This solicitation requests proposals for warehouse and distribution support services at the Defense Logistics Agency Distribution Center in San Diego, California. The services include receipt, storage, inventory management, order fulfillment, and delivery of depot-level repairables, electronics, industrial supplies, medical material, general supplies, petroleum products, chemicals, metals, and ship and aviation parts. The Distribution Center operates sites at Naval Base San Diego, Naval Air Station North Island, and Naval Base Point Loma. Offerors must demonstrate the ability to handle hazardous materials, classified items, and specialized products like boats and landing craft. The contract will have a one-year base period and four one-year options, with an anticipated award date in October 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Warehousing Services at DLA Distribution San Diego, CA, newest first.
File Type Posted
DDDC SP3300-20-R-5001 Questions 3.19.2020.docx DOCX document
SP330020R5001 Amend 0007 3-16-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 3.11.2020 AF Responses.docx DOCX document
Amendment 0006.pdf PDF
Amendment 0004.pdf PDF
Attachment J.2 Site Specific PWS 2-26-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 2.26.2020.docx DOCX document
Amendment 0003.pdf PDF
Attachment J.4 Wage Determination 2015-5635, Rev 12.pdf PDF
DDDC Occupancy and Density report as of Jan 2020.pdf PDF
A031 - MPC Cargo Status Report Amend 0001.pdf PDF
Amendment 0001.pdf PDF
Attachment J.26 TE 5.0 APLs.doc DOC document
A004 - MECSP 1.28.20.pdf PDF
Final PPC Instructions DDDC Jan 2020.pdf PDF
A013 - Monthly Cost Report for Material Support CLIN.pdf PDF
A015 - Monthly Cost Report for Special Projects and Surge and Sustainment CLIN.pdf PDF
A006 - Quality Control Plan.pdf PDF
Attachment J.26, TE 5.0 APLs.doc DOC document
A009 - Management Plan (MCCP).pdf PDF
A020 - Shipment to Restricted Country - Approval Necessary.pdf PDF
A024 - Physical Security Plan.pdf PDF
A036 - Local Delivery Refusal Log.pdf PDF
A017 - Government Cargo Recovery Effort Program (GOCARE) Program.pdf PDF
A001 - Transition Plan and Weekly Reports.pdf PDF
Attachment J.18, TE 3.4 GE MHE.xlsx XLSX spreadsheet
Attachment J.40 Draft Distribution Operations Training Schedule.xlsx XLSX spreadsheet
A027 - Monthly Contractor Employee CAC Report.pdf PDF
A004 - Surge, Sustainment, and Disaster Recovery Plan (SSDRP).pdf PDF
A014 - Monthly Cost Report for Travel and Training CLIN.pdf PDF
Attachment J.33, TE 5.6, Local Delivery and Pick Up Points.rtf RTF text file
SF33 SP330020R5001.pdf PDF
Attachment J.41, Limitation on Subcontracting Report.xls XLS spreadsheet
A011 - Montly Cost Report for Scheduled and Unscheduled Equip Main CLIN.pdf PDF
Attachment J.34, TE 6.2N, Delivery Schedule Greater 10 miles.rtf RTF text file
Attachment J.22, TE 4.1 Contractor Training.docx DOCX document
Attachment J.19, TE 3.5 GE Misc Equipment.xlsx XLSX spreadsheet
A026 - Wood Packaging Material (WPM) Report.pdf PDF
Attachment J.32, TE 4.6, Contractor Equipment List.xlsx XLSX spreadsheet
A031 - Non-Accountable Engine Issue Report.pdf PDF
A035 - Daily Boat Movement Report.pdf PDF
Attachment J.17 TE 3.3 Government Data Systems 9.9.19.docx DOCX document
Attachment J.15, TE 3.1 Government Facilities.rtf RTF text file
A025 - Container Reclamation Report.pdf PDF
Attachment J.39, Training Plan.xlsx XLSX spreadsheet
Attachment J.23, TE 4.2 Gov Operated Equipment for Contractor Maintenance.xlsx XLSX spreadsheet
Attachment J.25, TE 4.5 Other Equipment PM Tasks REV.xls XLS spreadsheet
Attachment J.37, TE 6.1 Government Forms.docx DOCX document
Attachment J.44 - Subcontracting Plan Template -Includes Elements 1-15.docx DOCX document
Attachment J.27, TE 5.1 DDDC Historical Workload Mar 2019 - update July 22 2019 12 PM.docx DOCX document
Show all 50

Warehousing Services at DLA Distribution San Diego, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.2

SP3300-20-R-5001
Page 5 of 30

SECTION C-N SUPPLEMENT TO ATTACHMENT J-1 SECTION C-SITE SPECIFIC REQUIREMENTS

1. This supplement to the PWS details the Navy customer and site specific requirements associated with warehouse and distribution operations performed at the Distribution Center located at DLA Distribution San Diego, California.

1. In addition to the requirements identified in Attachment J-1, Section C, the Contractor shall perform all of the requirements in Attachment J-2, Section C-N, and Site Specific Requirements. The requirements described in Attachment J-2, Section C-N are customer specific requirements of the Fleet units of the Department of the Navy (DoN), Fleet Readiness Center Southwest (FRCSW), Portsmouth Naval Shipyard Detachment San Diego (PNSY DET), and shore based units in the San Diego County Area.

GENERAL CONDITIONS AND REQUIREMENTS

1. This Section provides general information relating to the conditions of operation and general requirements relating to the material and distribution services.

C-1.1N SCOPE OF WORK

1. DLA Distribution San Diego, CA consists of three (3) sites. The Primary wholesale support location is at Naval Base San Diego (NBSD). The Retail Support services are located at Naval Base Coronado (NBC), 6.5 miles away. Additional support services are provided on site at Naval Base Point Loma (NBPL) located 11.7 miles from the NBSD Site.

1. Material Processing Center (MPC) requirements - DLA Distribution San Diego, California supports various Naval vessels home ported at NBSD, NBC, and Portsmouth Naval Shipyard Detachment San Diego (PNSY DET San Diego) as well as possible temporary support to units throughout Navy Region Southwest. Support to these Naval vessels require that material be temporarily staged while awaiting delivery. Material awaiting delivery may require temporary storage for up to four (4) weeks or longer if the Naval vessel is participating in short-term training exercises.

1. Work includes a significant amount of emergency interrupt type workload within all functional work areas. This is due to the high concentration of local customers that walk-in and request customer support services for expedited processing of requisitions (i.e., Bearer Walk Through) and special functions (e.g., transshipments, packaging, container fabrication).

C-1.2.3N DUTY HOURS AND ACCESS TO THE HOST INSTALLATION

A. DLA Distribution San Diego, California core hours are 0700-1545 hours (7:00 am – 3:45 pm) Pacific Standard Time or Pacific Daylight Time (PST/PDT) weekdays. The Contractor shall comply with OPNAVINST 5530.14 Manual of Regulations for Entering Departing and Movement on Board Naval Base San Diego.

B. The host installations are currently accessible as provided in the table below. It should be noted that changes to Gate hours can occur without prior notification.

Gate
Location
Days and Hours of Operation

NBSD

6
S 32nd St. at E. Harbor Dr

San Diego, CA 92136 Daily, 24 hours, 7 days per week No Trucks

6A
Harbor Drive

Wet Side – south of 32nd Street Monday – Friday 0500 – 1700 Trucks/Commercial Vehicle Inspection

7
Harbor Drive at Vesta Street

San Diego, CA 92136 Monday - Friday 0500 - 17900

9
8th Street at East Harbor Dr

San Diego, CA 92136 Monday - Friday 0500 - 0800 1430 - 1700 1430 -1700

NBC

Main Stockdale Gate 1

3rd. Street at Alameda Blvd. Coronado, CA 92135
Daily, 24 hours, 7 days per week

(Truck entry 0500-1800)

2
1st Street at Alameda Blvd

Coronado, CA 92135 Monday – Friday 0500 - 1800 Weekdays

5
Ocean Blvd past Ocean Drive
Monday – Friday 0500 - 1800 Weekdays

NBPL

Main Gate 1 Rosecrans St.

Monday – Friday 24 hours, 7 days per week

2
Corner Catalina Road and McClelland Road
Monday – Friday (0500 – 1800)

C. For Naval Base San Diego (NBSD): Commercial carriers may only enter through NBSD Gate 6A (Harbor Drive between NBSD Gates 6 AND 7) which will be open 0500-1700 (MON-FRI) for commercial vehicle traffic only. All official visitors shall register at the NBSD Pass and ID Office, Building 3436, Naval Base San Diego. Pass and ID Office is located north of Main Gate (Gate 6) on Harbor Drive.

D. Naval Base Coronado (NBC) Pass and ID office is located Building 680.

E. Naval Base Point Loma (NBPL) Pass and ID Office, Building B-174, is located at the corner of Rosecrans Street and Strothe Road. All non-CAC or Defense Biometric Identification System (DBIDS) card holders will need to schedule their access requests through the KO or designee who will then send their access requests to the appropriate Pass and Decal Office. Access requests may take up to 10 business days to process.

NBSD Pass and ID
Hours of Operation
Contractors
Monday through Friday, 0700-1500 hours (7:00 am – 3:00 pm)
Visitors
Monday through Friday, 0700-1630 hours (7:00 am-4:30 pm)

F. The NBC Pass and ID Office, Building 605, is open during the following hours. After hours, Contractors and Visitors must report to the Main Gate (Gate 1).

NBC
Hours of Operation
All Visitors
Monday, Tuesday, Wednesday, and Friday, 0730-1545 hours (7:30 am-3:45 pm) and Thursday, 0730-1200 (7:30

am-12:00 pm)

G. The NBPL Pass and ID Office, Building 174 is open during the following hours:

NBPL
Hours of Operation
All Visitors
Monday through Friday 0630 - 1430

H. Operating Locations/Hours. The operating hours for the participating sites are identified below:

SITE
Normal Operating Hours
FRCSW San Diego, CA. Bldg. 660
Monday – Friday 0600 – 1430

I. Normal hours of operation represent the minimum standard for customer support and do not include weekends and holidays unless otherwise stated. Actual hours of operation may increase for emergency, storage/distribution related functions that are performed in response to, or are affected by customer operational requirements. The times, including times outside of normal operating hours, that functions are performed under this contract are dictated by the operational requirements of the customers that are being supported.

J. Hours of Operation other than Normal. Some situations may require the Contractor to work other than normal operating hours. These situations may include contingency operations or weather emergencies. The Contractor shall schedule work to minimize the disruption when the Contractor’s access to a work area conflicts with a Navy mission requirement. Such scheduling may require work to be accomplished at times other than normal working hours. There may be an occasional emergency delivery of high priority material that would require the contractor to work later than 1430. There will be times of reduced operation or closure (e.g., weather days, the day after Thanksgiving, and usually the normal workdays between Christmas and New Year’s, referred to as the Christmas shutdown). The Contractor shall be required to have a minimal standby crew during reduced operations.

K. The preferred base access method for contractor personnel that do not require a CAC card is DBIDS.

C-1.4.9N PARKING AND TRAFFIC CONTROL

No personally owned vehicles shall be driven within DLA Distribution San Diego fence lines without prior approval from the Commander Magnetic placards bearing the name of the contract company may not be transferred onto personal vehicles for purpose of gaining access to the compound.

C-1.10N PREPAREDNESS EXERCISES

1. Fire, earthquakes and the possibility of a tsunami pose serious threats to personnel, ships, aircraft, and installations. The Contractor shall protect employees, material, and facilities when destructive weather or events threaten. The Contractor shall take action IAW the DLA Distribution San Diego Emergency Action Plan; which will be provided to the contractor after contract award.

1. The Contractor shall participate in preparedness exercises. Typically an exercise lasts three to five days. The objective of the exercise is to provide afloat and shore-based activities with threat scenarios for use in exercising disaster preparedness and disaster recovery and consequence management procedures. The exercises are intended to enhance disaster preparedness and execution through locally conducted drills addressing resource protection and recovery procedures, and plans.

SECTION C-3N GOVERNMENT PROPERTY (GP) SYSTEMS, TRAINING AND SUPPORT SERVICES

C-3.4.2N ENVIRONMENTAL

1. The Government is responsible for maintaining the Hazardous Waste (HW) Accumulation site for the turn in of HW IAW the host installation Hazardous Waste Management Plan. The accumulation site is currently located in Building 178. The Contractor will be notified of any changes to the accumulation site location. The host installation will provide containers for accumulation of empty paint cans, solvent containers, and containers from petroleum based products.

SECTION C-4N CONTRACTOR-FURNISHED, EQUIPMENT, MATERIAL, TRAINING, AND SUPPORT SERVICES

C-4.2N CONTRACTOR FURNISHED EQUIPMENT

1. If the Contractor leases the equipment, maintenance shall be included in the cost of lease. If the Contractor owns the equipment (title remains with the Contractor) and is furnishing for use in the performance of the contract requirements, preventative and unscheduled maintenance of this equipment shall be at the Contractor’s expense.

C-4.5.14N FUELS

1. The Contractor shall furnish automotive type fuel, diesel, and liquefied petroleum gas (LPG) HD-5 or better propane for the operation of vehicles and equipment that use this type of fuel in the performance of the DLA Distribution mission. The Contractor shall ensure all employees operate vehicles in a manner to preclude waste of fuels. The Contractor shall be responsible for all costs and/or delays incurred as a result of the failure to adequately fuel vehicles and equipment.

C-4.5.15N CUSTODIAL/HOUSEKEEPING

1. The Contractor’s custodial/housekeeping requirements for administrative and break areas are to maintain in a clean and usable condition, wiping down desks, counter tops, kitchen/breakroom tables, sinks, countertops and keeping breakroom equipment, such as refrigerators, microwaves, etc. clean and odor free.

1. The Contractor shall perform the clean-up of all warehouse and storage areas IAW Attachment J.1, Section C-5.3.2 General Warehousing/Storage Requirements, which includes but is not limited to, emptying wastebaskets into the assigned dumpsters and sweeping warehouse and storage area floors.

1. The Contractor shall ensure that the areas in and around their facilities are litter free halfway to the adjoining facility; to an appropriate physical barrier such as a fence, sidewalk, street; or 75 feet, whichever comes first.

SECTION C-5N SPECIFIC TASKS

THE FOLLOWING IS AN OULINE OF SECTION C-5N

C-5.6N PACKAGING

1. In addition to the references cited in C-5.6, the Contractor shall perform all packaging on Navy owned material received, stored, or issued IAW NAVSUPWSSINST P700 or service/customer requirements related to packaging, as applicable, for Navy items such as NAVAIR 17-600-183-6-1, Preoperational Checklist, Lifting Slings for Aircraft and Related Components.

C-5.6.1N PACKAGING IN SUPPORT OF FRCSW

1. The Contractor shall perform packaging on assets received from the FRCSW repair facilities. The Contractor shall complete 95% of all packaging actions for material returned from maintenance in 24 hours or less average and no FRCSW packaging action order than 30 calendar days; from tailgate date/time of physical receipt through completion of packaging action and work order is closed in DSS, regardless if the packaging action is completed in one of the satellite locations or the main packaging area in building 656. The Contractor shall order containers from the CRRC to support anticipated workload each week. It is critical that the assets remain visible and accessible to the owner or IM for immediate issue. Therefore, once the maintenance return or organic asset is delivered to the satellite locations and the FRCSW civilian or contractor personnel (co-located in the same area as the Contractor) attach the appropriate CAV-ORM documentation, the physical custody transfer has occurred. Once the CAV-ORM documentation is attached to the asset, the Contractor shall:

1. Induct the material into DSS as a receipt. For material with CAV-ORM documentation attached

0. Prior to 1400 establish the RCN by end of work day

0. After 1400 establish the RCN by 1000 the next business day (Monday through Friday)

1. Use the ION that corresponds to the work performed for input into the appropriate DSS screen, with a site-specific designated stow location at the packaging site, which will generate the PPP&M work order. Maintenance returns will have a DD Form 1149 or DD Form 1348. Process the receipt IAW Attachment J.1, C-5.2.4.2 Non-Procurement Receipts and organic assets with a DD Form 250 IAW Attachment J.1, C-5.2.4.3 New Procurement receipt.

1. Remove the Operational Documentation (OPDOC) and the Manufacturing Resource Planning II (MRPII) documents from the assets received and stage the documents for pick up by FRCSW civilian or contractor personnel.

1. Complete the required PPP&M action IAW Attachment J.1, C-5.6 Packaging. In addition:

3. For some assets, a Scheduled Removal Component (SRC) Card (Form OPNAV 4790/28A) is attached to material. In those cases, the Contractor shall ensure the SRC Card is included inside the packaging with the asset.

3. All maintenance returns have a RFI or NRFI card (DD Form 1577)

1. The hard copy of the RFI or NRFI card is included inside the packaging with the assets.

1. The soft copy of the RFI or NRFI is attached to the outside of the packaging/container.

1. If an MRO is received for the item prior to the completion of packaging, the Contractor shall expedite the packaging and upon completion immediately ship the item to meet the APLs in TE 5.0.

1. If no MRO has been received for the item, the Contractor shall initiate the rewarehousing action to rewarehouse to a finite storage location IAW Attachment J.1, C-5.3.7 Rewarehousing of Material.

1. The Contractor may receive material in the satellite locations with documentation for a transshipment. The Contractor shall perform a PPP&M action on the material and prepare for shipment as an Off-Base Transshipment IAW Attachment J.1, C-5.3.8.5 Transshipments.

1. The Contractor may receive material the FRCSW has prepared for transport to DLA Disposition Services. The Contractor shall stage the material in the appropriate staging location for transport to DLA Disposition Services. The FRCSW personnel will prepare and attached all required documentation for disposition to the material. The Contractor shall stage, pickup, transport and deliver to DLA Disposition Services.

1. FRCSW may identify initial packaging requirements, on the DD Form 250, as ‘First Article Inspection’. The Contractor shall perform packaging IAW the provided packaging requirements. Upon completion of packaging, the Contractor shall return the item to FRCSW for review. Upon acceptance, FRCSW will return the item for shipment. Changes in packaging requirements for these items may be required.

1. The Contractor shall be agile and flexible and adjust staffing and work scheduled to provide PPP&M support in the satellite packaging locations to support the FRCSW. This may require the Contractor to work outside of Contractor’s normal work hours to complete packing and packaging requests. The FRCSW will provide the Contractor with the requested support outside of the normal support hours. The Contractor shall notify the KO or designee, providing a document that at a minimum, documents all customer requests by identifying the individual and organization requesting the packaging and the requested scope of work.

1. The Contractor shall process all material requiring packaging in DSS as Scheduled (accountable and from stock) or Unscheduled (off-base transshipment - non-accountable - not from stock) for tracking workload. The Contractor shall complete all packaging actions to ensure RDD shipment dates are achieved.

C- 5.6.2N CONTAINER RECLAMATION SUPPORT

1. The Contractor shall stage all depacked and reusable fast-pack, standard pack, cases, LLRCs, and SPI containers outside the packaging satellite site or main packaging area in Building 110 for pickup by the Container Reclamation and Refurbishment Center (CRRC). The Contractor shall maximize the reuse of shipping containers available through the NAVSUPWSS CRRC, and Contractor reclamation actions of packaging materials including reusable fiberboard and wood containers, crates, and boxes obtained through the Depack process or picked up during the local delivery process. The CRRC will provide pick-up and delivery of LLRCs. The CRRC will deliver, if available, LLRCs requested by the Contractor. The Contractor shall mark or re-mark containers as required for issue or storage.

C-5.6.3N FABRICATION SUPPORT

A. The Contractor shall coordinate with the customer, and/or the transportation carrier regarding the date and time services are to be provided for oversized or outsized items. The Contractor shall coordinate any requirements for cranes or specialized truck services with the KO or designee.

C-5.6.6N DEPACK IN SUPPORT OF FRCSW INDUCTIONS

The Contractor transports local delivery issues and on-base transshipments to Government operated satellite sites within FRCSW maintenance activities. The Contractor shall offload the material and stage in the appropriate location for the Detrash/Depack function to be perform.

C-5.7N SPECIAL FUNCTIONS

C-5.7.1N MATERIAL PROCESSING CENTER (MPC) OPERATIONS

The MPC is a customer focused distribution support operation that specializes in receiving and processing material for the ships. This operation views each ship as containing floating warehouse(s) and work center(s) that requires the material to be moved from the MPC to shipside in a manner and configuration that reduces to the greatest extent possible the level of effort needed by the shipboard personnel to finish the stow action. Material being delivered to a ship or diverted from one ship to another may be destined for the ship or a unit or squadron being deployed with the ship.

The Contractor shall manage and operate the Material Processing Center (MPC) Operation for all assigned ships home-ported (See TE 6.35.6N, MPC Homeported Ships) at Naval Station San Diego, CA and any additional assigned visiting ships to the local geographical area.

Due to the nature of MPC workload, short term increases in workload are expected when a battle group deploys and returns to port. Battle groups are generally deployed in six-month cycles and material due to be delivered to a ship will start arriving at the MPC several weeks before the ship is due in port. MPC workload will also be impacted when ships deploy from San Diego for short-term training exercises or operations. There are approximately 64 ships home ported in the San Diego area; 50 ships are generally the most that would be in port concurrently. (See TE 6.3, MPC Supported Ships Listing). There will be MSC ship(s) and visiting ships that will receive material through the MPC for processing, staging, and delivery MSC ships shall be supported in the same manner as U.S. Naval Ships as outlined in the paragraphs following.

C-5.7.1.1N MPC CUSTOMER SUPPORT SERVICE

The MPC Customer Support Service (CSS) Office is currently located in Building 3641 at NBSD and building 656 Bay 2 at NBC (see TE 3.1). Locations may change or be added as a result of infrastructure realignment and customer base changes. The Contractor shall coordinate any re-location of the MPC CSS office with the KO or designee.

The Contractor shall perform receiving, identifying, sorting, processing, manifesting, and delivery. The Contractor shall provide the KO or designee a log of all resolution of customer service concerns and problems within four (4) working hours of receipt of customer compliant.

The Contractor shall receive updates to the Cargo Routing Information File (CRIF) information on line through DSSIAW DLA Distribution SOP 4540.12, RESHIP Process for Material Processing Centers (MPCs), and Fleet Freight Routing (FFR). Updates to the CRIF received directly supersede the data existing in DSS and shall be used for material distribution purposes. The Contractor shall attend, as requested, Port Operations Waterfront Ship Schedule meeting and receive and use the most recent updated copy of the Waterfront Ship Schedule, which contains information concerning ship arrivals, departures, and ship berthing. The Contractor shall coordinate workload, expedite high priority issues, and schedule deliveries to meet customer requirements as it relates to their availability to receive material. If the ship is not in port, scheduled for RAS (replenishment at sea), or due into port within 14 days, the Contractor shall transship MPC cargo IAW CRIF/FFR/FLC LSO guidance and appropriate documentation (such as DD 1149) within three (3) days for hi-priority and five(5) days for routine upon receipt of material or when CRIF/FFR and FLC/LSO/LSR/LSO routing guidance is changed or updated.

The Contractor shall primarily interface with the FLC Logistics Support Officer (LSO) or designees for the daily operational requirements for the MPC. The FLC LSO will assign each ship a designee FLC, LSR, who will act as the primary point of contact for all matters relating to the MPC operation. The FLC LSO and designees are considered customers of the MPC operation. The FLC LSO or designees may meet with the Contractor and KO or designee to discuss problems and/or changing requirements associated with a ship(s). The contractor for unusual or problems areas shall contact the KO or Designee to seek a resolution.

The Contractor shall provide the services required under this section. The FLC LSO or designee will interact with the Contractor and KO or designee to resolve MPC customer service issues. The Contractor shall provide resolution of pending customer service concerns or problems, such as providing information for customers to complete an SDR within four (4) working hours of request by the LSO/KO or designee. If the matter is not resolved within the four (4) working hours, it will be considered an unresolved customer complaint and reported to the KO or designee for discussion during the monthly customer service review meeting. The Contractor shall participate in periodic customer support meeting with the KO or designee to address any performance, procedural, and customer service issues.

C-5.7.1.2N MPC PROPERTY ACCOUNTABILITY

The Contractor shall ensure 100% accountability and traceability of MPC material from time of receipt to delivery. The Contractor shall process all MPC transactions through DSS from receipt to delivery for all material received at the MPC for delivery to a ship. The Contractor shall complete and maintain signature service of all MPC material received, shipped, packed, and delivered. This signature service shall be accomplished by obtaining on the manifest a printed name and a legible signature by the recipient of the MPC material with time and date annotated. The Contractor shall ensure that all MPC documents associated with the manifest have been properly closed out in DSS. Once all the MPC documents for the manifest have been closed out the manifest shall be stamped as “COMPLETED” and the Contractor shall print/sign/date next to the “COMPLETED” stamp. Depending on the type of action, the recipient of the material may be MPC personnel, the FLC LSO or designee, designated shipboard personnel, the Contractor’s transportation office, or a transportation carrier. The Contractor shall maintain all records by month, sorted by manifest number in a single file folder for each ship IAW paragraph C-4.5.13 Records Management and DLAI 2110 Source Documents Retention. The Contractor shall conduct research necessary to ensure the accountability of all material received at the MPC.

The Contractor shall limit access to the MPC to Distribution Center personnel, KO or designee, and Contractor personnel responsible for performing the MPC operations. The Contractor shall also provide escorted or monitored access to the MPC for the FLC LSO or designee or any designated representative of the ship. The Contractor shall maintain security control over all items delivered to the MPC, including classified, medical, and pilferable material. Any requests for access to the MPC not covered in this section shall be routed to the KO or designee for approval.

C-5.7.1.3N MPC RECEIVING REQUIREMENTS

The Contractor shall process transshipments into the MPC through DSS IAW DLA Distribution SOP 4540.19 Material Processing Centers (MPCs) within four (4) hours of receipt at the Distribution Center. The Contractor shall post the receipt as POD in DSS, with special attention given to process all Priority 1 packages before processing Priority 2 and Priority 3 packages The DSS MPC function includes the RF transshipment receiving process through to the consolidation process, sortation process, manifest process, delivery process and close out of the manifest in DSS. Generally, the material will arrive with a clearly defined and delineated destination, but as with any receiving function it may receive misdirected, damaged, or frustrated material. The Contractor shall induct material into the MPC for eventual delivery to the MPC customer by assigning the correct USN ship, Sub, or USNS “Delivery UIC (DODAAC)”. The Contractor shall establish a staging/segregation process to permit identification of an individual pallet to enable quick retrieval of customer requested material using DSS location identification processes (see paragraph 5.7.1.75.2N MPC Segregation and Staging). When the contractor receives material for ships that are not homeported the contractor shall check the CRIF if the CRIF doesn’t indicate DDDC. The contractor shall contact the local FLC LSO for validation of the CRIF prior to forwarding on the material to the designated CRIF location.

The Contractor shall establish in DSS MPC, Load and Maintain (L&M) files for each MPC customer. Within the L&M files, the Contractor shall establish material sortation’s for each MPC customer (ship or sub) based on the customers sortation requests. The FLC LSO or designee will provide ship’s storeroom and work center information to enable the Contractor to sort and to build local delivery table information to the storeroom and work center level of each ship. The Contractor shall separate and/or consolidate the ship’s MPC material onto pallets using the FLC LSO or designee’s updated DSS MPC sortation table information on how the material is to be sorted. The Contractor shall maintain for each ship a segregated storage area within the MPC that is used for the short-term storage of the ship’s material. To aid customers in receipt of material the MPC sorts deliveries cover seven basic groups, but not limited to this number if further reasonable sorts are requested by the customer. The goal is to decrease shipboard sorting and stowage time. The groups are:

1. CASREP Items

1. IPG I

1. IPG II

1. IPG III

1. Direct to Owner Requisitions

1. Stock Requisitions

1. Pharmaceutical Prime Vendor (PPV)

C. The Contractor shall process through DSS and perform a product receipt evaluation of all material received at the MPC IAW DLA Distribution SOP 4540.19 Material Processing Centers (MPCs). Any additional bar-coded information, such as RIC, distribution code, price, commercial vendor tracking numbers, nomenclature, special security requirements, compatibility/ incompatibility resulting from size, fragility or HAZMAT consideration shall be verified. The Contractor shall verify any additional bar-coded information, such as RIC, distribution code, price, and commercial vendor tracking numbers, nomenclature, special security requirements, compatibility or incompatibility resulting from size, fragility, or HAZMAT consideration. The Contractor shall establish a Barcoded Tailgate Number to establish the tailgate date and time of arrival of the conveyance for all the MPC material received within that conveyance that will be processed through the MPC. The Contractor shall scan the Barcoded Tailgate Number input into the DSS MPC processing screen. The tailgated material shall be consolidated into DSS within 24 hours (tailgate date/time to create date/time). The Contractor shall process material picked from stock into the MPC module (Create Date) within 24 hours of pick/DSS ship date/time. The Contractor shall process MPC material receipt through material consolidation within eight (8) Hours or Less (Average Hours and Minutes from time material is processed (Create Date) in the MPC through to the Consolidation Data and time. (DSS MPC MIS Data Element 62705). The Government will measure this requirement using all MPC material received and processed through consolidation for each month.

D. Contractor shall processes all incoming dedicated trucking Tri-walls/pallets/boxes (Multi-Pac) from DLA Distribution San Joaquin and DLA Distribution Susquehanna within 72 hours proof of site POD from DSS MRO tracker. Processing will compromise ofinclude opening and un-stapling (if needed) each DD1348 for label creation/consolidation, and manifesting of material for local delivery. The contractor shall ensure that all packages are with a document/NSN contained in a tri-wall and/or in an ALOC pallet, skids and wood pallets, are individually scanned into DSS with a handheld device to ensure 100% visibility of Navy material processed through the MPC. The contractor shall verify any additional bar-coded information, such as RIC, distribution code, price, commercial vendor tracking numbers, nomenclature, special security requirements, compatibility or incompatibility resulting, from size, fragility, or HAZMAT consideration.

E. The Contractor shall not open or remove DLRs material from “Crown Jewel” cases or wooden containers delivered to the MPC for delivery to a ship. For all other material received at the MPC, unless otherwise specified by the LSO or designee, the Contractor shall minimize to the greatest extent practicable excess packing and packaging material before delivering to the ship. The remaining package shall be such to prevent damage and degradation of the material during delivery to and storage on the ship. This De-bulk and De-trash function may include removal of all interior or exterior packaging, packing, dunnage, blocking, or bracing, etc. The Contractor shall re-label as necessary for identification the de-bulked or de-trashed item. The label should include as much information as possible about each item, such as NSN, Purchase Order Number, Part Number, Document Number, as available from the original paperwork. The Contractor shall ensure the original documentation accompanies the items as much as possible, which would provide the labeling requirement. The Contractor shall ensure MPC material is protected from the elements at all times.

F. The Contractor shall ensure that signed MPC manifests by the customer are closed in DSS MPC within 24 hours after having been signed and returned to the MPC. A MIS Element will be established by DLA Distribution to monitor this accomplishment; however, until the MIS Element is established, a DSS QMF may be created to ensure this effort is being accomplished. The Contractor shall view daily, the Cargo On-Hand Report (COH), to ensure lines delivered no more than 24 hours previously, have been removed from the report. Closing MPC manifest timely is required to ensure the MPC Website Cargo On-Hand Report (COH) that is viewed by the MPC customer and other Navy activities is current and accurate. Contractor shall report any discrepancies between the DSS Cargo On-Hand Report and the MPC website Cargo On-Hand Report to the KO or designee within 24 hours of discovery.

C-5.7.1.5N MPC PHARMACEUTICAL PRIME VENDER (PPV)

1. The Contractor shall process PPV material IAW DLAR 4145.21, Preparation of Medical Material Requiring Freeze or Chill Environment for Shipment. The Contractor shall perform daily surveillance of the temperature gauge in the Pharmaceutical Prime Vendor (PPV) cold storage area. Normal operating temperatures for this storage must remain between 35 and 45 degrees Fahrenheit. The Contractor shall notify the KO or designee immediately for maintenance and repair if readings fall outside of this range.

1. The Contractor shall not open the box or container of PPV material at any time during the receipt through to pick-up or delivery to the customer. If visual physical damage is noticed at the time of receipt, the Contractor shall annotate the carrier manifest and immediately contact the LSO or designee.

1. The Contractor shall enter into DSS using the same document sequence to enter the PPV material into DSS as an on-base transshipment (See J.1 PWS Section C-5.5.2.85.3.9, Transshipments, Paragraph A).

1. The Contractor shall segregate PPV from all other material for storage and delivery purposes. The document number sequence for entry will include the UIC of the customer, Julian Date and Call Number of the order. A shipment that has more than one container will have the same the UIC, Julian Date and Call Number (Purchase Order Number on the Military Shipping Label (MSL) for each container. To keep from having DSS reject the document number sequence as a duplicate, the Contractor shall suffix the document number. The Contractor shall enter the item into DSS using the same document number sequence. When PPV is received, the Contractor shall attach a label with PPV in 2 X ¼ inch red letters. The Contractor shall sort the material by ship for delivery or temporary storage, if required.

1. The Contractor shall handle PPV material damaged and frustrated in shipment individually by each customer with assistance from the FLC or LSO or designee. The FLC, LSO or designee, customer, and the vendor are responsible for disposal of damaged or spoiled freight. The FLC or LSO or designee will provide the material and invoice to the Contractor for return to the vendor at the next delivery.

C-5.7.1.6N MISDIRECTED, DAMAGED, OR FRUSTRATED MATERIAL

1. MPC material received in damaged condition that was not identified during the DSS receipt processes, (C-5.2, Receiving), shall be photographed, by the Contractor. Failure to properly document damaged material may raise the presumption that the Contractor damaged the material during in-processing. The Contractor shall prepare a DD Form 361, Transportation Discrepancy Report, or advise the customer that a Supply Discrepancy Report, SF 364 may be required prior to delivery to consignee or onward movement. The Contractor shall ensure a copy of the SF 361 is provided to the consignee IAW the DTR 4500.9-R, Part II, Section E. The Contractor shall process MPC material into DSS-MPC that becomes frustrated material, (e.g., not identified and resolved during the DSS process as described in C-5.2) by assigning the local MPC UIC N69267 and allowing DSS to assign the Julian Date and “Z” series serial number. The Contractor shall then temporarily warehouse the material in a Contractor-designated area with all documents attached to maintain integrity during investigation. The Contractor's investigation shall include calling vendors, item managers, FLC LSOs or designee, fleet locator, fleet unit customers, ships, etc., to determine the correct consignee. Frustrated material packages shall be opened to search for documentation. When properly identified to a customer, the Contractor shall back out the document number originally assigned and then re-input in DSS MPC with the proper ship or customer UIC and finalize all documentation necessary to forward the shipment.

C-5.7.1.7N MPC SEGREGATION AND STAGING

The Contractor shall process MPC material and material requiring special handling IAW with applicable directives, which includes but are not limited to:

· Classified Material

· Hazardous Material

· Repairables

· CASREP/NMCS/ANORS

· Items that must be refrigerated (i.e., vaccines)

· Pharmaceutical Prime Vendor Uncontrolled Medical Material

For each ship, the Contractor shall maintain a segregated staging area within the MPC that is used for the short-term staging of the ship’s material.

If necessary to comply with the directives or regulations covering security and storage of material, MPC material may be temporarily segregated and separately stored outside the MPC in classified or hazardous storage areas and when required for medical items, refrigerated storage.

The MPC storage area is located on Naval Station MayportNBSD/NBC and is aare secured short-term segregation and staging areas designed to process and handle a limited amount of material. For a variety of reasons, namely deployment, a ship may not be available to receive its material as scheduled. If a ship is unavailable to accept delivery, the Contractor shall contact the LSO or designee for assistance in scheduling the delivery or to obtain disposition of the material. After two (2) weeks from the original delivery date and prior to making any decision to move the ship’s cargo to a long term storage location the Contractor shall contact the LSO or designee for assistance in determining if the ship wants their cargo forwarded to them. The Contractor is required to obtain in writing or by e-mail a decision from the LSO or designee whether or not to forward the cargo based on the Freight Forwarder (FFR). The Contractor is required to obtain in writing or by e-mail a decision from the LSO or designee whether or not to forward the cargo. The Contractor shall notify the Transportation Officer (TO) when a decision from the LSO or designee was made not to forward the ship’s cargo. While the Contractor shall make every effort to retain a ship’s material within the MPC, if after two (2) weeks from the original delivery date or the storage constraints require the material removal, the Contractor may move the ship’s material to a long-term storage location pending the return or availability of the ship. The Contractor shall ensure appropriate material protection and security procedures are established and followed for the long-term storage of the ship’s material to provide the safeguards for that material as required. At a minimum, the material shall be isolated, marked for the ship, and stored in appropriate secured storage. All locations shall be recorded by RF Handheld scanner and maintained in DSS. In the event a home ported ship does not take delivery of its cargo within two (2) weeks after the original delivery date the Contractor shall inform the FLC LSO or designee of the situation and request that the FLC LSO or designee coordinate with the ship and transmit a revised schedule for cargo delivery to the Contractor and TO.

C-5.7.1.8N CROSS DECKING OF MATERIAL IN SEGREGATION AND STAGING AREA

1. Due to deployments and operational requirements, material being stored by the MPC operation for one ship may have to be transferred to another ship. Prior to performing a cross decking action, the Contractor must receive authorization in writing or by e-mail from the FLC LSRO or designee. After receiving proper notification, if another ship is to make delivery of the material to the original ship, the material will be manifested in DSS to the original ship. The delivery ship’s POC receiving the material will sign the manifest along with showing their ship’s UIC on the manifest. When the manifest is returned to close in DSS, the name of the POC that signed for the material shall be entered in the “REMARKS” column of DSS screen B2MG, along with the ship’s UIC and any other significant comments.

1. The Contractor shall receive updates to Cargo Routing Information File (CRIF) on-line through DSS, and directly by Navy message from afloat Commands. Updates to CRIF received directly supersede the data existing in DSS and shall be used for material distribution purposes. The Contractor shall receive and use the most recent updated copy of the Basin Movement Report (BMR), which contains information concerning ship arrivals, departures, and berthing. The FLC LSOLogistics Support Center (LSC) will provide a copy of the latest list BMR to the Contractor via email. The Contractor shall coordinate workload, expedite high priority issues, and schedule deliveries to meet customer requirements as it relates to their availability to receive material.

C-5.7.1.9N MPC DELIVERY

A. The delivery instructions will be tailored to the ship and will specify the delivery days, the time, the configuration/pallets to be delivered, and the pier to which the material is to be delivered IAW DLA Distribution SOP 4540.19 Material Processing Centers (MPCs). The LSO or designee is responsible for coordinating deliveries and will make its best effort to minimize the number of concurrent delivery times; however, at times this may be impracticable due to fleet operational issues. Historically, deliveries to the piers occur from of 05600-1200 hours (66:00 am-12:00pm) or as coordinated by the FLC LSO and the Contractor. At a minimum, the FLC LSO or designee will provide the Contractor and KO or designee with a daily time and location at which all the ship’s material can be delivered. MPC material is normally delivered on pallets. The Contractor shall manifest and deliver MPC material to the ship within 60 minutes (plus or minus) of scheduled delivery time 85% of the time (DSS MPC MIS Data Element 62727). The Government will measure this requirement using total deliveries for each month. To facilitate in the delivery process, the Contractor shall contact ships with over 50 line items held in the MPC staging area to prescreen the manifests prior to delivery. This will expedite the process at point of delivery, maintain delivery schedules, and ultimately reduce customer wait time. The Contractor shall not depart the delivery location without receiving signed acknowledgement of material receipt. The Contractor shall ensure 100% accuracy between the manifest and the material being delivered 100% of the time (right item at the right place at the right time in the right quantity). The Contractor shall generate delivery manifests as requested by the MPC customer of material being delivered, unless otherwise directed by the Navy. The Contractor shall deliver MPC material on standard warehousing and shipping pallet, 40” x 48”, non-reversible, winged pallet.

B. During scheduled delivery there may be situations when the scheduled delivery cannot occur due to unforeseen circumstances by the ship. When this situation occurs, the Contractor shall return with the material to the MPC to reschedule the delivery with the ship and annotate in the Non Delivery Log, CDRL A037. This can also be noted by placing a comment on the “REMARKS” line of the DSS B2MG screen of the Local Delivery Manifest when showing the new Requested Delivery Date and Time. Should this become a frequent occurrence, the Contractor shall work with the FLC LSO or designee and the KO or designee and local site functional area Government Representatives, if needed, to reduce the frequency of these situations.

C. If material is refused at the time of delivery, the ship is required to reschedule the delivery. The ship will is required to provide a minimum of 24 hours’ notice to change their delivery schedule is required. If however, the designated personnel at the ship do not accept their material as requested, for any reason, the Contractor shall document the event on the manifest, and notify the LSO and KO or designee of the non-delivery action.

D. When authorized by the FLC LSO or designee, the Contractor shall allow designated personnel to pick-up material from the MPC, and when requested by the FLC LSO or designee, the Contractor shall locate and expedite the delivery of material to the ship. Each delivery is accompanied by a manifest(s) listing all requisition numbers of material being delivered and an (Integrated Barcode System, Receipts in Place IBS RIP) disk(s), if required. The Contractor shall process, manifest, and closeout all deliveries through DSS. The Contractor shall deliver material to the pier and offload the material from the Contractor’s conveyance to the pier. The Contractor is responsible for providing MHE at the pier for offloading material. At the point of delivery the Contractor shall obtain on the manifest a signature from the designated personnel. The Contractor shall notify the FLC LSR if customers refuse or were not available to sign the manifest. Proof of delivery (POD) and posting of the delivery information in DSS is required for the Contractor to close the DSS records. The Contractor shall post all PODs for material delivered prior to 1400 hours (2:00 pm) by COB. Manifested material delivered and signed for after 1400 hours (2:00 pm) shall be posted in DSS by COB or NLT 1000 hours (10:00 am) the next working day.

E. The Contractor shall assist customers and/or the LSO or designee with pick up of material that is urgently required between the hours of 1300-1530 hours (1:00 pm-3:30 pm) Monday through Friday, except Federal holidays. The Contractor shall check the Authorized Material Pick-Up List on file at the MPC, prior to the time of pick-up, and before allowing the customer to pick up material. The Contractor shall ensure the Authorized Material Pick-Up list contains the following: Name, Rank, Division, telephone number and is on the ship’s letterhead signed by the Supply Officer. The ship’s FLC LSO or designee is authorized to pick-up material at any time.

F. The Contractor shall service ships in dry-dock (e.g., Atlantic Continental Marine) on an as required basis. Delivery services can be arranged by contacting the ship’s LSO or designee. DLA Distribution San Diego MPC supported ships may also contact the Contractor or the LSO or designee to arrange for additional or special deliveries.

G. Material received into the MPC shall be scheduled for delivery to the customer before the 15th calendar day of receipt shown on the Cargo On-Hand Report unless arrangements are made by the customer or FLC LSO or designee prior to the 14th calendar day. When the ship is in port, the Contractor unless otherwise notified, shall ensure that no material ages more than 14 calendar days in the MPC before being delivered to the customer. The Contractor shall provide a bi-weekly Cargo On Hand Report (See CDRL A0391) detailing all MPC cargo being held for more than 14 calendar days and the rationale as to why material is still in MPC. The report shall include, at a minimum, the name of the Navy POC/FLC/LSO/LSR who provided the latest vessel status, the date the POC was contacted, as well as a phone number and email address.

H. The Contractor shall view daily the Cargo On-Hand Report (COH), for any lines that remain open that have not been annotated by paragraph E above, to determine if the material was delivered, why the line or lines have not been closed thereby removing them from the COH report. If overlooked and not manifested for delivery, the Contractor shall then accomplish so the MPC customer will receive their material. If the line(s) have been physically delivered, the Contractor shall research to check if the manifest was timely closed or still remains open to close, or if the line was overlooked and not placed on a manifest to formally close. In this instance, the Contractor shall contact/LSO/LSR or designee and request they check with the MPC customer to see if the material was delivered and if so, shall close the line(s) in DSS MPC. If the customer states the material was never received, the line(s) shall be researched to see if they may have accidently been delivered to some other MPC customer. If that circumstance is identified, the Contractor shall attempt to have the line(s) returned so they can be handed over to the correct customer and then closed out in DSS and the MPC website. If not located, the Contractor shall notify DLA Distribution J3 and J4 and local site function area Government Representatives to obtain guidance on how to proceed to resolve.

I. Lines inducted into the MPC will display a date in the “Material Received Date” column on the COH report, so when the COH is being reviewed, any MPC material that is no longer sitting in the induction area, or consolidation area on the floor or work line to be worked that does not display a date in the Date Consolidated Stage Location column, could be a reason for concern that the material may be misplaced and should be researched, especially when other lines for that specific UIC around that processing timeframe have such a date assigned. Lines then that don’t display a date in the “Manifest Date” column of a specific UIC could also be a reason for concern that the material may be misplaced and should be researched, especially when other lines for that specific UIC around that processing timeframe have such a date assigned. Performing this research much earlier in the process may help to locate potential missing lines before they become aged where the risk is much higher that the line(s) may become lost.

J. The Contractor shall use the following web site for generating the data for the Cargo On-Hand Report. Reports can be found at https://dod.distribution.dla.mil/ddcmpc. The Contractor shall use the “Cargo On-Hand Report” on the MPC Uniform Resource Locator (URL) under DDC DSS MPC REAL-TIME WEB REPORT.

C-5.7.1.10N FREIGHT FORWARDING

A. Freight forwarding services are generally required when a ship’s material arrives at the MPC or at the pier after the ship has deployed. Freight forwarding involves the outbound shipment of a ship’s material to a destination outside of the local delivery area. As requested by the FLC/LSO or designee, the Contractor shall complete the following IAW with SOP 4540.12 RESHIP Process for MPC; prepare the material, documentation, and ship the material within the time frame requested and to the specified destination in accordance with the C-5.5.1.9.1 Shipping.