contracted AE and VA personnel. Equals are allowed but must be approved prior to the GC using them in the project.

4 4.4.2022 We would like the opportunity to bid Florock Resinous Flooring (Section 096726 Epoxy Broadcast OPT Finish with Urethane Topcoat) as an equal

Submittal approvals are submitted by the GC once project has been awarded. Review and approvals are done after that by the contracted AE and VA personnel. Equals are allowed but must be approved prior to the GC using them in the project.

For an equal to be approved, submitted product must meet ALL product requirements listed in spec section 09-67-26, section 2.3. No exceptions to those values will be made.

5 4.5.2022 Is there a geotechnical report for this project? No, we did not have a Geotech report done on this project.

This project was not done in new ground so we did not need one.

TECHNICAL QUESTIONS AND RESPONSE TRACKING SHEET - 36C77622R0049 - EHRM Infrastructure Upgrades Construction DBB - Sioux Falls
QUESTION RECEIVE
QUESTION ANSWERED
VA RESPONSES TO QUESTIONS
CONTRACTOR QUESTIONS
DATE
DATE